To split an operation quantity in a single production order into different work centers.

Detailed Process:
   Our client have 17 factories. Inside each factory there are 15-20 Sewing lines (Work Centers). In each line 15-20 machines (individual capacities) are there. The standard manufacturing scenario practiced here is MTO. Merchandisers create sales order and allot it to a particular plant. Now line level planning happens inside the factory. Based on the order delivery date to meet the requirements they split the production order and allot it to several sewing lines (work centers).  In SAP we can have work around solution to partially convert planned order to production order and allot it to particular line. The challenge here is to have same production order number which can be allotted to several sewing lines with a mandatory option to enter the quantity for each sewing line
We have proposed alternative and multiple routing for converting planned order into number of production orders but the solution was not meeting their requirements.
Please provide your valuable opinions on this issue.

Hi,
Please explore the option of using the concept called Parallel sequence in routing...
Check the below thread...
parallel sequence in Routing
Routing - Parallel Sequence
Hope this helps
Thanks
Kumar

Similar Messages

  • Single production order for many materials

    Dear Experts,
    We can create a single purchase order for many materials. Like wise can we create a single production order  for many materials which is produced from single raw material in same operation?
    Thnaks,
    Chetan

    Chetan,
    You can not create a single production order for multiple materials.
    However, the workaround would be create one material as BOM header and and assign the remaining materials (for which you want to have production order) as BOM components with by-product or co-product. With this you can receive all the materials against one single production order.
    This will have implication in many areas like planning and costing.
    Evaluate the option with your FICO consultant also, before going ahead.
    Regards,
    Himanshu

  • Convert multiple planned orders to single production order

    Dear All !
    In our business, same component is used for manufacturing multiple items. In a sales order multiple items are booked. When we do MRP RUN, system creates multiple planned orders for each line item. We can run only one production order as for every item order quantity becomes very small and we cannot process that lot. To have a sizable lot quantity we need to combine all planned orders into a single production order.
    Can someone please help.

    Govinder,
    Define those components for collective processing. You need to define "2" - for Field Indv/Coll in MRP4 view of those material master and you can have daily/weekly/monthly lotsize defined for those items.
    Regards,
    Prasobh

  • Single sales order to different ship to party

    Dear sd gurus very good mng
                         How to deliver single sales order to different ship to
    partys?
    thans in advance
    venu gopal reddy

    Hi Venu
    You have to create separate account group for Ship to Party customer XYZ
    Do the partner function determination & assign  SH for Ship to party customer
    Raise the sales order in VA01 & enter the Sold to Party Ex-  ABC & Ship to Party- XYZ
    Delivery will be done for the XYZ customer
    And also please check this below link it might be helpful for your issue
    http://forums.sdn.sap.com/thread.jspa?threadID=2081804
    Let me know if your problem is solved
    Regards
    Pradeep

  • EXTERNAL OPERATION in a production order with  different company code plant

    Hi,
    in my case i am having a production order with  4 operations.
      0010 milling
      0020 winding
      0030 cutting
      0040 milling
    among this opearion 0030 i want to do it in a plant which is assigned to different company code than mine.
    in this case whether i should proceed with PP01 Control key  with opearion plant as that plant which is lieing in diffent company code or
    i should specify  PP02 control key saying that plant as an external vendor for me and do PR  and PO for that service .
    which should i follow for my case and how cost gets updated .

    Hi,
          For different company code, u have to specify PP02 in the routing for external vendor. In PP02 control key indicator must be set in external opn.
    Before that create purchase info record.
    Enter subcontract info record in routing.
    after running MRP , convert the PR to PO.
    Send the material by MB1B by 541 mvt
    Receive the material by MIGO  by 101 mvt.
    Regards,
    Raja sd

  • Alternative item quantity greyed out on Production order creation

    I'm creating a production order. One of the materials in the BOM uses an alternative, the discontinuation indicator = 1 on material MRP4 view.
    The production order is using the alternative which is ideal, but the quantity for the alternative is greyed out so the quantity cannot be changed? Ordinarily the quantity for a component in a production order can be changed.  Can the quantity field be configured so it changeable for alternatives? Where is the discontinuation indicator configured please?
    Thanks in advance.

    In the production order both the original and the alternative material are listed.  The original item has a blank qty in the field and the alternative has the required qty (greyed out though), say qty 10. 
    If I want to issue say just 8 of the alternative and 0 of the original , why would I enter a qty for the original material?  The shop floor found 2 hanging around so I want to change the alternative qty to 8 if possible, and thats all I wish to issue against this production order.
    Thanks for your help

  • Not able to see material and operation overview as tab in production order

    Hello Friends,
    While creating the production order by T.C CO01, after giving the material code , production plant and order type, system took me inside it.There i am not able to see component overview, operation overview as tab.Whereas in menu option Goto - overview - component , i can see there.But i want this things as tab in screen where we give qty and dates.
    So guys do you know where to do configuration for it.
    Thanking you guys in ad

    Dear Jitendra,
    In Production Order you will find Component and Operation screen under two different icons (not tab) production Header screen.
    - For Component Overview it is something like Balance or on pressing F6 you will branch to Component overview Screen.You will find it just after Hat icon
    - And for Operation over view it looks like ladder or on pressing F5 you will branch directly to operation screen.you will find this icon just after Component overview Icon.

