Update COPA characteristic values during order settlement -  KO88

Hi,
We need to update some COPA characteristic values during order settlement using T-code KO88.
Looked for options in KEDR transaction, did not find any exits.
Could some one help us to resolve this issue.
Thanks
Vikram

Hello and thanks for your response.
We have actually created the new characteristic (WWCRE) and we are populating it in the user exit.  I think the issue is that the characteristic may be 05012010 at the time of the sales order, but it is 04012010 at the time of billing.
Unfortunately, the PAOBJNR in the billing doc is the same as the order and the user exit doesn't seem to accept the changed value or create a new entry in the CE tables.
For example, if I change the sales order to cause a new WWCRE value, the system automatically generates a new PAOBJNR but at the time of billing, regardless of changes to the values, it simply keeps the old PAOBJNR from the sales order and doesn't reflect the changes.
I hope that makes some sense.  Please let me know if you have any other suggestions.
>Ray

Similar Messages

  • Update item characteristic values using BAPI_SALESORDER_CHANGE

    Hi Experts,
    Could anyone give me sample code on how to update the characteristic values of a sales order item? Points will be awarded... Thanks!
    Regards,
    LM

    Just checked on OSS note 549563 regarding this. This is resolved. Thanks

  • Order settlement KO88

    Hallo Friend,
    I am going for Order Settlement KO88. getting error massage If any one face this massage than please tell me Solution.
    FI/CO interface: Balance in transaction currency
    Message no. RW022
    Diagnosis
    The balances in transaction currency must be zero for each logical transaction when transferring to the FI/CO interface. A balance of "               39.001,60-" "INR" was determined for the logical transaction "000001".
    System Response
    The FI/CO interface does not process any transactions which have a balance in transaction currency other than zero.
    Procedure
    This is a system error of the calling application.

    Hi, Check below SAP notes regarding this issue:
    1523814 Transaction AIST ends with error RW022
    1514384 Error message RW022
    1444750 Postings without transaction currency

  • Create COPA Characteristic Value groups

    Dear All
    We need to create copa characteristic value groups as recivers in COPA assesment. Where can i do the grouping?
    Thanks
    Gayani

    Thanks Paolo...
    Your answer resolved my issue...
    Thanks

  • Condition type value updation using characteristic value in sales order

    Hi Experts,
    We are implementing SAP for one of our Spain client. In that one of the Legal requirements is, whenever they are selling the finished products to domestic customers who contain OIL as one of the component then, some additional cost needs to be calculated and collected from customer and which needs to be paid back to Spain Government every month on Region basis.
           If OIL is not a component to produce the finished product then, not required to charge the customer additionally.
    The OIL content used to produce every finished product will vary based on product characteristic value. Meaning, for some finished product the OIL used will be 2.2 KG and for some products it will be 3.5, 4.3 KG and etc.
    Since various combinations of products are available for the client, during sales order creation we are planning to update some special characteristic which the data flow from u201CVariant Tableu201D. In the variant table we are going to maintain the OIL Quantity required making finished product.
    But we are not sure how to activate a new condition type with the value fetched in the special characteristic. This new condition type needs to be activated based on this characteristic value and multiplied with total order quantity and price to charge from customer.
    Example, the special characteristic fetched the value of 2.2 KG based on variant table. Total Order quantity is 10 PC and charge is 0.06 EURO per KG. in this case, (2.2 x 10 ) x 0.06 EURO = 1.32 EURO
    I need the expert opinion how to activate the new condition type based on characteristic value and achieve the above requirement.
    Thanks in advance.
    Warm Regards,
    VEL

    Hello,
    I have replicated the whole requirememt in IDES and getting the price calculation as needed but the only issue with the Conversion factor for the condition type. Either you need to maintian the conv factor in material master or need to enter manually for the condition type in SO. Some how you have to maintain the conversion factor to calculate the price for the condition type in different unit.
    For easy of understanding Lets make the whole requirement in 2 parts
    Part - 1
    Oil qty calculation. For convenience sake I have taken oil qty also in TO
    1) Created a num char OIL_QTY1 with length 9 and decimal places 5 and UOM as TO
    2) Created Variant table to infer the OIL qty in TO per piece of finished prod ( This oil qty data may be depends on various factors). For certain Finished products the oil qty may be 0 or blank
    3) Created a REF char SO_QTY  to pull the SO qty to configuration and add this char in class 300(Table:VBAP,Field :KWMENG)
    4) Created another char SO_OIL_QTY  (Num with length 9 and decimal places 5 and UOM as TO)
    5) Created a PROCEDURE say PROC_SO_OIL_QTY with code
    *$self.SO_OIL_QTY = $self.OIL_QTY1 * $self.SO_QTY*
    6) Create another PROCEDURE as mentioned earlier with modified code
    $SELF.A_VARCOND = 'TEST_001' if OIL_QTY1 specified,
    $SET_PRICING_FACTOR ($SELF,A_VARCOND,'TEST_001', SO_OIL_QTY)
    Note: Maintain proper seq of the procedures in profile. The Qty cal proc should be before the price related procedures.
    PART-2
    1) For the condition type maintained 60 EUR per TO (0.06 EUR per KG)
    Now if you create SO for the Finished product of 10 PC
    the Char values will be
    OIL_QTY1  = 0.00022 TO (inferred from Variant table th proc)
    SO_QTY    = 10
    SO_OIL_QTY = 0.0022 TO
    Get into conditions tab
    Here Condition type ZSIG will be displayed as error with Amount 60 EUR per TO and condition value will be blank. Just enter value 1 in the col NumC and CCon fields.
    Now the Condition value will appear as 1.32 EUR.
    Hope this gives some more clarity
    Regards
    Brahmaji D

