Subsequent Settlement - without periodic condition and with calendar

Hey everyone,
I hope you can help me with my issue. We are trying to use the subsequent settlement process for vendor rebate arrangements. We want to use the functionality to extend the rebate arrangement but we don't want to use periodic conditions. The goal is to only make a final settlement each year.
Is this even possible? If I maintain the rebate type and set an arrangement calendar I have to maintain the periodic calendar as well. If I then settle the document, there will always be an empty position in the vendor billing document for the partial setting.
At the moment both calendars are empty and we have to create a complete new rebate arrangement every year.
Thanks and regards
Kai

You can follow the best practices to configure it at first.
Look for G84 in http://help.sap.com/bp_blv1600/BL_ES/html/index.htm
The procedure is to create the agreement with meb1, adjust the volume with meb4 and in case you need to update volume backwards it is the Meba transaction.
send the news after having checked your configuration with best practices.

Similar Messages

  • Print of GR without material no and with Account assignement K / Q

    Dear Freinds,
    I want make Print out of Material Document with Material text (without  Material code with account assignement K or Q Project). I made out put setting for WE03, Transaction event type WE Print version 3 and Print Item 1, Material document.
    But i am not able to print in after MIGO. In MIGO Disply, it is showing error as "The system could not create any outputs"
    But I can able to make print out for Material document with material no. i am facing this problem only for text without material no with account assignement like K and Project refernce.
    Please guide me.
    Rgds
    Madhavan

    Hi Madhavan
    Go to MN22 , put WE03 , prsee enter , if u r alrady created any condition record , that will be diplayed , now select one line item , and clik communication . then after going in second screen , u will find box as " LOGICAL DESTINATION " ,  put the logical destination ( LP01 ) and check the tick box " print immediately , and save the condition record ...
    after donig these things ur problem will be solved , as i was also facing same problem , after doing this i got solution

  • Silent installation of Shockwave WITHOUT GOOGLE BLOATWARE and WITH ActiveX

    I believe a lot of corporate admins are looking for the answer to this question from Adobe...
    Q. How do we silently install Shockwave player on our coporate machines WITHOUT installing the GOOGLE BLOATWARE and at the same time ensure that the ActiveX is embedded with the browsers?
    At this moment in time we are downloading and installing Shockwave centrally using the SLIM installers because the Full installers install the Google Toolbar bloatware. This is a dark road and Adobe going down this route is in my eyes no different from e-mail SPAM (We don't want it!).
    However the issue with this installation is that the users still get prompted to install Shockwave and the associated Google Toolbar bloatware when they vist Shockwave enabled websites, even though Shockwave is successfully listed in Add/Remove/Programs. I believe this is because it's trying to install the ActiveX? This is no good if the users isn't an admin. Perhaps this is because we are using the Slim version?
    Anyhow, Adobe, the question still stands....
    Q. How do we silently install Shockwave player on our coporate machines WITHOUT installing the GOOGLE BLOATWARE and at the same time ensure that the ActiveX is embedded with the browsers?
    P.S. Here's our current command line installation:  sw_lic_slim_installer.exe /S _?=C:\WINDOWS\system32\Adobe\Shockwave 11
    Thanks,

    If you use the MSI installer, you don't get any bloatware.
    All you need to do is fill out the licensing info on this site: http://www.adobe.com/products/players/shockwave-player-licensing-distribution.html
    Then you can download the MSI installer and just install it with a command like like this: msiexec /i sw_lic_full_installer.msi /qn /log c:\support\logs\applogs\ShockWave_12.0.0.112.log
    If you don't use something like SMS or SCCM you could do it through goup policy or whatever mechanism you're using now.
    Also, IIRC, the exe downloaders you get from the license distribution page are different from the regular downloads, and also lack any bloatware.
    Hope that helps!

