Dear guru
In the ATP scope of check with inclusion planned orders I have also option B : only check planned order that are completely confirmed.
What does it mean completely confirmed ?
Thanks in advance.

Setting in scope of check is set to only consider completely confirmed planned orders
After some further testing with a 3 level BOM...
C > B > A, Each level has a planned order
When all 3 levels are shortage free, the availability check confirms each planned order as being 100% complete.
Creating a partial shortgage on planned order C will confirm planned orders B and A as 0% complete and planned order C as partially complete.
Creating a partial shortage on planned order B will confirm C as complete, B as partially complete and A as 0% complete.

Similar Messages

  • Availability check - Planned order not considered

    Hi Experts,
    I am facing an issue in Make to Order scenario.
    My sale order is of quantity 10.
    when i save the sale order, i get confirmed quantity as Zero.
    But in my controls setting of availability check i have selected consider all firmed planned order.
    Now  i have a firmed planned order for this sale order.
    but still system shows confirm quantity as Zero.
    Let me know what is the correct procedure and whether planned orders are considered for availabilty check for MTO scenario or not.
    Regards,
    Birendra

    Hi Venu,
    Please find answers of your query:
    1.    First have you maintained any safety stock in mm01:
    No
    2. Tcode: Md04
    3.> Tcode : Co09
    4> If that stock related to batch Please check in MSC2N Because if batch is restricted you cant get stock
    Not related to batch
    5.> schedule lines
    Let me know if any more information required.
    Regards,
    Birendra

  • ATP : Scope of Check : Requirements & Reservations ?

    Hello All,
    In OVZ9 --> for the Scope-of-Check combination 02-B , could anyone explain what is the impact of selecting the following fields with some examples :-
    1) "Include Reservations". (field RESBP).
    2) "Include Sales Requirements". (field VBBDP).
    There is not much information on help.sap.com/
    Thanks,
    Srinivas

    HI,
    Include Reservation  means system will consider Reserve Stock (Stock is blocked for any spl. orde/any order or you can say Make to Order stock) during availibility check if this check is activated at Checking rule level then system will consider these stock also for Aval. Check otherwise not.
    Include Sales Requirements Means System will consider the open sales order (Means the sales order not deliverd ) also consider for availibility check,Exp. you have 1000 Qty. stock available for you & 3 open sales order of 100 Qty. each ,now if you go for any new sales order system will show stock available 700 Qty. even if these order are not deliverd.
    Mean to say system will block the qty. for these order respectively based on the configuration done at checking rule level.
    I hope this will clear ur point...
    Revert me if still not clear.....
    Regards
    Deepak

  • COOIS Report to Check Planned Order

    Hi PP experts,
    My question is : Why COOIS for planed order operation detail is blank and how to show it?
    Please refer to below screenshot.
    Step 1: COOIS to get planned order.
    Step 2: Running and get result, and we can see the operation view is blank.
    Step 3: But if we check detail for planned order via T-code MD13 we can see the operation is in the detail.
    Best Regards,
    Bu Fanchao

    Hi Ganapathy,
    Thank you for your support.
    I have checked this profile '00000000001X'.
    The Order Categories of this profile is empty---Only Production/Process Orders.
    There is one case, in COOIS, I choose check-box for planned order and profile '00000000001X'.
    What is the logic of output for this case, the output display the Header, component.
    Best Regards,
    Bu Fanchao

  • Planned orders table/report

    Hi all,
    IS there any table/report which lists out the Planned orders and the converter Purchase requisitions from planned orders? I want a report/table which lists out Purchase requisitions and the related Planned orders.
    Thanks,
    Avani.

    Hi,
    no standard report for your reqirement
    pls check planned order table
    PLAF - planned order table
    once converted planned to pur. req, there is no table to store this converted data
    EBAN - Pur. req table
    Hope you understand
    Regards,
    Sankaran

  • Reservation against planned order

    Hi...
    I have one issue with reservation against planned order.
    We have REM & after MRP run generates planned order with order type PE.When i check planned order in table PLAF.
    I found reservation no. & same has been passed to RESB , I got the reservation details but it is not allowed for goods movement XWAOK field in RESB. So no question of goods movement through MB1B with movement type 311.
    My question is that is there any customization related to above scenario so that reservation is allowed for goods movement?
    Regards
    Tushar

