Optimizer creating high production plan in few buckets

Hi,
Optimizer is creating high production plan in few buckets though there is less demand.
Findings
1. system in not preplanning to cover future demand.
2. there is one resource used by three different products for one product optimizer is doing excess planning while it is showing supply shortage for other products.
3.If I again take optimizer run for all the three products at all the location system is giving correct results (all receipt elements in line with the demand.
Now i need to understand the reasons why optimizer gave high production plan in last run ?
Regards
Abhi

1. system in not preplanning to cover future demand.
check storage cost and penalty cost , i think storage cost is more then penalty cost.
2. there is one resource used by three different products for one product optimizer is doing excess planning while it is showing supply shortage for other products.
if you run all three one by one it plan only first product on that particular resource, if you run all three same time system will plan according to the cost optimisation logic, that means it checks all cost and calculate which product needs to be manufacture on that resource and how much.
you can check the log of snp optimisation run in
/SAPAPO/SNPOPLOG - SNP Optimizer Log Data

Similar Messages

  • Unable to create a production plan and schedule on SAP B1

    Hi,
    I've been trying to figure out how to use SAP B1 to give me a production plan and schedule for quite some time now.... I have no problem in accessing my pending orders. There seems to be no option in my production tab to enter resource information! Would be great if you could possibly tell me how to figure this out.

    Hi,
    Without capturing the actual time of production orders, it is not possible to perform scheduling. You may create planned production order by based on theoretical time.
    Only third party add-on fulfill your requirement.
    Thanks & Regards,
    Nagarajan

  • Daily production plan in manufacturing shop floor

    Hi, we want to generate 2 different weekly production plans based on 1) roh available 2)customer delivery date. pls advise how to generate same.

    Hi
    There is no planning method in SAP based on raw materials. if you know how much finished product can be made out of one raw material then you can use SOP and create a prodcution plan as inactive version.
    For customer delivery date, if you know the cumulative requirements then place this quantity in SOP as the sales plan with delivery dates and create synchronous production plan and save it as another inactive version.
    Once you take a decision on which version to be used you can copy the version to a active version and transfer to demand managment and run mrp which creates planned orders.
    Make sure you use backward scheduling in the material master
    Thanks
    Krishna

  • How can link the accosaries requirements with production planning

    "I am in cable manufacturing here i have a problem in  accessories requirements ( dies,Nozzles,Rollers,Embossing wheels etc )link with production planning,at the time of production than these material required for production   Can any body tell me how to link this ,accessories is not consubles "
    Thanks,
    Anurudh singh

    Yes you can use PRT for these requirments,
    Logistics - Production Process - Master Data - Production Resources/Tools - Production Resources/Tools - Equipment - Create.
    spro->production planning for process industries->master data->production resources/tools (PRT)
    you will see 5 transactions to configure your settings:
    -define PRT auth.grps
    -define PRT status
    -define Task List Usages
    -define PRT Group Keys
    -Define Overview Variant for Where-Used List/Mass Replacement

  • SOP- Production Plan

    Hi,Sales plan is prepared for every 3 months (month wise demand). based on that we need to generate weekly wise production plan forindividual months.pls advise how to do that?

    Dear,
    Create the production plan from sales plan in MC87 for three months.
    Then split it in to week just go to header menu EditPeriod splittingTotal Week. than transfer to demand managment ExtraTransfer to Demand managment.
    Else you can also split in MD62 in schedule line tap.
    Then run the MRP you you will get weekly requirement.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Planned orders are created when Production order is open

    Hi Everyone
    We have Make order and Make to stock scenarios in the system for various products. When Production order is still open ( Fully confirmed with C015 and partially delivered), system assuming that order is completed and created a new planned order for the undelivered quantity against Sales order.
    As per my knowledge MRP shouldn't create new planned orders when old production order is still incomplete. The old production order has status REL, PDLV and CNF.
    Any help is appreciate and it is our production issue
    Regards
    Prasad

