Transit time calculation through Route during Location Substitution

Hi All,
      I have standard route determination set up in SD. I am picking up the route from Sales order and calculating the transit time in APO through condition technique TRAN.
     But when I do a location substitution , my transit time calculation is being done with the original route.
    EX: Original plant P1            Route: R1         Transit time: 24 hours
           Substituted Plant:   P2   Route : R2        Transit time :96 hours
          But my transit time in the substituted plant P2 is also 24 hours. Although I can see the new route R2 in the sales order item of the substituted item.
     Is there a user exit I can put?

Hi ,
Please try using Plant and Ship To combination, I saw it does not work with Route and shipping point.
Thanks,
Pavan Verma

Similar Messages

  • Transit time calculation Route

    Hi,
    I have an issue in determining the delivery date for an STO.
    My route is maintained as XXX--02 which is 2 days transit time and is correctly getting determined in the STO, however the delivery date is not correct on the STO
    Order created date is 11th july
    Material availability is 12th July
    trnspt pllng/Load date is 12th July
    Goods issue date is 13th July
    Considering 13th july as goods issue date and route with 2 days transit time should determine 15th july as the delivery date, however I am getting 14th july as the delivery date instead of 15th.
    Can you please let me know if this is something that you have seen before? and any suggestions.
    Thanks

    Hi,
    Please check if delivery scheduling is active and 2 days has been defined in route determination under transit time.
    The planned GI and Actual GI dates also play an important role in delivery date determination.
    If you are just creating a sales order create a delivery for it and check what is determined.
    Regards,
    Amit

  • Transit time setting in Route determination

    Hi All
    I am configuring route determination. We have a transit time of 5 days for one route and if the system encounters a Sunday in between, it  considers sunday as holiday and confirms delivery after 6th day. Please note that we have maintained Sunday as holiday in the factory calendar because it should not allow shipping activities or any other activities on Sundays in the plant and shipping point, but transit should be allowed. (I mean, if a truck leaves on Friday, it will not take holiday on Sunday)
    Please let me know how I can do that

    Hi Monika,
    I havent really tried this...but my logic says that you maintain the holidays and working hours by factory calendar under
    SPRO -> Logistics Execution -> Shipping -> Basic Shipping Functions > Scheduling > Delivery Scheduling and Transportation Scheduling > Define Scheduling By Shipping Point
    Here you would be able to maintain working hours and holidays for your plant/shipping point and Sunday would be a holiday.
    In customizing for route determination maintain a new calendar with no holidays. So regardless of which day the truck leaves it doesnt have any holiday.
    Here you would need to activate delivery and transportation scheduling based on shipping point.
    Regards,
    Amit
    Edited by: Amit Iyer on Jun 8, 2011 3:56 PM

  • Interoperation Time Calculation in Routing

    Dear All,
    can anyone help me how Interoperation time is calculated?
    Thanks in advance.

    Hi,
    Basically time between operations consists of queue time of the succeeding operation and wait and move times of the preceeding operation. These times are entered in the operations in the routing, or might as well transfered from the work center master data.
    Check below link for the related SAP help page;
    [Date Determination at Operation Level|http://help.sap.com/saphelp_erp60_sp/helpdata/en/55/67049b95d711d3b6fb0000e8359890/content.htm]

  • Use the Transit Times of route stages ?

    Hello. I would like to now if I somehow can use the transit time of the route stages instead of the header route transit time to reflect correct ATP. Current SAP is 4.7.
    Business Scenario behind my request is mainly for Ocean Liner Shipments:
    For Liner shipments most of the times there are fixed sailing Days ( i.e. every Friday ).
    Here I use a route with two stages:
    Shipping point to port of depature
    Port of depature to final destination port.
    As a possible solution I thought to use a Transportation connection point in between which should reflect the waiting time at the port having a factory calendar behind. But during first testing I recognized that any time specific date in the route stages are not take into calculation when creating a sales order ?
    Help please !
    Thanks
    Joerg

    I think the sales order picks up the time and dates from header of the route and applies stages and leg determination during shipment creation depending upon your shipment doc. type settings, hence, I think doesnt add stage values during order creation.
    If I understand the problem right, perhaps a user exit or something can help you get the days to next Friday to add to the transportation lead time and get to the right dates. Check if this idea can help.

