Vendor Evaluation Scoring methods E & F

Dear Folks,
In the vendor evaluation, I see two scoring methods:
E       Determination of Price Variance from Invoice Documents
F     Determination of Quantity Variance from Invoice Documents
Can anyone advice me how these two scoring methods works?
For example, the method E, price variance from invoice documents. What does it means? It's the price variance from invoice documents against what? Is it against the PO price?
And for method F, what's the quantity variance compared against? GR quantity or PO quantity?
Best Regards
Junwen

Hi,
In case of scoring method E, the price variance in invoice is with reference to the price mentioned in PO. In customization, you maintain the score for each percentage or a range of percentage variance. System calculates variance from price entered in Invoice with reference to the PO & then assigns the score from the values entered in Customization.
In case of scoring menthod F, Quantity Variance is with reference to the quantity in GRN. In this case you enter the score in customization for the variance. System calculates the variance from the quantity entered in Invoice & the GRN quantity & assigns the score you maintained in Customization.
Hope this is clear.
Regards,
Prashant

Similar Messages

  • Vendor Evaluation-Scoring logic for percentage

    Dear Experts,
    I have mention below %  and score of vendors for sub criteria on-time delivery,it is mention in std SAP..I want to know % value is calculated here? how negative % values is given score?
    -          100     On-time del.
    1,0       90     On-time del.
    2,0         95     On-time del.
    10,0         80     On-time del.
    20,0         60     On-time del.
    30,0         40     On-time del.
    40,0         20     On-time del.
    50,         5     On-time del.
    99,9           1     On-time del.
    -5,0            95     On-time del.
    -10,0     65     On-time del.
    -20,0     75     On-time del.
    -30,0     60     On-time del.
    -40,0     40     On-time del.
    -50,0     20     On-time del.
    -60,0     5     On-time del.
    -99,9     1     On-time del.
    Thanks,

    Hi Shyam,
    I am also looking for the same.
    can u send me the full details of the Vendor Evaluation score % calculation .
    and MANUAL, Semi Auromatic,  Fully Automatic  Evaluation. what is the difference.
    what is the function of end user for execute Vendor evaluation for all the VENDORS AT A TIME.?
    Regards,
    Anthyodaya.

  • QM Settings for Vendor Evaluation

    Hi All,
    I am having a small issue with QM settings in Vendor Evaluation.
    Actual Scenario - My client makes use of "Weighted Charateristics" instead of "Usage Decisions" and decides whether the material can be used or rejected etc at the time of Quality Inspection.
    And, i believe that whatever the score or decision regarding the material was observed, it will be stored in a file with scores.
    Now, the problem is Automatic Vendor Evaluation is simply giving a single score of 82 for whatever decision they make. Please try to address my following queries
    1) Where the person responsible in QM needs to maintain the actual file with scores so that Vendor Evaluation can pick those scores for calculation?
    2) Is there any configuration involved in either QM or Vendor Evaluation?
    I came to know that all the configuration on the Vendor Evaluation side is OK
    Thanks

    In the MM side for QM criteria you have to make automatic only than rest will take by the QM module
    see below
    Complaints/Rejection Level
    This subcriterion is used to evaluate whether the materials delivered by the vendor are regularly found to be faulty subsequent to incoming inspection (for example, on the shop-floor) leading to additional expense and loss of time (due to loss of production, reworking etc.).
    The score (QM key quality figure) is calculated in QM Quality Management and the data passed on to MM Vendor Evaluation. This key quality figure is converted for use in the Vendor Evaluation scoring system.

