Workflow through status change

I have a Customer quotation which has different statuses in the system.
When a quote is 'approved/rejected' i need to send a mail to distributor though workflow. Quote user status is written to change documents.
status management --> customer settings
I maninted the statusOT as 'VBK', status profile xxx, bo 'zbus2031' and event 'statuschange'.
status restrictions maintained the user status codes 'zapp' n 'zrej'.
Delegated the object zbus2031 and created an event, this event is the triggering event for my workflow.
When i try to change the status to rejected or approved, event 'statuschange' is not triggered checked in the trace.
Quote changes are stored in jcds,jcdo,jest tables.
This change doc key field value is different from zbus2031-objectkey.
Am i missing anything? Inputs will be appreciated.

Hi Indira,
In this case you may want to break the problem down to see where the issue actually is.  First I would set up the status management to trigger one of the existing simple events - such as bus2031 CHANGED and see if your status restrictions work.  If this fails then the issue is with the restrictions. 
If so pare the restrictions back until it publishes and see what you needed to do to get there.  Then it is a case of adding each part and testing at each point so you nail where the issue lies.  I have had to use this approach as once ALL the config is done, analysing where or what is not correct is impossible.
Regards
Gareth

Similar Messages

  • How to configure workflow for status change of a salesorder.

    Dear Friends,
    I want to generate Idocs after a sales Order delivery  status changes
    using workflow.
    Please tell me the procedure ,as i am doing this for the first time.
    thanks,
    jeevan.

    Suggest using "Modes" in PPM. Mode 01 will have "x" capacity, mode 02 will have "y" capacity and so on. You will have to give a slightly different resource name for each mode. E.g, If there is a multi capacity resource named "RESOURCE", then first create following resources in the Resource master : RESOURCE_X and RESOURCE_Y. Define individual capacities ( Resource is same, only we are separating capacities). Then include these in the PPM -  mode 01 = RESOURCE_X, mode 02 = RESOURCE_Y.
    Hoe this helps

  • Event triggering through status change

    Hi,
    Currently I am learning workflow. I came to know that events could be triggered even with a status change. Could anyone let me what does "status change" mean? It would be better if anyone give me a high-level view of an example related to this?
    Thank you,
    Raja

    Hi Raja,
    Take an example of Service notification.
    It can have differnt technical status like <i>Created, Inprocess, Technically complete</i> or <i>Released</i>.
    Based on the particular status, say when notification is <b>Technically complete</b>, you want to inform somebody, you can do it with workflow and status management.
    Hope it clarifies idea of status changes/ management.
    For more help refer:
    http://help.sap.com/saphelp_47x200/helpdata/en/c5/e4aee2453d11d189430000e829fbbd/content.htm
    Regds,
    Akshay

  • Trigerring workflow through status management

    Hi Abappers,
            I am new to workflow, can any body tell me how to trigger a workflow using.
          1. Change Management Document
          2. Status Management.
    Regards,
    Narendiran Rathinavelu.

    Dear Narendiran
    Got it..No need to create your own Object.There is a object called "ZBUS2012" for purchase order  (Go to SWO1 you will find it in Object reposatory browser)Take its "Realeased" Event as your triggering event and u r done.
    And if you still wanna use your own object then use method "create_event*" to fire your own event and take that event as your triggering event in workflow
    Hope this will help
    Also sent one good ppt for basic workflow design..refer it..
    Reward points please
    Regards
    Message was edited by: Tushar Mundlik