  • Subsequent settlement in MM(Vendor rebate)

    I'm using subsequent settlement(rebate) on vendor side with partial settlement with the help of settlement calendar. However during vendor rebate maintenance in step of condition maintenance, I maintained condition rate(rebate discount) and scales on main condition. However system only copied automatically condition rate at main condition to period-specific condition not for scales. So I had to do it manually by copying scales at main condition to individual period-specific conditions. It's quite a tough life to do this. Could anyone give me some light to make life better for example any missing configuration or any enhancement.
    Home

    Hi,
    Use BADI to create rebate agreement in MM.You can explore following BAdI.
    These BAdI are applicable for MM & SD applications:
    (a) SD_BONUS_CREDIT_NOTE BAdI for Rebate Credit Memo Requirements
    (b) SD_COND_DETAIL Enhancement in Condition Detail Screen
    (c) SD_COND_SAVE_A Save condition application A, E
    I hopr this will help you out. Thanking you.

  • When I downloaded the iOS 8 on my iPhone it tried to download but I ended up without the update and about a gigabyte less storage then I had before

    When I tried to download iOS 8 it says it was downloading but then it didn't and left my phone without the update and with about one gigabyte less storage than it had before

    Hello amandah1013
    Try using iTunes to update your iPhone and it should sort out that space issue.
    Update your iPhone, iPad, or iPod touch
    https://support.apple.com/kb/HT4623
    Regards,
    -Norm G.

  • Subsequent settlement  "Urgent"

    Hi folks ,
    a). Can anyone explain subsequent settlement process  in brief and how its done in SAP?
    b). Also please explain business volume ??.
    whats business volume comparison ?
    Points for helpful answers
    Regards
    Kumar

    Dear Kumar,
    Subsequent settlement is big subject in SAP , however I will give you brief idea.
    Subsequent settlement is normally done in following ways
    1) Subsequent Debit  or Credit.
    a) This is done in case there is change in total value of invoice of PO item ( Value difference)
    b) Total Invoice Qty remain unchanged
    c) Only value base transaction takes place & not Qty based
    d) if the cost are incurred - Enter subsequent Debit in MIRO screen
    e) If credit memo is received from vendor enter subsequent credit in MIRO
    f) System suggest only entire invoice Qty & not value
    g)Maximum Qty that can be debited / credited is less or equal to invoiced amount.
    h)cannot refer to particular invoice
    i) List separately in PO history
    J) If Qty is already delivered thae system makes offset entry in stock A/c , Price difference or consumption account as applicable
    k) If qty is not red. then system makes offset entry in GRIR A/C & when good are delivered system post amount to respective stock Accounts.
    2) Invoice Reduction
    a)If invoice shows a variance when compared to expected Qty or expected value & you don't want to accept difference you can reduce invoice.
    b) There is special display in item list for invoice reduction in MIRO
    c) When you post reduction invoice document two Accounting documents are generated one actual value & qty as per invoice posting & another one is credit memo for difference between actual Qty
    I hope above explanation will give you brief idea how it works.
    If useful please reward points,
    Vivek Maitra

  • Subsequent settlement with different volumes (scale and rebate)

    Hi
    A nice question for you all.
    In subsequent settlement I want to do the following:
    Interval scales:
    >$100.000 -> 1% rebate
    >$450.000 -> 2% rebate
    >$600.000 -> 3% rebate
    (this is easy)
    When I want to determine the business volume I want to differentiate between:
    - trucks
    - cars
    Based on the following numbers:
    Annual business volume for trucks: $200.000
    Annual business volume for cars: $300.000
    Total volume: $500.000
    This means the rebate wil fall in the 2% interval.
    BUT.... the rebate is ONLY for cars and NOT for trucks.
    --> 2% of 300.000 = $6.000
    How to do this?
    Regards,
    Arno

    Sangeeta,
    What do you think of the following:
    Build up business volume for every delivery of the supplier and also for the trucks.
    I will make two rebates:
    For the total volume:
    >$100.000 -> -1% rebate
    >$450.000 -> -2% rebate
    >$600.000 -> -3% rebate
    For the trucks volume:
    >$100.000 -> +1% rebate
    >$450.000 -> +2% rebate
    >$600.000 -> +3% rebate
    Since the trucks will be in the +1% rate and the total volume will be in the 2% rate I have to change the interval for the scales condition manually in trx MEU2, but not the price condition. After the comparisation is finished both are in the +/- 2% scale and I can settle the agreement.
    Only one manual step needed, sounds as a fine solution, do you agree?

