Advance payment Condition in PO

Dear all,
Could any body say,is there any provision to mention Advance payment condition in Purchase Order.Please advise at the earliest possible.For suitable answer points would be assigned.
Regards,
NSB

Hello NSB,
The invoicing plan is a facility that allows you to schedule desired invoicing dates for planned procurements independently of the receipt of the relevant goods or performance of the relevant services. It lists the dates on which you wish to create and then pay the invoices in question.
You do not wait each time for the vendor to submit an invoice for goods supplied or services performed, but can have invoices created automatically by the system on the basis of the data available in the purchase order and then release them for payment to the vendor.
Integration: When you save the invoicing plan, data is passed on to purchase order commitments, and to Cash Management and Forecast.
Prerequisites: To be able to work with invoicing plans:
You must maintain certain settings in Customizing for Purchasing under Purchase Order à Invoicing Plan, such as the following:
Invoicing plan type
Date categories
Date descriptions
Date proposals
The PO item must have account assignment
You must use Logistics Invoice Verification
If you wish to use automatic settlement for periodic invoicing plans, automatic invoice creation must be agreed with your vendor. Eval. receipt sett. delivery must be selected in the vendor master record.
SAP recommends working with the order type FO (framework order).
An extended validity period and a "reason for cancellation" are defined in the header of this type of purchase order. The specified validity period is adopted for the invoicing plan.
If you work with standard purchase orders, you must maintain the date determination rules accordingly in Customizing, since there is no predefined validity period that can be adopted in the invoicing plan.
Features: The following two types of invoicing plan are available:
Periodic invoicing plan
Partial invoicing plan
Periodic Invoicing Plan
The periodic invoicing plan can be used for regularly recurring procurement transactions (e.g. rental, leasing, or subscriptions).
It facilitates the largely automatic creation and payment of invoices within the framework of the invoice verification process. The periodic invoicing plan uses evaluated receipt settlement (ERS) program functionality.
In the case of the periodic invoicing plan, the total value of the PO item is invoiced on each due date.
Example-  A monthly sum of $600 is charged for a leased car (represented by an item of a PO). This sum is invoiced and paid on the last day but one of each month.
In Customizing for Purchasing, you can define whether the dates are to be maintained manually or whether the system is to suggest invoicing dates according to the specified rules.
Partial Invoicing Plan: The partial invoicing plan can be used for the invoicing of high-cost material or projects involving the procurement of external services that are to be subject to stage payments (such as plant construction projects, or the invoicing of individual stages of a building project following completion in each case).You can also flag due dates in a partial invoicing plan as dates for advance payments.
The amounts corresponding to these dates are then not taken into account in the sum total of the invoice items because advance payments are set off against later invoices. In the case of the partial invoicing plan, the total value of the PO item is broken down and spread over the individual dates of the invoicing plan.
A purchase order item relates to building project no. 1 with a total value of $900,000. 33.3% ($300,000) of the total value is due to be invoiced and paid on completion of the first phase of construction, a further 33.3% ($300,000) on completion of the second phase, and the rest ($300,000) following completion and acceptance of the 3rd and final phase.
In the partial invoicing plan, you wish to maintain the invoicing dates agreed with the vendor yourself. Therefore there is no system support in the form of date proposals.
However, if you wish to have due dates suggested by the system as an entry aid, you can reference an existing plan when creating a new invoicing plan. Date proposals can then be adopted from the former.
Hope this helps. pelase assign points...
Rgds
manish

Similar Messages

  • Advance payment in PO

    Dear all,
    Could any body say,is there any provision to mention Advance payment condition in Purchase Order.Please advise at the earliest possible.For suitbable answer points would be assigned.
    Regards,
    NSB

    Hi,
    In the latest releases of SAP (after 4.7), there is a new function for Advance payments.
    You set the configuration to switch this on and flag the vendor thatb it relates to and the system will accept a parked invoice and post a payment to the vendor that uses a prepayment clearing account.
    Or you can use the "downpayment" process in FI (in earlier releases of SAP as well).
    Steve B