    Dear ,
    In REM , you will recieve reservation against planned order .But GI always happens during GR or after GR along with back flashing .I do not think so you can issue material against reservation as like normal PP Order reseravation  in the production order .
    1.Goto -SPRO->production-> Rep Manufacturing->Define Rem MAnufaturing profile(OSP2) --->Control data, in the Control data 1 tab select the "GI back flush at GR posting".
    2.Check in  the REM profile assigned in MRP view of material Master (MM03)
    Based on this above set up , you can make Goods Issue for Planned order in REM .If you deselect that option execute material staging transaction code is MF60 and then go for REM backflush. In materil staging the components issue is carried out for the planned order.After that you can execute the REM backflush in MFBF
    In rem scenarion components placed on the production lines anonomously (without ref to planned order)...you cannot issue materials like in production orders scenario. if you want to have track on the good issues before the GR then use the pull list concept...there will be no movement type but you will have track on quantities issued to header parts/production lines not to planned orders.
    Hope this clarifies your doubt .
    Regards
    JH

  • ESYU: Planner Workbench Release process가 다른 user로부터 planned orders를 release

    Purpose
    Materials Requirement Planning - Version: 11.5.9 to 12.1
    Information in this document applies to any platform.
    11.5.9 ~ R12 version:
    두 명의 users가 MRP Planner Workbench에서 Release를 위해 records updating을 진행하는 경우, 두 명 중 한명만이 update 후 실제로 release를
    submit 했으나 두 명 user의 모든 records가 release 되어 버린다.
    User1은 자신의 Planned Orders 만을 release 할 수 있고, User2 또한 자신의 저장된 Planned Orders 만을 release 해야 한다.
    STEPS:
    1. User 1이 MRP Planned Workbench로 log
    2. User 1은 특정 planner code를 위한 current planned order recommendations 을 찾는다.
    3. User 2가 MRP Planned Workbench로 log
    4. User 2가 특정 planner code를 위한 current planned order recommendations 을 찾는다.
    5. User1은 All for Release를 선택
    6. User2도 All for Release를 선택
    7. User1은 checking process를 끝낸 후 저장
    8. User2는 아직 checking process를 끝내지 못해 save를 아지 않은 상태로 남아 있다.
    9. User1이 [Release] button을 선택
    10. User1이 [Release] button을 선택시 User1과 User2에 의해 저장되거나 check 된 모든 planned order recommendations이 Work in Process와
    Puchasing modules로 released 되어 버림
    Cause
    이 issue의 원인은 현재 MRP planning의 경우 expected functionality 이다.
    MRP Workbench Release process는 모든 planner에 의해 check 되거나 저장된 모든 planned orders를 항상 release 한다.
    Bug 891669 : Enhancement Request
    PLANNER'S WORKBENCH SHOULD RELEASE ORDERS BASED ON PLANNER NAME NOT BY BATCH
    It is explained that this is current functionality in the following rejected Enhancement Request:
    Bug 891669 : PLANNER'S WORKBENCH SHOULD RELEASE ORDERS BASED ON PLANNER NAME NOT BY BATCH
    Solution
    Solution을 적용하기 위해 아래 steps을 실행:
    1. 모든 planner에 의해 check 되거나 저장된 모든 planned orders가 [Release] button에 의해 항상 release 되는것은 현재 MRP Workbench
    Release process에서는 correct functionality 이다.
    2. ASCP Planning의 경우엔 Planner/User에 의해 Release process가 아래 option에 의해 처리 가능하다.
    -- profile MSC:Released Only By User
    -- Standard MRP에서는 이 option은 사용할 수 없고 고려되지 않는다.
    Reference
    Note 311053.1

  • ATP-check - check completely confirmed planned orders

    Hi everyone,
    I just stumbled over sth. during checking the ATP-settings in my system.
    In OVZ9, when double-clicking on any of the combinations of checking-group and checking-rule, in the lower part of the righthand-side, I got the option to include planned orders as well. Now, if I open up my options, I find 4 of them:
    - empty: Do not check
    - A: check firmed planned orders only
    - B: check completely confirmed planned orders
    - C: check all planned orders
    So... can anybody tell me what's the story with completely confirmed planned orders? I know what it means to firm planned orders and I know how to do it, but what's the point with that?
    Any help greatly appreciated!
    Regards... Bobby

    Hi,
    There was a bug in the standard program.
    SAP create a new SAP Note '1616590' for the above correction.
    Thank You.

