Viewing the mrp run output based on mrp groups

Hi, please advise how to view the mrp run result based on mrp groups? also advise how to run mrp on the basis of mrp groups?
thanks.

Hi,
Can you use MRP Controller instead MRP Group. Because you have option to view MRP result by MRP Controller in MD05.
And you can execute MRP based on MRP Contoller by using user exit M61X0001 in MD01.
Regards,
Vishal

Similar Messages

  • How to view the purchase order output

    Hi all,
    how to view the purchase order output in the transaction me23n?
    How to obtain the purchase order output form?
    Please help..

    HI,
    goto NACE tcode then select the purchase order type and go to output types u cna use standard one NEU and provide the sapcript name and form name default will be there with MEDRUCK and print program.
    then in ME23n click on messages there create ur message type NEU and save it
    then print the purchase order...
    hope u get solved with this
    Regards
    Syed A

  • How to view the input and output layouts created in the planning folder?

    Hi all,
    How to view the input and output layouts created in the planning folder in the bw 3.5?
    Thanks
    Pooja

    Hi,
    You can refer to this link. How to create planning folder and executing the planning folder.
    http://help.sap.com/saphelp_nw04/Helpdata/EN/5d/7c4b52691011d4b2f00050dadfb23f/frameset.htm
    Hope this helps

  • To view the concurrent request output in a custom form

    Hi,
    I have a requirement to view the concurrent request output from a custom form.
    I can use the function "fnd_webfile.get_url " in a PL/SQL procedure and get the value for URL for the request output.
    I am not sure how I can call this function from the form directly , ie not sure which library needs to be attached.
    and also how to display the URL which has been obtained.
    regards

    Hi,
    I used the below code in my form
    l_url := fnd_webfile.get_url
    file_type =>'request_xml_output' , --fnd_webfile.request_out,
    id => req_id,
    gwyuid => l_gwyuid,
    two_task => l_two_task,
    expire_time => 10 -- minutes, security!.
    when I used fnd_webfile.request_out the form was not compiling and hence I passed the value 'request_xml_output'
    Now no compilation error exists however how do I display the concurrent request in the screen.
    I am not clear here, is there any function I need to use. I checked the FNDRSRUN form and there they have used
    editor_pkg.report(req_id, 'Y');, I tried using it but no use.
    regards
    Maya

  • Can we change MRP Run results after executing MRP. Can anyone tell me how?

    Hi,
    I want to change MRP rum planning results after executing MRP run. Is this possible??
    Regards,
    Thomas

    Hi,
    Yes, you can do changes. The MRP result will be the planned order. You can change the planned order qty and dates.  Once you change the planned order manually, it will get firmed and the system will not do any automatic changes in that planned orders. You can delete the planned orders, but again in the next MRP it will create the new planned orders once the requirement has not changed.
    Regards,
    V. Suresh

  • SAP PM-MRP RUN

    Dear All,
    Can you tell me How to run MRP in sap PM & How it is configure.
    Thanks & Regarsd
    Vishal

    In Spare Parts or materials which ever used in PM orders, MRP views should be maintained. There is no specific MRP run for PM. MRP is for all the materials under the plant.
    Materials availability check can be done at the time of saving the order & releasing the order. Based on the material availability, you can control order release.
    For stock items, reservation will be created. While running MRP, these reservations also will be considered if stock is not available. For non-stock items, PR will be created directly from PM order.
    Material Availability check config:
    IMG => PM & CS => Maintenance & Service Processing => Maintenance & Service Order => Functions & Settings => Availability check for Materials
    Under that, you can find different config. This availability check will be done at plant & order type level.