  • Workflow Internal Status: Cancelled

    Dear All,
    We have a SharePoint/Project Server 2013 Enterprise Edition and Sharepoint Designer deployment in HYPER V virtual environment. We are using it for Project Management. We are facing an issue while designing a workflows in SharePoint
    designer 2013.
      PROBLEM DESCRIPTION:
    “Workflow Internal Status: Cancelled
    " ERROR: 
    RequestorId: 7b51f972-22ad-faa7-a60a-20f365bff1e3. Details: System.ApplicationException: HTTP 500 {"SPRequestGuid":["7b51f972-22ad-faa7-a60a-20f365bff1e3"],"request-id":["7b51f972-22ad-faa7-a60a-20f365bff1e3"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"SPRequestDuration":["116"],"SPIisLatency":["0"],"MicrosoftSharePointTeamServices":["15.0.0.4481"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
    RequireReadOnly"],"Date":["Tue, 24 Dec 2013 19:28:11 GMT"],"Server":["Microsoft-IIS\/7.5"],"X-Powered-By":["ASP.NET"]} at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext
    context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
    bookmarkManager, Location resultLocation) "
    Workflow stage status: Workflow is still in processing please refresh the page and try again
    After configuring the workflow in SharePoint designer followed below mentioned TechNet blog to go through the workflow designing
    URL: http://msdn.microsoft.com/en-us/library/office/jj163494.aspx
    As in the blog project Event is set to when project is submitted, we tried a lot to submit the project but submit button was grayed out and unable to do this, then we changed to event
    when project is committed from that above mentioned errors are occurred. Moreover we have tried to make simpler workflow but same result.
    Detailed Description:
    Installation of Workflow Manager 1.0
    Installation of Service Bus and CU1
    Start App Management Service (Also Configured in Managed Service App)
    Start User Profile Service (Also Configured in Managed Service App)                      
    Run the full user profile sync and Completed
    Created the workflow using domain user account and assigned him proper permission
    Thanks in Advance 
    REGARDS DANISH DANIE

    If the workflow initiator does not have write access to the hidden Workflow History List, the same error happens.
    To solve the issue, simply open the hidden list permission (through SharePoint Designer>All Files>Lists, for example) and make sure to have your potential initiators contribute rights. The list defaultly inherits the site's permissions.
    kirtesh

  • Updated Latest End Time in workflow builder but change not taking place

    Hello everyone,
    In our existing leave application workflow (working fine for many years), we have set a deadline monitoring of Work Item Creation (WIS) + 10 days to send an email back to the applicant if his or her leave application wasn't acted upon by his/her supervisor.
    Recently we have made some changes to the leave program and are required to test this deadline monitoring. In development environment instead of waiting for 10 days, we updated the Time field in the Latest End tab to 3 mins and then we generate and activate the workflow (through the Activation submenu in the Workflow menu).
    Problem 1: But when the leave program generate the work item, inside the work item the Latest End date and time still show as WIS + 10 days, instead of WIS + 3 mins. We have already run SWU_OBUF and also refresh the organizational environment through SWUS but still to no avail.
    Problem 2: When we change the Latest End date of the workitem to trigger the deadline monitoring, nothing happens even though the deadline monitoring batch job (SWWCOND & SWWDHEX) is already running successfully every 3 mins. In the executed action it just show 'Deadline reached' and the work item is in READY status.
    In our work flow we have the process control to set the work item to obsolete. Really appreciate for any advice. Thanks.

    Hi Rick,
    Sorry, wrong choice of word. What i'm trying to say is as we don't have a workflow expert on our site, me and my colleague were a bit hesitant to manually change the work item deadline. But i see the benefit in doing that. At least now we know that changing the work item deadline would not affect the triggering of the deadline monitoring.
    Hi Viji,
    We haven't tied the changed workflow template to any transport request yet as we wanted to test it out in development environment first.
    Sorry but how do i check if the outcome is active?
    Hi Rob,
    We didn't do any import. Since we're testing the changes in dev, we're directly changing the workflow template and activating it without tagging it to any transport request. But thanks for letting us know about table HRS1205, will give it a look tomorrow afternoon.
    And also we're generating new work item for our testing. That's why we were surprise the new work item is still not picking up the WIS+3 mins latest end date.

  • Sale Order Status Change after delivery of materials from projects

    have ETO sccenario which consists of all modules such as SD,PS.PP etc. Materials will be procured from external vendors & manufactured inhouse through project systems. After delivery of materials from project systems, billing & invoicing will be done at sales level.
    On delivery of materials from projects, sale order status remain open. Request you to look into the matter & suggest about status change of sale order after delivery / billing.
    Regards,
    Ranjan

    Hi,
    In sale order, WBSE is assigned. Delivery of materials are through cns0. then subsequently picking / packing / billing will happen at sales level. Billing is of delivery related. Please suggest to fix the issue.
    Thanks & Regards,
    Biplab Ranjan