  • QUANTITY OF MATERIAL IN PRODUCTION ORDER

    CAN THE QUANTITY OF MATERIAL CONSUMED DURING THE CONFIRMATION OF PRODUCTION ORDER BE MORE THAN THE REQUIREMENT QUANTITY OF
    IN COMPONENT OVERVIEW?

    HI
    It is possible if manual changes are made in Goods movement during confirmation.
    Regards,
    Krishna Mohan

  • Quantity Withdrawn field in production order

    Hi all,
    I have a doubt
    there is a component A in production order
    Required quantity is 10
    Initially i issue 15 qty's then the same qty gets updated in "Quantity withdrawn" field (component overview screesn)
    Then i reverse 3 qty's of component A,which is very much visible in documented goods movement
    Whereas the same is not getting update in the ""Quantity withdrawn" field ,Still 15 qty is appearing against "Quantity withdrawn" field
    This may be normal behaviour of the system,I'm not sure
    Can you please confirm on this
    If not then please give me possible reasons why it is not getting updated ?
    Thanks,
    SVP

    Hi all,
    I also wonder about this (actually it's an issue for this customer ... ). As same as production order, Network order (it's activity more correctly) also show withdrawn quantity in CN25 transaction.
    In my case, I've done good issue quantity 2 EA, then I reverse it. and same again. finally I do good issue 2 EA.
    GI         -2 EA : CN25
    cancel GI 2 EA : CN29
    GI         -2 EA : CN25
    cancel GI 2 EA : CN29
    GI         -2 EA : CN25
    (Yeah, normally it will not happen often but it can.)
    I expect withdrawn Quantity 2 EA but it shows 10 EA. So have wonder with actual data table MSEG. It has SMBLN value (referred document number to cancel) as I think. It's very normal.
    Why withdrawn field doesn't count that cancel quantity?
    Is there any configuration that I missed ? or Is it normal result?
    But System should do show 'Cancelled GI Quantity' (so that end-user can notify actual GI quantity) to make it understand.
    Regards,
    Yeum
    Edited by: Hee Chul Yeum on Jan 22, 2009 10:50 AM

  • Scrap Quantity component  in the production order

    Dear gurus,
    in the material master of a component i insert the scrap % ( view mrp4) = 10 %.
    The field is read by planning Mrp and explosion of bom , but when i inseert this component in the production order manually the system don't read this % and the field "scrap quantity in the component detail of the production order is blank.
    Are there a setting for uograde this field ( in the production order ) when i insert MANUALLY the component in the production order?
    Example:
    1) material master of the component  > scrap % (view MRP4 ) = 10 %
    2) production order created
    3) insert this component quantity 100 pc and the system after read the material master  insert 110 pc , and upgrade the field automatically 10 % (as material master)?
    Thansk a lot
    Daniele Pistilli
    PP TEAM

    Hi Danielepistilli,
    Well there is a lot of difference is there: see you are creating production order for header material which is FG. If you maintained component scrap in material level it will be dependent on BOM quantity which you maintained for the header material.
    For example say component x quantity is 50 in BOM. How it will calculate when you run the MRP.
    component scrap % is 5% then:
                                     ===>            (5/100) * 50 + 50
    Formula is: Percentage of scrap quantity x original quantity + original quantity
      So                           ===>           52.5 quantity should be come for component
    So, the order quantity for the header material will not take this quantity or scrap but if you see individually in MD04 screen for X material you can find this quantity ok.
    I hope it clears your doubt and helps you any queries please revert me back.
    Regards,
    Madhu.G

  • Single planned order for different sales order of same material

    hi frnds
    my client want that if there is two  or more sales order of same material in a specific period than he require single planned order during mrp run for that material or when if he enter same material in two different line in single sales order than mrp doesnt considered it line item aand produce single planned order for both sales order
    please help me out its very urgent
    thanks

    Hi,
    In Mrp 3 view set the availability check as 01 and in Mrp 1 view
    Keep the lot size as periodic lot size and try the same.
    Thanks,
    S.Nandhakumar

