Subcontracting Scenarion

Can you guide me how to reverse the cenvat credit if vendor do not return the material after 180 days. Please suggest if different option is there.

Hi Ranjan
For the following cases...
1) Completion of subcontracting challan incase of total reconcile
2) Reverse the excise in case of non-return or non-consumption of components within 180days
3) Recredit of excise back incase of return of consumption of components by subcontractor
For all these case, you have to do J1IF13 transation only.
If your reconsile is 100%, your challan will get status completion.
If parital components lying at subcontractor, the excise amounts gets reversed.
If you do subsequent receipt or consumption which will be updated by reconcilation (J1IFQ), then if you carry out J1IF13, your excise will get recredited.
warm regards
sairam akundi

Similar Messages

  • Error while doing subcontracting GR

    Hi All,
    I am trying to simulate subcontracting scenarion in SAP.
    For that I have a matrl A which has got a BOM. BOM contains mtrl C.
    valuation class for matrl A = 1021
    valuation class for matrl C = 1001
    After sending the matrl C to vendor by doing ME2O now I want to do the GR.
    But when I try to post the GR I get the following error.
    Account 411003 requires an assignment to a CO object
    Am I missing something or there is some configuration in FI/CO that is missing.
    Regards,
    V S

    hi
    as ur acct 411003 might assign in the keys (BSV) Change in Subcon Stock ,(FRL) Subcontracting Charges or (GBB-VBO) Consumption A/c of Components  syatem will ask u for the co object
    to solve this
    go to FS00 here check is ur G/l acct have any Cost element
    or in OKB9 give the default cost center for that acct
    or if ur cost center is variable then give the cost center manually in acct asignment tab
    hope it help
    regards
    kunal

  • Subcontracting with external service / non-stock material

    Hi,
    I have a scenarion in subcontracting when i provided the components / raw materials to the in-house workshop (workshop treated as an internal vendor) and further more our workshop required some external services / non-stok material from third party... now how i will incured this service / non-stock material cost on finished product.
    (PP moudule is not implemented on project)
    Regards,
    Ali

    Hi,
    Please refer the following links ..it may help you...
    Subcontracting service to a FERT material.
    http://books.google.co.in/books?id=LDyarcerUu0C&pg=PA571&lpg=PA571&dq=Subcontractingwithexternalservice/non-stockmaterialinsap+mm&source=bl&ots=vj5kUO9dto&sig=vrlCpSZ0-V0BseN96Qw9rTVhsQ0&hl=en&ei=cJKRTs5_0MmsB6rrgIsB&sa=X&oi=book_result&ct=result&resnum=10&ved=0CG4Q6AEwCQ#v=onepage&q&f=false
    Regards,
    Udaya

  • Excise treatment during subcontracting process with excise duty

    Dear all,
    Iam aware of the subcontracting process STEPS, but my query is while dealing with Excise in Subcontracting process, will the Excise duties captured in J1IS(create outgoing excise invoice) be RECONCILED with excise duties captured in J1IEX(subcontractor's excise invoice). As per my scenario both the duties are different unlike reconciliation process in the process without excise duty. My questions are
    1.Do both excise duties during j1is and j1iex should be same or can it be different (since in  j1is we capture Duties on raw material's assesable value where as in j1iex we capture duties semi finished goods given by sub contractor.)
    2.Kindly eloborate treatment of  excise duties captured in these steps.
    Revert if you didnt understand this scenarion.
    Regards,
    Sravanthi.Y

    Hi,
    57fc challan will be issued when we send raw materials to subcontractors WITHOUT EXISE DUTY.Hence not relevant in my case. But my case is WITH excise duty.we send subcontractor the excise invoice by using j1is. later he will process these raw materials and will give back the semi finished goods along with excise invoice(which we will capture n post using j1iex). so my question will excise duties differ in j1is(excise invoice TO subcontractor) and in j1iex(excise duty FROM subcontractor)?

