Transfer between storage location to storage location within same plant

Dear Gurus,
We r doing storage location to storage location transfer within same plant through purchase order.
Due to excise requirement we have to raise excise invoice for the same for captive consumption purpose.
Is it possible to make it One step procedure so that GR will take place at same time as GI the way it works for plant to planrt.
In ECC 6.0 option is there for transfer between storage location. I configured but it is not working.
Please check the same.
Rgds,
Saurabh

Hi Saurabh,
The proceedure you are following is a bit wierd. But I think this is as per your business requirements.
You can continue to follow the same proceedure as this may  not be possible through one step movement type.
Best Regards,
Prateksha.

Similar Messages

  • Release Strategy for inter Storage Loc Material transfer within same Plant

    Hi Guru's
    I hope all are doing good. I gota small concern to share with you. Is it possible to apply Release Strategy between two Storage Locations within same Plant for Material Movement?
    Many Thanks
    SONAL

    Release Strategy cannot be assigned in material document.
    However you can restrict this at authorisation level for T code MIGO_TR.
    Regards
    Bhavesh Mistry

  • Stock transfer between storage location in IS -Retail

    Hi,
    I want to have a Stock transfer order between two storage locations in the plant.
    I have activated the "Activate Stock Transfer Between Storage Locations", now i can create a STO and have the "Issuing SLoc" tab.
    Having that i get an error message "Not possible to determine shipping data for material XXX" Message no. 06280.
    I am trying to have the shipping data in customizing for set stock transfer  - "Define Shipping Data for Plants", but my site is not listed due to the use of IS Retail. Is there a way to configure it?
    Tnx
    Lior

    Hello Lior,
    in Retail your distribution center is a vendor and a customer, and your store is a customer. Therefore when you create master data for your distribution centre and store, you also create the vendor and customer masters that are required.
    By this link of the DC / Store to the customer master the shipping data is derived. I hope this answers your question.
    If you have further queries related to this, please do post them.
    Regards,
    Smitha

  • Stock Transfer between Storage Location with Order

    Dear MM experts, 
    I am into SAP SD.
    Our client wants to Transfer Stock from one Storage Location to another Storage Location of the same Plant. (This can be easily done thru MB1B via Transfer Posting)
    But the unique requirement here is they require some kind of Delivery Order or Tansfer Order to be created first & only based on that document user can transfer Stock between Storage Locations of a same Plant. (Similar to Inter-Plant Stock Transfer where we create Stock Transfer PO & then move goods between plants).
    Can you please suggest on how to achieve the above scenario.
    Thanks,
    Jignesh Mehta
    Mumbai

    hi
    Stock Transfer between Storage Locations
    u2022 Function of stock transport orders between storage locations is available from ECC 6.0 onwards.
    u2022 As a result of which user can input issuing storage location with supplying plant.
    u2022 Facility of using different delivery types for different issuing storage locations is available.
    u2022 Shipping Point data can also be determined based on the issuing storage location.
    refer following
    http://sapfunctional.com/MM/StockTransfer/Configure.htm
    http://help.sap.com/saphelp_scm41/helpdata/EN/23/29cf20eabe094e957763a46aa5be9d/content.htm
    regards
    kunal

  • Transfer project/ SO stock between 2 storage locations of same plant

    HI,
    We have a requirement in which the we have to transfer  project/sales order stock between 2 storage locations of the same plant.

    Transfer between storage location.
       311 Q - Project Stock
       311 E - Sales Order Stock
    Transfer between storage location to own stock
       411 Q - Project stock to own
       411 E - Sales Order to own

  • Stock transfer between storage location

    Hi
    I have following requirement.
    I have material which is maintained in two different storage location in same plant at Storage location SLOC1 ( primary location)  and ( Storage location SLOC2). This locations are physically separated by 10 Km.
    My requirement is if stock at Storage location SLOC2 falls below then it should create stock transport order automatically
    Please give all details to be put to maintain configuration and masterdata.