  • Advance payment against Purchase order/Work Order: F-47

    Hi SAP Gurus,
    Our Client's requirement is as follows u2013
    Advance payment against Purchase order/Work Order:
    1. Advance should be PO/WO wise & not item wise.
    2. Advance should not exceed total PO/WO value.
    3. Advance against PO should include taxes & conditions maintained in PO/WO
    When I put the purchase order number along with the item number, it is taking into account the basic price for that specific item. This amount is excluding Tax.
    Actually the advance is given against the Purchase Order. So whether it is possible to
    1. Remove the mandatory filed of  Item number against the PO?
    2. Whether the amount of the advance should be inclusive of the Tax?
    Regards,
    Amit

    Amit kulkarni,
    For this requirement you have to do validation of the amount field for advance payment againest PO.
    i thiought this is only way to get your requirement
    May be this information is useful to you
    Regards
    Surya

  • Advance payment issue

    Hi
    I have an issue regarding customer's advance payment, the issue is urgent so Ill be grateful for early response:
    if customer has not made payment then system should not allow to create delivery for that customer
    Thanks in advance
    bhargav

    Hello,
      first of all, can you explain please the way you are managing advance payments? With billing plan or with document condition?
    Best regards,
    Andrea

  • Advance Payment by Customer

    Dear Guru's,
    The client want to have advance payment in the billing document print out.
    e. g. the customer will pay crtain % amt as a advance payment before creation of sales order. i.e if the order value is 1000 and the adance is 200 then the billing should be of 800 only.
    We dont want to use down payment here.
    Pl advise.
    Regards,
    Arunava Sahana

    Hi,
        You can try the following method. You define a discount condition type with absolute vale and no access sequence to it and it should be manual and statistical(So we can aviod passing this value to accounting). Then user will use this value as advance payment and deduct this value from Gross and  it will be  the net value. Make the changes in the script aswell to get this printed along with the net value. Kindly please let me know If you need any more information on this.
    Regards
    Ram Pedarla

  • Advance payment Scenario

    Hi All,
        can anybody please explain me the advance payment scenario and configuration in sap-sd?
    How this is integrated with finance?
    Rewrad Points for helpful answer.
    Regards
    Ashis

    Hi ashish patnaik
    make the following  configurations
    item category group - 0005
    item category - TAO
    for this TAO item category a billing plan 01 (milestone billing plan -01) will be assigned and its billing relevance should be I which is order related billing .
    billing doc type - FAZ
    cancellation billing doc type - FAS
    maintain a condition type AZWR which is down payment settlement , it has requirement as 2 and calc type as 48 acct key as ERL
    Now when you enter a material in line item 10 and go to item data , you can see the billing plan tab.
    now go to billing plan tab and enter the start date and enter the dates on which billing has to be done and then in billing request enter 0009 which is for down payment.once u press enter automatically it all the dates get blocked and billing request by default you get as 1 , that you change it to 4 or 5 . 4 is for down payment at value basis and 5 is for down payment at percentage basis. and beside that there will be a billing type .assign billing doc type as FAZ. to all dates
    check the copying requirements are there at VTFA as 20 and for item category TAO copying requirements 23 is maintained or not
    now do the cycle OR - LF - FAZ (billing doc type)
    Now in your case enter 50% of the value . and then enter the balance value in the next dates
    when you
    Regards
    Srinath
    Edited by: sri nath on May 13, 2008 9:26 PM

  • Advance payment and down payment with two diffierent tax code

    HI expert!!!
    i have one scenario that advance payment and down payment with different tax code.
    in this time, advance payement post to vendor with po number,  we do not know how to use tax code V1(deductable tax) or VF(Non-deductable tax),  so we post advance payement amount by tax code V1(deductable) even though the amount included both. but we must know how amount is defined deductable tax or non-deductable tax when invoice.
    when we want to post down payment with VF , we could not post it because advance payement posted with V1 tax code.
    this is main problem with my scenario.
    and  as i know,   can i post two advance payement to  same vendor and same po item?, i can't do it with my system.
    only one advacne payment  is possible with one vendor and one po item. or  amount of  advance payment is all cleared by down payment, then i can post another advance payment to same vendor.  is it standard process with po?
    thank you in advance!!

