Transportation lead,pick/pack & Transit time

Dear Friends,
After considering transpoartation lead time,pick/pack time,loading time & transit time system do confirm whether stock is available or not.....my doubt is whr do we maintain the above said times in the system?........

Hi saravanakumar
Transit time and Transportation lead time is taken  from or maintained in  Route
Loading time and pick/pack time comes from shipping point
You need to have clarity on backward scheduling  and  forward scheduling
For example you are creating a sales order today 15.02.2009 and the requested delivery date is 25.02.2009 from the customer side
Transit time is 2 Days
Transportaion planning time is 2 days
Loading time is 1 day
Pick/pack time is 1 day
Consider these settings
Now backward calculation  System does a backward calculation first
25.02.2009 (requested delivery date) -- 2 days (transit days) -- 1 day (loading time) -- 2 days (transportation planning time) = that is on 20.02.2009 there should be enough stocks in the unrestricted stocks and system checks stocks for this day or date ,that is 20.02.2009  ,whether the stock is available enough
This date 20.02.2009 becomes the material available date
Note Transportaion planning time and Pick/pack time will run parallely and the higest of these two is considered for delivery scheduling so in our case Transportaion planning time is 2 days that is the highest and hence it is taken for calculation and not pick /pack time
If the system finds enough stocks on 20.02.2009 (that means it performs a availability check for 20.02.2009 depending on OVZ9 settings) that is material available date then it confirms schedule lines for that order this is backward
Same example order is registered today 15.02.2009 and if the customer wants stocks on 17.02.2009
This means 17.02.2009-2 days (transit days)-1 day(loading time)-2 days (transportation planning time) = 12.02.2009
The order registered date is 15.02.2009and the material availablity date is past 12.02.2009 or material available date goes to past.
This is illogical
This means backward is failing here and now forward calculation takes place
Forward calculation
If you have enough stocks today 15.02.2009 + 2 days transportation planning time+ 1 day loading time+2 days transit time = 20.02.2009
This means that is on 20.02.2009 the stocks can be confirmed for this order as against a requested delivery date of 17.02.2009
In forward the system will give 2 schedule lines first that is requested delivery date that is 17.02.2009(in our case) with ZERO qty and the second date as 20.02.2009 with full qty
In backward you will find only one date in the schedule lines which is the same as requeted delivery date that is 25.02.2009 in our case
Hope i made things little bit clear to you
Transit and transporatation planning will come from route if route is maintained otherewise it is taken as 0 days
Loading and pick pack time will be maintained in shipping pt  if not maintained also then it is taken as 0 days (in enterprise structure logistice execution and your shipping point details it is maintained)
Regards
Raja

Similar Messages

  • Pick pack, transit ,load times configuration

    Hi all,
    I need the congiration steps for transportation scheduling (pick, pack, load times). Please help.
    regards,
    Vikrant

    Hi all,
    I need the congiration steps for transportation scheduling (pick, pack, load times). Please help.
    regards,
    Vikrant

  • Transportation/pick pack dates

    Our pick pack time and transportation planning dates changed on the sales order.
    For some reason the deliveries are now goods issuing on the same day as the material availability date.
    Where is the pick pack date,loading date or Tp date set?
    What config do I need to check?
    Edited by: saad A on Apr 23, 2009 9:16 PM

    Hi,
    You can search the forum, where you can find enough responses on this topic;
    For example, check the link
    [Transportation lead,pick/pack & Transit time|Re: Transportation lead,pick/pack & Transit time]
    Regards,

  • Delivery Date in SO not calculated with Route Transit Time

    Hello Experts,
    We are not able to calculate the delivery date in Sales Orders based on the Route transit time.We are using the Transportation group from Material master , Shipping condition from sold to Party , and Receiving issuing plants and zones .
    One thing I notices is if we don't use the Transportation group in the material master , then the delivery date calculated based on transit time.Not sure not why its not working with using Trans group in Mat master
    Please advise.
    Thanks in advance

    Hi,
    Kindly do not post same questions twice
    HI,
    For delivery scheduling enter time
    IMG >> SD >> Basic functions >> delivery scheduling and transportation >> maintain duration
    Maintain here route, pick/pack & loading time
    For in house production maintain time in material master in MRP view
    Then now system will take in account what is production time + pick/pack + load time and then will schedule
    Kapil

  • Diff between transit time - transportation lead time

    Hi all,
    What is the difference between transit time and transportation lead time?
    Regards
    Manivannan R

    transpotaion lead time
    is the time taken to arrange for a del i.e
    your picking / packing and loadin time ususally this is done after material available date and ready for shipping point .....
    means if fpr picking and packing it takes 1 days and for loading mat at shiping pint i takes 2 days then ur transpotation lead time wld b 3 days
    transit time is whr is the time taken for the matreial dispatched from ur shipping point to reach the ship to party usually ur route.
    ok