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Order Processing - Capacity and ATP check with planned order

    Dear all,
    is it possible to block the creation of a sale order based with PP strategy 81 (or similar) if missing components for planned order are given?
    Is also possible to block the creation of a sale order with PP strategy 81 (or similar) if no alllowable capacity for planned order is given in the scheduled dates?

    Luca,
    is it possible to block the creation of a sale order based with PP strategy 81 (or similar) if missing components for planned order are given?
    Not in Standard SAP ERP.  You can block confirmation in 81 or 82.
    Is also possible to block the creation of a sale order with PP strategy 81 (or similar) if no allowable capacity for planned order is given in the scheduled dates?
    Not in standard SAP ERP.  It is possible to generate a notification popup during the capacity check.
    The functionalities you seek exist in APO using either CTP or MATP
    http://help.sap.com/saphelp_scm70/helpdata/EN/25/b0c23ba6af1855e10000000a11402f/frameset.htm
    Best Regards,
    DB49

  • Set Availability Check to Exclude Planned Order

    Hi All,
    anyone know how to set the availability check so it will not include the planned order in the calculation ?
    I find one setting in SPRO, the path is :
    Sales & distribution ==>  Basic functions ==> availability check and Transfer of Requirements ==> Availability Check  ==> Availability Check with ATP Logic or Against Planning ==> Carry Out Control for Availability Check
    select one of the record, and update filed "Incl. Planned Orders".
    I've uncheck that field, but I can't get the appropriate result. When I create a new sales order, the availability check still take the planned order I created before into account.
    The problem is, my user want to prevent creating delivery before the goods are already put in the stock. So the planned order should not be considered in the availblity check.
    Thank you in advance
    Rudy

    Hi Rudy,
    Concept of availability check is to verify if the stock is available at the time of creation of sales order. If available, when it can be ready for delivery (as Packing, arranging for transportation, etc may have lead time) & if not available, when it would be available considering Packing, arranging for transportation, etc lead time.
    Availability check whether material is available on required delivery date (backward scheduling) or not. If not available on required delivery date, system will propose next available date (forward scheduling)
    1.     Define Checking Groups
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups
    You define checking groups with which you specify the type of requirements records the system is to create when processing sales orders or deliveries
    2. Define Material Block for Other Users
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Material Block for Other Users.
    3 .Define Checking Groups Default Value
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups Default Value.
    4. Carry out Control for Availability Check
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Carry Out Control for Availability Check.
    5. Define Procedure by Requirements Class
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure by Requirements Class.
    6. Define Procedure for Each Schedule Line Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure for Each Schedule Line Category.
    7. Determine Procedure for Each Delivery Item Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Determine Procedure for Each Delivery Item Category.
    8. Checking Rule for Updating Backorders
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Checking Rule for Updating Backorders.
    9. Define Default Settings
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Default Settings.
    Availability checks
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how – confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) – planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics – sales & distribution – sales – environment – availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks –
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups –
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above – checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing –
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out –
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups –
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 – summarized requirements and 02 – individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users – the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check – in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under –
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order – is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    Please Reward If Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • ATP Rule for Planned Orders

    Hi Experts,
    I have configured the ATP rule for Planned Orders. So I only want to check the component stock and Production Orders when running ATP check for the Parent Material.
    In OPJJ, I only selected the following options.
    Include Safety Stock : Ticked
    Check without RLT : Ticked
    Incl.production orders : X (Take all production Orders into account)
    No other options or boxes have been selected
    Also I have included the relevant Checking group in MRP 3 for the Parent Material (Checking Rule has been assigned to that Checking Group in Config) and also maintain the Plant Parameters for MRP (assign the checking rule to the plant)
    So, For an example :
    Parent : A
    Components : B and C
    Parent Material A has only 5 Planned Orders starting on same day 20.05.2014 each qty 5
    Components B got stock 300
    Components C got stock 1
    When I ran ATP Check for the Parent material A using COHV, qty 1 has been allocated to all the planned orders as committed. Why is this happening ?
    I also checked in CO09 for the Component Material C, and it says ATP Qty is only 1. I expected the system would allocate that stock 1 to one of the Orders but it seems to be not working as I expect.
    Any explanations will be much appreciated and will not hesitate to avoid the points.
    Kind regards,
    Ishara