    hi,
    As per my knowledge their is no difference between  advance payment and downpayment.
    and tax code is used for taxes purpose not for the payment terms.
    taxcode is created in ftxp.and related percentages are maintained in fv11.
    ex:-
    if i want  excise duty  - 10% on basic value
    education cesse 2% on excise duty
    sec.education cesses 1% on excise duty
    then fitst i have to create 3 condition types and that 3 condition types are used in my taxprocedure  and that taxprocedure is assigned to country code..
    after that i am created one taxcode in ftxp like v1= exciseduty10%educatiocess2%sec.edu.cesses1% with this description.
    and given the values for that conditions in fv11.
    and used that v1 taxcode in your p.o in invoice tab.
    and payment terms are came from vendor not from taxcode.
    Thanking you.

  • Advance payment/No data selected????

    Hi,
    I am trying to print advance payment invoice, but aftre creating all the docs, I am prevented to print the transaction, as the system gives the message'NO DATA SELECTED", when I populate the Sales Doc Number.
    Please give your input and assist me on this issue.Ever gratefull.
    AN

    Hi AN
    As you want to print the advance payment invoice then first of all check in the output type the Transmission Medium you maintained and the Payer / sold to party (SP)  you assigned (PY)
    Secondly also check wheather you have maintained condition record or not
    If the system is giving message as NO DATA SELECTED , then check the output type details
    Go to VF02->header data->output type  and  there click on the tab  Determine Analysis , so that you can know where the problem is
    In the same way Go to VA02->header data->output type  and  there click on the tab  Determine Analysis , so that you can know where the problem is
    For further information kindly check the configuration of the downpayment
    [https://forums.sdn.sap.com/post!reply.jspa?messageID=5084683&useDraft=true]
    Regards
    Srinath

  • Down Payment (Advance Payment)  and Retension money Scenario

    Dear Friends,
    Pls guide me in the following scenario.
    The scenario is that one very large construction co using SAP. And its sub contract within its different plant in the same co code when he got any new projects. Now the co using down payment or say advance payment and retention money  condition. In the billing document every time I want 10% advance to be settled & 5% retenssion amount to be minus. This will be mapped through a GL for with special indicator A. But where will I maintain the details like % deducted every month? Is there any condition record for this FSZW Condition type( down payment) or this is defined by FI?
    Regards
    Atul

    Hi,
    Both are used in the sales A/R module.
    If you received a down payment from customer but it is not to any available AR invoice, you could use the ARDPR and the other is vice versa.
    The important things is that the down payment request can be paid directly using payment means available in the document tool bar.  It is used before A/R reserve invoice job performed.
    I suggest you to read help files for more details.
    Rgds,
    JM

  • After advance payment made against PO system is allowing for ammendment

    Issue  is there is a PO for some amount 5000 as per purchase request we have made an advance payment  Later on we have learned that they have decided to cancel the freight cost as indicated in our PO and subsequently amended the PO value to INR 4500.
    Could you please check why the system allowing the amendment to happen even though there was an existing advance payment posted into the system
    <<<<<<Text Removed>>>>>>>
    Note : Follow forum rules.
    Edited by: sapmm99 on Nov 21, 2011 5:48 PM
    Edited by: Jeyakanthan A on Nov 21, 2011 11:48 PM

    I dont know of any setting to restrcit this.
    But how would you like to deal with this situation.
    you paid 5000, but shuold have only paid 4500 according to the new conditions.
    as you dont want to change the conditions, it looks like you are okay with having paid 5000 and want valuate your receipt as well with this price. so your 5000 are gone at the end.
    I would change the conditions.
    you would receive and valuate your receipt at 4500, and you have still 500 credit  left at the vendor which can be used for next delivery.