  • Vendor evaluation - Price level

    Hi,
    pls can anybody help me to explain procedure how system calculating the sub criteria PRICE LEVEL, PRICE HISTORY , ONTIME DELIVERY,QTY RELIABILITY (Under main criteria PRICE,DELIVERY) in vendor evaluation process.
    Possible give sample calculation.
    Aparji

    Price Level
    This subcriterion compares relationship of a vendor's price to the market price. If the vendor's price is lower than the market price, he/she receives a good score; if it is higher than the market price he/she is assigned a poor score.
    On the basis of the subcriterion "Price Level" you can compare a vendor's price to the current market price at a certain point in time.
    Price History
    This subcriterion compares the development of the vendor's price with the market price.
    On the basis of the subcriterion "Price History", you can determine whether the vendor's price has increased or decreased over a certain period in comparison with changes in the market price over the same period.
    Goods Receipt
    This subcriterion is used to evaluate the quality of the material that the vendor delivers. Quality inspection takes place at the time of goods receipt.
    Quality Audit
    This subcriterion is used to evaluate the quality assurance system used by a company in manufacturing products.
    Complaints/Rejection Level
    This subcriterion is used to evaluate whether the materials delivered by the vendor are regularly found to be faulty subsequent to incoming inspection (for example, on the shop-floor) leading to additional expense and loss of time (due to loss of production, reworking etc.).
    The score (QM key quality figure) is calculated in QM Quality Management and the data passed on to MM Vendor Evaluation. This key quality figure is converted for use in the Vendor Evaluation scoring system.
    On-Time Delivery Performance
    This subcriterion is used to determine how precisely a vendor has adhered to the specified delivery dates.
    Quantity Reliability
    This subcriterion is used to determine whether a vendor has delivered the quantity specified in the purchase order.
    "On-Time Delivery Performance" and "Quantity Reliability" always have to be seen in conjunction. You can specify for each material (in the material master record) or for all materials (in the system settings) the minimum quantity of the ordered materials that must be delivered in order for a goods receipt to be included in the evaluation. This enables you to avoid a situation in which a punctual goods receipt involving only a small quantity of ordered materials is included in the evaluation with a good score for "On-Time Delivery Performance". If this minimum quantity is not delivered, the vendor is not awarded a score. However, in this case the vendor

  • Simulating Vendor Evaluation on a spreadsheet

    Hello everyone,
    Has anyone ever successfully simulated the MM vendor evaluation scoring criteria on a spreadsheet, e.g. scores, weightings etc?
    On my project, we have a requirement to build and activate MM vendor evaluation, but the existing data is poor and it will not provide the end user the ability to see what data can be outputted with changes to weightings etc.
    Any feedback from other who have demoed this with an offline spreadsheet form would be appreciated.
    Thanx,
    SW

    http://help.sap.com/printdocu/core/Print46c/EN/data/pdf/MMISVE/MMISVE.pdf
    plese refer this link

  • Info Record with  Vendor Evaluation

    Hi gurus.
    I'm activating Vendor valuation functionality at ECC6.0, so I have defined the following:
    Main Criteria . 05-Services
    Subcriteria           1- Quality Services with scoring method C
                               2-Services timeliness with scoring methos D
    Both subcriteria are semi automatic, means is possible include any score via Info Record and after that run  vendor evaluation via ME61.
    When I try to update info record (Me12 ) via Extras->Vendor Evaluation, no subcriteria is showed for change. I just get Main criterion 05-Service. I think any customizing is missing..
    please advice...
    Best Regards.
    JB

    Hi Arminda.
    Yes, they were set as you mentioned but the  problem persist.
    Best regards.
    JB.

  • Kindly suggest me regarding vendor evaluation (me63) score

    Dear Friends,
    I have excuted the report of vendor evaluation but here for Price criteria ( subcriteria) 40,40 are coming and some times it is 46,48 are coming. and for other criteria delivery it is 68,70 like that it is coming. kindly let me know how much is the maximum score for delivery,quality and price. and how it is distributed in standard when i have selected equal weightage
    Regards,
    Saurav