  • Purchase requisitions in MRP run

    Hi ,
    When MRP is run for the total plant , MD01,what should be the control parameter for create pur req ?.
    I checked by altering the control parameters for MRP run(MD01). When MRP is run with option 1 (in create pur. req) it creates pur requistion and when run with option 3, it creates planned order.
    In the plant there are raw material as well as semi  finished products. So when MRP is run for the total plant what control parameter should be used ?
    Regards
    ShankarR

    Hi Shankar,
    Once you define which type of procesing you need for Raw Materials and Semifinished products you can control the creation indicator per material with MRP GROUP in MRP 1 View (MARC-DISGR).
    You define this parameter per plant and you can assign it to different materials. Tx: OPPZ
    IE
    MRP Group
    0000              Creates Purchase Requisition
    0001              Creates Planned Order
    There are other parameters that you can control with MRP Group
    So for Raw Materials you can use 0000 and for semifinished product 0001. (Let you Key user know what he prefers, its going to depend on the business!!!)
    Kind regards,
    Federico

  • Back ground job for automatic MRP run

    Hi pp guru,
    my client want for a particularly  material no XXXXXX ,there should be automatic MRP rum daily at 8:00 pm.
    kindly suggest me how i will map  back ground job in sap..
    regards
    Aqueel

    Dear Aqueel,
    1.Either make a copy of the MRP type say PD and assign the new MRP type to that paticular material.
    2.Or else assign one MRP controller sepecifically for this material.
    3.Activate the User Exit M61X0001 which allows to run the MRP in background based on MRP type or
    a MRP controller.
    4.Create the varaint for running MRP in MDBT.Schedule from here.
    or else use SM36 select the program RMMRP000 and select the variant and go to scehduling and
    select the time and execute.
    Regards
    Mangalraj.S

  • Time stamp in MRP list after MRP Run

    Hi Gurus
    After running a MD01-MRP at scope of planning level, with processing key as NETCH, materials which had no planning file entry also were updated with the latest executed MRP run time stamp in MRP List MD05.
    Is it the standard behaviour? As per my understanding, the materials with no planning file relevant change is not included in the MRP run with processing key NETCH/NETPL. Then how does the time stamp be relevant for the latest MRP run while the material was never included in the mrp itself?
    Regards
    Deepak Prasanna S

    Dear Deepak,
    If my understanding is correct only if a mterial is included in the last MRP run(MD01/MDBT) then the time stamp gets included in the
    MRP list which can be checked and confirmed through MD05 and also the output of last MRP run.
    Once after the MRP run is completed the system deletes the corresponding planning file entries in the system.
    On completion of the planning run, the appropriate indicator is automatically deleted in the planning file:
    The system deletes the net change planning indicator and the net change planning horizon indicator for a regenerative planning
    run and a net change planning run.
    The system only deletes the net change planning horizon indicator for a net change planning run in the planning horizon.
    Check and revert back.
    Regards
    Mangalraj.S

  • MRP run user exit

    Dear Experts,
    I want to club more than one material through MRP controller in the MRP run at MD01.will you pl let me know if the exit M61X000 is sufficient,where I have to mentain the DISPO (My MRP Controller Name) so that the relevant materials where this controller is assigned will be chosen.
    Regards
    Reshmi

    Dear ,
    Please find below the set up as mentioned  required for MRP  for those material whaih are under certain MRP controller
    This can be possible with User Exit: M61X000.
    You need to maintain the required Material Types in OMIX.
    Then you can use the Material Type in MD01/MDBT for Planning for specific Material Type.
    Before hand, check the Example code for the Function Module EXIT_SAPMM61X_001 and the documentation for the User Exit.
    Some documentation;
    For example, for each plant, you can define that in the selected plant the system will only plan;
    materials to be planned using MRP procedures,
    materials of a certain MRP controller
    externally procured materials or materials produced in-house
    Requirements
    User exist must be activated in the SAP extension concept. The name of the extension is M61X0001.
    In the documentation for this extension, you will find information on the use of user exits.
    For more information on the extension concept, please refer to the appropriate documentation
    Example:-
    To execute MRP run for particular MRP group you have to activate User Exit.
    1. Create User Exit
    Nav: Production > Material requirements Planning > Planning > User Exit: Material selec
    For ex: Z01 - MRP Group
    2. Create Project using enhancement M61X0001 in Tcode CMOD
    3. Write following code in function module EXIT_SAPMM61X_001 include ZXM61U01
    CLEAR: NO_PLANNING, STOP_PLANNING.
    CASE USER_KEY.
    WHEN 'Z01'.
    UXPAR = USER_PAR.
    CONDENSE UXPAR.
    WRITE UXPAR+0(3) TO DISGR.
    IF DISGR IS INITIAL.
    EXIT.
    ENDIF.
    IF MT61D-DISGR DISGR.
    NO_PLANNING = 'X'.
    ENDIF.
    ENDCASE.
    4. When you want to execute MPR only for MRP group "001", in MD01 select User Exit Key Z01 and MRP group in User parameter.
    5.In MD01or MDBT , Select  NETCH, 1,1,3,3,2  and In user exit tab select the MRP controler as configured based on the above set up.
    Refer : MRP run only for certain MRP controllers
    Regards
    JH