    Hi,
    is the order marked as completely delivered on the Warehouse view? Have you reached the under delivery tolerance for this order with your partial delivery from production? If yes, this would be the reason why the system thinks that a new order is required
    Regards
    Thomas

  • Create a new button in Financial Planning of the bucket

    Dear experts,
    We need to create a new button in the bucket financial information in order to when a user click on it, a report is executed, Does anyone know the steps needed to create the button and be showed in the bucket financial information?
    Thanks,
    Sara

    Hi Amit,
    Thank you ver much for your help. I tried this option and it works. The problem is this button is already configured at item level and we have no idea where is configured . We would like to retrieve it to copy in the bucket.
    It is not configured in the launchpad and it is not configured in the webdynpro, if it is not there where can be configured/developed?
    Is there any list of all buttons of the system?
    Thanks again for your help,
    Sara

  • Create a production order with variant configurator data

    Hello,
    Can anyone tell me the way to create a production order with variant configurator data. Is there a BAPI ? an IDOC ?
    Is there several steps ?
    I have to create an interface which creates automatically PP orders. The data input is a file.
    Thanks for your help

    Hi,
    There are fews BAPI's available for creation of Production Order. They are:
    BAPI_PRODORD_CREATE
    This bapi will suit to your requirement, as input will be provided from file.
    Others are
    BAPI_PRODORD_CREATE_FROM_PLORD " this converts planned order to production order
    BAPI_PRODORD_CREATE_FROM_REF      " this creats production order considering other production order as reference.
    Hope your query is answered.
    Regards,
    Brajvir

  • Error while creating Rough cut planning profile

    Facing the following error while creating rough cut planning profile (mc35) in SOP for product group. "Work center x plant y does not exist for task list type 3". pls advise- do i need to create tsk list for product group? pls advise with tcode to be used.

    pls check the (task list ) usage you have maintained in the Work center.
    In OP45 , pls ensure that for the usage ,
    task list type 3 (Rough cut planning profile) is included.
    If it is not included there , pls include the TL type 3 for your usage and now the prob will get solved.
    Regards.,
    Sheik

  • Sales order reference at the time of Production Planning

    Hi all,
    Is there any Hard check (or) Validation at the time of assigning sales order in Production order?
    to be more specific
    At the time of creating production plann, we assign open sales order  to that. Again if new production plan is created and with out knowing if he assign the same Sales order number system should block  it.
    Is there any solution for this
    Regards
    Shashi

    Shashi,
    Couple of important things to be noted.
    1.  How could you determine if the first user linking the SO to the Production Order really selected the correct one.  It could be very much possible that the same Sales Order linked to the another Prod Order is actually correct.
    Unless you have a business validation procedure to check this it will not be of much value to prevent duplicated.
    You can read about the transaction notification stored procedure using the link below
    https://service.sap.com/sap/support/notes/1011154
    This transaction notification is a stored procedure available in a company database and can be accessed from SQL Server Management Studio
    Suda

  • Create a product catalog from flat fiile

    Hello All,
    I have a requirement to create a product catalog from a flat file. Basic requirement is to add products under product catalog. Further requirement can be extended to add views and add images to product catalog.
    I want to know steps or function modules which will be used in order to achieve basic requirement first and then extended requirement.
    Any sample example explaining the same will be more useful.
    Thanks in advance
    Madhura

    By uploading images to a Product Catalog, the program below will also add the item to the catalog area specified.
    SE38 - Run Program COM_PCAT_MASS_DOC_IMPORT
    It has it's own Program Information to explain how it works.
    Here's the first portion of the that information:
    Title
    Mass Import of Multimedia Documents for Product Catalogs
    Purpose
    This report enables you to automatically import multimedia documents that are already available in a file system and assign these documents to product catalog items. The items are identified using a product number. An item is created if a corresponding one is not available.
    A simple text file, which can be created using the normal spreadsheet programs or simple text editors, is used as a basis for the import.
    We have used this in the past, but it has some performance issues, so experiment to be sure you don't try to upload too many images at once...it can bog down after a few batches and begin crawling.