  • Subcontracting Scenario -urgent

    Hi all
    our clients requires different scenario how would we map these into the SAP
    1-We send the material to Sub contracting Vendor for Machining operation suppose 100 piece. but Vendor make the some pieces faulty (Rejection) like 10 piece.
    2- by default vendor send some pieces without doing any machining operation.like  5 piece out of 100
    3- Some times we issues material defect pieces  to subcontracting  vendor by default 
    4- Component we have already received but some of them are get reject on production line but component can be rectify and for rectification we send the component back to Vendor for precessing without paying anything to vendor for this rectification
    How would we map these four scenario in SAP
    These are the scenario  please gives your valuable suggestion to map into SAP
    Thanks
    Edited by: JAM SAP on Feb 10, 2008 4:23 PM

    Dear Jam as far as my knowledge is concerned you can refer the Subcontract Scenario mentioned below :
    1) 100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and in Quality 10 Pcs gets rejected 90 is accepted
    In this scenario -if you are having quality check then material will be in blocked stock in quality rejection,and the material can be sent to scrap(or Rejection) stores but if you dont have quality check in that case when GRN of subcontracting PO is done for that you can do 542 movement of the raw material on which processing is done ,transaction code is MB1B and you can select the scrap(or rejection) stores during that movement.
    2)100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and vendor sends 90 with processed and  10 pcs without processing
    In this scenario-you can simply do 542 movement of the raw material on which processing is done ,transaction code is MB1B and you can select the Rawmaterial (which was sent to vendor for processing) stores during that movement.
    3)100 Pcs sent for subcontracting ,out of which 10 pcs of RM which was sent for processing is defective GRN of Sucontracting PO takes Place and vendor sends 90 with processed and  10 pcs without processing which are defective from our side back.
    In this scenario-you can do 542 movement of the raw material-defective pcs which was sent to vendor ,transaction code is MB1B and you can select the scrap(or rejection) stores during that movement.
    4)100 Pcs sent for subcontracting ,GRN of Sucontracting PO takes Place and  100 pcs is accepted but during processing it is found that the component which is in WIP which was received from subcontractor 10 pcs are not machined properly so it has to be reworked and to be sent back to subcontracting vendor for
    reprocessing and this processing should be w/o charges.
    Well in this case the WIP component which is found that it is not m/ced properly can be taken back into stock with 502 movement -T code-MB1C or it material to material transfer can be done ...i.e from WIP stock i am doing RM stock with 309 movement ,T Code-MB1A so that my original RM can be in stock and i can send this RM or WIP item to the vendor for reworking.
    For this you will have to make a subcontracting PO of the 10 Pcs which has to be reworked with Free Item to be ticked in PO(Because you dont want the charge of processing to be given to vendor). You will be doing the 541 movement so that in system it will show that stocks are lying with vendor , Create Challan ,
    T Code -J1if01 and after processing vendor will send it back .so you will do GRN of this subcontract PO and now the same can be utilised for further production purpose.
    WELL DEAR FRIEND HERE IN ALL THE SCENARIO I HAVE NOT MENTIONED ABT SUBCONTACTING CHALLAN RECONCILATION (J1iFq),You will have to take care of that in each of these scenarion mentioned above.
    Hope this information will be of some use to you
    Regds
    Shailesh

  • Subcontracting Process for providing materail from other supplier

    Hi,
      I want to know the detail process of subcontracting with senario as
    We want to procure material   A  from vendor   X  for this  vendor Y will provide  the material  B   to vendor X  and we will get the final material A from  Vendor X   so how to handle this scenarion   can you give the detail  steps for this  with all detail along with accounting data..
    regards,
        zafar

    Dear Zafar.
    As per your scenario.
    Material - A - Finished Material
    Material - B - -Row Material to created material A
    Vendor  X - Subcontractor
    Vendor Y - Vendor for component B.
    Now first create purchase order of material A with vendor X as per Jobwork price of finished Materail A. (PO no - 1)
    Then Create purchase order ME21N for component B with reference to vendor Y as per rate confirmed with vendor Y
    At the time of po creation with vendor Y with item B select this item B , Go to Item Details - >Select delivery address TAB
    -> Right bottom you will find field Vendor -> enter the vendor code of X (your subcontractor vendor for material A) in this filed
    -> Tick mark the Check box the SC vend beside this field. (purchase order no - 2)
    Now inform the vendor Y to send the components B to subcontractor X.
    When X will confirm you that the components are (material B) arrived at his place take the GRN for purchase order no 2.
    This will directly t/f the stock of material (B) provided to vendor X instead of your company/storage location.
    You are liable for component B to vendor Y  as now the stock is your but at subcontractor place.
    To payment for B of vendor Y do normai MIRO as you are doing regular.
    Vendor X will generate the material A and send it to you.
    This will consume the components B and you have to pay to vendor A as per jobwork price mention in PO no -1.
    This is regular subcontracting.
    Hope all the steps are very clear with accounting data.
    Regards
    Rajan