  • Route - Transit Time

    According to the business through EDI customer places orders. We maintain two shipping conditions delivery and Pick-up. Based on the customer profile we assigned shipping conditions on the ship to customer master in the shipping tab.
    My query is related to the customers assigned Pick-up as a shipping condition in customer master.
    As we receive orders through EDI sometimes pick-up customer will send in 2 dates on their orders.
    1. Requested delivery date u2013 The date they want the order in their warehouse.
    2. Requested ship date u2013 The date they want to pick up the order.
    In some cases customers will only send one date that is requested delivery date. In this scenario our customer service team is manually back out the date accordingly so it will show the correct u2018material availability dateu2019 and u2018loading dateu2019 on the u2018overviewu2019 of the order under u2018shippingu2019 tab.
    Eg: If customer sends the req delivery date is 05/27/2009 order created for the same. Manually we back out the date to 05/24/2009 so that the material availability date and loading date would also be changed to 05/24/2009 on the overview of the order under shipping dat.
    How to achieve the functionality where the system will back the order up to show the u2018material availability dateu2019 and the u2018loading dateu2019 as the date that the carrier will be coming in to pick up the order ie On 05/24/2009 and material available in the customer warehouse on 05/27/2009.
    If I can maintain the transit time as 2 days for the route determined (t code 0vtc) I can achieve this functionality. However I canu2019t maintain the lead time because we are not arranging the carrier, customer is arranging the carrier and that will be coming in to pick up the order.
    Please advice.
    Thanks.

    Dear Gopi,
    My sincere apologies for the delayed reply. I would like to reiterate my scenario.
    Based on the information enter in the Idoc Sales orders are generated automatically. Let us assume  requester delivery date has entered by the customer u2013 05/27/2009 if material is available, schedule lines are created for the requested delivery date and confirms the delivery date as 05/27/2009
    As the confirmed delivery date is 05/27/2009, Material availability date and Loading date is also 05/27/2009(based on the config settings) u2013 These dates can view sales order overview screen under shipping tab.
    In the scenario where the shipping conditions are PU u2013 Pick up, customer is arranging his own carrier to pick the goods.
    As customer requested delivery date is 05/27/2009 on this date customer wants the goods in his warehouse. According to our system material availability date is 05/27/2009. If goods leave our premises on 05/27/2009 it would take X days more to reach customer. So customer is getting goods on 05/27/2009 + X days of Transit time, ultimately he is not getting goods based on requested delivery date.
    In order to supply the goods on customer requested date, customer service rep has to manually back out the requested delivery date from 05/27/2009 to 05/24/2009 if material available, material availability date and loading date will be 04/27/2009. Customer can pick goods on 05/24/2009 so that goods will be in customer's warehouse based on the requested delivery date 05/27/2009.
    We can achieve this functionality by giving the transit time as 2 days so that through backward scheduling  system would automatically confirm the delivery date on 05/24/2009, material availabity date and loading availability date on 05/24/2009. However it is not advisable to maintain transit time for the route determined because we are not arranging the carrier, customer is arranging on his own.
    Please advice a solution or a user exit to achieve this functionality without maintain the transit time and without manual manipulation how to back out the requested delivery date on the order.
    Thanks.

