Hi,
As of now we enter  no.of KANBANS and KANBAN quantity  while creating control cycles for the material to be operated through KANBAN. The KANBAN quantity is decided at user level and updated  which is causing many discrepencies .
the requirement is can system calculate the KANBAN quantity automatically driven from the requirement calculated based on finished products PIR quantity ?
1. is it possible  that when MRP runs for the finished product  system calculated the KANBAN quantity for those BOM items of the Finished products which are marked as relevant for KANBAN.
2. if it is possible then what and all settings and other things required ?
3. any side effects?
please provide some inputs
regards,
madhu kiran.

Hi,
Pls. find inputs for respective queries as below :
1. Yes it is possible with using Kanban with MRP , pls go through the following link for details about Kanban with MRP :
[KANBAN With MRP  |http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f932e43b711d189410000e829fbbd/frameset.htm]
2. For Automatic Kanban Calculation pls go through the following link which gives all detailed settings & requirements for the same :
[Automatic Kanban Calculation  |http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f932e43b711d189410000e829fbbd/frameset.htm]
3.There are no side effects of automatic kanban calculation because It is Std Functionality given by SAP.
Hope this helps resolve your issues.
Revert in case any doubt.
Regards,
Tejas
Edited by: Tejas  Pujara on Apr 29, 2009 6:58 AM

Similar Messages

  • KANBAN control cycle quantity changes tracking -reg

    Hi,
    Which tables and fields are to be used to knwo the changes in the kanban quantities in the control cycle of a part number
    for a part number over a period of time what and all changes are done to the kanban quantity we would like to track
    how to go about ?
    pl guide
    regards,
    madhu kiran

    Hi,
    Try Table PKCH and field PKCMG.This would be your best bet.

  • Process Order Base Quantity calculation - WPL

    Hi,
    In COR2 when changing Total order quantity (Litres) (CAUFV-GAMNG) the Base quantity (Kgs) automatically re-calculates (CAUFV-BMENGE).
    As far as I can see this is calculated from the WPL found in the material master > additional data > units of measure e.g. 1000lts = 1255kgs.
    However if I create a process order it calcualtes with say 1.255 Kg/l, I then change the WPL in the material master, come back into the order and then change the Total order quantity. The base qty is still using the old WPL.
    My question is where does the base quantity calculation take the WPL from? If it does take it from the material master is there anyway of making the process order pick up the current WPL in the calculation and the not the previous one?
    thanks
    Tom

    Hi Pert,
    Follow the below link you have some idea OK.
    Any questions revert me back.
    Batch search strategy
    Regards,
    Madhu.G

  • Sequence of steps n Material quantity calculation functionality

    Hi, Pls advise the sequence of steps involved in MQC functionality in Master Recipe? Thank You.

    Hi Raju,
    Below are the steps you can explore.
    1. Assign Classification to component if you are using any batch classification values for calculation of other components. This you can do it in BOM section of Master recipe.
    2. Now goto calculation tab for the component of which quantity calculation is required.
    3. In this screen you can see the characteristic assigned for calculation in batch classification as per step 1.
    4. You can insert simple calculation formula using reference of these cells. The reference is simple like the references we have in excel. For example (001; 002) this given you value in 1st column & 2nd row.
    5. At the time of batch determination or quantity change in Process order please make sure to click on Calculation tab & then save. This is required to get the quantity calculated as per formula.
    Hope this will help you.
    Please let us know the industry you are working in. This will help all to help you better.
    Regards,

  • Quantity Posting Required (SPRQ),

    Dear Friends,
    For an Inspection Lot, System status is
    UD   Usage decision has bee
    LTIN Long-term inspection
    PASG Plan/specification ***
    CCTD Insp. characteristics
    CALC Sample calculated
    RREC Results confirmed
    STIC Short-term insp. compl
    SPRQ Quantity posting required
    SPCO Stock posting complete
    STUP Statistics updated
    In inspection Lot tab, inspection Lot qty is 4000,
    but total quantity posted is 0 and To be posted is also 0.
    And in Stock overview, no quantity is there in Quality Inspection stock type
    Please tell me how to post full quantity.
    Thanks and Regards
    Prashant Atri

    Prashant,
    For the status you provided on the lot, it appears to me that the lot is completed.
    According to your posting you have zero stock in QI.  According to the statuses you provided in your first post, the stock posting is completed, (SPCO), and the UD is made (UD).
    What makes you think you still need to post against this inspection lot?  You don't say that you are missing material in unrestrtcited stock. 
    The inspection lot quantity should not change.  It always remains the same, i.e. whatever the initial lot qty was +- any lot qty. corrections. I'm wondering if you are confusing this and thinking that needs to be posted?
    The only thing odd about your lot is the "amount posted" being zero.   Typically it should equal  some value between zero and the lot qty size. What does the sample size value equal on the stock posting screen shown just under the inspection lot quantity? Are they equal?  If so, is there any chance one of your characteristics is set up as a destructive test?  In that case, the system could think the entire lot was destroyed in testing.  Hence zero stock to post, posting complete and no stock in unrestricted.
    If you have the stock in unrestricted, then I come back to the question of why do you think you need to post against this inspection lot?
    FF

  • Restrict Automatic serial number calculation for Production order release

    Hi,
    I need the solution for following requirement.
    Release production order(CO02) . Then go to Menu header-> Serial Numbers.
    Here I am getting serial numbers automatically as the material used in production order is set for automatic serial number calculation.
    But I want to restrict automatic serial number assignment based on production order type.
    If order type is 'XYZ', I dont want to calculate serial numbers automatically.
    Can anyone tell me how to do it?
    Regards,
    Manan Desai.

