Why SIDs start with 2 in master data S Tables?

Hello All,
When we create infoobjects, S table(/BIC/S...) is created to store SIDs and respective values.
However, these SIDs start with 2 and not 1.
Please, can anyone tell what is reason for this.

Hi,
This is happening due to number range maintainance for SID values in your system.
Check below article for more information,
[http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0a6e3ff-f000-2d10-b59d-8ef35e248f83?QuickLink=index&overridelayout=true]
Regards,
Durgesh.

Similar Messages

  • Use of "with master data & with out master data" at DTP update level

    Hello experts,
    In DTP, I check "with out master data". When I try to send corresponding transactional data, It is showing SID related error. Can anybody suggest what is the use of "with master data & with out master data" at DTP level.
    Thanks in advance,
    Zakir.

    HI
    HI in DTP level If you set this indicator, the system terminates the update of the request if no values are available for a data record.
    Load the relevant master data before you load the transaction data.
    If you set this indicator, the system terminates activation if master data is missing and produces an error message.
    If you do not set this indicator, the system generates any missing SID values during activation.
    In DataStore maintenance, if you do not set the SIDs Generation upon Activation indicator, the No Update without Master Data indicator in the DTP has no effect.
    thx
    vijju

  • Asset master data synchronization with HR Master data

    Dear Experts:
                          I am FI consultant and i am doing Research on Synchronization of asset master data with HR master data. Our management wants that if company gives any thing which is regarded as an asset e.g Laptop, expensive tools e.t.c to its employee then beside opening its asset master data in FI it should also be updated in HR Employee master data. For this from FI side there are 3 asset classes for which we want that if any asset is opened in these classes then the data should be updated in HR. I have turned on Personnel number in screen layouts and have fetched this field in asset reports. We want
    1...Asset Description
    2...Cost Center
    to be updated in HR master data. Now my question is that how this can be achieved. Is it possible? What configuration will need to be done for it.
    Regards

    Hi
    FOr assets created in FI and reflect them in HR use the feature ANLAC and it will take care.
    This feature determines whether or not the system checks the fields Asset number in infotype 0040 (Internal Control) and Loan object number  in infotype 0040 (Objects on Loan) against database ANLA.
    R K

  • Automatic PO creation from PR with no master data

    Dear gurus,
    Is it possible to run ME59- Auto PO creation from approved PR with no master data/source assigned/PIR? Assuming user create adhoc PR.
    Is it possible to run this process successfully if i didn't meet on the criteria below? let say no.1 is not checked?
    1.Material Master purchasing view, check automatic PO check box.
    2. Vendor Master purchasing view, check automatic PO check box.
    3. Maintain Source list for Vendor and Material (transaction ME01) and also see validity period.
    4. Maintain Purchase Info Record (transaction ME11), check info record category (must be standard or pipeline or subcontracting)
    5. Create a Purchase Requisition ( transaction ME51N), during creation select check box of Source Determination.
    6. Use transaction ME59 and execute for purchase requisition for vendor, you will be able to create automatic PO.
    Thanks in advance.

    Hi,
    yes all point should be checked
    check following link
    [http://www.sap-img.com/materials/steps-to-create-auto-po.htm]
    Regards
    Kailas Ugale

  • How to write export dump commad with no datable data only table structure.

    How to write export dump commad with no datable data only table structure will there and command for hole schma.
    e.g. export dump command for scott schema and all table within scott schema in it no table data should be exported.

    If I understand the question, it sounds like you just need to add the flag "ROWS=N" to your export command (I assume that you're talking about the old export utility, not the Data Pump version).
    Justin

  • Issues with loading master data and hierarchy from BI InfoObject

    Hi,
    I was successful with loading the master data from BI InfoObject. It copies the text node as well but it discards the space I have in the technical name when it copies it to BPC. For example if my Text Node technical ID is "NODE 1" it copies it as "NODE1" on BPC side because of which my hierarchy load fails as it is not able to find "NODE 1".
    What is the reason it deletes the space from technical ID? and how can I resolve this issue?
    Do we have a provision to write a ABAP exit where I can check?
    (PS: If i manuallay enter space on my BPC dimension the hierarchy loads successfully)
    Thanks in advance,
    Diksha.