  • Question over the appraisal status change

    Dear All,
    Our appraisal has ( following the flexible template ) has planning, mid year review and final phases. With in each main status we have sub status configured. Example - In the planning stage ( say in the month of February ) , employee add objectives, change weights etc and send to manager for approval. If manager approves, the document status will be changed from planning  to mid year status and employee's form is changed to the display mode ( so he cannot update objectives / weight etc)
    Then again in the mid year  status ( say a few months later - June ist ), the employee needs to review the appraisal, add or update the objectives etc and submit for manager approval.
    My issue is -  After the employee's appraisal form is changed to display only from planning to review status - How the employee's appraisal  form can be changed from a read only to change mode in the same status ? As it is necessary for employee to add/ update in the form.
    I am seeking the best approaches for the below as I am considering two options ( as mentioned below )
    1)   For the  mid year status  , I will configure a sub status ( called start mid year ) and attach a push button. The employee select the push button during the mid year  period ( say June 1st ) and this push button triggers the status change from Mid year to Mid Year / Start Mid year. We also plan to apply a custom implementation for  BADI for column access and badi  (HRHAP00_COL_ACCESS) will decide the access control for columns etc.
    2) The other approach I am considering is we are considering a workflow (INFO_APPRAISEE_CHANGE_REVIEW ) to notify th employee 7 days before the mid year review starts. Can this workflow trigger the status change or read the column access from the BADI (HRHAP00_COL_ACCESS) ?
    Any other simpler approaches ?
    I saw in the Process config ( tabs and process ) that we can define the phase with dates and status / substatus etc. Can this be useful for the above scenario. For eg. On June 1st when the mid year review start, can the status be changed  like from Mid year  to Mid Year / Start Mid year ?
    Please let me know . Greatly Appreciated!
    Aneez Hameed

    Hi Aneez, both options are great,   HRHAP00_COL_ACCESS is configurable at each sub-status, so you have many options.  You can have the manager "approve" at beginning of year, but keep it in "in planning" by having a 3rd sub-status.
    You can have the employee or manager have access to the pushbutton so that mid-term can start. 
    you can also do a workflow option where it is changed automatically, your option 2.
    the final option is the HR adminstrator can change the status, by doing a mass select in phap_admin and then they change to the status to move it to "in review" with all of your mid-term substatuses. 
    they key to making this work is the additional config that goes along with HRHAP00_COL_ACCESS.  here you will want to do define a Z table with the following columns:
    object id - your template ID
    role - which are the same roles values defined at your template - apee for apraisee
    template status - integer - represents status ID
    template sub-status - ID
    column id - FAPP, OBJO, etc..
    availability indicator (char) - here you will configure H, X etc... which the badi uses to know how to handle it. 
    best regards - michael

  • Status change from 'Completed' to 'In Process' not allowed

    When configuring Appraisals in R/3 we want to change the  Status of 'Completed' when pressing the 'Reject' button so that it moves to the Target Status of 'In Process'
    However, we are getting an error message:
    Status change from 'Completed' to 'In Process' not allowed
    The SAP help states the following:
    In Process (only if final appraisal or part appraisal is defined)
    This has been defined at Template Level.
    So I don't understand why we are getting the message.
    Does any one else know of a way to configure the Appraisal template so that after it has been 'Rejected' it moves back into 'In Process'
    Thanks
    MN
    Points Rewards!

    Hello Andreas,
    Ah, sorry, there was so much talk about user decisions that I assumed you were using a standard decision task.
    Still, I would be extra careful of changing the way workflow usually works because you have an unknown target audience that are based on the standard.
    The standard SAP philosophy is quite simple: cancel/F3 or do nothing and it stays reserved. If you do not want it reserved, you need to perform an action. This is based on a majority of processes: in most cases when you execute a work item you will also be the one who is going to completed it. Replacing it is the lesser used of the two alternatives, therefore it is the only one that requires an action on the part of the user.
    Again, this is intended as constructive input. Strange quirks and unusual behaviour tend to add a black mark to software if they do not make things easier to use. In many environments users are not even aware of the reserve/replace business, so there you would be adding an additional layer of complexity.
    Personally I would find an exit popup annoying as a regular workflow user - regular decisions can be approved with one click, or I can back out with a single click if I need to make a phone call or look up some info before approving - but with this new-fangled thing I've got an extra button to click and an extra thing to think about. This is especially the case in a payment approval scenario where you may have users in some departments who may approve hundreds of payments each week.
    My suggestion would be to leave it like that. By all means put an option into the user decision to put it back or to 'un-reserve' it (and loop round if the user chooses it). That way you are adding value and not clicks.
    Cheers,
    Mike

  • How can I hide a contact's status changes?