  • Routes and Transit times with Global ATP

    If Global ATP is used where are the transit times managed usually? in SAP or APO. Since Transit Times are in Routes in SAP. Is there any equivalent data management point in APO?
    Thanks
    venkat Jupudy

    Hi Venkat
    You can either call scheduling locally in R/3 and also in APO as part of GATP function.
    Transit times are maintained in scheduling steps( creating condition records of condition technique scheduling) for condition type TRAN.
    Route determination can be done in R/3. There is a possibility of dynamic route determination in APO but I guess it requires TP/VS and gatp functions.
    Regards
    Mohan Venkat Ramana Chunchu

  • Delivery Date in SO not calculated with Route Transit Time

    Hello Experts,
    We are not able to calculate the delivery date in Sales Orders based on the Route transit time.We are using the Transportation group from Material master , Shipping condition from sold to Party , and Receiving issuing plants and zones .
    One thing I notices is if we don't use the Transportation group in the material master , then the delivery date calculated based on transit time.Not sure not why its not working with using Trans group in Mat master
    Please advise.
    Thanks in advance

    Hi,
    Kindly do not post same questions twice
    HI,
    For delivery scheduling enter time
    IMG >> SD >> Basic functions >> delivery scheduling and transportation >> maintain duration
    Maintain here route, pick/pack & loading time
    For in house production maintain time in material master in MRP view
    Then now system will take in account what is production time + pick/pack + load time and then will schedule
    Kapil

  • External Location Ship Method and Transit Time

    Hi
    I have got scenario -
    1: Primary Suppliers are in APAC region.
    2: They send the units to a site for consolidation
    3: Based on the receiving site, east coast or west coast the lead time is different
    4: If I cannot place orders to these suppliers then I can place order with local supplier and then the lead time is different
    Now I have modeler following -
    1: The lead time between supplier and consolidation site is in the Processing LT at ASL Level
    Now the issue comes in replicating the lead time between consolidation site and the receiving site.
    I can put this in Post Processing LT. But when I want to evaluate the local supplier, then the post processing LT kicks in which makes it even longer total time for local suppliers.
    I am evaluating to capture this in shipping method.
    But I am not finding any setup or document where I can setup Shipping Method and Lead Time between Supplier Site and Inventory Organization.
    I setup a location in inventory but this location is not appearing in the Inter-Company Transit Times. I am trying with 'Extenal Location' as source.
    Can you please help me on this?
    Regards

    Hi ,
    Please try using Plant and Ship To combination, I saw it does not work with Route and shipping point.
    Thanks,
    Pavan Verma

  • Promised Date Calculation based on Need by Date and Transit Time

    Hi,
    I have created PO with NBD as D25 (Day 25) and approved it. This means that i need the goods to be at my premisis by D25.
    Now the requirement is
    Promised date in my PO should be calculated to D25 - Transit Time. So that supplier will be notified D25-Transit time.
    Or Is there any workaround to overcome this.
    Thanks,
    Jey

    Jey-SCMFG wrote:
    Hi,
    I have created PO with NBD as D25 (Day 25) and approved it. This means that i need the goods to be at my premisis by D25.
    Now the requirement is
    Promised date in my PO should be calculated to D25 - Transit Time. So that supplier will be notified D25-Transit time.
    Or Is there any workaround to overcome this.
    Thanks,
    JeyHi Jey,
    Where you are capturing your lead time. You can do it in item master.
    Once it is there, write a personalization to calculate the promised date and update the field.
    Thanks,
    PS.

  • I presently have a linksys wifi router, can i connect a time capsule through cat 5 cable for my apple products and to boost my signal ?

    I presently have a linksys wifi router, can i connect a time capsule through cat 5 cable for my apple products and to boost my signal .i live in a three story home and my linksys is in the basement. I have one cable on the top floor where most of my computers/ipads are.

    can i connect a time capsule through cat 5 cable for my apple products and to boost my signal
    Yes, configure the Time Capsule to create a wireless network using the exact same wireless network name and password as the Linksys wireless network.

  • Transit time of routes from the availability check

    is it possible to exclude the transit time of routes from the availability check

    Dear Varada,
    no, it is not possible to exclude the route transit time from the availability check process. The ATP process and transportation scheduling are always running together because we have to deliver to the required relivery date. Therefore the availability check always takes into consideration the transportation scheduling.
    I hope, this information helps you a little bit further.
    Kind Regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • Transit Time in Calendar Days?