    When you press Release Order button the BADI 'WORKORDER_UPDATE->AT_RELEASE' will be called.
    At this point the internal tables for Serial numbers are filled by the program automatically.
    So call function module 'SERIAL_INTTAB_REFRESH' which will refresh the internal tables for serial numbers generated before teh serial number window pops up.
    Also at the BADI 'WORKORDER_UPDATE->AT_SAVE' call the same function module because before this BADI call when you press 'SAVE' the program again checks if automatic serial number is set for that material and if yes then check if no serial numbers are generated then it generates the serial numbers again and fills the internal tables. So clear the internal tables again based on the conditions.
    In these BADI's we have access of header information which can be used to check condition.
    I hope this will give you better idea.
    Thanks for your efforts.
    Manan Desai.

  • Target quantity calculation in Production order.

    Hi Freinds,
    Target quantity of the components to be issued is calculated from the ratio from BOM of header material.
    If there is component scrap for the components mentioned in BOM then the Target quantity calcultion also considers this and increases the quantity by the Scrap percentage mentioned.
    Target quantity gets updated at the time of goods issue during confirmation
    Problem is only for orders of one material, the target quantity calculated of components is not considering scrap inspite of maintaining the scrap for components in BOM.
    Can anybody help in this matter, what could be the missing setting ?
    Thanks in Advance
    Shailesh

    Hi Shailesh,
    Please check whether the BOM where u maintained the scrap is being copied to the order. To my knowledge there is no other settings required to consider component scrap.
    I think the BOM which is copied to the order might be of different alternative BOM where you have not maintained the scrap for that particular component.
    Please check and revert.
    Regards
    Suri

  • Material quantity calculation to be done upto a limit

    Dear PP experts,
    I am using material quantity calculation for acitve ingredients. The quantity of API should be calculated as per the assay recorded in inspection lot. But the additional requirement is that the API quantity should be calculated after batch determination only if the assay recorded is 99 % or below 99 %. If the assay recorded against inspection lot is more than 99 % the API quantity should remain the same.
    Pl. suggest how to proceed.
    Thanks,
    Prashant

    Dear Prashant
    If you can post this question in PP forum, may be you can get lot of suggestions.
    thanks
    G. Lakshmipathi

  • Batch determination issue in process order Material quantity calculation

    Dear Gurus,
    We are facing issue in auto batch determination in process order (Material quantity calculation ).
    eg Material X  is active material 200 KIA used in BOM as
    10  X   200  KIA  
    20  Y   10           Filler
    30  Z
    40  X   200  KIA
    50  Y
    60  Z
    We select line item 10 and 40 and do Batch determination system proposes 2 batches for line item 10 as Batch A and B
    and for line 40 again Batch A (with 0.01 KIA) and batch B proposed which is wrong.
    For line Item 10 Batch A and B
    For line Item 40 Batch B and C or as per FIFO logic.
    As Batch A should be consumed in Line item 10 then it proposed Batch B and so on....
    We have already maintain data in COB1.
    Can any body explain what is wrong in determination.
    Regards,
    J.H.Pert

    Hi Pert,
    Follow the below link you have some idea OK.
    Any questions revert me back.
    Batch search strategy
    Regards,
    Madhu.G

  • How to get MRP elements - quantity received/required

    Hi all
    I have a report and I need it to show the quantity received/required for each material in a plant due to MRP execution.
    Basically something like MD04 showing each MRP element entry (Deliv., OI-SL, Order, etc) but a sum of quantity received and required
    Do anyone knows a function, bapi, or other that can helps calculate this?
    Thanks in advance

    Hi,
    Sometime ago I were asked to solve a similar problem.
    Just try FM 'MD_ABBL_REPORTING', see if this FM meets your requirements.
    Hope it helps!
    Best regards,
    Carlos Constantino.

  • New Store Quantity Calculation

    hai..
    i have been assigned an object.
    I need to use the function exit WRPL0001 for the transaction wrp1 to calculate the total consumption for the given fiscal year.
    Inside the user exit using the article number and site, the corresponding reference site and article from store logistics view is to be read.
    Does any one know wat a store logistics view means?? also the minimum TROC should be read from store logistics view.
    Can anybody help me regarding this?