    It is a pain to scroll through the history of a conversation with all of the status changes mixed in with my conversations. Is there a way to suppress seeing these? It seems like I could hide these several years ago (perhaps with the older version of Chax) but I can no longer find this option anywhere.

    Hi,
    I have Chax 2.2.2 used with my iChat 4 computer
    In the tab "Notifications" it does have a box that Needs Ticking to Show the Status changes in Messages. (I have not tried Setting it and then Unticking it to see if that works - sort of in reverse)
    I also don't remember using it before to Set this.
    I consider several of the Chax settings to mimic the same thing iChat 4 already does.
    These maybe an hangover from previous version though.
    Having said that their Site suggests using the correct version for the OS/iChat version you are using suggesting they were created from the Ground up or very close to it for each version of iChat
    I have not seen anything on removing the Message's Notifications.
    9:05 PM Friday; March 18, 2011
    Please, if posting Logs, do not post any Log info after the line "Binary Images for iChat"

  • Error "Status change from READY to COMMITTED is not allowed"

    Dear experts,
    once again SAPs workflow environment drives me crazy with mysterious error messages.
    Some time ago I posted a question here concerning the problem that I cannot put back a workitem by using function module SAP_WAPI_PUT_BACK_WORKITEM due to a lock on this workitem which has been set right after it has been double clicked in the business workplace workflow inbox:
    [How can I put back a workitem before I'm back in the business workplace?;
    Since I do not want to dequeue the lock for the workitem in my application (where the user finds the appropriate detail information along with the function buttons for approval, rejection and F3/BACK) I tried it with calling a POPUP_TO_CONFIRM ("Do you want to put back the workitem?") directly from within the BO-method, right after returning from the FM that called my application. From here (the popup then shows in front of the business workplace instead of the application) the locking doesn't seem to be a problem any more! But whatever I do after the users decision to put the WI back - calling the FM SAP_WAPI_PUT_BACK_WORKITEM or trying to leave the method with macro EXIT_CANCELLED - leads to the error message "Status change from READY to COMMITTED is not allowed" and the workitem changes to status ERROR, too. This message seems to be bull***t, since the status of the item is supposed to go back to READY.
    Does anybody have experience to help me on that ?
    Thanks in advance
    regards
    Andreas

    Hello Andreas,
    Ah, sorry, there was so much talk about user decisions that I assumed you were using a standard decision task.
    Still, I would be extra careful of changing the way workflow usually works because you have an unknown target audience that are based on the standard.
    The standard SAP philosophy is quite simple: cancel/F3 or do nothing and it stays reserved. If you do not want it reserved, you need to perform an action. This is based on a majority of processes: in most cases when you execute a work item you will also be the one who is going to completed it. Replacing it is the lesser used of the two alternatives, therefore it is the only one that requires an action on the part of the user.
    Again, this is intended as constructive input. Strange quirks and unusual behaviour tend to add a black mark to software if they do not make things easier to use. In many environments users are not even aware of the reserve/replace business, so there you would be adding an additional layer of complexity.
    Personally I would find an exit popup annoying as a regular workflow user - regular decisions can be approved with one click, or I can back out with a single click if I need to make a phone call or look up some info before approving - but with this new-fangled thing I've got an extra button to click and an extra thing to think about. This is especially the case in a payment approval scenario where you may have users in some departments who may approve hundreds of payments each week.
    My suggestion would be to leave it like that. By all means put an option into the user decision to put it back or to 'un-reserve' it (and loop round if the user chooses it). That way you are adding value and not clicks.
    Cheers,
    Mike

  • TFS 2012 Update 4 - Build Alert - "A build controller or agent's status changes" doesn't work correctly

    We are running TFS2012 Update 4 and have set up some build alerts.  The alert we have set up is "A build controller or agent's status changes".  When this alert is first set up the default filters which are included are for fields "Team
    Project" and "Status".  However through much testing we have discovered that when either of these fields are included as a filter the alert doesn't work.  When other fields are used in the filter the alert works fine (as long
    as neither of the stated fields are included), indeed if all alert filters are removed then the alert also works successfully.  Has anyone else experienced this?  Is there an issue with the fields "Team Project" and "Status"?