    Hello,
    For quite a long time, I thought in transportation and delivery scheduling the TRANSIT TIME is measured in Calendar Days, which means weekends and public holidays are also included. For example, if the delivery date is 2007-12-31, and transit time is 8 days, the system will calculate Loading Date as 2007-12-31 minus 8, which is 2007-12-23.
    But a few days ago, I found my understanding is not correct. It seems the TRANSIT TIME is also measured in work days, in the route factory calendar (not the shipping point factory calendar). In this case, the loading date in above example will be calculated as 2007-12-19, for a typical calendar.
    Can someone confirmed this?
    Regards, Ke

    Yes that's right Ke.
    The calendar you maintain, if has a weekly off or for that matter country specific holidays these days will be considered as non working days in SAP. however if you want to change this you can define your own calendar having 365 days working.
    Regards
    Ranjeet

  • Transportation lead,pick/pack & Transit time

    Dear Friends,
    After considering transpoartation lead time,pick/pack time,loading time & transit time system do confirm whether stock is available or not.....my doubt is whr do we maintain the above said times in the system?........

    Hi saravanakumar
    Transit time and Transportation lead time is taken  from or maintained in  Route
    Loading time and pick/pack time comes from shipping point
    You need to have clarity on backward scheduling  and  forward scheduling
    For example you are creating a sales order today 15.02.2009 and the requested delivery date is 25.02.2009 from the customer side
    Transit time is 2 Days
    Transportaion planning time is 2 days
    Loading time is 1 day
    Pick/pack time is 1 day
    Consider these settings
    Now backward calculation  System does a backward calculation first
    25.02.2009 (requested delivery date) -- 2 days (transit days) -- 1 day (loading time) -- 2 days (transportation planning time) = that is on 20.02.2009 there should be enough stocks in the unrestricted stocks and system checks stocks for this day or date ,that is 20.02.2009  ,whether the stock is available enough
    This date 20.02.2009 becomes the material available date
    Note Transportaion planning time and Pick/pack time will run parallely and the higest of these two is considered for delivery scheduling so in our case Transportaion planning time is 2 days that is the highest and hence it is taken for calculation and not pick /pack time
    If the system finds enough stocks on 20.02.2009 (that means it performs a availability check for 20.02.2009 depending on OVZ9 settings) that is material available date then it confirms schedule lines for that order this is backward
    Same example order is registered today 15.02.2009 and if the customer wants stocks on 17.02.2009
    This means 17.02.2009-2 days (transit days)-1 day(loading time)-2 days (transportation planning time) = 12.02.2009
    The order registered date is 15.02.2009and the material availablity date is past 12.02.2009 or material available date goes to past.
    This is illogical
    This means backward is failing here and now forward calculation takes place
    Forward calculation
    If you have enough stocks today 15.02.2009 + 2 days transportation planning time+ 1 day loading time+2 days transit time = 20.02.2009
    This means that is on 20.02.2009 the stocks can be confirmed for this order as against a requested delivery date of 17.02.2009
    In forward the system will give 2 schedule lines first that is requested delivery date that is 17.02.2009(in our case) with ZERO qty and the second date as 20.02.2009 with full qty
    In backward you will find only one date in the schedule lines which is the same as requeted delivery date that is 25.02.2009 in our case
    Hope i made things little bit clear to you
    Transit and transporatation planning will come from route if route is maintained otherewise it is taken as 0 days
    Loading and pick pack time will be maintained in shipping pt  if not maintained also then it is taken as 0 days (in enterprise structure logistice execution and your shipping point details it is maintained)
    Regards
    Raja

  • Time-out checking log bucket location.