    Hi DB49,
    Appreciate your reply. Please see the following comments.
    Right now I have been assuming that you have performed an availability check manually for one of the planned orders, and you got the same results (overconfirmation).  Please confirm.
    Yeah I have performed for one order and it gave me the same result.  Also, when I perform for the 2nd Order, it allocates the quantity.
    OK, basic things you should already have checked:
    You have maintained the checking rule for planned orders (OPPQ or OPPR)
    You have maintained the ATP group for the materials (OVZ2)
    You have assigned the ATP group to the Material Master of the components (MM02)
    You have maintained the scope of check according to the rules you mentioned earlier (OPPJ).
    You have no planning strategy in the component material that would have invoked a special ATP.
    I checked everything apart from point 2 (OVZ2). I have maintained that via MRP Group and that MRP Group has been linked to Master Data (MRP 3)
    Really appreciate your support in this.
    Kind regards,
    Ishara

  • Scope of Check Variation in Missing Part list Production Order

    Hi,
    I have a problem that While creation or conversion from planned order to production order if i get missing part list i found that Scope of check is as Z6 and ZP (Checking rule).But when when i Release the same production order also am getting missing part list here when i check scope of check as Z6 and PP(Checking rule).
    Why this difference is coming,can any body tell the possible causes.
    Cheers,
    Kumar.S

    >
    KUMAR.S. wrote:
    > Hi,
    >
    > I have a problem that While creation or conversion from planned order to production order if i get missing part list i found that Scope of check is as Z6 and ZP (Checking rule).But when when i Release the same production order also am getting missing part list here when i check scope of check as Z6 and PP(Checking rule).
    >
    > Why this difference is coming,can any body tell the possible causes.
    >
    > Cheers,
    > Kumar.S
    Kumar,
    Its simple for creation and release of Production order different checking rule is used(This must be intentional). You check this in OPJK transaction,  check for your order type / Plant combination for Business function 1(Create) the checking rule assigned would be ZP, whereas for the same order type / Plant combination for Business function 2(Release) the checking rule would be PP.
    If you want the same, you can change it here. But I assume there must have been a purpose for this custom checking rule creation. You can find the scope of check difference between these 2 combinations in transaction OPJJ.
    Regards,
    Prasobh

  • Availability Check in planned order

    Hi Everyone,
    What is differecnce between MDVP  collective ATP check and MD12 ATP.
    I am getting different result for the same planned order.
    could you plase tell me why this so.
    Thanks
    Siddhesh

    HI R.Brahmankar,
    Thanks for your quick replay.
    But I am getting different results for same materil in MDVP and MD12 Component Avail check.
    I am not getting  the logic why the system is giving this results.
    can you please tell me the same.
    Thanks a lot in Advance.
    Siddhesh

  • ATP Check - Sales order

    Dear All
    Our company requirement is not to save the sales order if stock is not available for any of the line item. This requirement is for specific order type or item catagories.
    Currently system is saving the order even if quantity is not available. 
    Can you please help me how to configure the same in SAP.
    Regards
    K.C Choudhury

    hi,
    ATP Check is checking of availablty quantities i.e ATP = Total Warehouse Stock + Planned receipts(Incoming Stock) - Planned Issues (Out going stock)
    Availbilty Check is an integral part of business process it determines the if the desire deliverible quantity can be met on requested delivery date or not.Then it passes to Material Requirement Planning. Or
    avability check is nothing but checking of availibility of stock which is placed in the order , sys carries out this check through a available to promise (ATP)
    When we create a sales order, there are several basic functions which are executed automatically for the dynamic order management . among these basic functions , availability check and transfer of requirements are crucial.
    the system first prepares schedule line containing the information on the desired delivery date and quantities , this information is passed to MRP and an avialability check and transfer of requiremnts are executed
    First the system carries out backward scheduling and establishes the material avaialbility date = desired delivery date-transit time-loading time-picking & packing time and on this date an availability check is carried out using ATP logic which means avialable to promise quanity =total ware house stock+incoing orders-outgoing
    along with the avialability check the requirements also are transferred to MRP.
    the configuration involves following
    1. switching on at schedule line catagegory the avialability check and TOR
    2. configure the avilability check using ATP and using the checking group and Checking rule
    Regards,
    Raj