Project Systems Business Content - Residual Order Plan

Hi all,
I a issue which I hope someone can help me with:
I am lodading data into cube 0PS_C08 and then into 0PS_C04 as per the BC. When I view the BC restricted key figure "residual order plan" i get nothing (blank).
I look in R/3 I have values for residual order plan. I have looked at the Help on SAP and they say there is some config that needs to be done in SPRO. I dont really understand what config needs to be done can someone help?
Many thanks,
Leo

Hi,
We are searching for project versions(project systems) business content :
Base tables :
VSAFVC_CN     Version: Operation in order
VSAFVV_CN     Version: Quantities/Dates/Values in order operation
VSAUFK_CN     Version: Order master data
VSEBAN_CN     Version: Purchase requisition
VSEBKN_CN     Version: Purchase requisition account assignment
VSJEST_CN     Version: Individual status per object
VSJSTO_CN     Version: Information on status object
VSKBED_CN     Version: Capacity requirement records
VSKBEZ_CN     Version: Additional data for table KBED (ind. capacities)
VSKBKO_CN     Version: Capacity requirements header for an order
VSKOPF     Version: Header - general data for a version -
VSKPER_CN     Version: Workforce Planning
VSMLST_CN     Version: Milestone
VSNPTX_CN     Version: PS texts (network)
VSPRHI_CN     Version: WBS, edges (hierarchy pointer)
VSPROJ_CN     Version: Project definition
VSPRPS_CN     Version: WBS element (work breakdown struc. ele.) mast. data
VSPRTE_CN     Version: Scheduling data for project item
VSPRTX_CN     Version: PS texts (WBS)
VSPSTX_CN     Version: PS texts (header)
VSRPSCO_CN     Version: Cumulation table for project reporting
VSSTEU     Version: Control table - one entry per version object -
I didn't find any relevent business content for above tables.
If anybody extracted these ,please let me know where and how they extracted.I will assign points.
Thank you,
GSR

Similar Messages

  • Project Systems - Business Content

    Hi,
    We are trying to install Project Systems Business Systems. We are in process of creating technical specs.
    In the help.sap.com or best practices ,There is no detail explanation is available (Source field,source table or logic to get the field).
    Some of the data sources don't have documentation.
    I hope many of you implemented Project Systems.
    Please share your experiences about finding Source fields and tables.
    Please share the documents : [email protected]
    Thank you,
    GSP
    Thank you,
    GSR

    Hi,
    We are searching for project versions(project systems) business content :
    Base tables :
    VSAFVC_CN     Version: Operation in order
    VSAFVV_CN     Version: Quantities/Dates/Values in order operation
    VSAUFK_CN     Version: Order master data
    VSEBAN_CN     Version: Purchase requisition
    VSEBKN_CN     Version: Purchase requisition account assignment
    VSJEST_CN     Version: Individual status per object
    VSJSTO_CN     Version: Information on status object
    VSKBED_CN     Version: Capacity requirement records
    VSKBEZ_CN     Version: Additional data for table KBED (ind. capacities)
    VSKBKO_CN     Version: Capacity requirements header for an order
    VSKOPF     Version: Header - general data for a version -
    VSKPER_CN     Version: Workforce Planning
    VSMLST_CN     Version: Milestone
    VSNPTX_CN     Version: PS texts (network)
    VSPRHI_CN     Version: WBS, edges (hierarchy pointer)
    VSPROJ_CN     Version: Project definition
    VSPRPS_CN     Version: WBS element (work breakdown struc. ele.) mast. data
    VSPRTE_CN     Version: Scheduling data for project item
    VSPRTX_CN     Version: PS texts (WBS)
    VSPSTX_CN     Version: PS texts (header)
    VSRPSCO_CN     Version: Cumulation table for project reporting
    VSSTEU     Version: Control table - one entry per version object -
    I didn't find any relevent business content for above tables.
    If anybody extracted these ,please let me know where and how they extracted.I will assign points.
    Thank you,
    GSR

  • InfoPackages Missing in Project Systems Business Content

    Hi all,
    Just installed PS business content in a BW 3.5 system.  Cubes, ODS's, etc are all OK.  But should there be InfoPackages supplied?
    Thanks!
    Gerry.