    Hi,
    You can check this in start routine which can be called from Transformation file using BADI.
    http://help.sap.com/saphelp_bpc75_nw/helpdata/en/28/b66863b41f47589b9943f80b63def6/content.htm
    Hope this helps...
    regards,
    Raju

  • Issue with 0hrposition master data

    We are extracting data from SAP using 0HRPOSITION_ATTR datasource. I noticed that data is not maintained correctly in master data tables in BW and giving us incorrect results in reporting. Consider below mentioned scenario:
    Position A created as vacant on 04/01/2006 with start date (BEGDA/ Valid from) as 04/01/2006 and End date (ENDDA/ Valid to) as 12/31/9999 and is vacant. Below mentioned entry is shown under maintain master data for 0HRPOSITION in BW:
    Position Valid To Valid From Position Vacant
    A 03/31/2006 01/01/1000
    A 12/31/9999 04/01/2006 X
    Position A is now delimited on 09/15/2006 as it’s no more required. In SAP, position has record only from 04/01/2006 till 09/15/2006 as vacant. When record is extracted in BW, it creates below mentioned entry in master data table.
    Position Valid To Valid From Position Vacant
    A 03/31/2006 01/01/1000
    A 09/15/2006 04/01/2006 X
    <b>A 12/31/9999 09/16/2006 X</b>
    Entry 09/16- 12/31 is incorrect as position doesn’t exist for this duration. If we report on 0HRPOSTION with key date as 09/30/2006, it shows position A as vacant though position no longer exists.
    Has anyone come across this situation. any help is greatly appreciated.
    Kamal
    P.S: Milind Rane...I was searching through the forums and came across your post.I would appreciate if you could let me know how you solved this issue...
    Message was edited by:
            Kamal K

    HI KK
    I have a similar issue. Can you please let me know how this Issue with 0HRPOSITION_ATTR extractor was resolved. In my case i have incorrect data in BW when reporting is done. THrough the extractor untill the PSA i have the correct records coming  but in the master data 0HRPOSITION i have incorrect records.
    Please help.
    Thanks
    Hari
    Message was edited by:
            SAPCOOL

  • Problems with uploading master data in BI 2004S

    Hi all,
    I wanna upload master data in FI from R/3 System to BI System. I created its <b>transformation</b>. Then, I <b>migrated</b> it WITH EXPORT option. After that, I created <b>Data Transfer Process</b> (DTP), I didn't change any thing, just "Save and Active". Then I created <b>InfoPackage</b> for it => choose Schedule tab and press Start. Open DTP and choose Execute tab -> press Execute.
    1. In the case of successful process (the log showed no  errors), How can we check that data is transferred successfully?
    2. <b><u>Case 2:</u></b> I did all above steps for a data source. But when I opened InfoPackage -> it said <b>"This InfoPackage has been already in Process Chain"</b>... I still continued to execute its DTP but I failed. The log said that the data was duplicated.
    What does it mean? And what should I do in this case?
    3. <b><u>Case 3</u></b>: I have a data souce Account Type with <0ACCT_TYPE_TEXT> (icon dialog). I migrated it but failed. Then, after I refreshed, this datasource moved to the group that had been migrated before (in the end of the tree) but <0ACC_TYPE_TEXT> disappeared.
    So, I cannot create DTP or InfoPackage for it to transfer. In this case, Do I have to re-create a DataSource? What should I do?
    Thanks in advance.

    case 1:
    Check there might be duplicate record. as it is a text datasource language may be maintained. U can check in monitor what record is showing error.
    case 2:
    If u migrate the data source then it is a BI7.0 version.
    If u want to recover 3.x datasource then u need to use RSDS .
    Then again u can create Data Transaformation and DTP and migrate once again.
    then load the data.
    Normally if u r working on BI7.0 do all the stuffs(DT, DTP) using 3.X version then do the migration of datasource else if u migrate first and do the transformation then u will have to manual mapping and u may missed and do a lot of mistakes.
    Thanks,
    Debasish

  • Problem with the master data restriction

    Hi All,
    I have a master data 0EMPLOYEE. The requirement is such that we need to restrict the future dated records i.e BEGINNING DATE <= SYSTEM -DATE. This we need to do at the extractor level which was done successfully. Now even after refreshing the master data 0EMPLOYEE in BW, I see the future dated records. May be these are the earlier records which were pulled.
    I don't want to see these records in the cube. Obviously I need to put the same logic in cube. But I need to know where should I write this code. I want to know the BEGINING DATE field is assigned to what field in the cube?
    Every where the assignment is of type "Master Data Attribute of".
    Thanks,
    Srinivas