    Dear Friend,
    Kindly go through the below documents,
    Define the weighting keys in SM30 - V_T147J. Weighting keys 01 and 02 are defined in the standard system. You combine the following weighting shares for the standard main criteria: Main criterion Key 01 Key 02 Price 1 5 Quality 1 5 Delivery 1 2 Gen. service/support 1 1 Ext. service provision 1 2 Define the criteria in SM30 - V_T147G - Double click on the line items In this step, you define the criteria by which the system computes scores for vendors and specify whether the scores for the subcriteria are computed manually, semi-automatically, or automatically. You can also store your own methods of computation for the scores for subcriteria in the form of user exits. The enhancement MM06L001 is available for this purpose. Define the scope of list in SM30 - V_T147M - Double click on the line items Define Purchasing Organization data for vendor evaluations in transaction OMGL. An example :- How the system calculates the score for the automatic subcriteria "On-Time Delivery Performance"? The system uses the statistics-relevant delivery date in the purchase order (Items -> Delivery Schedule) and the goods receipt date to calculate date variances. You use the statistics-relevant delivery date, for example, if you know that the vendor will not deliver the material as scheduled on September 15 but on September 30. Enter the delivery date as September 30, but enter the statistics-relevant delivery date as September 15. In calculating the score for on-time delivery performance, the system will then not use the actual delivery date, but the statistics-relevant delivery date. This has a negative effect on the score for this goods receipt. However, materials planning and control uses the realistic delivery date (September 30) which the vendor will actually adhere to. The system considers only goods receipts against purchase orders and scheduling agreements into stores and the release of GR blocked stock into stores. In the standard system, these are the movement types 101 and 105. Minimum Delivery Percentage - OMGL in the On-time delivery section If you do not want a vendor to receive a very good score if he delivered the goods on time, but did not deliver the required quantity, you can maintain a minimum delivery percentage in Customizing. Assume you set the Min. del. perc. parameter to 60% and the vendor delivers the goods on time, but only 55% of the ordered quantity. Although the goods receipt is punctual, it is not included in the calculation of the vendoru2019s score for on-time delivery performance. So that the non-scoring of the on-time delivery performance criterion in this case does not bring an unfair advantage in comparison with a poor score, the vendor is awarded a low score for quantity reliability. On-time delivery performance is thus always to be seen in conjunction with quantity reliability. Standardizing Delivery Date Variance - OMGL in the On-time delivery section To rate delivery date variances in days, maintain the Std.del.time var. parameter. If you assign a lower standard value, this means that relatively low date variances produce high percentage variances. If you set a higher standard value, this results in a relatively low percentage variance: The Std.del.time var. parameter has the value 20. The goods receipt took place on Nov. 27; the statistical delivery date was Nov. 15. There is thus a difference of 12 days. The system calculates the percentage variance as follows: 12 / 20 x 100 = 60 If the Std.del.time var. parameter had the value 60, the variance would be 20% (12 / 60 x 100 = 20). If you do not maintain this parameter, the system calculates the delivery time variance via the firm zone in the case of scheduling agreements, and via the order date and the statistics-relevant delivery date in the case of purchase orders.
    http://www.sap-img.com/mm009.htm

  • Vendor Evaluation - Price history

    Hi
    In vendor evaluation the score for the subcriteria Price History is not getting calculated.
    The scoring method that I have used is : Automatic Determ. from Purch. Statistics: Price Behavior
    What can be the reason? How it is calculated?
    Regards

    to determine how a vendor's price for a material has changed over the last few years, the material's price history is compared with the market price history.
    The system first checks whether the buyer has maintained the current market price and last year's market price for the material.
    If not, the system uses the price for the material group to which the material belongs.
    If this price is not maintained either, the system uses the effective prices from the previous year and the current year. Prices from standard purchase orders for materials and prices from subcontract orders are dealt with separately.
    The system then calculates the percentage variance between the old and new market prices.
    The vendor's effective price is re-calculated with this percentage variance. The result represents the effective price the vendor should be asking if his price had changed over time in the same way as the market price.
    This calculated effective price is then compared with the actual effective price, and a percentage variance is determined.
    The system then awards the vendor the score you have maintained in Customizing for this percentage variance.
    The system repeats this process for all the materials you procure from the vendor. Each time you start an evaluation, the system calculates the average score for all the materials. The result is the vendor's score for the subcriterion "Price History".

