Cost Center required for Mvt Type 309

Hi,
In the standard configuration of Mvt Type 309 without special stock indicator, is the cost center field required?

Hi
Cost center is not a mandatory field for movement type 309.
Material to material transfer posting is possible only if both the materials are maintained in the same base unit of measure.
The following additionally applies to material-to-material transfer postings:
• They cannot be preplanned via a reservation.
• They can only be posted from unrestricted-use stock of the issuing material to
unrestricted-use stock of the receiving material.
• They can only be posted in a single step.
Hope it helps
Thanks/Karthik

Similar Messages

  • WBS element&Cost center required for Account 11111000000 Profit center 1234

    Hi,
    While realeasing the billing document we are getting the subjectted error.
    We do maintain the cost centre in the sales order, however no idea about the WBS elemnt.
    Pls help.
    Regards,

    For information, if you want to post any data to WBS element, the Account Assignment indicator should have been ticked which you can do in OPSA or try in T.Code CJ20N where you can input manually.
    For more information on WBS element, go through this thread
    [WBS Element  |WBS Element]
    thanks
    G. Lakshmipathi

  • Cost center planning for overhead calculation

    Gurus,
    I have a doubt regarding the cost center planning for overhead calculation.
    My scenario is:
    There is a service cost center from which a certain percentage I want to allocate to the products as overhead. Now while doing so I have created a cost center and a cost element of type 43 (internal activity allocation). This cost element is the base for overhead calculation. Also I have created one cost element of type 41 (overhead rates). I have defined the credit (of cost sheet) with the cost element of type 41 and the cost center as mentioned.
       Now I am facing a problem while planning the cost center with cost element type 43 through KP06.The system is throwing the error message: 'Cost element xxxx can only be used for activity input'. My understanding is we must carry out the planning for the cost center to allocate a certain percentage to the product cost estimate. If I am not allowed to use the cost element of type 43 to plan, what should I use for the planning?
    Request your suggestion.
    Thanks in advance!
    Snigdho.

    Hi
    Since you mentioned catg 43 cost element, I thought you are using Activuty Type
    To apply overhead on the product during CK11N, you need not plan any value on the cost center... The values planned in the cost center can not be used as a BASE in your costing sheet....
    It goes like this
    1. Your cost estimate has BOM + Routing
    2. So, the cost elements that you would see during CK11N, can be broadly classified into 3 types
    a. Primary cost ele - Material Consumption accounts for BOM components
    b. Secondary cost ele (Catg 43) - If you use any actvity type in the routing
    c. Secondary cost ele (Catg 41) - These cost elements are parasites... They need some basis to calculate the overhead value... That basis can be either the (a) or (b) above.....
    I think, what you are planning to do is Plan Primary cost ele in a cost center and trying to use the same as the Basis.. That wont work!
    What you need to do is
    a. PLan the values in the cost center, say, 100,000 USD
    b. Absorb it on the basis of 2.a or 2.b
    If 2.b is not applicable in your case, since you are not using activity types, then 2.a is the Only option left for you
    Hope it is clear....
    Regards
    Ajay M

  • Make cost center default for an internal order

    Hi friends,
    I want to make the cost center default for an internal order type. Can you please tell me how can i achieve that.
    Regards,
    Wasim.

    Hi Atif,
    thanks for your valuable reply but i am having different cost element depending on what is ordered. Is there anyway we can achieve this.
    Regards,
    Wasim.

  • Cost center requirement

    Hi
    I am provided with an excel sheet and the client requirement is to search for the POs against which cost center requirement is necessary.Can anyone tell me the short cut how to do it?The PO no is already given but searching for each and every PO is cumbersome.
    Need Help.
    Thanks in Advance
    Nisha

    Reddy made syntax error
    BBP_BW_SC2
    BBP_BW_SC3
    BBP_BW_SC4
    not BBP_BW_SC1 tcode
    br
    muthu

  • GL account for movement type 309

    How to find GL account for movement type 309. Tcode etc
    Stop Cross-Posting

    Hi,
    Try using transaction code OMWB (press cancel on pop-up) >
    Press "Simulation" button and enter plant + mat + movement type >
    Press "Account assignments" button
    Dr/Cr G/L accounts displayed for posting lines.
    Kind regards,
    Robert