    Hi,
    after doing at the extractot level,you need to replicate and then activate the DS.
    Then run the InfoPackage with repair full req and then run delta DTP. It should solve ur data issue.
    For Cube logic,
    You need to declare the data declaration and select stmt in start routine and then write the code in indiv level routine.
    check which field have u mapped for the masterdata and i think you can use cal day for beginning date but i'm not sure on this.
    Wait for other's suggestion.
    Cheers,
    shana
    assign pts if it is useful

  • FI master data integration with hr master data

    Dear Xperts i had an issue regarding integration of FI and HR Master Data.in pe03 i changed the feature ANLAC by Replacing N with Y because of this the integration get ON but the issue is that whenever our FI consultant assign asset to any personal number say for example Personnel number 1.then if i create it40 for personnel number 2 that asset which is assigned to personel number 1 is displaying in it40 in asset fiel of personal number 2 but we assigned to 1 not to 2 what will be the problem could u please help me in this regard

    Dear Experts.
    Say for e.g i assign two different assets to two different personal numbers e.g asset no 14000235 to pernr no 1 and asset no 14000236 to pernr no2 but when i maintian them in pa30 in infotype40 if firslty before mainting asset no for 1 i maintian it for pernr no 2 it is displaying asset no 14000235 which is for pernr no 1 not for pernr no 2 is their any way that respective asset number should come in personal to whom i assigned in FI
    Regards

  • Program to update info record with material master data

    I am trying to determine if there is a standard SAP program that can be run as a batch file  to update the fields in the info record with the same fields that are in the material master?  ie:  Planned delivery time, Tolerance, purchasing group etc.

    Hi,
    There is no standard report or transaction that can do this.
    The data from these fields in the material master is brought in as a default to the info record when it is created. beyond this point the Info record is treated as being the correct data regardless of what happens to the material master data and so no updates occur in the standard system.
    It would not be difficult to build an LSMW job to copy the data from the material master to the info records and this would be the recommendation if you want to do this.
    Steve B

  • Problem with the master data loads

    Hi Guys,
                 I am trying to load 0MATERIAL_ATTR in QA,but it is throwing error(Record 2 :0MATERIAL : Data record 2 ('000000000000000012 '): Version '000000000000000012 ' is not va ) and also similar error is coming when i load for 0VERSION(Record 1 :0VERSION : Data record 1 ('000E '): Version '000 ' is not valid ).
    but for the same master data object in development with the same R/3 data the loads are successful,only in QA it is giving the problem.

    Hi Abdul,
    Check if the data you are getting for the two fields in your data loading are correct. I think it has some illegal characters(I guess it has a trailing space). If possible try and correct it in the source system itself.
    If you are doing full load for the master data, everytime the system is going to pull these values in and throw error. One other way of avoiding it will be to maintain routines to eliminate these.
    The quickfix will be to correct it at the PSA level and load it again.
    Regards.

  • Unable to make entries for objects with no master data in IP

    Hi All,
    In BPS, when created a layout, which contains characteristics, in whose properties 'Master Data' is not checked, we could enter the new values for them directly in the layout.
    In IP, we could not do the same with the 'New Lines" option set on Analysis Item in the WAD for the characteristics whose master data property is not checked.
    We have a layout, where, some characteristics are having master data checked, and some other characteristics where master data is not checked.
    With the 'New Lines' option set on Analysis Item in the WAD for the characteristics whose master data property is not checked, when data entered, the error message is appearing saying that the data is not valid.
    This is so quite simple in BPS. I think, I might be missing something in IP on how to achieve this.
    Thanks in Advance,
    Best Regards,
    - Shashi

    Hi,
    In IP it's integerated that if you will not maintain master data you may not be able to plan for new value of characteristic.It's the normal behavior of system.
    Cna check the link below:-
    Master data planning in BI
    Hope it may be helpful

  • How to handle 2 semanticaly different characters with same master-data?

    Hi specialists,
    I've got a little moddeling problem - here's the szenario:
    I've got a cube with a dimension "Customer".
    This dimension shall have the following characteristics
    - CustomerNumber (0Customer),
    - Region_Cust (0Region (or reference of 0Region))
    - Country_Cust (0Country (or reference of 0Country))
    - Region_ShippedTo (ZRegion (=Reference of 0Region))
    - Country_ShippedTo (ZRegion (=Reference of 0Region))
    (The mentioned Info-Objects are just a proposal)
    The regions need to be in the cube (for historical correctness) - (Display-)Attributes won't help.
    The hatch: 0Region has a compound with 0Country. There seems to be no way to tell Region_ShippedTo to use ZRegion for the compound.
    Let's say a customer has it's headquarter in Germany(Region: Berlin) - while the product is shipped to the brance in France(Region: Ile-de-France). Imho this is currently not modellable.
    So how can one implement that (not that artificial) szenario without beeing forced to dublicate and keep synchronized the 0Country-InfoObject and all of its master-data? Master-Data should imho follow the idea of beeing centralized - it should be useable for the customer country/region as well as for the shipped-to country/region.
    Could you please gimme a hint how to solute that problem?