  • Asset value date in Internal order settlement ko88

    Hi.
    I have posted some expenses to the internal order. I m trying to settle it to AUC with tcode KO88.
    In the selection screen of ko88 i gave asset value date as 15.07.2011 but system is posting with month end date only as 31.07.2011.
    I read the sap note 98496. In that its mentioned that the asset value date given in settlement parameters will override the asset value date given in the selection screen of ko88.
    I tried to update the AUC asset value date in KO02 where we give settlement rules but i couldnt find any field there.
    Where do i update the AUC asset value date in settlement parameters. Can anyone provide me the tcode and the field where i update this asset value date.
    Regards,
    Padmavathi

    Hi
    You can the same in transaction code KO02 
    1. Click on 'Settlement Rule'
    2 Select 'Goto' in toll bar
    3.Select 'Settlement Parameter F8"
    4 there you will get" Asset value date"
    Table  Name" COBRA" field "BZDAT"
    Hope this will helpful for you
    Regards
    Praveen P C

  • User exit to break up variances during order settlement(CO88 )

    Hi
    As per the standard SAP process during C088(process order settlement)
    the entire variance is settled to once single variance account. But we
    have a requirement to break up the variance into repective variance GL
    accounts(eg.RM cost, Conversion cost, etc resply) as a part of the C088
    settlement. Can you please help us understand how can this be achieved.
    Also is there any user exit which we can utilise to achieve this.
    Hope you could understand our requirement.
    Regards
    Ganesan
    Mobile#9885567427

    Detail variance reporting is possible via 'variance calculation'. SAP calculates different type of variances on input & output and it can be posted to different value fields in COPA for analysis.
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/90/ba81d2446711d189420000e829fbbd/frameset.htm
    Ideally, a single GL account is sufficient for variance posting and COPA is used for detail analysis. If it is absolutely necessary to post to different FI accounts, post variances to COPA. Develop an ABAP program to read the data from COPA value fields and create a batch input or call transaction for FI postings and reverse the original variance posting, periodically. (though it is not a very good idea from long term perspective!!)
    Regards,

  • Auto Update of characteristic values in PO from SRM.

    Hi,
    For Configurable material we have characteristics values.
    Material is configurable material with material type as services.
    Same ECC material is replicate in SRM.
    Create Shopping cart in portal SRM EBP for Multiple line item for material. Each material item will have different characteristics value.
    Currently User attaching excel sheet with different characteristic value in Shopping cart.
    Once Shopping cart no is created and Shopping cart no goes for approval.
    Once approved, PR is created automatically.
    Attached document is available in PR.
    Buyer has to maintain manually characteristics value for material in Purchase order (PO) for each material item.
    Is any way to Update Characteristics values in PR automatically when saving?
    Regards,
    Swapnil

    check if the condition is marked as statstical one in the pricing procedure

  • Error in Order Settlement (KO88) Complete PA transfer structure A1

    Dear Gurus,
    In order to close a Production Order
    I am trying to Settle the order using KO88 after determining Variances using KKS2.
    The System is showing Error "Complete PA transfer structure A1".
    Pls guide what to do?
    Himanshu

    Go to KEI2 and assign any unassigned cost element used in the settlement to a  CAOP value field for transfer structure A1

  • KEDR - substitute copa-fkart field from order settlement

    When I do KO88 - Actual order settlement, my user exit logic for COPA0005 is not been trigger. I need to substitute FKART(billing type)= 'F2' when VRGAR (record type) = 'C'. Since my logic doesn't work in COPA0005 and hence I try in KEDR transaction but COPA-FKART is not there for me to susbtitue it back. Field VRGAR is not there for me as well. Any suggestion?

    Yes I have activate it. I have included COPA0005 to a project, add code to include zxkkeu07 in function exit EXIT_SAPLKEII_001. This logic work for those posting from financial side but not from KO88. I have tried all the enhancement assignment component. COPA0001 - COPA0007 and COPA00RE. Nothing work. I put break point in the code and it won't even break for me. I don't think SAP code calls those customer function exit point and hence I tried KEDR transaction. Only to find out that FKART is not there for me to substitute it back.