  • Delete score in vendor evaluation

    Hi, everyone!
    How can i delete  vendor evaluation score for delivery?
    After make evaluation, I delete a good reciept document (cancellation), so now I don't have movement document for this vendor.
    If i make new vendor evaluation old score doesn"t change.
    Thanks

    Hi,
            GO to Spro--->Material Management -> Purchasing-->Vendor evaluation ->define criterial>01 quality--> subcriteria ->03 Audit---> Scoring method -
    >07 automatic determination from system audit.
    but for that please create the inspection lot with 07 inspection type and do the UD .
    with regards
    Yashodhan

  • Vendor Evaluation Configuration

    Configuring the vendor evaluation there is no any subcriteria under "delivery" for early delivery that can be evaluated, I know we can create subcriteria, however I do not know how the new subcriteria will be evaluated if there is no any "scoring method" for "early delivery" so I would like to know how I can set up a new method or is even possible to do it , or how this work please.
    Thanks
    Nelly Reguera

    Dear MK,
    The automatic quality score in standard is get from QM inspection lot result or audit lot, you have two option, if the quality need to be consider , you can also maintain the quality criteria with manually enter the value (so need extra work), but if the percentage of the quality is not significant you can ignore it, it depends on your business need , you can discuss with your  vendor cataloger for this.But ,from mention that all defects materials is send back to vendor, so it means all goods will received in Good quality to your warehouse. So it means all quality will be Good (100 point) and if you enter it in quality then it no use , since all the value will be the same, so you can ignore the quality criteria.
    Regards,
    w1n

  • Vendor Evaluation in MM

    Hi All
    Can u tell me the Detail  process of Vendor Evaluation in MM
    Regards
    Manju

    HI,
    Vendor Evaluation for Purchasing
    Define the weighting keys in SM30 - V_T147J.
    Weighting keys 01 and 02 are defined in the standard system. You combine the following
    weighting shares for the standard main criteria:
    Main criterion Key 01 Key 02
    Price 1 5
    Quality 1 5
    Delivery 1 2
    Gen. service/support 1 1
    Ext. service provision 1 2
    Define the criteria in SM30 - V_T147G - Double click on the line items
    In this step, you define the criteria by which the system computes scores for vendors and
    specify whether the scores for the subcriteria are computed manually, semi-automatically, or
    automatically.
    You can also store your own methods of computation for the scores for subcriteria in the
    form of user exits. The enhancement MM06L001 is available for this purpose.
    Define the scope of list in SM30 - V_T147M - Double click on the line items
    Define Purchasing Organization data for vendor evaluations in transaction OMGL.
    An example :-
    How the system calculates the score for the automatic subcriteria
    "On-Time Delivery Performance"?
    The system uses the statistics-relevant delivery date in the purchase order
    (Items -> Delivery Schedule) and the goods receipt date to calculate date variances.
    You use the statistics-relevant delivery date, for example, if you know that the vendor
    will not deliver the material as scheduled on September 15 but on September 30. Enter the
    delivery date as September 30, but enter the statistics-relevant delivery date as
    September 15.
    In calculating the score for on-time delivery performance, the system will then not use
    the actual delivery date, but the statistics-relevant delivery date. This has a negative
    effect on the score for this goods receipt.
    However, materials planning and control uses the realistic delivery date (September 30)
    which the vendor will actually adhere to.
    The system considers only goods receipts against purchase orders and scheduling agreements
    into stores and the release of GR blocked stock into stores. In the standard system, these
    are the movement types 101 and 105.
    Minimum Delivery Percentage - OMGL in the On-time delivery section
    If you do not want a vendor to receive a very good score if he delivered the goods on time,
    but did not deliver the required quantity, you can maintain a minimum delivery percentage
    in Customizing.
    Assume you set the Min. del. perc. parameter to 60% and the vendor delivers the goods on
    time, but only 55% of the ordered quantity. Although the goods receipt is punctual, it is
    not included in the calculation of the vendoru2019s score for on-time delivery performance. So
    that the non-scoring of the on-time delivery performance criterion in this case does not
    bring an unfair advantage in comparison with a poor score, the vendor is awarded a low score
    for quantity reliability. On-time delivery performance is thus always to be seen in
    conjunction with quantity reliability.
    Standardizing Delivery Date Variance - OMGL in the On-time delivery section
    To rate delivery date variances in days, maintain the Std.del.time var. parameter.
    If you assign a lower standard value, this means that relatively low date variances produce
    high percentage variances. If you set a higher standard value, this results in a relatively
    low percentage variance:
    The Std.del.time var. parameter has the value 20. The goods receipt took place on Nov. 27;
    the statistical delivery date was Nov. 15. There is thus a difference of 12 days.
    The system calculates the percentage variance as follows:
    12 / 20 x 100 = 60
    If the Std.del.time var. parameter had the value 60, the variance would be 20%
    (12 / 60 x 100 = 20).
    If you do not maintain this parameter, the system calculates the delivery time variance via
    the firm zone in the case of scheduling agreements, and via the order date and the
    statistics-relevant delivery date in the case of purchase orders.
    You can also refer http://help.sap.com/saphelp_47x200/helpdata/en/8d/b97e4f414511d188fc0000e8322f96/frameset.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMISVE/MMISVE.pdf
    Thanks & Regards,
    Kiran