    Gerry
    Welcome To SDN
    Usually we will create our own info Packages based on our requirements like what cubes or ODS it should load also it is Delta/init/full. All these settings could be done in our info Packages based on our requirements.
    Hope this helps
    Thnaks
    sat

  • New Cubes in Project System Business Content

    Hi
    I am going through the business Content Help. We have standard Cubes like 0PS_C02 for dates 0PS_C04 for Controlling, 0PS_C07 for Claims and so on
    Also I see new cubes 0PS_C021 with different description Dates ( Identification using GUID) and 0PS_C041 FOR Controlling (Identification using GUID) and so on.
    My question is what for these new cubes with Description Identification using GUID.
    Thanks
    Satish

    Hi Satish,
        I believe the 0PS_C041 , 0PS_C021 are the used when you create projects in R/3 using cProjects or xRPM. When you create a project in cProjects and replicate it, a corresponding project is created in R/3 which is identified by a 24 character String(this is the GUID). And the cubes 0PS_C041, 0PS_C021 in BW.... are used to store such projects information.
    Hope this helps!!!
    Rajesh.

  • Residual order plan not calculated, in Object Currency for report 12KST1C

    Hello everybody,
    I have a question related to PS report painter Costs reports.
    I have created a form by copying the 12KST1C standard form, and I needed to create it, in order to change it and display the data (Costs, actual, commitment and so on) in <b>Object currency</b>, instead of CO Area Currency.
    The CO Area currency is USD and I need the reports in ARS (Argentinean Pesos)since the project objects (WBS elements, activities, etc) are in ARS too and I do not want to make a currency convertion to a specific date.
    So I created the Z12KST1C and change the ratios of the columns to Object Currency.
    The problem is that the Remaining order plan or Residual Order plan column, which is calculated at the runtime of the report is not showing any amount, while when I run the report in CO Area currency it shows the amount OK.
    I would like to know if that column (Residual Order plan) is only calculated in CO Area currency, or If I have to make adjustements to my form. Any ideas???
    I have read several SAP notes like 668240 (2 F) but I still do not see that amount calculated in Object currency.
    Thanks in advance
    Kind regards
    Pablo

    It really worked fine. Thanks a lot for your response to this issue.
    Kind regards
    Pablo

  • Unable to get tha data for Residual Order Plan query-0PS_C04_Q0008

    Hi Xperts,
    i have activated  standard query-0PS_C04_Q0008.
    But when i am executing the query i am unable to get the data for "Residual order plan" in the report output..
    As i  checked the transformation and the queries for this, every thing seems ok.
    Could please suggest me the best way to check further or How can i get the data for this field?
    Regards,
    SAP

    Check whether you have data for "Residual order plan" in 0PS_C04.

  • Business content-Personnel Cost Planning

    Hi, expert
    Now, our clients work in HR dept. wants to do personnel cost planning in BW side.
    1) is there any standard business content for Personnel Cost Planning in SAP?
    2) and if we have how to active these required BCT.
    3) Does SAP have 'personnel cost planning'  best practice? If Yes, please post useful links just about 'personnel cost planning' best practice information and documentation.
    Thanks for your kind support.

    Hello,  
    See this link for [Personnel Cost Planning|http://help.sap.com/saphelp_nw04/helpdata/en/88/b11d3ca2a25013e10000000a114084/frameset.htm] and [Personnel Cost Planning and Simulation|http://help.sap.com/saphelp_nw04/helpdata/en/13/be533dd5ce930fe10000000a114084/frameset.htm]
    See this for all [Human Resources |http://help.sap.com/saphelp_nw04/helpdata/en/2a/77eb3cad744026e10000000a11405a/frameset.htm]Related BW Information
    [Thanks|http://chandranonline.blogspot.com/]
    [Chandran|http://chandranonline.blogspot.com/]

  • Billing for Project Systems without using Sales Orders

    Hello All,
    We are using project systems in our project and we are not creating any sales orders for the same, however I am creating delivery using t-code CNSO and hence the outbound delivery is getting created, my question is can I create a billing document for this delivery and if yes how can I create the same.
    Kind Regards
    Atul