  • Best practice for updating ATWRT (Characteristic Value) in AUSP

    I've notice that when we change the Characteristic Value of a Classification, that it does not update in the MM record. We have to go into MM02 for each material number that references Char Value and manually change it for row in AUSP to get updated.
    Should i just create a report to Loop through and update table AUSP directly? Or is there a better way to do this via a function or BAPI etc? Wanting to know what best practice is recommended.

    Hi Scott
    You can use a BAPI to do that.
    Check the following thread:
    BAPI to update characteristics in Material master?
    BR
    Caetano

  • PROCESS ORDER SETTLEMENT - KO88

    Hi!
    As per my knowledge KO88 will be done for OHDS and for Material.  OHDS settlement will be done in month ending which results the difference between KSII and KP26.
    Can anybody explain how the accounting entry will be generated at the time of Process order settlement of material i.e. KO88. 
    Sreenivas

    Hi
    Settlement entries are same as in production order.  No diff
    However, u must be aware settlement entries are dependent on status of process order.  If status is DLV or TECO wip is calcelled and variances are calculated.  If status if PREL or REL or PDLV wip entries are posted. 
    Hope you have made settings in WIP for offsetting entries
    Pls assign points if this clarifies else send query with more explanation

  • BAPI that creates an order settlement - KO88

    Hi,
    I'm trying to find a BAPI that creates a Single Order Settlement just like the KO88 transaction does.
    Does anyone knows if there is a chance of existance of such a BAPI?

    Hi,
        Check with FM MAT_ORDER_SETTLEMENT_CREATE.
    Thanks,
    Asit Purbey

  • User Exit/Enhancement to populate the characteristic value during runtime in FB50

    Hi
    I have a requirement where in FB50 when I enter the GL Account , Tax Code, Tax Jurisdiction code and Assignment and press enter  I need to default some of the characteristics value (which comes in the popup when you click on the Profit. Sgment ).
    Please let me know if any enhance or exit is there to achieve this.
    FB50 screen.
    When I enter the GL account and click on Profit Segment button below popup will come . I want to default Rebate field with some value.
    Thanks,
    Sumit

    Hi Gangadhar...
    Thanks for your reply. Actually our requirement is not with the fixed values .
    We need that , when we go to FB50 and then provide the GL account and there is one column called 'Assignment'. As soon as we fill the value in assignment column and then if I click on Profit. Segment button for that row the value from the 'Assignment' column should get populated in the Rebate characteristic value field.
    For eg.
    As I gave Assignment field value as 1234 and when I click on Profit. Segment button the Rebate characteristics value should get populated with 1234.
    Please suggest.
    Thanks
    Sumit.

  • CO - Production order settlement(KO88)

    Dear SAPns
    1.Explain why the production order  actual settlement have to do.
    2. What is the financial impact (P&L and B/s) due to settlement of  production order
    3. Where/How  the actual cost is calculated?
    4.What is the benefit to do the settlement of production order.
    Anybody have document regarding above pls send me.
    My Id : [email protected]
    Regds
    Tamil

    Hi,
      Production order settlement is done to capture the variance and the WIP to the header material of production order. On execution of the settlement the entries for FI will be posted with respect to variance and WIP
    Regards
    Kaarthik.D
    Assign points if useful

Maybe you are looking for

  • Can's see my events saved on my NAS

    After the upgrade my external hard drive which contains all my events movies have the yellow triangle sign next to it with ! mark. It use to work fine with imove 08. what should I do to be able to see my movies. Alternatively can i downgrade.

  • Error while transport to Consolidation

    Hi All, When I am trying to import the activities in Consolidation I am getting the following error in the SDM log. 'appl/wd_test'/'lonmin.com'/'DEP_APPL_C'/'4410'/'0' dependency:        name:     'appl/ext_lib_sp14'      vendor:     'lonmin.com' And

  • Start up very slow and sometimes not at all and other weird stuff

    Installed Leopard right after its release...had a mail issue which was resolved using phone support. My Macbook seemed to be a bit slower functioning and yesterday I couldn't get into it half the time - it would either get stuck in the screen between

  • 24F capture problem with CS5

    I own a Canon HDV40 camera and I recorded video set at 24F. I chose the 1080/24p preset for my sequence. I now have several .mpeg clips. Each clip is a 60 minute tape. When I try to move the clips to the timeline CS5 stops responding. Is there an iss

  • Yes, I have the 'intellisync unknown error reported' issue too.....

    Hi everybody and sorry for the blast about this well known error that a lot of people are faced against! I run a Windows XP SP2 OS hosting Outlook 2007 SP2 which updated an already existing Office 2003. I also have my Bold9000 and DM 5.0.1. Same erro