Trigger Point

Dear Experts,
Production order to be released at operation level automatically one by one, after confirmation of operation.
Let us suppose
Op 10 ...... 10 Confirmed
Op 20 ...... 10 Confirmed
then in the Op 30 ..... 4 Quantity to be released automatically once Operation 20 is confirmed and then after comfirming Operation 30, then operation must be released.
How to create trigger point for this?
Can anybody give clear idea, what all the fields I need to maintain ?
Oonemore thing, if I create a trigger point, how can I make it applicable to all orders with out manually changing every order in Change mode...
regards
Ram Kumar

HI
Go to CO31
Give the following inputs
TrigPointUsage : start execution
under trigger point function tab,
Tick Release succeeding operations  -  confirmed (sys status)  tick again  ONCE . Leave BLANK agaist Activity
Then go to the Routing . assign this trigger point to your operation 20
so once this operation is confirmed the operation 30 is get released\
check and back

Similar Messages

  • Rework order thro' trigger points

    Hi,
    I am using the trigger point in the routing to create the rework order. The scenario is as below.
    1) I confirm the opn 0010 of the original production order with Yield 99 EA and Rework 1 EA.
    2) Rework order gets created for the rework qty.
    3) I confirm the rework order and set the status to TECO.
    4) After rework, I again want to confirm the opn 0010 in the original production order for the balaqnce qty 1 EA. But I am not able to confirm the operation. I need system to update/propose the balance qty. for which rework has been done.
    Please guide how to solve this problem.
    Thanks,
    Sunil

    Hi,
    The original production order you need to process as it is like 99 nos and you need to confirm all the operations and do the goods receipt. To rework the 1no you are creating the rework order and you are capturing the rework costs and settling this in to the original production order.
    This is the way of handling the rework order.
    Regards,
    V. Suresh

  • Trigger points is not working

    Hi;
    I have an order.It has three operations 0010-0020 and 0030.
    Operation 0010 has a trigger point which TRIG1
    I choise;
    - Release succeeding operations is activated
    - System status : PCNF-Partially confirmed
    - Change: *
    - Activate: 2
    I release operation 0010 and go to CO11N and partially confirmed the operation.
    However the succeeding operations is not released.
    Where am I wrong?

    Hi,
    I guess you have flagged the check box once in trigger point defn, uncheck the same & then proceed.
    Regards,
    Vivek
    Added
    If am right you want to trigger a rework order for each PCNF, so in this case, set the Activation indicator to 2, then you can trigger the rework order each time manually.

  • Configuring shipping point as Trigger point for posting outbound idoc

    Hello All,
    I have a requirement that on saving an Outbound Delivery(VL02N), an Outbound Idoc should be posted...but the condtion for posting the idoc should be its shipping point. I am not sure how to configure shipping point as the trigger point for the idoc.
    Please suggest.
    Thanks for your co-operation.
    Regards
    Anand

    Hi Anand,
    1. Go to transaction: NACE & select application V2 and click on output types.
    2. change display <->Change mode.
    3. select LAVA and press F6 (to copy Standard output type LAVA to ZLAV).
    4. Give ur Z name for the new custom output type.
    5. change access sequence from 0005 to 0012(shipping point).
    6. Press ENTER and click copy all.
    7. Now goto trasaction VV21, give the created output type name. ENTER
    8. Maintain entries, shipping point, customer#, Medium as '6' ...etc
    Now try VL01N with the given shipping point and check the output ZLAV has been triggered or not?
    Let's see, if we miss any configs still!
    Keep this as reference:
    http://www.erpgenie.com/sapedi/messagecontrol.htm
    Reddy

  • Trigger point of function module EXIT_SAPMV45A_002

    Who can tell me the trigger point of function module EXIT_SAPMV45A_002?
    It is the one of user exits of T-CODE VA01.But it didn't be executed all the time during I executed the T-CODE: VA01 as well as finished the sales document.