    Hi,
    Yes you can create billing document for this delivery
    Make sure following pre requsites
    In VOFA for your billing type assign document pricing procedure under account assignment/pricing tab
    In XD02 for customer under sales area data >> Billing assign customer pricing procedure
    And last in OVKK in combination of
    sales organization + distribution channel + division + document pricing procedure + customer pricing procedure = Price procedure
    kapil

  • Sales order with project system

    Hi,
    Is any one can explain for the mentioned scenerio pl:
    In production cost by Sales order, is production / process order will be linked for production booking or always is it best to implement the make to order with project systems - Sales & Process / production order is used as WBS element?
    Also, can u pl. exlain me how to activate the same?
    Rgds
    SMK Ganesh

    Hi,
    Is any one can explain for the mentioned scenerio pl:
    In production cost by Sales order, is production / process order will be linked for production booking or always is it best to implement the make to order with project systems - Sales & Process / production order is used as WBS element?
    Also, can u pl. exlain me how to activate the same?
    Rgds
    SMK Ganesh

  • Project System Extraction

    Hi Friends,
    We are going implement Project System in our project.
    I want to know the how the Extarctors will work in the project system.
    Please focus some light on this.......
    Thanks &Regards,
    Anand
    <Moderator Message: Have you ever thought about having a look at [the help|http://help.sap.com]>
    Edited by: Siegfried Szameitat on Aug 16, 2010 11:25 AM

    Hi Bramha,
    the project system Extraction also like FI
    here all datasources in RSA5 we need to Activate from Delivered Version to Active Version
    Theier no deffiernce
    i think you people ane implementing Standeard  Contents
    i will give Imfoproviders and Cubes and Datasources and its Reports
    Multifroviders
    0PS_C051
    ZPS_C061
    Infocubes
    "0PS_C021
    0PS_C041"
    "0PS_C031
    0PS_C041"
    Reports
    0PS_C041_Q0002     Overview Report - Projects
    0PS_C041_Q0005     WBS Element: Costs/Variances
    0PS_C041_Q0009     Hierarchical Project Overview / Settlement
    0PS_C041_Q0008     Hierarchical Project Overview / Residual Order Plan (New)
    0PS_C041_Q0006     Commercial Project Overview
    0PS_C021_Q0002     Technichal Project Overview (New)
    0PS_C061_Q0001     Progress Values / Costs
    0PS_C051_Q0001     Project Overview Report
    i hope .....Helpful for u.
    Regards,
    Mallikarjuna Reddy.

  • Remaining Order Plan.....No SAP Notes Please....