  • Advance Payments in Sales Order

    Hi,
    Say, Customer Terms of Payment --> 50% Advance ; 30% Dely; 20% Receipt.
    The customer can issue Letter of Credit Also.
    Scenario:
    Customer PO value / Sales order value  : USD 5000/-
    Advance to be paid : USD 2500 (50%)
    There may be a scenario where the customer shall pay the Advance - USD 1500 by cash & remaining USD 1000 by Letter of Credit.
    But, when i create a Sales order for this PO, the Order value shall be USD 5000/- whereas the Letter of Credit shall only be for USD 1000. The system blocks the Sales Order for Financial Document value. This block should not happen as this will cause delay the delivery for no fault from the customer.
    Can anyone let me know the SAP standard process for handling Advance payment from Customers.

    Hi narain
    Your requirement can be fulfilled through down payment configurations
    Make the following  down payment configurations :
    item category group - 0005
    item category  - TAO
    for this TAO item category a billing plan 01 (milestone billing plan -01) will be assigned and its billing relevance should be I which is order related billing .
    billing doc type - FAZ
    cancellation billing doc type - FAS
    maintain a condition type AZWR which is down payment settlement , it has requirement as 2 and calc type as 48 acct key as ERL
    Now when you enter a material in line item 10 and go to item data , you can see the billing plan tab.
    now go to billing plan tab and enter the start date and enter the dates on which billing has to be done and then in billing request enter 0009 which is for down payment.once u press enter automatically it all the dates get blocked and billing request by default  you get as 1 , that you change it to 4 or 5 . 4 is for down payment at value basis and  5 is for down payment at percentage basis. and beside that there will be a billing type .assign billing doc type as FAZ. to all dates
    check the copying requirements are there at VTFA as 20 and for item category TAO copying requirements 23 is maintained or not 
    now do the cycle    OR - LF - FAZ (billing doc type)
    Regards
    Srinath

  • Advance Payment and Retention Money adjustment.

    Dear Friends,
    Pls guide me in the following scenario.
    The scenario is that one very large construction co using SAP. And its sub contract within its different plant in the same co code when he got any new projects. Now the co using down payment or say advance payment and retention money  condition. In the billing document every time I want 10% advance to be settled & 5% retenssion amount to be minus. This will be mapped through a GL for with special indicator A. But where will I maintain the details like % deducted every month? Is there any condition record for this FSZW Condition type( down payment) or this is defined by FI?
    Regards
    Atul

    hi,
    try with installment - payment terms.
    This sould help you.
    Thanks,
    Sujai C

  • Advance payments in sales

    Hi guru's
    i have any an issue can provide solution asap.
    issue:
    1. System should accept the 100% advance payment against any sales order.
    eg  sales order  raised     on  15 jan 2012  with rs 1000,00.00, validity of S.o is 30 jan 2012
        100% advance should receive before 25 jan 2012, after 25 jan sys should not accept any advance payment for this S.O
        validity column should be there in va01
    delivery should take place only for the amount of advance it has
    eg sales order is placed for rs 100000 on 15 jan 2012
    on 15 jan advance received for rs rs 40000
    on 16 jan raised delivery for rs 20000
    on 17 jan trying to raise delivery for rs 50000.( it should be blocked because advance payment received for rs 40000.00 out of that rs 20000.00 delivery is made, so he has just rs 20000.00 advance and delivery is for rs 50000.00 so delivery should be blocked.
    thanks in advance
    Edited by: imam sk on Jan 17, 2012 4:43 AM

    Hi narain
    Your requirement can be fulfilled through down payment configurations
    Make the following  down payment configurations :
    item category group - 0005
    item category  - TAO
    for this TAO item category a billing plan 01 (milestone billing plan -01) will be assigned and its billing relevance should be I which is order related billing .
    billing doc type - FAZ
    cancellation billing doc type - FAS
    maintain a condition type AZWR which is down payment settlement , it has requirement as 2 and calc type as 48 acct key as ERL
    Now when you enter a material in line item 10 and go to item data , you can see the billing plan tab.
    now go to billing plan tab and enter the start date and enter the dates on which billing has to be done and then in billing request enter 0009 which is for down payment.once u press enter automatically it all the dates get blocked and billing request by default  you get as 1 , that you change it to 4 or 5 . 4 is for down payment at value basis and  5 is for down payment at percentage basis. and beside that there will be a billing type .assign billing doc type as FAZ. to all dates
    check the copying requirements are there at VTFA as 20 and for item category TAO copying requirements 23 is maintained or not 
    now do the cycle    OR - LF - FAZ (billing doc type)
    Regards
    Srinath

  • Billing, advance payment?