  • How can I sync "On My Mac" iCal calendars on Snow Leopard with iPhone and Google Calendar?

    Hi,
    (I've done a lot of searching for a clear answer but without success.)
    Can someone please advise how I can get the "On My Mac" calendars on iCal v4.0.4 (running under Snow Leopard 10.6.8) to sync with an iPhone and Google Calendars,  'over the air' (i.e. not via iTunes) and both ways (two-way syncing).
    There was a great bit of software called Spanning Sync which did it all but it's now discontinued. I'm running Snow Leopard and do NOT want to upgrade to OS Lion.
    I've tried the iCloud route but it just creates an extra set of "@me.com" calendars under the "On My Mac" calendars - it is not syncing the "On My Mac" calendars themselves (and I want to use the "On My MAc" calendars as the master dataset (the 'Truth database' to use an Apple term!).
    ... And the same happens when I try to sync my Google Calendars: another set of "@google.com" calendars appear.
    Now instead of 2 calendars in iCal I have 6: 2 On My Mac calendars, 2 iCloud ones, and 2 Google ones. (This is not progress Apple!)
    Hope someone can advise.
    Many thanks.

    Thanks Winston.  I'm aware that the 'on my mac' calendar doesn't get picked up by iCloud.  I'm wondering whether anyone can help with the best alternative solution for synchronisation of phone and Outlook.

  • Hi... I am looking for an inexpensive app for my macbook pro that I can put pictures and videos together into a slideshow with captions and music WITHOUT a watermark and that also will burn the slideshow to a DVD in its own app. Help?

    Hi... I am looking for an inexpensive app for my macbook pro that I can put pictures and videos together into a slideshow with captions and music WITHOUT a watermark and that also will burn the slideshow to a DVD in its own app. Help?

    The issue with the A1400 is that like most economy compact cameras, they will not have very fast focus times in indoor lighting situations. Many people have gone to entry level DSLR's (Canon T3i) or micro 4/3 cameras. They are fairly expensive, but a late model refurbished T3i can sometimes be found with a kit lens for about $300.00. With Auto and scene modes, as well as full manual modes, these are very versatile cameras that focus very quickly, even in lower lighting situations. Canon is not really into the micro 4/3 cameras, instead they are focusing on the new G7x and G1x cameras, which are way out of your price range. The A720 is still available used at some places such as KEH camera, but you'll need to check often as their stock changes constantly. Obviously the DSLR's don't use AA batteries, but the T3i is good for about 600 photos (or more) per charge.
    My refurbished DSLR was practically brand new condition when I got it. I could not find any sign of wear at all, so I feel they are a real bargain. These are rugged cameras that are made to last. The A1400 is a $99.00 camera, so it's not intended for heavy usage, plus the image quality of a DSLR (even entry level) is far better than the A1400. That would be my recommendation.
    Steve M.

  • My itunes says that my ipod is synced with another library when it is not and cannot update or sync without wiping it and all its data

    My itunes says that my ipod is synced with another library when it is not and cannot update or sync without wiping it and all its data
    Can anyone help me

    Syncing to a new iTunes library or computer will erase your ipod. Only if you back up your iPod manually before syncing, you can restore your device from that backup again. A manual backup does not include the sync process.
    Do this:
    Disable autosync in iTunes, connect your iPod to your new computer and right click on it in the device list and choose backup. iTunes will backup your iPod without syncing.
    Transfer your purchases the same way, choosing "transfer purchases" this time.
    All media content will be erased during the first sync, but you can restore your settings and app data from your manual backup afterwards.
    Don't forget to set up at least one contact and event on your new computer to be able to merge calendars and contacts when you sync the ipod for the first time.
    Music is one way only, from the computer to your device, unless you bought the songs in itunes and transferred your purchases.
    There is 3rd party software out there, but not supported by Apple, see this thread:http://discussions.apple.com/thread.jspa?threadID=2013615&tstart=0