    Hi Everyone,
        I want someone who really understands Remaining Order Plan to validate if my understanding of it is correct or not. If it is not correct, I would like someone to explain it. I am not finding satisfactory answers from any SAP PS consultant yet, on Remaining Order Plan. Whenever, I ask this question, they say, they will get back with the answer and the next thing you know is that they have disappeared into Aladdin's Magic Lamp.
        I understand that,
        Assigned = Actual Costs + Commitment + Remaining Order Plan.
        I believe that Remaining Order Plan, basically is the value, that is deduced when we assign activities to WBS elements, and arrive at a certain figure called Planned Costs. At this point, All WBS elements have the status CRTD, .i.e., created.
         So at this stage (CRTD Status), I believe that, Assigned = Planned Costs, or we can also say that,
                                                                            Rem Ord Plan = Planned Costs.
         Now, Once we have released the WBS Elements, Actual Costs are going to be incurred, and we are gonna have additional commitments, apart from planned commitments, (realizing that we missed some commitments we had to assign while creating the plan during CRTD Status).
          So, Now during (REL Status), i.e., Released Status, the formula for Assigned would look like this.
           Assigned = Actual Costs + Commitments + Remaining Ord Plan.
      Now, Referring to the  Assigned Formula, in both the CRTD and REL status, lets analyze how Remaining Order Plan behaves.
         In the Released Status, if Actual Costs = 0 &
                                              Commitment =  0 &
                                              then,
                                              Assigned = 0 + 0 + RemOrdPlan.
                                      ==>  RemOrdPlan = Plan Costs
                                   Hence, Assigned = Planned Costs.
           As real costs are incurred (i.e., Actual & Commitments), values move from RemOrdPlan to Actual & Commitments Columns, or say they are apportioned appropriately to these two columns, and what is still remaining of the Planned Costs we would term that Remaining Order Plan.
            Suppose, Actual + Commitment  = Planned Costs, at some stage in the project, It means, we havae reached the threshold value of the Planned Costs, and the combination of both Actual + Commitment, can cross the planned costs. ( not in all cases, but maybe in some cases, as no one can plan a project ideally anyhow ).
            Once the threshold value of Planned Costs has reached, it would mean that RemOrdPlan is completely apportioned appropriately to both Actual and Commitment Columns. Hence, the Assigned column would look like this...
            Assigned = Actual ( % of Rem Ord Plan) + Commitment ( Remaining % of Rem Ord Plan ) + 0.
            Here, 0 means, zero value in Remaining Order Plan, as it has distributed its values to Actual and Commitment in a certain percentage depending on how the project was executed.
    Now, During one of the projects, I have noticed that,
    if Planned costs was 100,000 during CRTD stage, they were distributed, in a certain percentage like say,
                10 % to Actual & 25% to Commitment. Hence, 65 % is still left with RemOrdPlan Column.
               Hence , Assigned = 100%,
                The problem is that, When you see, the System status, it shows, ISBD, Insufficient Budgeting, even if there is the same 65% amount available in the RemOrdPlan column. My argument, is that, when RemOrdPlan is something still consumable, how can the system show insufficient budgeting, ISBD status, when there is still 65% in Rem Ord Plan, and that same amount available in WBS element, (via budgeting transactions).
                  Moreover, the Available Column should show the same amount as RemOrdPlan, that is 65% of the amount, but it does not. Because, in reality, RemOrdPlan is what is available, and still left to be consumed, until it becomes zero. I think, this concept is confusing all the project engineers who are SAP PS, users.
                     Please, can anyone throw more light on the above arguments.
    Regards,
    Owais.....

    Dear Owais,
    Let me try to explain my understanding about availability control and residual order plan =) hope it'll help
    The problem is that, When you see, the System status, it shows, ISBD, Insufficient Budgeting, even if there is the same 65% amount available in the RemOrdPlan column. My argument, is that, when RemOrdPlan is something still consumable, how can the system show insufficient budgeting, ISBD status, when there is still 65% in Rem Ord Plan, and that same amount available in WBS element, (via budgeting transactions).
    Status ISBD is set for any activity which is relevant for availability control which increase the assigned value not actual value.
    If you include the activity group 02 (Orders for project) in your availability control setting then any increase you make in order plan value will trigger the availability control ergo it will set the ISBD status if the value exceeds the tolerance limit even it's still a plan value, not an actual value yet
    Moreover, the Available Column should show the same amount as RemOrdPlan, that is 65% of the amount, but it does not. Because, in reality, RemOrdPlan is what is available, and still left to be consumed, until it becomes zero. I think, this concept is confusing all the project engineers who are SAP PS, users.
    IMO, if the system shows the 65% of the amount in Available column, user will assume that that amount is free to use while in fact the value is already 'reserved' only for material/activity which has been planned, user can't post any cost outside what has been planned
    Please correct me if I'm wrong =)
    Regards,
    -K-
    Edited by: Kealin F on Mar 30, 2009 5:54 AM

  • Business content 3.30: Datasources not available for installation

    Hello,
    we have recently upgraded our business content from 3.10 to 3.30 in order to get new business content (e.g. datasource 2LIS_13_VDKON - billing item pricing conditions).
    Although the upgrade was successful, the new datasources cannot be found in the Administration Workbench/ Business Content in order to install them.
    Is there something more we should be doing after the upgrade, in order to be able to see the new Business content as available for installation?
    Thanks in advance,
    Pavlos