    Hi,
    Earlier this month, I successfully ran the OSB Cloud Module for Amazon S3 installer. It created a "new registration for this S3 user" with a new "Registration ID". It also generated an "S3 Logging Bucket" with a name based off of my Amazon nickname which at the time of running the Cloud module installer was "javanetworking".
    $ *./osbws_install.sh*
    Oracle Secure Backup Database Web-Service Install Tool, build 2011-02-04.0001
    AWS credentials are valid.
    Creating new registration for this S3 user.
    Created new log bucket.
    Registration ID: xxxxxxxx-xxxx-xxxx-xxxx-xxxxxxxxxxxx
    S3 Logging Bucket: oracle-log-javanetw-1
    Validating log bucket location ...
    Validating license file ...
    Create credential oracle.security.client.connect_string1
    OSB web-services wallet created in directory /u01/app/oracle/product/11.2.0/dbhome_1/dbs/osbws_wallet.
    OSB web-services initialization file /u01/app/oracle/product/11.2.0/dbhome_1/dbs/osbwstestdb1.ora created.
    Downloading OSB Web Services Software Library from file osbws_linux64.zip.
    Downloaded 20744341 bytes in 10 seconds. Transfer rate was 2074434 bytes/second.
    Download complete.
    Extracted file /u01/app/oracle/product/11.2.0/dbhome_1/lib/libosbws12.so
    Since then, I have changed my Amazon nickname (https://www.amazon.com/gp/nickname/index.html"). I was hoping to re-run the Cloud module installer and have it generate a new "S3 Logging Bucket". I removed the two S3 buckets that were created in the initial Cloud module install (the data and log buckets).
    However, when I attempt to re-run the Cloud module installer, it complains that it cannot find the original "S3 Logging Bucket":
    $ *./osbws_install.sh*
    Oracle Secure Backup Database Web-Service Install Tool, build 2011-02-04.0001
    AWS credentials are valid.
    S3 user already registered.
    Registration ID: xxxxxxxx-xxxx-xxxx-xxxx-xxxxxxxxxxxx
    S3 Logging Bucket: *oracle-log-javanetw-1*
    Validating log bucket location ...
    Time-out checking log bucket location.
    Please try again later.
    I even tried using the *-newLogBucket* option to osbws_install.jar so it would force the creation of new log bucket; however, it doesn't appear to do anything. It still complains about not finding the original S3 Logging Bucket.
    I thought the best option would be to "un-register" the Amazon S3 user the installer generated. There is no documented option in osbws_install.jar to perform a full "un-install" or "un-register". The Registration ID the installer creates appears to be hard-coded metadata somewhere in Amazon S3.
    +AWS credentials are valid.+
    +S3 user already registered.+
    +Registration ID: xxxxxxxx-xxxx-xxxx-xxxx-xxxxxxxxxxxx+
    I know that the registration information is not stored with your OTN profile because I tried putting in a fake OTN username/password when calling osbws_install.jar. It doesn't use the OTN username/password because it first uses your AWSID/AWSKey to see if there is information that the S3 user is already registered. Once it determines that the S3 account is already registered, it doesn't need to log in to OTN and displays:
    *S3 user already registered.*
    I did try this and it worked for modifying the backup bucket (OSB_WS_BUCKET) but didn't appear to work for the S3 Logging Blucket (_OSB_WS_LOG_BUCKET).
    1.) Manually re-create the missing S3 Logging Bucket (oracle-log-javanetw-1).
    2.) Run the Cloud module installer so it creates the wallet, configFile, and downloads the library.
    3.) Determine list of valid parameters that can be set in the configFile:
    $ *strings $ORACLE_HOME/lib/libosbws12.so | grep '^OSB_' | sort*
    OSB_WS_BUCKET <----------
    OSB_WS_CHUNK_SIZE
    OSB_WS_HOST
    OSB_WS_LICENSE_ID
    OSB_WS_LICENSE_MAX_SESSIONS
    OSB_WS_LOCATION
    OSB_WS_PFILE
    OSB_WS_PROXY
    OSB_WS_WALLET
    $ *strings $ORACLE_HOME/lib/libosbws12.so | grep '^_OSB_' | sort*
    _OSB_WS_100_CONTINUE
    _OSB_WS_ACCESSLOG
    _OSB_WS_ACCESSLOG_CLEANER
    _OSB_WS_ACCESSLOG_RETENTION_TIME
    _OSB_WS_ALLOCBUF_DISABLE
    _OSB_WS_BASIC_AUTH
    _OSB_WS_BUFFER_READ
    _OSB_WS_BUFFER_WRITE
    _OSB_WS_CHECKER_RETENTION_TIME
    _OSB_WS_CLEANER
    _OSB_WS_CLEANER_RETENTION_TIME
    _OSB_WS_DEFERRED_DELETE
    _OSB_WS_EVENT
    _OSB_WS_IP_REFRESH_TIMEOUT
    _OSB_WS_LOAD_BALANCE
    _OSB_WS_LOG_BUCKET <----------
    _OSB_WS_PURGE_LIMIT
    _OSB_WS_RECV_BUF_SIZE
    _OSB_WS_REDIRECT
    _OSB_WS_RESPONSE_TIMEOUT
    _OSB_WS_RETRY_WAIT_TIME
    _OSB_WS_REUSE_CONNECTION
    _OSB_WS_RUN_CLEANER
    _OSB_WS_SDU_SIZE
    _OSB_WS_SEND_BUF_SIZE
    _OSB_WS_SESSION_RETENTION_TIME
    _OSB_WS_TDU_SIZE
    _OSB_WS_TRACE_LEVEL
    _OSB_WS_UPLOAD_DELAY
    _OSB_WS_USE_IPV6
    _OSB_WS_VALIDATE_CHUNK
    4.) Modify the configFile to include:
    $ *cat $ORACLE_HOME/dbs/osbwstestdb1.ora*
    OSB_WS_HOST=s3.amazonaws.com
    OSB_WS_LICENSE_ID=xxxxxxxx-xxxx-xxxx-xxxx-xxxxxxxxxxxx
    OSB_WS_WALLET='location=file:/u01/app/oracle/product/11.2.0/dbhome_1/dbs/osbws_wallet CREDENTIAL_ALIAS=idevjhun_aws'
    OSB_WS_BUCKET=idevelopment-oracle-backups
    _OSB_WS_LOG_BUCKET=idevelopment-oracle-log
    So,
    1.) Is the *-newLogBucket* option broke or an unimplemented method?
    2.) Is there a way to "un-register" or modify the S3 registration information so that the Cloud module installer will register a new S3 user? (i.e. starting from scratch)
    It would seem to me that a user might want to completely uninstall and un-register at some time in the future.
    3.) Where is the "Registered S3 User" metadata stored?
    4.) Can you specify the S3 Logging Bucket (and data bucket) during the install?
    There is a similar post which the user ran into the same issue when removing the S3 Logging Bucket.
    https://forums.oracle.com/forums/thread.jspa?messageID=4581188
    Best regards,
    jeff

