ASA5505 Upgrade License Delivery Time

Can someone explain to me why it takes 1 - 3 days(usually 3) to receive an upgrade license?   Flew out of state to install a new ASA5505 in a new branch office only to find that the L-ASA5505-10-UL= license had not been ordered. So all the severs have been moved from the old office to the new and I cannot power them all up because I exceed the host limit.
This is seriously causing me to look at new products before I buy another Cisco device.
Is there a way to receive a license quickly?     

The license ASA5505-SW-10-50= only gives you more internal users bot not more VPN-Peers. You need the SecPlus license upgrade (L-ASA5505-SEC-PL=) for more VPN-peers. But that won't give you more internal users if these are also too small. If you need to increase these also, you need both licenses.

Similar Messages

  • LR4 upgrade license key works on Desktop but not Laptop?

    Hi,
    I had a fully licensed copy of Lightroom 3 running on my desktop machine (iMac). Once LR4 was released, I downloaded LR4 on that machine to use on a "trial" basis while waiting on my boxed copy of LR4 (upgrade version). Once I get my boxed copy of LR4, I entered the upgrade key from the LR4 box into Lightroom, and (as expected), the software asked for my "previous version" key since what I entered was an upgrade key rather than a full key. I noticed that it pre-populated my LR3 key (I suppose since a licensed version of LR3 had been running on that machine previously). All was good - it took the key and enabled the software.
    So far so good.
    Now, I just bought a new laptop (MacBook Pro). This machine has never had LR3 on it. I installed LR4 and started using it on a trial basis same as my desktop. Once I got my boxed copy of my LR4 upgrade, I enter the key from the LR4 box into Lightroom, and like on my desktop it asked for the key from my "previous version" of Lightroom. Same as before. Only this time the LR3 key was not pre-populated (I suppose since LR3 had never existed on this machine).
    Now, the problem is that when I enter my LR3 key (in conjunction with my LR4 upgrade key) on my laptop, it does not take. There remains a big "X" to the right of my key as if the key is invalid. I have triple checked the value of the key (it is the Serial Number from my LR3 boxed copy) and it is correct, and it is the same one that worked on my desktop.
    Questions:
    - Anyone else know what could explain this?
    - Do I actually have to have an installed version of LR3 on my Laptop in order to use the upgrade key to enable LR4? Or should I just be able to have only LR4 installed, and enter both my LR3 (full) + LR4 (upgrade) license keys? Hopefully the latter..
    - Any other suggestions?
    Thanks
    Chris

    Please disregard.
    It just worked all of a sudden (copying and pasting same S/N, so I don't know what changed...).

  • Using Upgrade License on UCCX 8.0 with "Fresh Install" setup

    Hi all,
    My situation right now is that I want to install UCCX 8.0 (on a VM environment) and I don't have any previous UCCX version deployed, but the licenses I have are :
    - an Upgrade License from ver.5 to ver.8
    - a PAK and SW kit license (also contains the seats licenses) for UCCX version 5.
    Because I don't have any previous UCCX version deployed, I installed UCCX 8.0 and chose "Fresh Install". When I upload the upgrade license, the server returned a warning that said "The license for Cisco Unified CCX Premium Seat ESW or UCSS Upgrade is not a valid addition for the package None and therefore it will be ignored" and "The license for Cisco Unified CCX Premium ESW or UCSS Upgrade is not a valid addition for the package None and therefore it will be ignored".
    My questions are :
    - Can I use the licenses I have on a fresh installation of UCCX 8.0 ( the upgrade license and the ver.5 license) ? Because I've tried similar scenarios with the licenses on Unity Connection and it worked. I'm wondering if it's not possible with UCCX 8.0 and that's what caused the error.
    - If the answer for the "Fresh Install" path is No, does it mean I have to use the "Upgrade" path -what I'm trying to avoid if I can- meaning that I have to install ver.5 first and then upgrade it to ver.8 using PUT( ? Because on the initial setup If I choose "Ugrade from previous version" it will ask where the data from the previous version are located and right now I don't have any.
    Thanks in advance.
    Regards,
    Regi