    HI,
    Go to transaction CMOD.
    Enter project name and select the button Create
    we want to create a project to enahance trasnaction VA01 .
    - Create a project called ZVA01
    - Choose the Enhancement assign radio button and press the Change button
    In the first column enter V45A0002 Predefine sold-to party in sales document.
    Note that an enhancement can only be used in 1 project. If the enhancement is already in use, and error message will be displayed
    Press Save Press Components. You can now see that enhancement uses user exit EXIT_SAPMV45A_002. Double click on the exit.
    Now the function module is displayed. Double click on include ZXVVAU04 in the function module
    Insert the following code into the include: E_KUNNR = '1000'.
    Activate the include program. Go back to CMOD and activate the project.
    Goto transaction VA01 and craete a salesorder.
    Note that Sold-to-party now automatically is "1000"
    Reward points pls.
    Regards,
    Govind.

  • Ref. Operation Set for Trigger Point

    Friends,
    I m doing Trigger points in CO11N. Production Order quantity is 10. While confirmation yield qty. 7 & rework qty is 3. After saving trigger point function pop up but after pop up of ref. operation set, i m selecting Group and Task list type, system displayed *Ref. operation set ********** is not valid according to selection conditions.*
    In CA02 change  routing I hav done all settings of trigger points and created Ref. op. set by CA11.
    Pl. guide.......

    Dear,
    Kindly change order type dependent parameters(TCode OPL8), and check routing selection (3 Routing/ref. op. set optional (automatic selection))
    and task list type S     Reference Operation Set.
    check and revert back.
    Thanks
    Muhammad Ashfaq
    Edited by: Muhammad Ashfaq on Sep 10, 2011 1:46 PM

  • Trigger point for no. of calls of a router

    Hello,
    we would like to limit the number of calls for a router.
    So the first three prototypes should use one router, the following work orders should use another one.
    We would like to inactivate this prototype router and activate the standard router after the prototype router has been called several times.
    It's not enough to reduce the validity period as we do not know befor when the third work order one will be started.
    Can we set a kind of trigger point depending on the no of calls of a router which starts a workflow (like sending a message or does anything else to inform us that a certian no of calls is reached)?
    Thank you!
    Anne Mielke
    Edited by: Anne-Kristin Mielke on Sep 23, 2008 3:38 PM

    Hi,
    A table may not have more than 249 fields. The sum of all field lengths is limited to 1962 (whereby fields with data type LRAW and LCHR are not counted).
    http://help.sap.com/saphelp_webas610/helpdata/en/cf/21eb6e446011d189700000e8322d00/content.htm
    Check the SAP Help Link
    Constraints
    All the key fields of a table must be stored together at the beginning of the table. A non-key field may not occur between two key fields.
    A maximum of 16 key fields per table is permitted. The maximum length of the table key is 255.
    If the key length is greater than 120, there are restrictions when transporting table entries. The key can only be specified up to a maximum of 120 places in a transport. If the key is larger than 120, table entries must be transported generically.
    A table may not have more than 249 fields. The sum of all field lengths is limited to 1962 (whereby fields with data type LRAW and LCHR are not counted).
    Fields of types LRAW or LCHR must be at the end of the table. Only one such field is allowed per table. There must also be a field of type INT2 directly in front of such a field. The actual length of the field can be entered there by the database interface.

  • About trigger points

    hi
      everybody
                   i need,as im new to sap
                            wat is trigger points, wats their functions, how they r used
                        plz. explain in details

    Dear please see the link given by MSH.
    Apart form that, following are the details.
    Trigger point as name suggests, to trigger some action, when some thing is not going as per planned activity,
    In PP, we use it for creating rework order/operation when during confirmation if you find a product is to be reworked, then we use enter the qty is reworked qty field. System will create rework order or rework operation as per you designed in Trigger point.
    Please go through the link...
    You need to design the trigger point in CO31, assign it in routing.
    How to create in C031...depends your requirement whether you want rework operation or rework order..pl come back what actually you want out of two options so that we can guide.
    Edited by: Rajesha Vittal on Jan 13, 2008 1:32 PM