  • Problem during MRP RUN.

    HELLO, FRIENDS,
    if i select mixed MRP in the material master with indicator 2 i.e.gross reqirement
    for MRP run ,but after taking MRP run through md01 .its not exploding dependent requirement of its component.Is there any setting for this?
    lpease give solution
    regards,]mangesh

    Hi,
    Check with t.code CS11 & check the result whether BOM is exploding or not.
    Then check in t.code OS23, whether mrp exlosion is activated or not.
    Check the BOM usage used while creating the BOM.
    Regards,
    Senthilkumar

  • User exit for MRP run - MD01

    Hi All,
    Can i know the use of "User exit parameter" field in MD01. as i know it means if we only want to plan the materials of a certain MRP controller, for example, we can enter the key of the appropriate MRP controller as the parameter.
    in my scenario, we have already incorporated a user exit for MD01 - MRP Run.
    i have 3 MRP controllers, but want to plan for only 2 MRP controllers, then how to enter in that field?
    Regards,
    Ram

    HI,
    User exit are available for Md01 transaction. You can plan material by MRP Type, MRP Controller,MRP Type, Procurement type & so on....
    Once you activate user exit, you can select the same by drill down option in user exit Key field.
    Regards,
    Milind.

  • Generate Plan Order from MRP Run (MD51) by WBS Element

    Dear All,
    1. I have created sales order with assigment WBS element (VA01)
    2. Then I created Routing & BOM for Material (CA01 & CS01)
    3. Generate MRP Run (MD51)
    The problem the generated mrp run doesnt consume planned order .. i have set the planning strategy 21 or 40, but still doesnt works.. is there any other parameter that i should configure..???
    Help Me...
    MamaRara

    Hello,
    Hopefully, the following link can assist you.
    - Re: After firming planned order, new planned order is generating in MRP run
    - Basic Scheduling in MRP run
    - Re: MRP run
    - During MRP run unwanted plant and storage location include and exclude
    - MRP run does not consider the common stock
    Thanks & Regards
    JP

  • MRP running on an STPO

    Hi,
      Is there any option of running MRP on an ( stpo)stock transfer purchase order.
    I am also in knowing can i run mrp for a sales order for one sub assembly only but not on the material as a whole in MD02 or MD03.
    Please suggest if you have any idea.
    regards
    madan

    Hi
    MRP at STPO level: When STPO is created, automatically, thats becomes the requirement in the supplying plant. if that material has planning strategy as 40, I think, it creates the receipt element during MRP run.l check.
    MRP at SO level for an assembly:
    MRP at SO level is possible through MD50. But, you are saying at an assembly level. I feel, you have 2 options
    (1) use ND as MRP type for materials other than particular assembly.
    (2) use complicated strategy ( I am not sure.. you need to check through 60-80 number strategies, which may suite to requirement).. sorry for vague answer. I am trying to some thought for your requirement which need to be furthre investigated.
    Thanks
    JK

  • MRP run process

    Hello,
    How to trigger purchase organization automatically in PR after MRP run? please explain.

    Hi,
    MRP PR creation on MRP run depends on which MRP type you used in material master where  MRP parameter ( Safety stock , Reorder point, Minimum and maximum stock level etc....) with MRP type play vital role for the above PR creation.
    Refer link for details:
    http://www.sapsword.com/home/learn-sap-pp/sap-mrp/sap-mrp-functionality/step-2---sap-mrp-material-master-and-mrp-types
    Regards,
    Biju K

Maybe you are looking for