    Hi T Quinn,   
    Thanks for your post.
    I reproduced this scenario in my TFS 2012 Update 4 Server and received the same result.
    For this scenario, please submit it to Microsoft Connect Feedback portal at:
    https://connect.microsoft.com/VisualStudio. Microsoft engineers will evaluate them seriously. 
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • PO workflow showing status as APPROVED.. but in Oracle status is"IN PROCESS

    In Our 11i , one of the PO workflow showing status as APPROVED.. but in Oracle Still showing the status as "IN PROCESS".. could you Please suggest solution...?

    Hi,
    What is the application release?
    Please see if these docs help.
    Troubleshooting Purchasing Approval for Documents in "IN PROCESS" or "Pre-Approved" Status [ID 225017.1]
    How To Diagnose An Issue In Requester Change Order Processing [ID 453551.1]      
    How To Reset a Document From In Process or Pre-Approved To Incomplete/Requires Reapproval For Isolated Cases [ID 390023.1]
    Thanks,
    Hussein

  • Email notification in Charm with several status changes

    Hello,
    according to OSS 1275036 I tried to implement email notification in my Charm-process using BADI  AGS_SDK_SCHED_ST_CHD in my schedule condition. If a new partner is responible in Charm-process, this partner should be notified by email. The email should be send if user status is changing.
    It still works for my change request (notification of change manager) and the first step of my change document (notification of developer). But for all following steps (e.g. notification of tester) no action for email-notification is found in my change document.
    In my actions I only use schedule conditions (according to OSS) and no start condition. To use the BADI for several user status, I maintained my user status in field value instead of inital value.
    Does anybody know, how to use this BADI for several status changes in my change document?
    Thanks,
    Laura

    Hello together,
    I solved my problem by using CRM Standardcustomizing. Forgot SAP note 1275036 and 865619. They are all bad and not sufficient for a complex Charm scenario.
    I only used note 1275036 for the first mail in my change document (email to developer). For all following mail notifcations I'm using actions based on workflow conditions instead of BADI.
    Just using normal CRM-Customizing and create one schedule and start condition for every used action.
    E.g. send mail to tester:
    schedule condition:
      &Servicevorgang CRM.Anwenderstatus&  [*] E0002+DHFHEAD 
      and    &Servicevorgang CRM.ErrorFreeFlag&  = X 
    start condition:
    &Servicevorgang CRM.Anwenderstatus&  [*] E0004+DHFHEAD 
      and    &Servicevorgang CRM.ErrorFreeFlag&  = X 
    This works perfect, because you won't get several mails for one status if you save your document more than one time, which is a problem with note 865619.
    Regards,
    Laura Mathes

  • SD OVERALL STATUS CHANGE

    Hi Gents,
    The requirement is that, there is trial Sales Order is there, which will not be invoice nothing will happen, it will just for trial...
    So what i need is that once that trial is expire (7 days assumption), is there any way that this sales order should not show in Open Sales Order.
    Rejection line item will not work for this as client not required.
    So what i am trying that, is there any way to change the OVERALL STATUS to COMPLETE manually. So that i can go for back ground scheduling.
    hope you will gents will respond asap.
    Thanks in Advance !!!!
    Regards,
    Kundan

    to create events from a status change use transaction BSVW see Maintaining the Assignment Between Status Change and Event - Roles in Workflow - SAP Library.
    use the event to start a workflow, after approval/rejection use a background method to change the user status.

Maybe you are looking for

  • TS1489 tried to update my phone, now it has frozen, with an apple on it and i can't turn it off

    I have a iphone4, i was updating itunes, now the phone has frozen, with an apple on the screen. It wont off and i cant use it. What do i do...?

  • BSEG SPS14

    hello , my problem: we have added a field ZZCASH into table BSEG using Coding Block before. Now we want to update system with sps14 ,when  we upgraded DEV system with support package 14 for 7.00,the data in field ZZCASH was lost . please help me. tha

  • Best reason for a built-in downloader in Bridge

    I just heard the best reason to have a photo downloader built-in to Bridge. I already own Downloader Pro from Breeze Systems which is a bit complicated to set up, but has great functionality. But, because it's not integrated into Bridge, my workflow

  • Writing papers with an Ipad

    Hello, So I recently crashed my laptop and I need a laptop or tablet for college. I thought about getting a Macbook but don't think that its worth spending the cash because the IPad does everything I need (Internet and papers) and its cheaper. The on

  • HR_PERSON_EXTRA_INFO_API.create_person_extra_info

    Please tell me the table that is getting updated by HR_PERSON_EXTRA_INFO_API.create_person_extra_info.