  • The time for transit, transportation lead time and loading time of the mate

    Dear Friends,
    Please mail to me, where should I give the time for transit, transportation lead time and loading time of the material at the ware house.
    This is at the time of Transportation scheduling, for a specific material.
    With regards,

    i am giving u the exact & specific answer.
    please follow the menu path in SPRO
    IMG, Logistics execution, shipping, basic shipping functions, scheduling, delivery and tranportation scheduling, maintain duration,
    In that screen, maintain the settings
    Hope it answers
    Do reward points if it is useful

  • Transportation Lead Time and Transit time

    Hi All,
    How to calculate the transportation lead time and the transit time from the delivery document in SAP. Please clarify me.
    Regards
    Srikkanth

    Dear Srikkanth,
    [How to calculate Lead Time|lead time]
    Also refer:
    [Scheduling|http://www.sap-img.com/sap-sd/backward-and-forward-scheduling-in-sap-sd.htm]
    [Scheduling - |http://www.sap-basis-abap.com/sd/what-is-forward-and-backward-scheduling.htm]
    Best Regards,
    Amit
    Note: Path
    SPRO --> IMG --> Logistics Execution --> Shipping --> Basic Shipping Functions --> Scheduling --> Delivery and Tranportation Scheduling --> Maintain Duration

  • Pick/Pack Times not relevant in Stock Transport Orders?

    Hi gurus. I have a question.
    I have Pick/Pack times maintained in our Shipping Routes. In my tests I notice that entering days or hours here modify my "Material Availability Date" in Sales Orders, so I need to have the material on stock some time before shipment.
    My question is, are these Picik/Pack times relevant for Stock Transport Orders? There's no "Material Availability Date" in those documents, and in my tests, the time I put as Pick/Pack time doesn't affect the STOs.
    If these values are not relevant for STOs, I'd like to know, is there something that will?

    Hi,
    It did not work. I created a new pricing procedure as a copy of the standard for STO (RM2000). Then, I added the tax condition "NAVS". I created a new document type as a copy of UB and assign the new pricing procedure to it. I also changed the field selection for STO and made the tax code optional.
    I created STO using new document type. Tax code and tax jurisdiction code are defaulting now based on condition record NAVS. However, taxes are not calculated. Base amount shows as zero and no tax calculations are done.
    Regards, Jose Oyon.

  • Purchase-How could I consider Transit time and lead time in imported mat.

    My doubt refers about master data configuration of imported material.
    My sittuation is :
    Material - Lead Time:  (depend on source)
                   Transit Time: (depend on source)
    My company is responsable to transport all bought material. Besides, I can buy of differents suppliers.
    Considering these rules, It s impossible to fix dates in material master, because material purchase is related with center and not with supplier. By the way, I need to discover other master data to configure it maybe : Inforecord, quotization... Whatever...
    I need to correct this to generate Purchase order with dispatched date of my source against required date of my company after execute MRP.
    I tried to study this scenario but until now I ve not got a solution.
    Probably, you have had it before and can help me.
    I hope your help!
    Thank you!
    Regards!

    Create POs with respect to either PIRs (if you don't need to print out) or Contract/item, both of these are Vendor/material specific so you can set lead times accordingly .  Probably best to use Source List and set requirement in material master too (Purchasing view).
    Regards,
    nick

  • Pick Pack time in shipping point.

    Hi Gurus,
    I would like to have a clear understanding on the Pick Pack time / Loading time in Shipping point Configuration.
    1. I have configured shipping point with factory calendar assigned to it.
    2. I have given the pick pack time in the shipping point config.
    Now the question is, i'm able to give fraction values also here , say 2.5 days for pick pack time,.
    what does this mean? how do i infer.
    Please provide clarity.
    I do not want details on how the dates are determined in Sale order w.r.t to this details, instead more clarity on how days will be taken if fractional values are given in days and not in hours.
    Regards,
    Basha.

    System will consider decimal based on factory calender and work times fields
    If work times are defined, lead times can be set in hours/minutes and applied to the work times.
    The following priorities are used for scheduling:
    Factory calendar and work times maintained
    The lead times are used in hours / minutes work time. Here, both the work days defined in the calendar as well as the work times on the individual weekdays (Monday through Sunday) are taken into consideration.
    Additionally maintained lead times in calendar days are possibly not taken into consideration if the lead times are not maintained in hours/minutes. The work time would then be zero from the schedulung view.
    Factory calendar maintained
    The work times in calendar days are used and the workdays defined in the calendar are included. From the scheduling view, each day has 24 hours (in contrast to the lead time in hours/minutes where the work times are taken into consideration).
    Additionally maintained lead times in hours/minutes are possibly not taken into consideration if the lead times in calendar days are not maintained. The work time would then be zero from the scheduling view.
    No factory calendar maintained
    As above, the system calculates only using calendar days, and work-free days, such as weekends or public holidays, are not taken into consideration
    Thanks
    Chidambaram

  • List of route, pick/pack, loading, Transit

    Hi,
    I have shipping point  eg.abc .Let me know How to get list of route, pick/pack, loading, Transit time from mention shipping point,,means which table or any other way?/
    Thanks

    Hi,
    You can get from LIKP
    Cheers

  • Pick/pack time and loading time in route

    HI People,
                If  I make entry in the shipping point that loading time and pick/pack time as route dependent then where do I enter these times in route as I didn't find any feild to enter these in routes.