  • Vendor Evaluation With Non Standard Main and Sub Criteria

    Hi Gurus
    I have a requirement wherein I  have to evaluate a vendor on non stanadard Main Criterias like
    1. Productivity  with sub criteria as Receipt / Excepected Yield, for which I have used Scoring method 2
    2.Quality Standards with Sub Criteria,- Germination (%),Genitic Purity % , Field level flags, for which i have used scoring method 7 by activating user exit- MM06L001
    3.Raw Seed to Clean Seed ratio, with the same sub criteria and with the above scoring method and user exit.
    The weightages given to the above three are 40 , 35 and  25 respectively.
    Can you please tell me how to calculate the values for subcriterias( for example for my main criteria 2. i want to assign the weightaghes for sub criterias - Germination - 50 , Genitic Purity %- 30, & Field level flags - 20, . along with smoothin factors.
    I want to automise the whole process and run the evaluation in the background.
    An early reply will be very helpful to me.
    thanks and regards
    Ashok Kumar Pitla

    T147   - Control table for vendor evaluation
    T147A - Definition for main criteria
    T147B - Text for main criteria
    T147C - Definition for sub-criteria
    T147D - Text for sub-criteria
    T147E - Definition of weighting keys
    T147F - Description of weighting keys
    T147G - Main criteria
    T147H - Interval for delivery time statistics
    T147I - Definition of sub-criteria for the main criteria
    T147J - Weighting keys
    T147K - Assignment: Percentage X Score
    T147L - Intervals for quantity reliability
    T147M - Definition of scope of list
    T147N - Text for scope of list
    T147O - Scope of List
    T027A - is the table for defining shipping instructions
    T027C - specifies the points scores for compliance

  • Vendor evaluation - General Service and support

    Hi
    What are the subcriteria that can be under General Service and support?
    How the scores are calculated for this?\
    If manual where can we enter the scores for these?
    Regards
    Soumen

    Hi,
    Following are the answers for your questions.
    What are the subcriteria that can be under General Service and support?
    Ans: - Subcriteria can be defined by us as per our requirement but SAP has provided following 2 Subcriteria;
    - Quality of service
    - Service timeliness
    How the scores are calculated for this?
    Ans: - For above 2 subcriteria, you can assign a scoring method as following;
    C Determination from quality rating of service
    D Determination from timeliness rating of service
    Config Path: - SPRO > MM > Puchasing > Vendor Evaluation > Define Criteria > Here maintain subcriteria for Service criteria and assign the scoring method
    At the time of processing Service Entry Sheet, under "Vendor evaln" Tab, you will have option to enter scores for the following subcriteria
    - Quality of service
    - Service timeliness
    Once you enter scores here, it will get calculated in ME61, if automatic evaluation is configured for above 2 subcriteras
    Config Path: - SPRO > MM > Puchasing > Vendor Evaluation > Define Purchasing Organization Data for Vendor Evaluation > Here for Service criteria and it's subcriteria do not activate manual maintenance indicator
    If manual where can we enter the scores for these?
    Ans: - And if you want to maintain values manually for Service criteria and subcriteria then activate the manual maintenance indicator in above config path and then maintain it duirng ME61 (Vendor Evaluation)

  • Vendor Evaluation Price Level  For services

    Hi expert, I've seen that the Main Criterion "Price" is just for materials, and I wanted to know whether there is a way of Calculating Scores for Automatic Subcriteria for services.
    I also wanted to know if there is any other standar criterion for evaluating services.
    Thanks !!