  • Change in confirmed quantity resulting in another production order

    HI Gurus
    I have an issue where the user changes the confirmed quantity in sales order schedule lines it is resulting in creation of
    another production order.
    PRocess flow:
    In depot
    1) creation  of sales order which has scedule line category CP MRP requirements are passed to Plant to create a production order
    In PLANT
    1) Run MD03
    2) create planned order and then production order
    3)create stock transfer order STO
    Suppose A sales order is created today and the system gave a confirmed qty date as 10-02-2010. Here requirements are passed resulting in a Production order.
    now when the user goes and changes the confirmed qty or date the system is creating another production order
    My requirement is not to have another production order when the user changes the date or quantity
    regards

    Dear Farrukh,
    There is not tcode to run sales order for all line items, but if you run MD02 it will plan all sales order & line items also. You can run MD02.
    Regards
    Abhijit Gautam

  • Single Purchase Order for different Plants of Different Company Codes

    Hi Experts,
    I have a scenario, My Client has 3 Company Codes (1000, 2000, 3000 )
    Company Code 1000 has 2-Plants    ( A001 and A002 )
    Company Code 2000 has 1-Plant      ( B001 )
    Comapny Code 3000 has  3-Plants   ( C001, C002, C003 )
    All these 3-Company codes has centralised purchase organisation.
    My Client requirement is to raise a single purchase order for external vendor, for all the plants A001, A002 which is in one company code and similarly in same Purchase Order for B001 plant which belongs to 2000 Company Code and Similarly for same purchase order for C001, C002, C003 plant which belongs to 3000 Company Code.
    1)Is it possible to raise a Single Purchase to External Vendor for plants of Different Company Codes ?
    2)Does it affect the accounting document ?
    3)How to inward and where to inward these goods ? with respect to plant wise ?
    Please Guide with Valuable inputs.
    Thanks in Advance
    Best Regards
    Javeed
    Best regards
    Javeed Ahamed

    1) How about Profit Centre ? We have Framed each Profit Centre with respect to Plant
    Why should there be a problem?
    2)In Case of Migo does we have to be careful and do stepwise MIGO with respect to different Plants ?
    of course people have to be careful when performing transactions.
    if you have multiple items in a PO then you can easily receive all items in one go. So people have to careful and need to check if they really received each of the PO items. Especially if people have authorization for many plants, then the user who is usually performing the receipts for plant A can easily post the receipts of plant B too.
    3) How to Process MIRO ? Can we process Partial MIRO"S with respect to Line-items of those particular Plants ?
    MIRO allows to post the invoice like it is send to you from your vendor. If it is just for a part of your PO then this is just a fact and MIRO allows to post this kind of invoices too.

  • Different Tax base in pricing procedure for a single sales order for different line item material.

    Hi,
    I have a scenario wherein in a sales order, for two different material, the tax base of pricing should get triggered on the basis of sold to party and the material entered at line item level.
    Logic triggers on the basis of Region of Customer & a unique field in the Material Master but problem comes in the calculation of Tax base as the sequence of condition type (from – to)  is already defined in the pricing procedure to pick from a particular step but in second line item the base is different i.e. the sequence of condition types that are maintained in pricing procedure should be different for Tax to calculate differently.
    Kindly suggest if the same can be handled in a single pricing procedure and dynamically taking care of condition type sequence through Alt Cal Base Formula, so far I’ve tried both Alt Cal Formula & Base but it is not working
    Client doesn’t want to go ahead by creating two different orders (through separate Pricing Procedure) for that. They want to have both materials in same order.
    Kindly suggest a suitable way to handle this scenario.
    Regards,
    Aashika Agarwal

    Hi,
    Click on the ''check availability'' button at item overview and then click on ''One-time delivery'' on the top. This will ensure that you will have only one delivery for whatever quantity is confirmed on that date.
    If you want to apply this rule for all orders across a sales area, then you can do the below configuration step :
    SPRO->sales and distribution->basic functions->availability check with ATP logic->Define default settings-> Here in avail. checking rule select A (one time delivery). This will ensure that all orders created for a particular sales area will have only one delivery.
    Hope this helps.
    Regards,
    Palani

  • Split orders into different billing documents depending on exchange rate

    We are going to have a new business and process sales orders with currencies.
    As our materials have a long life cycle and for commercial reasons, users want to freeze the currency rate on the material.
    Our first analysis leads us to use the pricing date on item, to get it from the u201Csale from dateu201D maintened on the material, so SD determines the exchange rate valid at this date in the currency table (TCURR). This exchange rate is kept on the order item in the u201Cexchange rateu201D field (VBKD-KURSK).
    So we can have in the same order (and obviously for the same currency) items with diffrent exchange rates.
    Now, we would like to split the billing document depending on the exchange rate (or the pricing date is it determines the rate). My question is : how to do this ? Is there a way thru u201CCopying control: Sales document to billing documentu201D ?

    Thank you Caveman
    We have added a new routine to concatenate the exchange rate in the VBRK-ZUKRI field and it works !

Maybe you are looking for