    You can control scheduling by sales doc type & shipping point. Logical path - Logistic Execution-shipping-basic shipping function -scheduling-delivery scheduling & Transportation sch.
    Trasportation planning will determine below mentioned fields.
    Check-in
    Loading start
    Loading end
    Shpmt completion
    Shipment start
    Shipment end.
    Picking, packing will be controlled by delivery scheduling
    give me ur email id will forward u the document for it
    Regards,
    Krishna O

  • CRM 5.0 ATP check to ECC not including pick / pack time in ECC 6.0

    Been searching SDN & OSS, our ATP check in 5.0 is reading the proper inventory in ECC but when no inventory is available the date being returned is the total replenishment leadtime in the ECC material master. (good)
    When the order is entered in ECC if no stock exist, the total replenishment leadtime become the material availability date in the ECC schedule line, we have 2 days pick / pack time in the shipping point so the confirmed date is 2 factory days after the material availibility date.
    Therefore in CRM the ATP date in CRM looks to be 2 days earlier than desired or what ECC provides.  I also set up the vendor partner in CRM but that did not help.
    Anyone have experience with this one?
    One similiar topic, if total replenshiment leadtime is 3 days and saturday & sunday are not workdays.  a CRM order placed on saturday gives wednesday (monday, tuesday, wednesday) as the date.    ECC gives thursday (tuesday, wednesday, thursday)

    I had 2 issues
    - I didn't have the X set in SMOFPARSFA so i was doing availibility information which doesn't include scheduling (pick pack)
    - other issue was timezones which required note 1423767

  • Pick Pack Time and Route

    Hello Everyone,
    I know that Pick and pack times are using the Shipping point working times or calendar.
    Just to confirm, can I say that Pick / pack time cannot be derived from the Route?
    regards
    John

    This is really depends on what value you set in the field Determine Pick/Pack time in the shipping point definition. If value A is selected then the pick/pack time becomes route dependant.
    By definition the pick/pack time is the time in days that is required for allocating goods to a delivery as well as the time in days that is required for picking and packing. It is calculated using the shipping point, the route, and the weight group of the order item. (from help.sap.com at http://help.sap.com/saphelp_47x200/helpdata/en/dd/5607e7545a11d1a7020000e829fd11/frameset.htm). So the route can impact the pick/pack time.
    Regards,

  • Different Pick/Pack Time

    Hi Fiends,
    Can anybody advise me how can we have different Pick/Pack Time for different materials but with same Shipping Point ?
    Regards,
    Harsh

    Hi,
    As far as Standard SAP goes, you will not be able to do this. Pick / Pack time can be only Route dependent, Route Independent or it can be Defaulted from shipping point. You might have to build a logic based on some criteria such as material group (as having this for each material is practically impossible) and use the user exit to run this code to determine different pick pack time for each material.
    Hope this helps.
    Thanks
    Mukund S

Maybe you are looking for

  • Lightroom 1.1 Import Stall and Poor Performance: a solution?

    My lightroom is extremely slow (unusable) when trying to import approx. 1000 JPGs into a brand new, fresh catalog. I've got a Intel Mac 2.33Gz MBP w/2G RAM running 10.4.10 and lots of free disk space. A workaround?: As soon as I select "Quick Collect

  • Not able to deploy MDM Enrichment Controller.

    Hi Guys, I am not able to deploy the MDM Enrichment controller, i get ServerDeploymentException. I tried Deploying using the JSPM tool. I doubt whether is it due to the mismatch is SP level of my MDM server and the Netweaver installation. MDM version

  • Missing disk in Time Capsule

    Hi, everyone. This is my first post. I bought a 500G Time Capsule April 2008 and suddenly I cannot mount my disk when my Time Machine is doing a back up. I contact my local distributor and what they told me is that Apple would replace it with a new o

  • Flash "applet" for finance info web site

    "If you don't mind a bit of Flash on your site, I'd suggest using one of these stock applets: http://www.tufat.com/script52.htm They draw from Yahoo finance, and are fairly easy to set up if you have some basic HTML know-how. I chatted with the devel

  • Comp characteristics extraction - Func Modules

    All, There are 2 function modules to get characteristics info: 1. CUAB_DISPLAY_CD_CONFIGURATION 2. CUD0_GET_VAL_FROM_INSTANCE Both work off the CUOBJ value that is derived either from the RESB table for the Prod Order (component config information ex