Version 999 Project System Plan Data Issue

I am using transaction CJ9B to copy the Project System related plan data i.e. plan data at the WBS element level from Version 10F, period 1 to 12  in year 2010 to version 999, period 1 to 12 in year 2010. The transaction CJ9B runs successfully in the update mode. But when report CJI4 is executed for version 999, period 1 to 12 in year 2010 then we do not find plan data in sync with version 10F.
I analysed this issue, had a meeting with end user and blanked out target version 999 using source version 9ZR for the year 2010. Then I again copied version 999 from version 10F. Still plan data in version 999 do not exist as they are in version 10F. I have checked the version 999 master data in transaction OKEV. Integrated Planning for SPL, COPA, cost center accounting and business process is active. COPY Allowed is also enabled. Version 999 is unlocked as well.
Hence I am not sure why the copy functionality is not working fine for version 999, period 1 to 12 in year 2010.
Can you please take a look and revert with your opinion so that this issue can be fixed ?
Thanks,
Umesh

Hi,
If you want to copy all the plan date from 10F to 999, then in Txn CJ9B
select the indicator reset and overwrite in target version and execute in test mode.
Regards,

Similar Messages

  • Version in Project System

    Hi all,
    can anyone explain me the Concept of version in Project System?
    And How to get the Version by giving the Project ID as Input

    Hi,
    SAP PS differentiates between the following versions:
    1.• Simulation versions
    •2.Project versions
    •3. CO plan versions
    In SAP PS simulation versions are modifiable versions of projects. You create a simulation version in the quotation phase, for example, if an operative project does not yet exist or if you want to plan other alternatives to an existing operative project or subproject.
    Project versions are snapshots of a project at a specific point and are used for documenting the progress of a project over time. Both quantities and values are stored in versions. Project versions are created either manually or automatically when a status changes.
    CO planning versions are used to plan costs and revenues. Using CO planning versions you can define various cost plans for a project, for example, an "optimistic" and a "pessimistic" plan. You can copy values from one version to another. You can change planned values manually in every version. The costed values are retained.
    Muzamil

  • BTE's used for project systems master data.

    Hi ,
    Can anyone tell me what are the BTE's used for project systems master data.
    Tcode used are CJ01,  Cj02,  CJ20N,  CJ12,  CNMASS
    When master data is changed or created BTE should trigger.
    Regards
    Subin

    I don't think there are any open_fi BTE available for PS master data.
    you can use classic subs/vals using GGB0 and GGB1 transaction codes.

  • Project System: Plan Version

    Anyone know how many plan version can I have in Project System for 1 project in same year?
    Edited by: ytai on May 25, 2010 11:20 AM

    Hi,
    You can define up to 10 versions (0 to 9). Please, search basic SAP material on help.sap.com
    Regards,
    Eli

  • Project system planned quantiy

    Hi all
    I maintain the unit cost price and quantity at general cost activity master data but problem is that the quantity is not show in any reports. please guide me. is this any configuration problem......
    thanks
    shabbir

    This is related to project system activity(general cost activity) not controlling activity type.
    i need report that show the plan quantity that maintain in ps activity master data .....
    thanks

  • In which tables this Project system 'CJ20N' Data has been stored.

    Dear Guru's
    Please help to fullfil my requirment.
    In Project System we are creating 4 levels WBS structure in CJ20N; we are assigning deferent machine types and deferent Personal nou2019s to deferent WBS elements.
                     Here I want a report against this project what all the Machines & Employee No that we have assigned, and against Employee Network we are booking the time sheet for Employee and we are transferring the same to Controlling, we are Preparing the Sales Order by using the WBS element and than we do u201CDP91u201D to create Debit Memo request with reference to sales order for that employee for his working approved working Hrs.
    From which tables we will get this required information to prepare u201CZ-Reportu201D
    Are there is any link to get the document flow from Project to Debit memo request.
    Regards,
    Kalyan

    U have to refer multiple tables for this.
    Fot CATS time entry u can get the date from table CATSDB.
    Refer below link.....
    SAP Project System - A ready Reference ( Part 2 )

  • Project system: Budget exceeded issue.