    Palvos,
    You can not find the datasources in Admin workbench. Datasources can be found in R/3.
    Login to your R/3 system. Go to RSA5. Expand all. Search for your datasource. Click on "Transfer Datasources" icon on tha tab. This installs your datasources on R/3 system.
    Once the installation is complete, login to BW, go to RSA1, "Source Systems" tab, select your source system and 'replicate datasource' by right clicking on it.
    You can install corresponding Infosource from "business content" tab in BW.
    Hope it solves your problem
    Gova

  • Reduce Remaining Order Planned value for services with PO

    Hi guys,
    I'am looking for a way to reduce the remaining or residual order plan value for a network activity with services where the amount on the PO is below the planned value. If for example the planned value amounts up to 1000 and the PO has been reduced due to negotiations to 900, a remainder order plan of 100 remains on the network activity till the activity is technically closed.
    Is there a way to reduce the ROP when a PO exists for the network activity?
    Thanks, Geert

    We are combining an early visibility of all costs and a strict budget availability control with a formal procedure for project managers to request additional budget.
    We have more and more projects where a part of the budget remains blocked in ROP for service activities because the planned value was more pessimistic than the real PO amount. Since these service activities are typically executed at the end of the project that part remains blocked. Of course the project managers want to use that marging elsewhere without having to pass a request for additional budget.
    We have no issue with the network activity planned costs remaining visible, we just want the ROP to be 0 when a the purchase requisition for the service activity has been transformed into a purchase order. In the above example 100 of the budget would be freed for other use.

  • PS Project description when creating sales order using BAPI

    I am trying to create sales orders using BAPI_SALESORDER_CREATE_FROMDAT2.
    Because of the material configuration in table TCN61 the material will trigger a project creation in the project system.
    Now, in order to create a project, we must provide the project description.
    I would like to ask you if anyone knows how to pass the project description in one of the BAPI parameters.
    Thank you for your help.

    Thank you Sreedhar for the answer.
    I tried the CAMPAIGN field but did not work...
    In fact, I am not able to find a field, in any of the of the tables, that could hold the project description (PROJ-POST1).
    An entry is created in PROJ table when we manually create a sales order for materials specified in table TCN61.
    Thanks.

  • Business Content Project System

    Hi Friends,
    Can any body provide the link for   Businees Content for Project System module in BI 7.0?
    will assign the points.
    Thanks in advance.
    Regards
    SAP

    thanks for ur reply. i assigned the points.
    I can see lot of Infocubes are duplicated like
    Dates (Identification Using External ID) and Dates (Identification Using GUID)
    Earned Value (Identification Using External ID) and Earned Value (Identification Using GUID)
    what is the diffrence bet ween External ID and GUID.
    Cleint will use two types oe he can choose either of one?
    Please provide some use ful documents  PS Extrators.
    I have been assigned to PS Module in BI 7.0
    I am extractind data from PS module.
    Is there any diffrences extracting data from Ps system compare to LO and FICO modules.
    Will assign the points.
    Thanks in advance.
    Best regards
    SAP

Maybe you are looking for

  • Remote Control and Kaspersky

    Anyone run into a problem of Kaspersky console not working/responding through ZEN Remote control. I can control everything but if I bring up Kaspersky console it will not respond to rc controls.

  • Information Broadcasting in SAP BI 7.3

    Hi All, We have a requirement to send a report to few recipients through Information Broadcasting in .CSV file. When I entered Info Broadcast setting through BEx analyzer, I am not able to find the option to send the file in .CSV format. I could only

  • Problem with Secondary window in smartforms

    Hi Experts, I have an issue with smartforms while looping internal table. Here is the scenario: I have two records in my internal table. For each record, I need to print two pages For example: In internal table records like.. TEST1 TEST2 First for TE

  • HP1102W can't print with wireless

    Greetings, I wanted to report a problem i have with my printer (HP1102W). 1. When I first bought the printer. It worked fine and both laptops that I had in my home could easily send files and print, 2.  after a while, one of the laptops began to have

  • How do i contact technical support?

    i recently reactivated my creative cloud application.  I have an existing creative cloud account on my computer.  When I tried, to install the download, i encountered an error telling me the download had failed.  Is there a technical support site whe