  • Planned order with Lot size and Planning Calendar in MRP

    Hi All
    I request your help in understanding MRP results in below mentioned scenario:
    Material: A
    Planning Calendar: D1 (Monday only)
    MRP Type: PD
    Lot size: Z1 (this is copy of PK with Period Start = Start Date)
    Safety Days Time: 3
    Safety time indicator: 2
    In house Production time: 1
    I am running MRP with
    NETCH
    Planning mode: 3 (Delete and recreate planning)
    scheduling: 2 (lead time scheduling)
    "My PIRs are:
    "Date--------------------PIR   -----Receipt------Avail Qty------ATP Qty ----Actual Cover
    "Friday :08.4.11" ----  "-100"   ------ "0"  ----   "-100.00"  ------ "0" ----   "-5"
    "Monday:  11.4.11" ---  "-200"  ----- "0" -----    "-300.00"  ------ "0" -----  "-2"
    "Wed      :  12.4.11" --- "0" ----  "370" ---------- "70.00" --------"20"----- "5"
    "Thursday 14.4.11" --- "-50" ------ "0"  -------- "20.00" ------- "0" ------"3"
    "Saturday 16.4.11" -- "-10" ---------- "0" ------- "0.00" --------  "10" ----- "1"
    "Sunday    17.4.112" ---- "-10" ------- "0" ------- "0.00" ---------- "0" ----- "0"
    "Tuesday   19.4.11" --- "0" ------- "2000" ------- "2000.00" ------ "2000" --- "6"
    "Thursday 21.4.11" -- "-1000" ------ "0"  -------"1000.00" ------- "1000"  --- "4"
    "Monday   25.4.11" --- "-1000" ------- "0" ---------- "0" ----------- "0"------- "0"
    "Tuesday  26.4.11"---- "0" -------- "100" -------- "100" -------- "100" ----- "3"
    "Friday      29.4.11" --- "-100"  ---- "0" ------ "0" -------- "0" -------- "0"
    I am executing MRP on 7.04.11
    As shown above the, can you please explain why the planned order is on Wed 12th and it covers 5 days requirement and similarly Tuesday 19th and covers 6 days.
    I am not able to relate the relation between Planning calendar and Lot size procedure used. Also what would happen if I make planning calendar valid for two days in a week.
    Thanks in advance
    Rahul

    Thanks dear
    Yes you are right the Planning Calendar starts 18.4.11 and ends 24.4.11
    Now as far as first planned order is concerned I thought it should be scheduled to start&end  on Monday 11.04.11, rather it starts&ends on Tuesday 12.4.11. Also the actual coverage days goes up to 5 days even though its maintained for 3 days.
    Similarly the second planned order also comes up on Tuesday 19.04.11 and covers 6 days (more than the setting and planning Calendar of only Monday)
    On the whole this is confusing me on Lot size and Planning Calendar relation and how it impacts MRP. Can you please help me on this.
    Also if you can throw some details on: how to restrict MRP to give planned order only on, say, Monday and Thursday, as only then it could be produced.
    Thanks in advance
    Rahul

  • Is it possible to sync with both my win 7 computer (Outlook 2010), and with iCloud, without duplicating contacts and appointments? thanks.

    Is it possible to sync with both my win 7 computer (Outlook 2010), and with iCloud, without duplicating contacts and appointments? thanks.

    Hey keiichi-san,
    Yes, It is possible. You can merge contacts, calendars, and bookmarks between multiple computers.
    When you sync the contacts and calendars to your iPhone from the new computer you'll see the option to Merge or Replace, just choose Merge.
    These articles provide more information on syncing options:
    http://docs.info.apple.com/article.html?artnum=306071
    http://docs.info.apple.com/article.html?artnum=305741
    Jason