  • Partial assembly of BOM being sent out as subcontracting

    Dear All,
    Please provide solution to the below given business process
    Load Body (sub assembly) comprises of 51 component, once the scanning is done for the load body there is automatic consuption of the compnents through movement type 261 with tcode MFBF.
    Now in the actual scenarion in the line partial assembly is done with 23 components and then it is sent to outside vendor (just like subcontracting) to do some quality testing and after testing when it comes back the balance component aare fitted and the scanning is done to product the load body.
    Till now the business process of sending the partial assembly to outside is not configure,the contrain is that the existing BOM cannot be changed
    Please suggest

    Naveen,
    I think the question is whether you want to map the stock and material flow or not.
    1. If not, you can simply create a new routing where you put in the subcontracting operation (using the proper control key - PP02 in standard system).
    This would be simple, however, you won't have information on stock level in the system.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/b1/c04ad5439a11d189410000e829fbbd/frameset.htm
    2. If you want to have information on stock and material flow I think you have to solve this via purchasing.
    Steps:
    2a) You have to have a part number (let's say materialA) for the SFG that contains the 23 parts and issue PrdOrd for this
    2b) You have to have a part number for the purchased part (that is produced by your sucpntractor, let's say materialB). You need:
    - BOM, where header is materialB, children part is materialA (if there are other components to be provided to the vendor you have to insert them in this BOM as well)
    - you need subcontracting info record
    - you have to send out the components (materialA) to your subcontractor (e.g. MB1B+541 /w and w/o PO reference, ME2O)
    - you receive the goods produced by your subcontractor in MIGO with reference to the PO - materialB will be received by mvt 101, materialA (and other components) will be consumed by mvt 543.
    2c) You have to create a BOM for your final assembly process where components are materialB and other components, header material is the "load body", you have to have routing, work center (and maybe production version - based on your scenario). So, this last step goes through PrdOrd as normally.
    You can find many threads on subcontracting via purchasing and PrdOrd on this forum (MM, SCM-PP)
    Regards,
    Csaba
    Edited by: Csaba Szommer on Jul 14, 2009 8:04 AM

  • Report for Material at subcontract AND PO number

    We are preparing for Inventory verification at subcontractors.
    My boss believes it would be easier for the SC vendor if we could supply the PO number for which the material was shipped.
    I haven't found such a report.  Is there one?
    If you know the tables and links, I can write a ABAP query
    Thank you for any help that can be provided.
    Althea

    Hi,
    ME2O works fine if you want to track which subcontracting PO's are still open and what is the current stock at vendor.
    ME2ON is another version of the same basic ME2O report.
    Try also MBLB - Stocks at subcontractor.
    As far as PO to 541 link is concerned, I do not think it is possible to find it unless there is some specific business process being followed which is supported by custom code.
    The reason is that when you issue against 541, you are simply providing materials to vendor that the vendor needs.
    There might be multiple open SC POs for same material/batch and there is no point in tracking against a particluar PO. Its the same material/batch the vendor receives.
    When you post a PGR for a SC PO, then the stock from vendor premises is consumed by 543 and the track to your SC PO is maintained.
    I tried maintaining EBELN as required in OMJJ for 541 but still no MSEG-EBELN is populated. Maybe I am missing something.