    Hi
    Refer the Link :
    http://www.sap-basis-abap.com/sappq003.htm
    Storage Location included/excluded from MRP
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run :-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards
    Anand

  • Accounting entries after PGI for STO Within same Plant

    Dear Members,
    We have activated STO within same plant in OLME->PO->Setup STO -> Set up stock transfers between Storage locations
    Cycle is PO ->VL10B->VL02N ->PGI ->GR
    We are using newly created delivery type ZNL ( copying NL ,Using 641 )
    Which is working fine
    Now the thing I am observing here is this
    a > When we have not assigned any pricing procedure  in  Determine Schema for Stock Transport Orders
    after PGI no accounting document was generated
    But our requirement is to add freight cost that is why we added a pricing procedure ZRM200 (copying RM2000)
    Here we are observing after PGI accounting document is generated
    Postings are ( Material cost 500 Eur i.e 100 Kg @ 5.00 Eur in PGI )
    RM stock a/c       500 Cr.
    RM stock a/c       800 Dr.
    Freight clearing   300 Cr
    And it does not matter whether P101 is in ZRM200 or not (Same posting with or without P101)
    Now my question is it correct system behavior ?
    And requirement is postings should only be like this ( i.e without including transfer posting price)
    RM stock a/c       300 Dr
    Freight clearing   300 Cr
    Can it be possible to achieve ?
    Many thanks in advance
    Edited by: redriver on Dec 29, 2011 2:35 PM

    Not necessary to activate Purchase account
    Even for STO we use FRE. It is only a name and called as Purchasing freight account
    So check the pricing procedure at M/08 for freight condition and account key. I think it is FRE
    Check which GL account assigned at OBYC/Purchasing freight account(FRE).
    if the GL is same as your RM and if your need mainatain separate GL enter that GL here.
    Let us know result
    Srinivas

  • Transfer of stock between two storage locations within a plant in two steps

    Hi,
    We have a plant 6400 & we have two storage locations 6401 & 6402. Each storage location belongs to a department which are located at some distance from one another.
    The material to be moved from one storage location to another using a truck.
    For the above mentioned process can we have the following process
    (1) In first posting the material is issue from the storage location to a transit
    (2) In second posting the material from the transit is received into the storage location
    I am looking for a feature that is possible between two plants, can we have a similar feature available within a plant.
    Warm regards,
    Umesh

    Hi Umesh,
    It would be a business decision i suppose. If those 5 nos. are lost / damaged in transit & needs to be scrapped, then the ownership needs to be decided first. If it lies with the sender, then reverse the 5 nos. (MB1B mvt is 314) & then proceed with your scrapping or if it lies with the receiver then receive the 5 nos & then proceed with the scrapping.
    Posting in system is one aspect, but a clear business rule is the key factor. So discuss with your materials mgmt personnel to define the process flow.
    Hope the above helps.
    Regards,
    Vivek

  • Stock transfer between storage locations and lead time

    Hello,
    We use stock transfer orders between different storage locations. Is it possible to maintain the transport lead time between storage locations somewhere or do in need to use routes and scheduling?
    rgsd
    GAR

    Hi,
    Try using movement type 313 and 315
    313 -- Transfer posting SL to SL --- Remove from issuing SL
    315 -- Transfer posting SL to SL  -- Placing in Receiving SL
    Regards

  • Stock transfer between stor locations - copy in reference data

    Dear all,
    We would like to implement a process in SAP MM that is as follows.
    However so far we have not been able to find a suitable/good solution for the below step number 5 below
    Proces in general: A number of Materials are to be received in storage location 1 but to be stocked in storage location 2 of the same plant.
    We configured it like this so far:
    1                    MM01 - Material master created in both storage locations. In the field MARC-LGFSB ( external procurement stor.location) we have filled in storage location 1
    2                    MD01 - mrp runs are executed ; results in Purchasing Requisitions created for storage location 1
    3                    Purchase requisitions are converted to Purchase orders
    4                    MIGO u2013 goods receipt for the purchasing order , hence receipt into stock of storage location 1
    5                    MIGO_TR u2013 stock transfer posting stor.loc 1 to stor.loc. 2 . At this point we would like to be able to reference/copy the data of the step 1 into this transaction in order that the data does not have to be re-entered manually. We canu2019t find a way how to do this. Should we use other functionality to enable this? In the end what we are after is to avoid typing in data twice.
    Your help would be much appreciated.
    Cheers,
    Arjan
    Edited by: A. de Vries on Oct 27, 2010 5:41 PM

    Why don't you receive the goods directly in the storage location where it is "stocked"?
    If you still adhere to your idea you maybe could trigger an output (via message determination) when posting the GR in MIGO. The output would create an IDOC which posts the goods movement (check IDOC "MBGMCR02"??? --> this IDOC uses function modul "MB_CREATE_GOODS_MOVEMENT" )
    This needs some development...