    Dear Sir or Madam,
    This issue is related to project system.  We have overall budget and annual budget.  If annual budget in a year is exhausted is it possible to make the system look at overall budget since there are sufficient funds in overall budget. 
    Thanks
    Joseph

    Hello Joseph,
    Unfortunately not. You may however change the assigned budget profile so that the overall budget is
    checked (transaction OPS9->tab "Availability Control->flag the field "overall") and rebuild availability control of the project in transaction CJBN afterwards.
    But there is definitely no "combination" of both possible.
    Greetings
    Florian

  • Project Systems delta data

    Hi,
    I need to capture data at runtime through CJ20n before saving.
    I have used Validation at Network Header level and used the function module 'CO_BO_OPR_OF_ORDER_GET' to get activities.I need to get delta data,
    So I check on the field VBKZ.
    However if I change one activity, for all the activities
    i get VBKZ = 'U'.
    I want to capture only those activities that are actually changed.
    Any idea?
    Thanks & Regards,
    Vanita

    Vanita,
    It makes sense if SAP marks all activities updated even if you change one activity because activities have relationship among them and change in duration of one activity may change the scheduling of other activities too.
    Inside the network header level validation, you could read the activities from database again. You can do it by reading table AFVC against routing number of network and blank SUMNR. It will give you all activities in one select statement. You can move the both data for one particular activity( from datbase and from function module)  to two similar structures ( structure almost like AFVC but with out administrative information like last changed on, at, by etc etc). By comparing them, you can identify if aqctivity got changed.
    If an activity was previously scheduled and now you change its duration or dates then SAP puts a system status NTUP. if you are just interested in activities with changed dates, you can go by system status change to NTUP.
    I hope this helps.
    PS - Please award the points if it helps.

  • Project system related PP issue

    Hi dudes,
    here i have a requirement that if i assign a material to a project which is having a production BOM, i have to enter the BOM data in the project master data manually. Is there any way to get BOM data automatically picked to project master data.
    thanks in advance
    Robert

    Hi,
    Refer below thread..
    /thread/917234 [original link is broken]
    may be useful..
    Regards,
    Siva

  • Get Resource Plan data without making a PSI call

    I've found that retrieving project resource plan data (for all resources on the project team) takes around one minute when calling ReadResourcePlan via the PSI.  We'd like a way to retrieve that data without the overhead of the PSI call.  We've
    tried querying the Reporting database, and have found some differences.  For instance, ReadResourcePlan returns plan data, even if the resource plan is checked out / in a non-published state.  Is there a way to retrieve the same resource plan data
    returned by the PSI without making the ReadResourcePlan call?

    Hi TYRichardson--
    Before diging into it, have you read this excellent
    post from Brian about the resource plan and PSI? Take alos a look to the comments which talk about the check-out.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Where does Plan Version field store in SAP project system table?

    Hi,
    I would like to know where where does Plan Version field store in SAP project system table.
    The plan version that I m refering is the Plan Version 1 in the menupath u201COn the Project Info System: Progress Analysis: Initial Screen, Choose Settings > Value display > Plan versionsu201D.
    T-Code: CNE5
    Thanks.

    hi,
    try table TKA09
    regards

  • Planning Profile Start and Finish Dates (Project systems)

    Hi Friends,
    I need a help from you in regard to Start and Finish dates of Planning Profile dates.
    For transactions cmp3 and cmp9, the start date should be the current date, and Finish date should be End of the current year for the selected profiles. I had done the necessary configuration for profiles in spro and tried. I could make the starting date appear as current date, but the year is increasing the next day, which i do not want.
    Can anyone suggest how to tackle this problem. Can we get the soln, by any non standard method.
    I appreaciate your valuable views.
    Regards,
    VENKAT

    The fourth parameter of your start condition is probably incorrect. When your event is not in the queue, the virtual attribute doesn't bind the webservice to the agent determination subworkflow, which probably causes the third instance of the org management object to fail, resulting in a knock on effect of the workflow inserting an incorrect planning date.
    Alternatively, might I gently suggest posting your question in a PS forum, we mostly deal with workflow and BPM-related issues here.
    Cheers,
    Mike

  • Project Systems Business Content - Residual Order Plan

    Hi all,
    I a issue which I hope someone can help me with:
    I am lodading data into cube 0PS_C08 and then into 0PS_C04 as per the BC. When I view the BC restricted key figure "residual order plan" i get nothing (blank).
    I look in R/3 I have values for residual order plan. I have looked at the Help on SAP and they say there is some config that needs to be done in SPRO. I dont really understand what config needs to be done can someone help?
    Many thanks,
    Leo