  • Settlement to cost center posted for statistical WBS element

    We have the following scenario
    Statistical WBS elements with assigned Cost center posted for actual postings
    Network assigned to statistical WBSE and settlement rule on the same WBSE
    On settlement run CJ88  the network costs are transferred from network to Cost Center posted in the WBSE.
    Issue:
    While analysing the active availability control the assigned value is doubled. This happens only of the networks are settled. System considers the Actual values from network + Statistical value from WBSE to caculate the assigned values.
    Simulation details as under.
    SP-SET-02-3  (wbs element)
        COSS 2011 11 0007101000     0001240704 KOAO D INR                 100.00  INR
        NWA 500000002408 0010
            COSS 2011 04 0007101000     0001240704 KOAO O INR                 100.00- INR   S  -- does not contribute to assigned value
            COSP 2011 04 0007101000     0001240704 COIN D INR                 100.00  INR
            COSP 2011 01 0007101000     0001240704 KPPP D INR                 100.00  INR   M   -- does not contribute to assigned value
    Hence the assigned value gets doubled and eating up the budget.
    Anyone encountered similar issues pls share the possible solutions.

    Hi Mohit
    It is against SCN's rules to post the same discussion thread twice. You have already posted a similar question in the below thread. Please refrain from doing this and close one of the threads.
    Initial balance upload of revenue GL accounts with wbs
    Regards
    Sowmya

  • Cost center missing for pers. no

    Hi,
    While prosting exps in TC: TRIP, we are getting the error "Cost center missing for pers. no". After analyzation the issue we came to know that there is no relationship with org. assignment. We went to TC: PO13>give position>select relationship-->click on create infotype. Here we have given relationship A 011and click on save and again save. Now, we went to TC: PA20/30 cost center is appearing correctly.
    We have couple of pers nos. Instead of doing manuallthis we are doing executing program RHINTE30 in TC: SE38. But it is not updating cost center in TC: PA20/30. How should i achieve this issue? Pls advice....

    you are correct RHINTE30 report will update Cost Center in IT 0001 from OM. Before that you have to upload CC to position through T.code  P013 using either LSMW / BDC.
    For updating CC in IT 0001 process is below.
    First Create Cost center to position using P013 t.code and relation ship A 011.
    Excutre report RHINTE30 using T.code SE38.
    After that there will be one batch input session created in SM35.
    Finally Select your batch input session and Excute through SM35
    Then CC will be updated in IT 0001.
    If there are no much employees you can manull create CC directly in P013 and CC will directly upte in IT 0001.

  • In a sales order, entering the cost center field for line items

    In a sales order, the cost center field for the tab 'account assignment' of line items is suppressed. Is there any possibilities to open the cost center field(for line items)?

    Hi kim,
    You can do this in Account Assignment Catagory..
    Hope this helps.
    Regards,
    Sree

  • Transfer Requirement for Movement Type 262 (Cancel With Ref to Reservation)

    Hi Experts,
    it is possible to configure the system to create a Transfer requirement for movement type 262 (Cancel With Reference to reservation) ?
    When i execute a movement type 262 (Cancel with reference to Order), the system creates a Transfer Requirement, i can process it in transaction LB12. Now i am using the movement type 262 to Reservation, but the system does not create a transfer Requirement.
    I am using SAP ECC 6.0.
    Thanks in advance,
    Alejandro López.

    Hi Alejandro,
    Can you clarify what process you are performing by this comment? .. "_Now i am using the movement type 262 to Reservation"_.
    As per standard process TR (transfer requirement) creation takes place as per the setting in IM-WM interface. Please check in Tcode OMLR, if TR create field is having "X" for the warehouse and reference movement type record. Normally whenever any material document gets posted in IM, MM-WM interface provide the decisions about which WM movement type to pick for warehouse and data about TR , PCN and TO creation.
    Hope this will help.
    Regards,
    Sudhir

