Work center and material

Hi Gurus,
is there a table that will give me work center, material that is being run at that work center, quantity and date ?
Thanks
Anusha

Hi,
You can use this FM 'COIS_SELECT_ORDER_DATA_READ':
CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
      EXPORTING
        iv_prod_order_sel       = lv_prod_order_sel
        iv_proc_order_sel       = lv_proc_order_sel
        iv_planned_order_sel    = lv_planned_order_sel
        iv_rem_objects_only_sel = lv_rem_objects_only_sel
        is_objects_to_read      = ls_objects_to_read
        it_parameter            = lt_parameter
        it_status_hdr           = lt_status_hdr
        it_status_opr           = lt_status_opr
        it_status_cmp           = lt_status_cmp
      TABLES
        ct_ioheader             = lt_ioheader
        ct_ioitem               = lt_ioitem
        ct_iodocl               = lt_iodocl
        ct_ioopdocl             = lt_ioopdocl
        ct_iomamo               = lt_iomamo
        ct_ioconf               = lt_ioconf
        ct_ioopconf             = lt_ioopconf
        ct_iosoconf             = lt_iosoconf
        ct_iogomo               = lt_iogomo
        ct_ioopgomo             = lt_ioopgomo
        ct_iosogomo             = lt_iosogomo
        ct_iogmer               = lt_iogmer
        ct_ioopgmer             = lt_ioopgmer
        ct_iosogmer             = lt_iosogmer
        ct_iosequen             = lt_iosequen
        ct_iooper               = lt_iooper
        ct_iosoper              = lt_iosoper
        ct_ioopcomp             = lt_ioopcomp
        ct_iooppreq             = lt_iooppreq
        ct_iosopreq             = lt_iosopreq
        ct_iooppord             = lt_iooppord
        ct_iosopord             = lt_iosopord
        ct_ioopmst              = lt_ioopmst
        ct_ioopprt              = lt_ioopprt
        ct_ioopcap              = lt_ioopcap
        ct_ioopscap             = lt_ioopscap
        ct_iosocap              = lt_iosocap
        ct_iososcap             = lt_iososcap
        ct_ioopsccf             = lt_ioopsccf
        ct_iososccf             = lt_iososccf
        ct_ioprodlist           = lt_ioprodlist
        ct_iomatver             = lt_iomatver.
Give the selection for workcenter. Check the transactipon COOIS and fill up the lt_parameter table with the workcenter detail. It will give the detail.
Thanks and regards,
Pradip
Edited by: Pradip Ray on Aug 26, 2009 10:34 AM

Similar Messages

  • Work center in material determination of DIP profile

    Hello,
    the source of our DIP-Profile is 0001 Acutal costs - line items.
    We have the requirement to use the work center in material determination as criteria.
    But in DP90 we get material determination error.
    The issue is that in the failed combination no work center is available.
    Why can´t the DIP find the workcenter we used in the service confirmation?
    Thank you
    Kind regards
    Manfred

    Hello,
    after above setting have tried this in ODP1
    select The Work Center in Chr.then >select Source on left hand side  ->Select the Actual cost Line Item>select Material determination-->Select Material for which Transfer Cost and Quantity -->Marked the Check Box Material determination and Individual
    Also please let me know Which Control Key you are using in service order??????
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Sep 9, 2010 3:16 PM

  • Cost Center, Work Center and Profit Center

    Hi ALL,
    Can any one please explain me the concept of Cost Center, Work Center and Profit Center.
    And where and when do I assign the cost center???
    Amit

    Hi Check the following "
    Cost centers represent areas of responsibility where costs are incurred or where responsibility for costs may be assigned.  They represent the smallest unit of responsibility within the organizational structure of an enterprise.
    A cost center can be pictured as a ‘cost bucket’ such as a department, product line, production stage or geographical area. 
    An unlimited number of cost centers may be created.
    All cost centers within on controlling area have to be assigned to a cost center hierarchy (standard hierarchy).
    Costs originally posted to one cost center may be distributed and assessed to one or more other cost centers using allocations.
    How are costs assigned/posted to a cost center?
    External financial accounting documents created in FI, AM or MM that post to a G/L expense account can be configured to require a cost center assignment be entered at the time of transaction entry.  The system automatically creates a parallel CO document that posts to the indicated cost center.
    Cost elements master records can be configured to be posted to a certain cost center (automatic account assignment).
    In addition, other non-financial activity (i.e., direct labor hours) may be posted directly to cost centers from within CO or via other modules such as PP  or HR
    chandra

  • BAPI_FUNCLOC_CREATE : Main work center and plant associated

    Hi,
      I'm trying to create Functional locations using BAPI BAPI_FUNCLOC_CREATE. I got almost all the fields except 'MAIN WORK CENTER' and 'PLANT  Associated with main work center'. Please advise me the relevant fields in the importing parameters of this BAPI so that I can upload the same.
    Thanks:
    Gaurav

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • Selection of technical objects by work center and plant

    Hi there,
    I want to select functional locations and equipments that are diretly linked to a workcenter which you can see in the location tab in the standard-transactions.
    How can I select this data the way from work center (and plant) to the technical objects? Which tables I have to use??
    Kind regards
    Jens

    Try using Function Module ITOB_FUNCLOC_READ_SINGLE.