  • Trigger points

    Hi,
        I am wondering how to best use trigger points in routings and production orders to insert a rework operation into an existing production order. On a shopfloor rework could happen at any given operation. Does that mean that I have to maintain a trigger point in every single operation of the routing ? That looks like a lot of data to maintain. Is there any other way to "reuse" a trigger point ?
    Thanks
    GS

    please check this thread:
    http://scn.sap.com/message/6295289#6295289

  • Trigger point for the quantity

    hi all
    In routing i have maintained trigger point function . I assigned reference operation set( lot size 0 to  1) . for system status 'pcnf'. My question is with example-
    I have to produce 15 pieces .
    I assigned trigger point to 2nd operation.
    Now while iam 2nd operation( i have to  confirming piece by piece)
    while iam  confirming 1st  piece a pop has come for rework operation i said yes. rework operation is triggerd . but it is triggered for all 15 pieces where as it should be only for 1 piece.
    I want the operation should be only for 1 piece. how to proceed.
    please help me
    thanks in advance
    anitha

    Hi,
    I can explain how an rework order is created with
    reference op set.
    First check in Tcode OPJF for the selection id a
    Priority is defined for the Task list type S
    with usage 1 and status 4 and then Proceed as
    follows.
    1. First create a Reference op set in tcode Ca11.
    Enter the plant,Description , usage and status
    for the ref op set
    Enter lotsize and unit of measure.
    Enter the op as 0010 / workcenter/op control
    key/Description for the op
    Enter the standard values and save.
    2. Create a Standard trigger point in CO31.(Ex
    Production)
    Enter the Trigger Point usage /Group as FERT.
    3.Tick the Trigger Point Functions.
    4. Enable the indicator create order with Reference .
    5.Enter the system status as PCNF.
    6. Enter change as +.
    7. Enable the indicator once.
    8 . Now place the cursor on the create order with reference.
    9. Goto Parameters.
    10. In the Parameter enter in the group the created Reference op set group no.
    11. Order type as PP01 and group counter as 1 and save the Trigger Point.
    12. Now goto the Routing for your Material.
    13. Choose the last op to assign the Trigger point.
    14 .Select the OP -
    > Goto ---> Trigger Point overview.
    15. Enter the Trigger Point usage as FERT.
    16.Now choose that line ,select the Details---> Trigger Point
    17. The system will says standard trigger point exists from which you can
    select the created Trigger Point (EXx Production)and save.
    18. MD02/MD04.
    19. Convert the Planned Order into Production Order and Release the order.
    20 .Now confirm th ops.
    21. For the last op enter the yield and rework qty
    and set the status as PCNF.
    22. If the status of last op is PCNF then in the
    system a POP UP will appear as Activited by
    Trigger Point /Create order with reference/order
    number/sequence and op number which trigger point
    works and enter.
    22. Now a rework order will be created.
    23. In c003 enter the number which is next to the actual prodn order no.Rework
    order will be seen.
    Regards,
    nandha

  • Trigger points for the first operation

    Hi,
    We want to use triggerpoints on operations in PP. We want to set the status on the first operation to be released when we create an order. The problem is that systemstatus CRTD can not be used. Can someone help out how to get the first operation to be release automatically when the systemstatus is set to CRTD?   Thanks Marie Hillerbo

    Hi Marie,
    I dont know if this would meet your exact need.
    Based on my knowledge what you could do, is flag the order to release when it is created & saved. Assign a trigger point to the first operation, such that only on confirmation of the first operation you release the subsequent operations.
    Hope this is of some help to you.
    Rgrds,
    Vivek

  • Trigger point use

    consider for finished material there are 10, and 20 operations .for finished material at  10 operation we confirmed quantity of 100 km for example.after that at 20 operation we found that only 80 km is approved and confirmed  by quality ,then for rest we want rework .please clarify can it is possible to tell the system to create rework order as soon as quantity of opration 20 confirmed is less than the operation 10.