    Thanks for the answer Hoai Huynh (and Aaron for adding the info).
    Just what I was worrying about, I need to build a ver.5 first. I would appreciate it if you can answer a few last questions if you don't mind :
    So, I need to install UCCX v.5 and also CM v.5 (because my CM v.8 is not supported by UCCX v.5).
    Can the UCCX ver.5 data from the migration tool (PUT) be used on the UCCX v.8 that is integrated with different CM server (different IP address, different credentials, etc) ? Because the steps in the UCCX v.8 upgrade guide are describing a scenario where the CM is the same server and is being upgraded at the same time with UCCX.
    Related to no.1 question, Is there anything I should be aware of when setting up the UCCX ver.5 and CM ver.5 ? For example : need to have same IP addresses with the version8 servers, same AXL / application user name and password, etc.
    At exactly what point of configuration on UCCX v.5 can I use the PUT to migrate data from the ver.5 (the guide only mentioned to make sure that the server is up and running)? Can I do it right away after the first initial setup ? Or do I need to configure a working application to get all the subsystems in "full-service" first ?
    Thanks again.
    Regi

  • Flash Builder 4.7 Upgrade license rejection

    I recently purchases an upgrade license for Adobe Flash Builder 4.7.  The installer accepts my new serial number but then indicates a qualifying product cannot be found to upgrade.  It allows me to specify Adobe Flash Builder 4 Standard, and enter my old serial number, but subsequently rejects it with the following error message.
    "This serial number is not for a qualifying product.  Please try another."
    I have tried live chat support multiple times only to be told it is not available.  I have a valid licesene, so how do I get around this problem?
    Note: It does this regardless of whether I try to install cleanly or on top of my older version.

    I have the same problem, and i have send request complementary upgrade (Adobe® Flash® Builder® 4.7 Complimentary Upgrade), and only received a Acrobat change licensed...
    I´m working with 4.7 Beta the last mounths, and now all the days have to see "please enter your license". So one problem that you can jump with money (if you have that money..), isn´t a problem. Like a i have license from flex 3, upgrade to flex 4, and upgrade to flex 4.5, i´m going to take de upgrade from 4 standard to 4.7 standard (47,97 euros), and not waste my time and money on calls. So yes, I'll see adobe with another eyes...
    Best regards,
    José Ramón León

  • MRP - Auto creation of del schedule lines based on planned delivery time

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Nirav,
    This subject has been discussed repeatedly in this and other forums.  I must assume that you overlooked the rules of engagement, which state that you should first search the forums and other public sites, before posting questions here.
    Standard SAP MRP cannot be made to generate multiple items in a Purchase requisition.  The functionality you seek is usually achieved when converting purchase reqs to Purchase orders, where many single purchase reqs can be adopted into a single Purchase order.
    You also might want to investigate use of Vendor Scheduling agreements.
    Best Regards,
    DB49

  • After upgrade to mavericks: time machine keeps asking for my back up disk and won't open unless i plug in the disk. any solutions?

    after upgrade to mavericks: time machine keeps asking for my back up disk and won't open unless i plug in the disk. any solutions?
    before the upgrade, i could open time machine without the need for having the back up disk plugged in.

    Ok. I got it to work, sort of....
    As I mentioned before I tried the "disk password" and the "Time capsule Password" options to see if I can start the back up again or start a new backup. Neither worked. So I tried the firmware down grade, but like you said that did not work. I then decided to try the "Account password" option and I have never used this option before becasue it states that if there is data on the drive it would not be acessable after creating an account. Since I wiped out the disk that was nno problem. When I created the new account and choose the drive it asked for the user name and password. I entered the info for the new account I just created(FYI this has nothing to do with your login username and password), bingo! It worked!
    Now I have two partitions on the TC disk. The old one and now the new account. I am guessing this is to be used if I have multiple computers, which I don't.
    I any case, I am going to wipe out everything again and try again to do a backup the way I had it before.

  • Delivery time in sale order

    Dear Sap Gurus,
    I had created a sale order with reference to a quotation.
    In the quotation-there are 2 line items with different delivery time.
    sale order date is 15/2/2008
    for eg line item 1  is 3 days
    line item 2 is 1 week
    the maximum delivery time is for line item 1 is 3 days
    so 15+3=18/2/2008.
    the system allows me to do the delivery,and pgi  even on 29/2/08.
    so the delivery time is not effective here.
    kindly suggest me what is the exact usage of this delivery time in a sales document.
    Points will be rewarded

    The Delivery date in the sales order is the Earliest date proposed by the system after automatic availability checks and delivery scheduling.
    The system uses the delivery date for each schedule line together with predefined time estimates for delivery activities (such as picking and packing) to determine the
    Material availability date
    Loading date
    Goods issue date
    Transportation planning date
    In ur case, ur order contains two item with different delivery dates of 15th and 28th.
    Suppose if u deliver the order on 15th , the delivery split takes and only one item will copied into the delivey.
    But if u deliver the order at 28th, both the items will be copied to the delivery, since both have already confirmed on the date
    Hope u understand...