  • Stock transfer between storage locations

    Hello All,
    We have a scenario wherin ONE PLANT has MULTIPLE SLOC's across INDIA.
    Now we need to transfer some manufactured machines to these various storage locations which are actually stockyards.
    How do we go executing this??
    I know about the STO between sloc's...but how is the excise angle covered here, since when the materials are transported across various states this would include the EXCISE component as well.
    A detailed description is expected please.
    Regards,
    Manoj

    Hi Manoj,
    You can use the S. loc to s. loc STO for this issues.
    Since it is exciable use below steps.
    Create STO ME21N.
    (Pricing procedure) (Invoice Tab u2013 Mention the Excise Tax procedure)
    Outbound delivery : Vl10B
    PGI:  Vl02N
    Outbound Excise Doc. For PGI material Doc. :
    Billing u2013 Vf01
    MIGO at Receiving S.LOc u2013MIGO
    Inbound Excise Invoce : J1iEX (W.r.t GR Material Doc )
    SAM

  • MRP - Create STO for Stockk Transfer between Storage Locations

    Hi Everyone,
    I have a scenario where MRP run should create Planned Order as well as STO for a VSF Requirement. The reason is our Plant has got 2 Storage Locations. One is the Production Storage Location and the other is Warehouse Storage Location. The Planned Order should be for Production SLoc and STO should for Stock Transfer from Production to Warehouse Storage Location. Your suggestions are much appreciated to resolve this issue.
    Thanks,
    Jay.

    new releaes bring new features........
    not all new features can run in old environments.
    I know that companies did already Storage location to storage location STOs in 4.6c but they had z-tables to assign customer numbers at storage location level, and they had changed some  coding to make it happen.
    I am not sure if there is an OSS note that explains the steps and modifications needed......but try to search OSS.

  • Stock valuation different for different storage location in same plant

    Hi SAP Gurus,
    Please provide me a detailed idea and solution for this.
    My client has simulated several transactions in MM.
    Say it has two storage location 1110 and 1120 under plant 1100
    Now in 1120 there are stock movements pertaing to a project (includes stock transafers from 1110 and issues made to project)
    Finally, the MB52 report is showing valuation of stock (unrestricted) at different rates for 1110 and 1120.
    My client is raising issue, saying the value should be same for stock under a single plant as valuation is done at plant level.
    Also, both the stock is under unrestricted category, so valuation should be same.
    What could be the issue?
    Any solution?
    The auditors will raise issue over this.
    Please help ASAP.
    Regards,
    Sumit

    Hi Sumit,
    In valuation using the moving average price (price control u201CVu201D), the system valuates goods receipts with the purchase order price and goods issues with the current moving average price.
    So, for Plant 1110 the rate could be the PO price used for procuring the material whereas for Plant 1120, it is the moving average price and hence the difference in rates.
    However the auditors would look after the Material Valuation at the Valuation Area level which is the Plant.
    Thanks,
    Ankur

  • Transfer between storage types and putaway strategies

    Dear All,                    
    Here is my scenario and please guide me on as detailes as you gurus can on how to proceed achieve this:                                        
    When receiving good from a PO the materials are received in 902: How to move them to my Raw materials storage type?                                        
    Note: I have defined 4 storages types, one for raw materials, one for production, one for Finished goods and one for spare parts.                                        
    And once I move the materials into the warehouse, what strategies do I have to define in order to place the materials in specific bins? Here's an explanation on how I need the putaway:                                        
    I have 5 different racks or stacks but I need all materials to be placed in a specific row of the first level, lets say material A in 01-A-01  the first 2 digits are stack then level then row(SS-L-RR); Material B should be placed 01-A-02 Material C 01-A-03; meaning all the materials should be placed in the level A of stack 1 but if there is another recepit of material A and it is already full then the system should propose another bin doesn't matter which one as long as it is not in the first level (because this positions are reserved for other materials).                                        
    This is the same for materials D, E, F but those are to be placed in stack 02 in level A                                        
    I need this because that's the way my client work right now, it is like Lean manufacturing strategy, so whenever they need to pick materials they always have them available at the lowest level                                        
    Is there an automatic bin to bin TO creation for when the picking empty the bin at the lowest level then a TO should be triggered automaticaly saying move from whatever bin the material is available to the "fixed" bin assigned in level A                                        
    Stack 1                         Stack 2               
    Level     1     2     3          Level     1     2     3
    D     free     free     free          D     free     free     free
    C     free     free     free          C     free     free     free
    B     free     free     free          B     free     free     free
    A     A     B     C          A     D     E     F
    The variable here is that as I said before I have 5 Racks  so in the other 3 stacks doesn't matter the levels, the materials can be placed wherever, and this will happen when receiving material A but all stack 1 is full then system should try to place it in the nearest bin available of stack 2 (only levels B, C, D) or if this is also full, then goes to stack 3 ( all levels available)                                        
    Please advise on how to map this, and the transactions and mvt types involved, and also please explain how should I make the picking or removal strategy to propose the picking always from the specific lower level bin, if not enough qty available then go and pick from other bin (and if it is possible at this point to create a TO to refill the fixed lower bin)                                        
    Thanks in advande to all.                                        
    Julio