  • Subcontract Opening and closing stock and program

    Dear All,
    Is there any standard program for subcontract stock for which i can give previous date range and get the stock on older date to older date for the vendor (example like in MB5B for inhouse stock)
    also we need to insert this details in custom report program so can anybody have developed such program or any function module is available for this
    Pl suggest
    Regards,
    Vimlesh

    dear sir.
    Tcode : S_P00_07000140 - inventory and raw material for special stock report.
    in selection-field give the special stock indicator O. and give the selection Date : Date on which u and to see the stock at vendor.
    and exective it will show the stock on date.
    in selection-fields we have an option for vendor and material also.
    regards
    jrp

  • Error while creating PO in operation subcontracting

    I am getting an Error while creating PO in operation subcontracting.When I'm trying to convert the purchase requisition for the operation in the routing into a Purchase order it gives me the error "Not possible to determine any components".Please guide me why I am getting this error. I have already assigned the component to the operation in the routing. I also have this component in stock. But no Idea why I'm getting this error

    Hi  Sam,
    please check ,
    Assign a recursive BOM for the material for which you want to  create the purchase order .ie. create a BOM  of mat say X having a component  X and marking the indicator  recursive ticked.
    Please create the BOM  which is valid much before the date of creating a purchase requisition .
    And proceed for the creation of subcontract purchase requisition.
    Please Revert back, if the problem is solved.
    OMKAR

  • Error while posting GR for subcontracting process

    Dear Friends,
    while creating a GR for a subcontracting PO, I get the following error. please suggest what to do. i checked the configuration for the movement type and could not come up with the solution.
    Fld selectn for mvmt type 543 / acct 7449990 differs for Vendor goods movement (014)
    Message no. M7093
    Diagnosis
    Comparison of the field selection strings from movement type 543 and G/L account 7449990 has revealed that there is an incompatible field selection combination at one or more points.
    Field for which the field selection is different: Vendor goods movement
    Example
    On the movement type screen, a given field is a mandatory-entry field, whereas on the G/L account screen, the same field is suppressed.
    System Response
    You cannot post this transaction, unless you have changed the field selection adequately.
    Procedure
    Contact your system administrator.
    Action to be taken by the system administrator
    Check whether any postings resulting from this movement type are to be made to the G/L account determined automatically. If you find that the G/L account is not correct, check the automatic account determination in the Customizing system for valuation.
    Proceed
    If the G/L account is correct, use the report RM07CUFA to compare the field selection for the movement type with the field selection for the G/L account and change the incorrect settings or the field status group of the G/L account.
    Proceed

    The field is mandatory in acct 7449990 and hidden in movement type 543 or vice versa.  To check the field status for that movement type, you can run the program RM07CUFA
    Once you execute this program and found that the field is set to mandatory, then it should be mandatory for that movement type field status also.
    Alternatively, Go to txn OMJJ, click on Movement Type and execute.  There double click on "Field selection (Enjoy) and see whether the movement is maintained as Required Entry or Optional Entry.
    Now go to FS00, input the G/L Account 7449990 and execute.  There go to tab Create/bank/interest and chech whether you have maintained any value against "Field status group" and also you have checked the box for "Post automatically only".
    This should be done in consultation with FI people only if the issue is in production client.
    thanks
    G. Lakshmipathi

  • Error while releasing Billing document in Subcontract process

    Hi All,
    We are working on Subcontract process as explained below:
    Company code X purchases the component A and sends it to Company code Y on Subcontract. Company codes X and Y belongs to one company using single operative chart of Accounts, Controlling area & operating concern. FI configuration has been maintained in OBYA by treating above company codes Inter company GLs. The component A is sent to company code Y as non value added item. Through 501 movement type, as the component is sent by Company code X.
    Company code Y will add some components (like B,C and charges some expenses as service component D for preparing Finished good) and send this FG to Company code X. For this company code Y will raise a Sales order and followed by MRP run and Production order is created.
    In VA02 of above Sales Order, while entering Item details, where the Settlement rule is asking for PA Transfer structure (in Account assignment tab of Item details) and giving the following error analysis:
    Enter a PA transfer structure
    Message no. KD 044
    Diagnosis
    A PA transfer structure is required for settlement to profitability analysis.
    System Response
    You cannot save this settlement rule.
    Procedure
    Enter a PA transfer structure. To do this, choose the "Parameters" function in the settlement rule. As part of customizing, you can also store a default value for the PA analysis structure, in the settlement profile. The system then uses this default value when you enter a settlement rule.
    In addition to above, another issue has raised while releasing the Billing document after doing PGI. Accounting document is not getting generated and while releasing the Billing document (VF02) it is throwing an error as
    “Enter profitability segment as cost object for Revenue and COGS posting”
    Message no. ZC 001.
    MM,PP,SD & FICO configuration settings maintained:
    1. All required OBYC settings
    2. All cost element and Cost element categories have been maintained
    3. From MM side the system is generating FI & CO documents
    4. Settlement profile in Production Order type is maintained (in KOT2). Allocation structure and PA transfer structure were maintained in (OK06, OK07 & KEI1).  In PA transfer structure we have assigned the required Sources and Value fields and settlement cost elements.
    5. In VKOA condition types KOFI and KOFK were maintained for relevant Customer & Material Account Assignment groups.
    6. Required settings have maintained in OKB9.
    Movement types 501 (sub contract), Received back to Company code X through Movement  type 101. In spite of these settings still we are getting the above mentioned errors.
    Could any one help to provide some inputs on the above issue as early as possible.
    Thanks in advance.