  • Show days left until reset based on date and condition associated with date

    My question is simlilarly based to the previous discussion https://discussions.apple.com/message/15134714#15134714
    What I need to do is display the number of days until I have to reset a flight condition (FS Column) based on a set number of days (60 days).  I have several colums of information but the two I would use is a Date Column and the FS Column(drop down menu with text for options). I would need to be able to look at certain FS options and use the date associated with it to subtract from 60.
    If FS= "NG" use date associated with it to add 60 days, and then use that date to compare it with today's date to show how many days are left till the 60 day mark.
    So if the last "NG" was Jan 1, 2011 and today was Feb 1, 2011 I would want one cell to show 30 days and another cell to show Mar 2, 2011.
    I need to fly in a certain condition once every 60 days. I want to show how many days left I have until I need to reset that 60 day counter.  Also, I would like to have another cell show the date associated with the day I would need to reset that counter on.
    Unfortunately I am in a limited internet environment so I can not post a picture of my spreadsheet.  Sorry for the over explination, trying to make it as clear as possible first go round.
    Thanks in advance!

    Aron,
    I added a few columns to correlate the conditions and dates. There may be a better way than this brute force approach, but this will work.
    Date
    DS
    FS
    Hrs
    Seat
    Mission ID
    D
    H
    N
    NG
    NS
    Aug 1, 2011
    PI
    D
    1.0
    F
    C
    8/1/11
    Aug 1, 2011
    PI
    N
    0.5
    F
    C
    8/1/11
    Aug 2, 2011
    PI
    D
    0.5
    F
    C
    8/2/11
    Aug 2, 2011
    PI
    NS
    1.4
    F
    C
    8/2/11
    Aug 4, 2011
    PI
    NS
    0.2
    F
    C
    8/4/11
    Aug 12, 2011
    PI
    NG
    1.0
    F
    C
    8/12/11
    Aug 12, 2011
    PI
    NS
    1.2
    F
    C
    8/12/11
    Aug 14, 2011
    PI
    NG
    0.5
    F
    C
    8/14/11
    Aug 14, 2011
    PI
    H
    0.5
    F
    C
    8/14/11
    Aug 14, 2011
    PI
    NS
    0.6
    F
    C
    8/14/11
    Aug 20, 2011
    PI
    NS
    2.1
    F
    C
    8/20/11
    Aug 21, 2011
    PI
    NG
    2.0
    F
    C
    8/21/11
    Aug 22, 2011
    PI
    NG
    1.0
    F
    C
    8/22/11
    Aug 22, 2011
    PI
    NS
    0.4
    F
    C
    8/22/11
    Aug 29, 2011
    PI
    NS
    0.5
    F
    C
    8/29/11
    Then I added a summary table:
    FS Condition
    LastDate
    Plus 60 Days
    Today is Oct 11, 2011
    Alarm
    D
    8/2/11
    10/1/11
    10d
    Overdue
    H
    8/14/11
    10/13/11
    -2d

  • I'm too old to learn iCal.  How do I tell iTunes to synch with Outlook for Mac for all of the Contacts and the Calendar on my iPhone and iPad??  Thanks

    I'm too old to learn iCal.  How do I tell iTunes to synch with Outlook for Mac for all of the Contacts and the Calendar on my iPhone and iPad?? 
    Also, once I figure out how to replace iCal with Outlook/Mac on iTunes, how do I synch the phone and pad so that the information on those devices over-writes onto Outlook as a backup, rather than having a blank Calendar on Outlook wipe out all of the information on the phone and pad???
    Thanks

    If you haven't tried already, plug your devices into iTunes, and on each device next to the "Summary" tab at the top is another tab called "Info." Click that and scroll down to Contacts, Calendars, etc. There should be a pull down bar under each category for "Sync contacts from..." and you should be able to select from that pull down list Outlook.  Hit Apply at the bottom and see if that does it.

  • We have an older IMac (preIcloud) and just purchased a new Macbook Air. Our Iphones are set-up to synch with the IMAC and my calendars on the IMac & the phone look the same. But when I open ICal on the MacBook Air my calendar is missing items? Help..

    We have an older IMac (preIcloud) and just purchased a new Macbook Air. Our Iphones are set-up to synch with the IMAC and my calendars on the IMac & the phone look the same. But when I open ICal on the MacBook Air my calendar is missing items? Help.

    Are you wanting to import iCal to the MacBook Air. Since iCloud doesn't work with 10.6 OSX you probably don't have any data in iCloud yet?

Maybe you are looking for