    Hi again,
    my problem seems to be caused by us having deleted the bucket at an earlier stage. When we ran the installer script again, the installer was confused by this, and was not able to re-create a bucket.
    Rune

Maybe you are looking for

  • Can you have multiple ipods under one itune accounts on one computer same log in

    i have nurmeous ipods and iphones and i have 4 different log ins on my computer for them can i have them all under one log in without resyncing and putting songs and pictures on each one???

  • Goes into SafeBoot, Password doesn't work.

    This morning I was on my MacMini, when it started acting buggy. I'd go to quit an application, and it would ask me if I wanted to Log Out. I re-started, and it booted up in SafeBoot. But it wouldn't accept the password for either admin account. Even

  • My iPhoto 9.4.2 keeps crashing during downloads to Facebook

    I keep trying to cancel the downloads but they keep restarting when I open the application again then it crashes. I have also tried repairing the system using the Command and Option keys as I have seen in other discussions. I have pasted the error me

  • Is Adobe working on a version of Shockwave for the iPad?

    Is Adobe working on a version of Shockwave for the iPad? I've tried to access the Junior RAI site on my iPad.  It uses Shockwave.  It has great content for children, but the site is blank because I don't have shockwave on my iPad.  There are many sit

  • Reinstalling CS3 to Windows 7, without disc or serial number

    Im upgrading my OS from Vista to Windows 7, which requires a clean install.  I have CS3 that I would like to reinstall to the same computer once Win 7 is set up. My problem is that I bought CS3 when I was a photoshop student, receiving a student disc