    Hi,
    We are searching for project versions(project systems) business content :
    Base tables :
    VSAFVC_CN     Version: Operation in order
    VSAFVV_CN     Version: Quantities/Dates/Values in order operation
    VSAUFK_CN     Version: Order master data
    VSEBAN_CN     Version: Purchase requisition
    VSEBKN_CN     Version: Purchase requisition account assignment
    VSJEST_CN     Version: Individual status per object
    VSJSTO_CN     Version: Information on status object
    VSKBED_CN     Version: Capacity requirement records
    VSKBEZ_CN     Version: Additional data for table KBED (ind. capacities)
    VSKBKO_CN     Version: Capacity requirements header for an order
    VSKOPF     Version: Header - general data for a version -
    VSKPER_CN     Version: Workforce Planning
    VSMLST_CN     Version: Milestone
    VSNPTX_CN     Version: PS texts (network)
    VSPRHI_CN     Version: WBS, edges (hierarchy pointer)
    VSPROJ_CN     Version: Project definition
    VSPRPS_CN     Version: WBS element (work breakdown struc. ele.) mast. data
    VSPRTE_CN     Version: Scheduling data for project item
    VSPRTX_CN     Version: PS texts (WBS)
    VSPSTX_CN     Version: PS texts (header)
    VSRPSCO_CN     Version: Cumulation table for project reporting
    VSSTEU     Version: Control table - one entry per version object -
    I didn't find any relevent business content for above tables.
    If anybody extracted these ,please let me know where and how they extracted.I will assign points.
    Thank you,
    GSR

  • For 0PS_C02  cube  Project System - Dates update rules not activated!!

    Hi All,
    When we are trying to install update rules from the BI content for PS module  for the cube "0PS_C02  Project System - Dates",  the
    update rules are not activating. under the cube when BI content activation. What is the issue in activating the update rules from BI content. From BI content the available version objects only will be activated i think. Please rectify and resolve the same at the earliest friends.
    thanks,
    Sakali

    Hi,
    Try to activate through program RSAU_UPDR_REACTIVATE_ALL.

  • Project System Issues

    Dear PS Masters,
    1.Can any one tell me the scenerio of Simulation.
    Basic configuration.
    2.Can we delete whole cost plan at single shot (element wise).
    3.Is there any standard report to see the values of Costplan(cj40)..Budget(cj30)
    Reagards&Thanks
    Chandra

    Hello Chandrasai,
    For Query - 1: Follow the following steps:
    (1) Goto T.code SPRO --> IMG Menu --> Project System --> Simulation --> Stipulate Version Keys for Simulation (T.code OPUS). Over here create version keys as per your requirement.  Do not Flag for inactive input template.
    (If you tick the input mask to inactive, then no version numbers can be created in this number range.) You can cancel this indicator.
    (2) Goto T.code SPRO --> IMG Menu --> Project System --> Simulation --> Stipulate Simulation Version.
    (3) Project Version are called Screen Shots of Operative Projects and not simulation version.  Simulation version are usually used for having different Planned version of one project before the execution starts.
    (4) Now Goto T.code CJV1. Enter Simulation version key, Project Definition, Project Profile.
    (5) Choose continue.  You would see project planning board enter/edit the data and save the simulation version.
    For Query - 2: Follow the following steps:
    You need to manually clear the plan cost defined in CJ40.  There is no option to delete the plan cost at one go.
    For Query - 3: Follow the following steps:
    (1) Goto T.code CNS41. Enter the Project Definition and Execute or F8
    (2)Choose Fields or F5 and select "Project Cost Schedule" and "Budget" or any required fields.
    Please let me know if you need more clarifications.
    Thanks & Regards,
    Anish Walinjkar

Maybe you are looking for

  • HP LaserColor 3550 : printing jobs just hang for no apparent reason

    On an iMac G5 I administer at work an HP Laser Color 3550 was recently installed by a professional from the store. It did one printing job just to please the technician and then, later, when someone else tried to print, the job just hung! I should pe

  • HT204411 error -42110 comes up when I want to view a rented movie?

    why can't i view a rented movie?  error -42110 problem in itunes store... try later!  But this continues over & over again?

  • Decode variant data w/o using 'Variant To Data' function.

    I need to decode variant data w/o having foreknowledge of the type used to create it. That is, I'm using the 'Flattened String To Variant' function which gives me the info I need, but it's all contained within one indicator. I need some way to break

  • Sun Java 1.4.2 and MS JVM

    A customer has MSJVM loaded on their win2000 server running SP4. In order to run our application, sun java 1.4.2_07 needs to be loaded. After loading 1.4.2_07, whatever java applet I am trying to load hangs. The screen locks up, and the status bar se

  • Idoc pordcr1

    Hi I am having trouble with IDoc PORDCR101 message type pordcr bapi_po_create i  asked this question on another forum and they said post it here so here is my question in we19 for idoc pordcr101 standard inbound i put in comp code 3000 doctype NB ven