    Hi,
    1. First create a Reference op set in tcode Ca11.
    Enter the plant,Description , usage and status
    for the ref op set
    Enter lotsize and unit of measure.
    Enter the op as 0010 / workcenter/op control
    key/Description for the op
    Enter the standard values and save.
    2. Create a Standard trigger point in CO31.(Ex
    Production)
    Enter the Trigger Point usage /Group as FERT.
    3.Tick the Trigger Point Functions.
    4. Enable the indicator create order with Reference .
    5.Enter the system status as PCNF.
    6. Enter change as +.
    7. Enable the indicator once.
    8 . Now place the cursor on the create order with reference.
    9. Goto Parameters.
    10. In the Parameter enter in the group the created Reference op set group no.
    11. Order type as PP01 and group counter as 1 and save the Trigger Point.
    12. Now goto the Routing for your Material.
    13. Choose the last op to assign the Trigger point.
    14 .Select the OP -
    > Goto ---> Trigger Point overview.
    15. Enter the Trigger Point usage as FERT.
    16.Now choose that line ,select the Details---> Trigger Point
    17. The system will says standard trigger point exists from which you can
    select the created Trigger Point (EXx Production)and save.
    18. MD02/MD04.
    19. Convert the Planned Order into Production Order and Release the order.
    20 .Now confirm th ops.
    21. For the last op enter the yield and rework qty
    and set the status as PCNF.
    22. If the status of last op is PCNF then in the
    system a POP UP will appear as Activited by
    Trigger Point /Create order with reference/order
    number/sequence and op number which trigger point
    works and enter.
    22. Now a rework order will be created.
    23. In c003 enter the number which is next to the actual prodn order no.Rework
    order will be seen.
    Pls reward if you found useful
    Regards,
    nandha

  • Trigger Points in Collective Orders

    Hi
    Need a help. I am working with collective orders and my requirement..the order should be released automatically once the previous linked order is confirmed.
    Could you pl let me know " How can i use the trigger point functionlity in the same. I have worked with the Trigger points where next operation is released after the previos is confirmed but tht is in one routing .
    Thanks in advance

    You can setup external job (maintain variant in co41) to release the order automatically once the previous order confirms.

  • Trigger Point Table

    All,
    Does anybody know if or what the table is to view trigger points?
    I have assigned to operations in routings, so would like to view routings on mass to see if the operations all have trigger points, some have been missed.
    Thanks.

    Hi,
    You can check below Tables...
    MLG       Standard milestone group
    MLS       Standard milestone
    MLT        Standard milestone description
    Regards

  • Stopping a buffered AO channel by a analog trigger point

    What I need to do is stopping an buffered AO instantly when I receive a limit from a transducer.
    The problem is when I tried writing zeros to Ao Write When a limit occures that there was a few seconds laps before the output channel went to zero. I would like to see at max. 200mS for this to happen.
    Should I just clear the channel that a limit has occured and write a zero to AO Single Update to solve this problem or is there another method to stop generation with AO Write.
    I have a PCI 6071 and use both analog output channels for outputting buffered generation. One cahnnel is configured as AO group 0 and the other as AO group.
    The program is written using Labview 6i
    Thanks

    Hello;
    Onw thing you can do is to configure the Labview shipping example that does triggered Analog Output, to pause while gate is TTL high, at the "trigger or gate condition" input. Also, you need to make sure that the external TTL signal that comes from the sensor, stays high state so the Analog Output will be paused.
    Hope this helps.
    Filipe A.
    Applications Engineer
    National Instruments

Maybe you are looking for

  • Problem with columns in the middle of my book

    I am writing my second book with Pages 2.02 and have run into a problem with columns. I want to add a long list of items as a list with check boxes for readers to check off. If I paste in enough text for three or four pages of two columns it gets mes

  • Backing up photos from iPad while travelling

    Can people suggest the best way for me to backup photos whilst I'm travelling for 6 weeks? I will have the following: 32Gb of SD cards 16Gb iPad 2 16Gb iPhone 4 Regular access to wifi (and possibly an unlimited data SIM card in phone) iMac at home (c

  • R500 Restarts when shutting down

    i have a R500 that has windows 7 on it when i goto shutdown it shutsdown and then 2-3 sec later it starts back up on its own.  i have flashed bios, set bios defaults,  ran diagnostics and everything checks out ok.  i have also reinstalled windows 7 a

  • T500 Specs

    Are the published specs for the T500 video display wrong T500 (See http://shop.lenovo.com/ISS_Static/merchandising/US/PDFs/t400_and_t500_datasheet.pdf )?  The information shows both of the available video modes having the same dpi even thought the re

  • USB ports -- not enough power error

    Hello, I tried to connect my blackberry phone to my Mac Powerbook, running leopard, and on the phone's screen, it warned me that there was not sufficient current or power in the USB to use it. It told me to make sure that the drivers were installed.