    Hi,
    Please help me on this.
    The advance payment in reference to the Sales order is maintained in Accounts receivables.The details of down payment(advance payment) is captured in SAP.The amount of advance payment is shown when account for customer is reconciled.The problem occurs when this invoice is again printed , after the final account reconciliation, as no advance payment amount is shown on the invoice though the balance figures are accurate.
    With best regards,
    Archer

    Hi  archer naz
    Check the following Customizing settings  for down payment processing:
    Settings for the billing plan - To activate the billing plan function, maintain the materials, for which you wish to process down payments, with item category group 0005 (milestone billing). This gives the item type TAO via item type determination. The item type TAO calls up the billing plan function.
    You need to implement the following activities in the billing plan for down payments:
    Maintain deadline category - This determines the billing rule (percentage or value down payment) for the down payment request. The system assigns billing type FAZ (payment request) defined in the standard system with billing category P. (For the billing type FAZ there is the cancellation billing document type FAS in the standard system).
    Maintain the deadline proposal - Use the down payments that are due for the proposed deadlines.
    Maintaining a Pricing Procedure with the Condition Type AZWR:
    In the standard system the condition type AZWR is delivered for the down payment value already provided but which has not yet been calculated. You must include this condition type in the relevant pricing procedure before output tax.
    Enter condition 2 (item with pricing) and the calculation formula 48 (down payment clearing value must not be bigger than the item value) for the condition type AZWR.
    Before the condition AZWR you can create a subtotal with the base value calculation formula 2 (net value). If the condition AZWR is changed manually, you can get information on the original system proposal from the subtotal.
    Maintain the printing indicator - The pricing procedure can not be marked as a transaction-specific pricing procedure (field Spec.proc.) The condition type AZWR has the calculation type B (fixed amount) and the condition category E (down payment request / clearing).
    Maintaining the Billing Document - In the standard system there is the billing type FAZ (down payment request) and the billing type FAS for canceling . The down payment is controlled using the billing category P of the billing type. A billing type becomes a down payment request when the billing category P is assigned. You have to maintain blocking reason 02 (complete confirmation missing) for the billing documents and assign it to billing type FAZ.
    Copying control - Copying requirement 20 must be entered in copying control at item level for the down payment request. In the standard system the order type TA for copying control is set up according to the billing type FAZ for the item category TAO.
    Copying requirement 23 must be entered in copying control at item level for down payment clearing. In the standard system the order type TA for copying control is set up according to the billing type F2 for the item category TAO.
    Financial Accounting settings - A prerequisite for down payment processing is that the account is assigned to the underlying sales document. To do this, change the field status settings in Customizing as follows:
    Set reconciliation accounts (t.code OBXR) - For the `received down payments' and `down payment requests' from
    the G/L accounts you have selected, you should assign the field status definition G031.
    Maintain accounting configuration (t.code OBXB) - For the down payments (posting key ANZ in the standard system) and the output tax clearing (posting key MVA in the standard system), you must maintain the posting key.
    You must also carry out a G/L account number assignment for the tax account.
    Maintain the posting key (transaction OB41) - For posting key 19, set the sales order as an optional field !!!
    Maintain the field status definition (transaction OB14) - For field status variant 0001, field status group G031, set the
    sales order as an optional field !!!
    Assign the company code to the field status variants (transaction OBC5)
    Regards
    Srinath

  • Advance payment report required

    Dear guru
    generally in our plant for advance payment we have to intimate the account department for release the payment against advance or PI or any other terms.
    i want the report which can show me that which supplier payment is pending (for advance only)
    at present i m using FBL1N. i didnt get the required report from this
    Regards
    Devesh

    Hi Devesh,
    There is no standard report to address just your specific requirement. However as others suggested you need to rely on the line item reports with specific selection criteria which you might already be doing.
    Else develop custom report to suit your specific requirements.
    Thanks & Regards
    Subhasish