  • Transfer Requirement for Movement Type 262 to Reservation

    Hi Experts,
    it is possible to configure the system to create a Transfer requirement for movement type 262 to reservation?
    When i execute a movement type 262 to Order, the system creates a Transfer Requirement, i can process it in transaction LB12. Now i am using the movement type 262 to Reservation, but the system does not create a transfer Requirement.
    I am using SAP ECC 6.0.
    Thanks in advance,
    Alejandro López.
    Edited by: Alejandro López on Feb 28, 2011 1:55 PM

    Hi Alejandro,
    Can you clarify what process you are performing by this comment? .. "_Now i am using the movement type 262 to Reservation"_.
    As per standard process TR (transfer requirement) creation takes place as per the setting in IM-WM interface. Please check in Tcode OMLR, if TR create field is having "X" for the warehouse and reference movement type record. Normally whenever any material document gets posted in IM, MM-WM interface provide the decisions about which WM movement type to pick for warehouse and data about TR , PCN and TO creation.
    Hope this will help.
    Regards,
    Sudhir

  • How to get cost center ranges for a given company and division...

    Hello Experts,
    Is there a table, BAPI or FM that can get the company or division of a given cost center?
    Currently I am creating cost center ranges in my program but that is not the best way to do it
    since they can always add or delete cost centers. Just like in transaction OKEON wherein you
    can see the cost center ranges for a given company or division.
    Hope you can help me guys. Thank you and take care!

    Hi Viray,
    You can try BAPI 'BAPI_COSTCENTER_GETDETAIL1'.
    You need to pass controlling area and cost center detail to this BAPI.
    It will return the cost center detail in return.
    Hope this helps you.
    Thanks,
    Arun

  • Need to get cost center details for a requisition

    Hi All,
    Could you please help me to find table for cost center details for a requsition.
    Thanks,

    Hi;
    Did you see:
    http://www.aboutoracleapps.com/2007/08/oracle-general-ledger.html
    Information Center : Oracle Cost Management [ID 1417659.2]
    Regard
    Helios

  • Batch does not exist for mvt typ 411 K

    Hi Experts,
    While i am perform migo for mvt type 411 K,it shows Batch does not exist but i check in MMBE,the batch for this vendor consignment was exist with stock.
    Any advice?
    Thank you.

    How did the batch go into your system? with an initial load program, or with a standard MIGO movement?

  • How to identify Sale Order costing is required for Items in Sales Order

    Howstandard cos estimate*w to identify Sale Order costing is required for Items in Sales Order?
    On which criteria we can conclude Sale Order Costing is reqd ?
    ? * means what and wat is the purpose and how to chk for the Item in Sales Order, either it is required or not**.

    Hi Dharamveer,
    The best way is to make the order qty is equal to the quantity delivered. This way, when some one looks at this order in future - they think that the order was for X and the delivery was for X qty is completed. They will not know the background of the issue unless they go through change log. Even in change log, they see that the Ord qty was adjusted, but may not understand why?
    The good practice is to make order qty equal to already delivered qty.
    Create a new line for the remaining qty and reject the same with appropriate reason for rejection. This way, any one can understand the background , the reason for rejection easily. Hope it helps !

Maybe you are looking for

  • Adobe AIR 4 Not reading a XML file larger than 10MB

    I have an application where the XML file could be over 10MB in size. I am using XMLHttpRequest to read the file in. However, on Air 4, it results in null when the file is greater than 10MB in size. This was working until I updated to AIR 4. I can go

  • Error in Derivation and Profitability Segment

    Hello Gurus, I am two issues, which isnt allowing me to create a sales order in IDES. I am referencing a quotation when i want to create the sales order. But i got a warning message 'error in derivation rule' and the log text has                     

  • Rule in Invoicing Plan

    Hi experts Where i exactly i can change and create new rule for the invoicing plan. I need 7 new rules in invoicing plan. Thanks

  • Why do I keep getting the message "invalid image" when trying to download an item?

    Most of the time I am unable to download a document or an attachment from an email.

  • Wierd data loading issue

    I am doing a test in BI 7.0, Datasource to PSA. overall status and technical status turn to green, but when i go to detail, i saw a warning: requests (messages): Request confirmed Missing message: Request confirmed So i goto source system, SM37 and s