    Hi Rajesh,
    Thanks for your input.i have alredt reffer the same,
    i am working with PI.I have some doubts .Pl.clear the following.
    1)Is it mandatory to create bath determainationin PI.
    2)As our bom components vary for the header material.How could it be map in master recipe.Whether this material quantity calculation link with batch  & how it perform.
    Regards,
    Devendra

  • Reservation: withdrawn quantity exceeded requirement quantity

    Hi Gurus.
    Please help.
    Is there a way to check why withdrawn quantity exceeded requirement quantity in reservation? System should get standard message M7362 when this happens. Settings in OMCQ are correct.
    Thanks in advance...

    Hi,
    The message might relevant for the scenario of GI to reservation, which issued quantity greater then reserved quantity in reservation.
    You may check your reservation with MB25 for listing your reservation document and I suggest to use MB26 for collective and more accurate GI processing of relevant reservations.
    Cheers,
    Girang

  • The quantity received/required for each material (only sum of Dep and Foreq

    Hi all
    I have a report and I need it to show the <b>quantity received/required</b> for each material (<b>only sum of Depreq and ForReq</b>) in a plant due to MRP execution.
    Basically something like MD04 showing each MRP element entry (only sum of Depreq and ForReq)
    Do anyone knows a function, bapi, or other that can helps calculate this?
    Thanks in advance

    Hi srivalli,
    U mean that for every material u need sum of recieved quntity and required qunatity? if this is your requirement.
    Try the synax below.
    Example.
    itab - internal table of any sturcture. suppose itab  consits of materil and quantity fiedls.
    sort itab by matnr.
    loop at itab.
    At end of matnr.
    Sum.
    Write: itab-matnr, itab-menge.
    ENDAT.
    endloop.
    This syntax will display the sum of quantity for each material.
    <b>Reward if useful</b>
    Any thing please reply back if you have any other doubt.
    Regards,
    sunil kairam.

  • Tcode Lp10 requested quantity calculation.

    Hi Friends,
    I want to know logic for requested quantity calculation in LP10 as I see that there is stock available for the material but qty is not calcualted in requested quantity field.
    Thanks,
    Kiran

    Hi
    Requested quantity gets calculated based on how much left over stock you have in production supply area. Suppose in PSA available qty is 100pc and if you consumed only 70pc in the production order fow which you have staged it. SO left over stock will be will reduce the requested quantity by 30pc for next production order.
    In your that may have happened, at first instance there might be some leftover stock was available, while next if might have consumed by someone
    BR
    Kamal

  • Automatic Pick Quantity In Outbound Delivery

    Dear all,
    Please give me a solution for Automatic Pick Quantity In Outbound Delivery using t-code VL01N.
    Thanks & Regards
    Amit Karalkar

    Hi Amit,
    I will explain how you set up this automatic picking, and then you can
    work backwards from there.  The automatic picking you are experiencing
    is actually related to the output type EK00 assigned to your shipping
    point.
    Consider the following two setup steps which will result is automatic
    picking:
    Set the output type to EKOO, in the print picking list of the shipping
    point in customizing.
    Make sure the parameters below are set:
    Message Language
    Number of Messages
    Send Time              <<<<<<<<<<< this must be set to 4 (send immed)!!
    Transmission Medium
    1) you have to set the parameters for EK00 in the shipping-point-
       maintenance in customizing:
              -> Enterprise Structure
                 -> Definition
                    -> Logistics Execution
                       -> Define, copy, delete, check shipping point
    2) as second step you define the shipping-print-parameters in
       customizing:
               -> Logistics Execution
                  -> Shipping
                     -> Basic Shipping Functions
                        -> Output Control
                           -> Define print parameters shipping
                             -> Shipping (Spec.case)
    Therein there should be an entry for every shipping-point, where
    you like to use the picking-list EK00!
    If you have 1 & 2 setup for a particular shipping point you will
    experience the "automatic" picking of deliveries.
    Regards,
    Ramana

Maybe you are looking for

  • Open & Edit an Excel File

    I am using 'Write to XL' Example VI with Labview 7.0 . I would like to be able the data on the front panel to an already existing Excel spreadsheet, without deleting the old data in the original spreadsheet.  I have the opening an existing spreadshee

  • How to do the Manual Depreciation for Closed Fisical Year (2009) in Feb2010

    Hi Experts, One Asset Start Using from 30.06.09. Capitalized Date is 30.06.09. But Asset (invoice) is Created, First Acquisition Date is 31.01.10. Manually Entered the Depreciation Date is 30.06.09. now i have to run the depreciation previous year (7

  • Process Order Quanity based on Component Quanitity

    Hy, In most cases the component qty. are depends on prodcution/process order quanity, but we have a scenario in which Order quanity is only decided on the basis of Active component's avalable qty of a single bacth which is based on its potency. For e

  • How do I move a photo within a cell? (montage)

    Hello there. I am trying to create a photo montage. I have all my photos in cells on the page, but now I am trying to zoom in on and move photos around within each cell (sort of what you do when you upload a photo in Facebook). This was quite easy fo

  • 8.2.1 grays out external speakers

    I updated to iTunes 8.2.1 and now my external speakers (which I accessed through my airport express) are grayed out. I've restarted my computer, unplugged and replugged the airport, and checked the iTunes prefs, making sure that "look for remote spea