  • Particular sales order of the same line item hv created multiple production

    sir,
    I am having a problem in MD04. A particular sales order of the same line item hv created multiple production order.and continously planning is going on... I didn't get why it happens.
    Will u please suggest me what should i do in this case?
    Regards
    Meenu

    Hello sir,
    yes, ofcourse, for the finished material have the BOM with some semifinished productes which are to be produced .
    In co02 , we can go through the collective production order.
    One more thing is that, in the multiple production order date(scheduling date) shows in forward(future dates).
    For ex:09-05-2010.
    Regards
    Meenu

  • Need to create a product in Service Oder

    Hi Gurus,
    Standard Contract---> Service Plan ---> Service Order
    From Standard contract, I am creating a service plan through copy routine.
    The std contract has 3 products with it. But the service plan is getting copied with only one product.
    Now I am creating service order from Service plan. The service order has only one product which comes from service plan.
    I need to add the remaining two materials also with the service product which is available in std contract.
    Can you please advice me how to achieve this through BADI or FM?
    Thanks & Regards,
    Bhuvana

    And that answr is?
    Ben
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

  • Creating Service product in Interaction centre

    Hi all ,
    I have been going through the best practises doc for SAP-CRM 2007 (C78_BB_ConfigGuide_EN_DE)
    and configuring accordingly. I strucked in creating service product(page-13). I couldnt find the below path
    CRM WebClient UI menu-------     Master Data -- Create: Service        to go further.
    I would highly appreciate if any one of you help me in creating service product for IC
    Thanks in advance,
    Sampath

    Hi Sampath,
    I am not sure how helpful this doc could be for you but try it. It gives process to create CRM Service Products using a Function Module.
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/d0c4a6b1-5baa-2a10-3381-8671732327e8
    Regards,
    Saumya

  • Is there a situation where we create a production order without BOM/Rtg ?

    What I see in the system, I was able to create a prod order without maintaining master data for PP ( expect material master)
    Is there a situation/scenario where we create a production order without BOM, Rtg
    Does the above situation applies to scenario like special procurement key ( 40- stock transfer from other plant )
    Please clarify

    Pradeep,
    Thank you for detailed answer
    Round robin of discussions
    When you covert a planned order to a prod order with reference to a material (CO40), it will ask for routing
    if rtg is not maintained for the material, the system will automatically pick the default rtg from OPJG
    When you create a prod order ( without ref to a material- C007), say suppose for unplanned rework we have
    maintain the rtg and BOM manually to the prod order
    Lastly, FOR SPk - 40 ( Stock Transport) for the issuing plant both BOM & Rtg needs to be maintained in the recieveing & issuing plant
    Due points have been assigned

Maybe you are looking for

  • I did the update and now cant open itunes i get a error 7  windows error 198

    I did the update and now itunes wont open...I get a windows error 7 (windows error 198)  HELP

  • OS 10.9.2 will not allow me to update my old iPhoto app.

    OS 10.9.2 will not allow me to update my old iPhoto app. I upgraded computer from a PowerBook G4 to a MacBook Pro and migrated my data onto the new machine. I had iPhoto '09 installed running on 10.5.8.Now on 10.9.2 and I get  get a message that iPho

  • Interactive HTML in JEditorPane?

    --Sorry, I just realized this belongs into the Swing forum, I'll repost it there.                                                                                                                                                                         

  • Camera RAW won't work

    I signed up for the Cloud and downloaded photoshop for my photo class I'm taking. Only problem is, it won't open the RAW files. So I followed the link it gave me to determine which version of the update I needed. Downloaded it and it still doesn't wo

  • Why Data Services Validation doesn't give the right result in XML?

    Hi, I am struggling with a dataflow that contains the following: - an Excel as source - a validation transform that check a specific value in one of the excel columns. If the value is equal, the record goes to the pass path and if not, it goes to fai