  • Planned delivery time in Scheduling agreement and MRP

    Hello,
    Do you know is it possible to determine system so that MRP run will consider the planned delivery time from the scheduling agreement line instead of material master? Now the system read planned delivery time from material master when creating schedule lines automatically by MRP-run.
    Regards, jaana

    This can be customized in
    SAP Customizing Implementation Guide
    -> Production
    --> Material Requirements Planning
    ---> Planning
    > Procurement Proposals
    > Define External Procurement
    Here you can select the indicator "Scheduling according to purchasing info record or agreement" either at plant or MRP group level.

  • Planned Delivery time in case of Scheduling Agreement

    Hi All,
    Does system consider the planned delivery time in case of Scheduling Agreement for Vendor like in normal Purchase order and requisition?
    I am doing the MRP run, but system is taken planned delivery time into consideration. I have one material that is Inhouse produced material for plant X and Y Plant needs this material for further making of a finished goods.
    Y plant have scheduling agreement for STO from plant X. After MRP Run required Delivery date in plant X for Material is same as plant Y. but from Plant X to Y, it take 4 days to reach. So Ideally in Plant X this delivery date should be less than 4 days as plant Y.
    Please look into the issue and reply if you have some answers.
    Thanks
    Pavan

    Hope you have maintained different Planned Delivery times in plant X and Plant Y as per your requirement. For procurement in Plant Y the system would consider the planned delievry time maintained in Plant Y. If you want in-house production time to be considered with Basis date sheduling during MRP run in PLant X then enter the in-house production time approprietely. Else if ou want to consider the exact routing times then consider Lead time scheduling in plant X.
    If the above are maintained properly then you should get the desired result.
    Regards
    Ramanujan

  • System is not considering Planned Delivery time

    Dear Gurus,
    As iam planning for the month of January and running the MRP,schedulelines are getting generated but system is not condering Planned Delivery time maintained in the material master ie. 7days.Following is the example:
    I have a FERT-X with a component A-1PC in its BOM and its planned delvery time from vendor is 7 Days.If iam running the MRP on 13/12/2010 for FERT-X  100 PCS for January1,2011 then the schedule lines are getting generated for for component A is on 01/01/2011.But PDT is maintianed in material master is 7 days and same has been maintianed in vendor inforecord.But system is not considering it.
    Kindly help to resolve the issue.
    With Regards.

    I have one ROH which has two different vendors.
    Two scheduling Agreemnt with target qty 100000 kg each.
    Two different Vendor info record with Min. order qty maintained.V1-1000Kg,V2-6000Kg.
    One source list with two vendors and with respective scheduling agreement.
    Quota arrangement is there in which SOB is maintiained 50:50.
    I hv the requirement of 3084 kg of ROH.
    I run the MRP and two diiferent schedule lines are getting generated with 50:50 qty as mentioned in Quota arrangement.
    Not considering the minimum order qty maintiained in vendor info record.
    The above process is correct
    Only One doubt In Quota Arrangement?
    IS two schedule line is created after MRP run?
    Generally System will  select a vendor Whose Quota value is less
    quota rating   = quota base quantity + quota-allocated quantity/ quota
    Edited by: Sundaresan . E. V on Dec 14, 2010 3:26 PM

  • Is planned delivery time is considered in scheduling agreement ????

    Hi experts
    problem is that the schedule lines (for external procurement) generated from MRP are not taking the "" Planned delivery time into consideration"". System is only taking the G.R processing time.
    I have mentioned the Planned delivery time in .
    1) Scheduling agreement for 1 day.
    2) In material master for one day.
    3) In info record 1 day.
    e.g Suppose req date is 13.07.2008. MRP run date 4.07.2008.
    a) Planned delivery time = 1 day . B) G .R processing time = 3 days.
    Now when i run the MRP on 4.07.2008.
    Schedule line is generated on - 10.07.2008
    Please Guide . How i can take care of that time which is requiered at vendor ends.
    Regards
    Rahul Bhardwaj

    Go to OPPQ for that plant
    Click on "External Procurement " tab and check if you have maintained any planned delivery time?
    Tick indicator " Scheduling info record/agreement " (This will take Planned del time specified in scheduling info rec or agreement)

  • How planned delivery time effects delivery creation?