    Hi,
    check  in the sales order line item procurement tab . u can get the requirement type. in SPRo check the requiremnt class for the requirement type. in that requirement clas u will get settrlemnt profile for the sales order. Check that settlemnt profile there u have to maintain the PA transfer structure.
    I think both problem will get solved by maintaing the PA structure..
    You are doing sales order costing right....and i hope it is non vsaluated sales order costing .....
    If help ful please assign points.
    cheers
    Prabhat

  • Subcontracting in scheduling agreement

    Dear all,
    while doing subcontracting scheduling agreement, how can we add the child components to the parent material.
    in cs01 ,we maintained the bill of material for the parent material.in CS11 we are able to view it.
    Regards,
    velu

    Hi,
    If you have already maintained the BOM in CS01, you need  not have to maintain the seperate BOM in Scheduling Agreement, because, the already existing BOM will get copied. The only thing you will have to do is that, define special procurement category as 30 (Sub-Contracting) in MRP2 view of the material master & then create the SchedulingAgreement with item category as L (Sub-Contracting).
    Hope this clears.
    Regards,
    Prashant
    - Pl. reward points if the answer is helpful to you

  • Account determination error in Subcontract PO-MIGO.?

    Hi all
    While doing GR, i mgetting error i "Account determination for entry LDCA BSV 0001 ___ 5010 not possible".
    The above PO is subcontract PO .
    Thanks
    sap-m

    Hi,
    For subcontracting..maintain these keys..so that you will not get any problem..
    BSX, BSV, WRX, PRD, FRL
    Regards,
    Prasath

  • Standard Cost Estimate for Subcontracting

    Dear Sir / Madam,
    We are in the process of migrating from our normal R/3 operations for Production Planning to Execution inclusive of Costing of materials by using iPPE functionality for repetitive scenario. We have our BOMs for painted body currently in R/3. The painted body falls under subcontracting scenario.
    In this scenario the body in white produced from our bodyshop is sent out to the subcontractor along with certain paint items and is received as painted body and consumption of the body in white and the paint items sent needs to be shown during the goods receipt of painted body.
    For this we have maintained the BOM for the painted body in iPPE. Also in the costing variant "ZD01" in order to arrive at Standard cost (CK11N) for the painted body we have maintained the following settings for Valuation variant for subcontracting :
    Priority     Strategy Sequence     
    1          Net Quotation Price
    2          Effective Price from Purchase Order
    While running CK11N for the material (painted body) we are receiving the following message
    Message no. 28501 : Error in dependency processing: condition 0000062388 is empty
    We wanted to verify whether the message raised is normal or would it have any adverse impact.
    Your assistance would be highly appreciated.
    Regards,
    Bhavika
    Edited by: Bhavika Goyal on Feb 7, 2009 12:20 PM

    Dear All,
    Control Key is important for inhouse producrtion and Sub Contract.  Check it once and when ever u have given the Product (semi fisished) to Sub Contractor, along with Paint. 
    Here one thing is important what is your process? how much portionis involced in Sub contracting.  why because
    Paint issue to the sub con is captured by the way for migo or miro
    Payment to sub contract is capture all the cost of the Sub Con., then is there any cost is missed for this process.  Let me know the remain things?
    thanqu
    raj