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Control Key in Work Center and Routing

    Hi Gurus,
    Can anybody tell me what is the difference between Control Key we are providing in second tab of work center and the control key we input in routing.
    can i use same control keys at both the places.
    Regards,
    Anand.

    Hello,
    Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
    Almost in all the PP we define same Control key to the work center as well in the routing.
    For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
    No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
    Regards,
    Piyush

  • Link between work center and G/L Account

    Hi All,
    I need to link work center to the G/L account in PM Module . I know the link between work center and cost center . But would like to know how MO cost hits which cost element/ G/l account and there assignment
    Thanks and Regards,
    Vivek

    Hi check the below definitions
    Cost centre : Organizational unit within a controlling area that represents a defined
    location of cost incurrence.
    Profit Centre: Organizational unit in Accounting that reflects a management-oriented
    structure of the organization for the purpose of internal control.
    Work Centre: An organizational unit that defines where and when an operation should
    be carried out.
    Regards
    Sreeni

  • How to retrieve work center from material document

    Hello,
    For a report I need to display all the backflushs for a work center. Therefore I read table MKPF and MSEG selection the correct mouvement code, and from here I need to find the production version in order to get the work center.
    However I can not find this information in MKPF or MSEG. Material document is associated to a CO Production order but field AFPO-VERID is empty.
    Can someone provide me the correct path to read table MKAL starting with MKPF/MSEG.
    SAP version is ECC6 and we run repetitive manufacturing.
    Thank you.

    Hi,
    The FM L_TO_CREATE_SINGLE or L_TO_CREATE_MULTIPLE could solve your problem.
    Hope it helps.
    Chang

  • System monitoring work center and CEN system

    Hi everybody.
    I'm setting up the central monitoring, using SSM as monitoring system. I'm also having a look at the work center for system monitoring; but I don't find how to link the central monitoring capabilities with this dashboard.
    I mean, it looks the central monitoring does not provide any advantage to work with this work center, am I right? Anyone has experienced this?
    Thanks for your answers!!
    Fermí

    Hi!
    I've done finished this issue!
    Please follow steps below:
    1. Create activity type in T-Code: KL01
    2. Go to KP26 to create the realtionship between Cost Center and Activity.
    Now you can see new activity in Costing tab.
    Regards!
    Woody.

  • Connection between work center and ppome

    Hi,
    in the work center I defined the connection to a o-unit in ppome. Which table represents the connection between the org-management and the work center?
    Thank you,
      Vanessa

    Hi Roman,
    thanks for your answer. I don't have evaluation path PPDM (and if it is a t-code I don't have the right to use it).
    I have seen that there are different kinds of work center. I am talking about the one created with the cnr1 transaction.
    Greetings

  • Download notifications based on main work center and edit based on task level person responsible

    Hi Experts,
                   My requirement is to download notifications based on main work center.The downloaded notifications contains task level person responsible.If the notification contains four task assigned to different persons.Let suppose one task is assigned to the mobile user and other three task to another user.Now the first mobile user should able to edit the task  assigned to him ,but he should able to see all other task in disable mode that are assigned to other user.Iam using agentry work manager 5.3
    Please help me to achieve this requirement as soon as possible.Thanks in advance.
    Thanks & Regards,
    Sravanthi Polu
    Tags edited by: Michael Appleby

    Please refer my earlier posting for Work Order related requirement similar logic can be extended even to your Notification requirement.
    Also refer.
    Work Order and Notification Assignment Types Supported In Work Manager 5.3
    Thanks
    Manju

  • Work Center and Quality Notification

    Hi
    Can any one help on linking Quality table (QMFE / QMEL) with work centre info from COOIS .
    We have to get the work center from the above Tcode in to our quality data source. When I checked in this field and table it is derived from a structure (AFVGD - ARBPL). Is there any other place or table I can get this work centre data ? We need this in to Quality for control Key (AFVGD-STEUS) ZZ40 only.... Thanks in advance for the help!!!

    Hi ,
    Please check in table CRHD
    Also check this thread for more info
    Table linking Routing and work center.
    -Mayuri

  • IW51-52 - Updating fields Main work center and Maintenance plant

    Hello Experts.
    I Have a task which includes recieving a file and using the data to create new notifications. I need to update the fields above (Data elements GEWRK & SWERK ) but i can't find the right BAPI or Function which will do this work for me.
    Thanks for your help.
    Motty Gal.

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • What is Control Center, Work Center and BTM

    Can someone please explain to me the Work Center, Control Center and BTM?
    Best Regards

    hi amit,
    will u explain more clearly  what do u need??
    workcenter, control center and btm  will come in plant maintance and in guided procedure
    ravindra