    Hi,
    Subcriteria can be defined by us as per our requirement but SAP has provided following 2 Subcriteria;
    - Quality of service
    - Service timeliness
    For above 2 subcriteria, you can assign a scoring method as following;
    C Determination from quality rating of service
    D Determination from timeliness rating of service
    Config Path: - SPRO > MM > Puchasing > Vendor Evaluation > Define Criteria > Here maintain subcriteria for Service criteria and assign the scoring method
    At the time of processing Service Entry Sheet, under "Vendor evaln" Tab, you will have option to enter scores for the following subcriteria
    - Quality of service
    - Service timeliness
    Once you enter scores here, it will get calculated in ME61, if automatic evaluation is configured for above 2 subcriteras
    Config Path: - SPRO > MM > Puchasing > Vendor Evaluation > Define Purchasing Organization Data for Vendor Evaluation > Here for Service criteria and it's subcriteria do not activate manual maintenance indicator
    And if you want to maintain values manually for Service criteria and subcriteria then activate the manual maintenance indicator in above config path and then maintain it during ME61 (Vendor Evaluation)

  • Vendor evaluation on JIT delivery

    In case of JIT scenario how vendor rating on delivery, as schedule lines are dynamically changed in past and future.
    Does this mean that for a JIT scenario vendor is suppose to be delivering on time? And rating could be affected. Is there sufficient justification for this functionality not being available? Most of the automotive industry works on daily JIT schedules.  Clients say that it is important for the on-time and quantity reliability of vendors to be evaluated based on Goods receipt against JIT call. How vendor evaluation can be performed based goods receipt using JIT call.
    Rgs

    Hi Pankaj,
    I found a table called T147K ..
    I am passing xyz Purch Org. and Scoring Method is 3 (on-time delivery)..
    Here I found that
    Percentage Score Percenta
    000        100   100.0
    010        90    101.0
    020        95    102.0
    100        80    110.0
    200        60    120.0
    300        40    130.0
    400        20    140.0
    500         5    150.0
    999         1    199.9
    050        95    95.0
    100        65    90.0
    200        75    80.0
    300        60    70.0
    400        40    60.0
    500        20    50.0
    600         5    40.0
    999         0     0.1
    which one we need to consider when .. I am doing the calcuation to get percentage for vendor...
    Vendor Percentage =
    ( actual Del date - statistical del date) / Std del time var * 100.
    Raghunath.S
    Edited by: Raghunath Shyamala on Aug 29, 2008 1:07 PM

Maybe you are looking for

  • Passcode locked, and ipod not being recognised on itunes, keeps asking for a passcode, Passcode locked, and ipod not being recognised on itunes, keeps asking for a passcode

    My son has locked his ipod touch and cannot remeber the passcode, it is stuck on ipod disabled.  We have tried to connect it to itunes but keeps asking for passcode, have tried to log a support call, but asks for seriel number which we cannot find as

  • ITunes Radio not playing songs I want

    I set up a station with the following artists: Gene Clark, Poco, Flying Burrito Brothers, Pure Pararie League, Gram Parsons, New Riders of the Purple Sage, The Byrds, etc. I have the "variety" setting selected for the station. The station plays very

  • Fit video into an image in iMovie

    Hi, I have a recorded video of an iOS app that I would like to insert into a static image representing the iPhone border. How can I do this in iMovie? I've added the video to a project, then added the photo as an overlay but the video is bigger that

  • CP 8 Standard project not resizing in IE11

    We were testing our projects created in CP8 in IE11 and the project isn't resizing to fit the window.  These are standard projects (not responsive) but when we publish them we select the setting to Scalable HTML content.  In the past in IE8 the proje

  • What am I upgrading?

    Hi, I own CS6, and have a Type kit account, membership.. I don't even know what to call it anymore. I am being asked to upgrade something, but Adobe is not being clear as to what exactly I'm upgrading. Last time I simply said OK, I ended up with a ha