    Dear All,
    Some time before, while placing order thro' CRM, we came across a typical error (hard error).
    "date (11/12/2011) lies afterthe end of validity calendar". 
    we could not place order in CRM but in SAP we could create save the order despite of same error but soft. However system didn't allow to create delivery for same order & same error message populated"
    Later it was found that it is because for material  " Planned Deliv. Time  maintained for say "X "days in material master MRP2 view" & was corrected.
    How planned delivery time effects delivery creation?
    For material even though planned delivery time was maintained as say for 500 days, sales order requested delivery date & delivery date in order schedule line got determined as order date (Considering avaliability of funds & material).
    i.e order date/req. delivery date/delivery date in schedule line are same as date on which order is placed.
    Regards
    Suhas W

    Hi,
    Extended your factory calender in SCA3.
    Regards,

  • Planned delivery time issue

    Hello Experts,
    We have below requirement.
    Created sales order for a particular material. Planned delivery time is picked from info record for that material and PR has been created.
    We are converting PR into PO and the planned delivery time is fine. Now we are updating the ASN from vendor with some prior dates. In MD04, the same got updated. However the sales order still shows the old planned delivery time only. How to get the new planned delivery time  in the sales order based on the ASN updated in PO.
    Example:
    Material: A
    Planned delivery time is 10 in info record
    Created sales order. Planned delivery time in the sales order is 10. PR created with fixed vendor and planned delivery time is 10 days from the date of creation.
    Converted PO.
    Now we received the ASN from Vendor that the vendor will deliver this material in five days. So accordingly we are updating the ASN in PO with delivery date.
    In MD04, we could the new planned delivery time based on the ASN. However sales order delivery still shows the previouls delivery date only.
    How to get the new delivery date in the sales order based on the ASN update?
    Regards
    Bala

    This is not standard SAP logic. Required delivery date on the original line item stays as it was when you issued the order. Then you create a confirmation (ASN) that is relevant to MRP with the updated delivery date. Planning sees the new date and acts accordingly, and also in the order you can see both "old" and "new" (in the confirmation tab).

  • Planned delivery time

    Hi,
    I have created a sale order on 1/7/2009 with a material which has planned delivery time of 4 days.
    Now when I go to the schedule lines screen I see that the delivery date corresponding to the confirmed quantity is 1/8/2009.
    Why is not SAP taking the 4 days into considerations while determining the delivery date?
    Please see below the screen shots:
    Scheduling configuration in material master:
    [http://i40.tinypic.com/14b2fyc.jpg]
    Schedule lines screen shot:
    [http://i44.tinypic.com/9pxkzc.jpg]
    Sincerely.
    Ketan

    Hi,
    You seems confused with planned delivery time in MRP 2 view of material master to Sales order delivery date.
    Material master Planned delivery time is for the material which is procured externally  through PR -- PO process.
    In Sales order the delivery date is with respect the ATP--Avalible to Promise.
    If the stock is avalible in the storage location on the date of Sales order creation, then system will consider the delivery date an the basis of confirmed qty in the sales order. You can check in CO09 for confirmed qty.
    rgds
    gsc

  • Planned Delivery time not considered after MRP run for scheduling

    Dear All,
    After running MRP, the planned delivery time maintained in Purchase info record is not taken into consideration for calculating start date of the schedule line of externally procured material generated by the system.
    Planned delivery time is 3 days & Requirement of parent material falls on 15/02/2010. With this, system should calculate the start date for schedule line as on 12/02/2010 considering 3 days Planned Delivery time.
    Any idea as to what might have gone wrong?
    thx for your help in advance.
    Rgds,
    Ranjeet

    Hi,
    Determination of PLD from the Purchase info record is maintained in transaction code:OMDT. Planned Delivery time is also maintained in Scheduling agreement. However, it is not calculating delivery date as well as release date.
    Rgds,
    Ranjeet

Maybe you are looking for

  • How do I stop Firefox from preloading websites?

    Whenever I try to go into Facebook or LinkedIn Firefox has already loaded the user name and will not allow me to change it. How do i fix things. My family has multiple sites with all of us having our own accounts. Since installing Firefox only one of

  • How can I edit text tabs in Photoshop...?

    how can I edit text tabs in Photoshop like in Illustrator that I can choose to view the tab rulers and edit the alignment on the tabs? is it possible? otherwise I can't understand why I can use the tabs at all... thanks!

  • 6/4/2014 - Beta - Flash Player 14.0.0.126

    The latest Flash Player 14 builds are now available.  You can download Flash Player here:http://www.adobe.com/go/flashplayerbeta. Please note that this build is identical (except for version number) with the official release slated for next week.  Pl

  • How to convert substring(date) as the format i need...

    Hi to everyone... actually i got a field (datetime) in this format: yyyy/mm/dd throught a function, i turned it in ex: 16/12/2012 (italian). the issue comes when i have to concat 2 dates as: min(date) || max (date) (range of the week) to do that, i h

  • BEST PRACTICES - BOM

    Hy Experts Does anybody know with is the best practicies that I need to use in order to activate the 'Bill of Material' (BOM) Thich function module contain this? Thank you in advance