    I see - you're absolutely right! - Thanks!
    Unfortunately the time-dependance is just the half job.
    I fear I've to modify my szenario for making my problem clear:
    Customer (with region_customer and country_customer) orders a product which might need to be shipped to a different region/county for every new order. (Simple example: Customer often orders flowers at flowershop.net - which need to be shipped to an always different ship-to region/country ).
    In that case I certainly can't store the ship-to region/country in the customer's master-data, can I?
    But I need them for futher analyze. In this case I need to add them to the cube - and it needs to be navigation-enabled. (region_shippedTo, country_shipedTo)
    Now I want to report all customers from France together with all regions where the product was shipped-to.
    Is that possible? Can I set a filter for country_customer (=0Country) without filtering the shipped-to regions (which are references of 0Region, which has a compound-key with 0Country) at the same moment? Will the report still show me the flowers shipped to Berlin?
    Hope I could clearify my question a bit!?

  • Need help with loading master data from R/3 to BI 7.0.

    Hi,
           First i thank everybody who took efforts to answer for my posting, i really am learning this new version with your helps. I really appreciate  it.
    Could any one help me with a step by step process to load master data from R/3 to BI 7.0. Please don't send help.sap.com.
    will assign points .
    With Thanks,
    Ranjani R

    Hi,
        Thanks for the answers. I tried loading it yesterday, i had lot of confusions.
      What should i do to load a master data from a R/3 to BI7.0.
    1. Created a Info object named (EKKO_mas) with some attributes (ernam, ekorg, lifnr).
    2. Go to info provider and right clicked on info area and selected insert char as data target. (Please correct if i am wrong).
    3. Login to R/3, go to sbiw generic data source created one with a view/table as EKKO and map the application compound and select the needed fields by checking the checkbox. (please correct if wrong).
    4. Go to source system tab and replicate data source. ( Please correct if i am wrong)
    Then what should i do.
    guessing steps:
    4. Create a Data source, in BI 7.0 . In that as i am not using flat file, should i select "application server" instead of "local workstation" . In field tab i specified all the fields given in Info object. ( Will there be anything else i should do or change in this tab)
    5. Load data in PSA. ( will the data from R/3 i selected loaded in PSA without any problem)
    6. Create transformation , save and activate.
    7. Create DTP save and activate , click execute.
    By doing the above given step will i be able to load the master data from R/3 to BI 7.0 data target (IO) .  Please help me if something is wrong with my steps.
    Thanks.
    RR.
    *will assign points.

Maybe you are looking for

  • Iphone 5s playlists wont sync with 12.0.0.26 iTunes

    If I look at the device (Snow White) on my iMac, it states in the left hand side bar, that all of my playlists from my iMac are on the device.  However, if I look at the device itself on on the Synch Music tab, some of them are absent, and the ones t

  • Oracle application server 10g and fusion middleware 11

    Hi I am confused about architecture of application server 10g and oracle fusion middleware. I have installed oracle application server 10g that includes infrastructure tier ( database repository,SSO,OID,DAS,OCA) and mid tier (OC4j,forms,reports,disco

  • Prepositioning files on a Server 2008 Cluster

    I recently replaced a Server 2003 cluster with a server 2008 cluster. After the migration my prepostioning stopped functioning. The virtual servers are named the same and all the credentials, etc are the same. If I go into one of the preposition defi

  • JVC HDD GZ-MG157U --is it compatible w/ iMovie08

    I have a JVC HDD camera GZ-MG157U and was told that iMovie08 would solve import problems. Now I've updated to iMovie08 and the file types on the camera do not seem to be "importable". Am I missing something? While somewhat savvy, I am a novice at the

  • How to make reports on FI Line items

    Hi all, Let me know  how to make reports on FI Line items especially drill down reports. suggest me steps for developing reports through Bex query designer. Am new in reporting on FI. How to make the drilldown reports. Plz let me know step by step. T