    Hi,
    Try using movement type 313 and 315
    313 -- Transfer posting SL to SL --- Remove from issuing SL
    315 -- Transfer posting SL to SL  -- Placing in Receiving SL
    Regards

  • How to add jump to location within same topic?

    We are migrating a client-server application to being a SaaS application.  In the process, we need to consolidate all of our 650+ context-sensitive topics into a much smaller number of what we're calling "page topics".  Each page topic will document all of the data entry fields, drop-down menus, checkboxes, and radio buttons available in a single data entry window of the SaaS application.  Since some of these windows contain dozens of data entry fields, etc., their page topics will be long.  We'd like to simplify the user's task of finding a specific data entry item by including a list of links at the top of each page topic that jump to all of the respective data entry items covered in the topic.
    While I've created countless jumps between topics, I haven't been able to find a way to create jumps within a topic.  I currently use RH X5 on a Windows XP machine, but I am considering upgrading to RH 8.  Also, while the Help system in question is currently compiled as Microsoft HTML Help (.chm), I plan to move to WebHelp format for our SaaS application.  Is there a way to create intra-topic jumps in RH X5?  How about RH 8?
    Many thanks for any suggestions you can make!

    Hi Elisa
    I'm shocked! Me? Harsh?
    Okay, I do admit to being a bit opinionated when it comes to the Word/HTML bit.
    A couple of points here.
    The Mini-TOC placeholder may be inserted independently inside any topic you like. You aren't limited to using it inside Master Pages.
    The behavior you cite isn't a WebHelp behavior. It's a standard behaviour you see with Web Browsers. And there is a workaround. Just position your cursor at the end of the text and press Enter many times to create "White space" at the bottom of the topic. This then allows the page to position to the Bookmark properly.
    And before someone chides me and says: You know, Mr. Man, that if the user prints that topic it will make more paper come out of the printer!
    I will heartily agree with you. That's the trade off. But why is the user printing the electronic documentation anyway?  After all, it *IS* called WebHelp for a reason.
    Cheers all... Rick
    Helpful and Handy Links
    RoboHelp Wish Form/Bug Reporting Form
    Begin learning RoboHelp HTML 7 or 8 within the day - $24.95!
    Adobe Certified RoboHelp HTML Training
    SorcerStone Blog
    RoboHelp eBooks

Maybe you are looking for

  • IPnone 4s not recognized by Envy dv7-7333cl rnning Windows 8 when plugged into usb port

    Laptop does not recognize iPhone 4s when plugged into any of the 4 usb ports. All usb drivers are up to date. All Win 8 and HP udates have been installed and are current. Ports do recognize memory sticks so seem to be working. Is there a special driv

  • Asset - WBS element-PO

    Hi All, I have created a wbs element. Assigned it in the Asset master. Now, when I create an asset PO for the said asset, it is not populating the WBS element automatically. Which other settings needs to be done other than giving the WBS element in t

  • Invoice for México

    I want to pay for Creative Cloud from México, ¿how do I get an invoice valid for tax deduction?

  • Parameter transaction for table maintenance - multiple tables?

    Hello, I am very familiar with creating a parameter transaction to call SM30 for a specific Z-table of ours. However, I have 14 tables that a group of users will need to maintain. Rather than create 14 different transactions in SE93, what are my opti

  • Javamail and bad file names in attachment

    Hi all, We are having an issue interpretting bad filenames are in the attachments of emails received. Our application listens to an inbox and then interprets the messages in the inbox.We copy the attachment to the local machine.Now some email attachm