Background MRP Run Some times Planned orders are not generating.

Dear All,
We run MRP in the background at plant level once in a month. Some time we do not get planned order for the material in MD04. Than we run MRP (Selected material only) manually through MD01 considering MRP control parameter 13132.Than only we get planned order. Plesae let me know why it happens? Please give your comments on this.
Thanks & Regards
Kundan Kumar

Dear Kundan Kumar,
First check the output list or the results of MRP run in SM37,find out for how many materials it has
throwned out error,I hope in this list you can find out the materials.
Then the next step you have to check once again the material master settings.
Instead of running in MD02,first check whether was there any issue in master data,or if this happening
repeatedly for the same materials and work around.
Regards
Mangalraj.S

Similar Messages

  • Planned orders are not taking into account the processing time

    Hi,
    Could you please tell me why planned orders quantities are not based on processing time from the material master.
    Materials was set before with 1 day in house production , no matter of lot size.
    Based on routings I updated material master with processing time depending on lot size.
    What is bottering me now is that planned orders are not taking into account processing time. (e.g.  based on my processing time 1000 pce are produced  in 3 days, but planned orders show me that 1000 pce are still need  in 1 day , but it  can not be produced in 1 day   ).
    what did I miss?
    Thanks a lot for any information!

    Hello Simona
    The in house production time from tab MRP 2 is lot size independent.
    However, on tab work scheduling you can define a lot size dependent times.
    Please observe that, if you have entered an in house production time, the processing time will not be considered. The F1 help of the field provides the following explanation:
    You can define work scheduling times in the material master record in one of two ways:
    Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
    Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
    Therefore, if you want to consider the processing time, you should remove the in house processing time.
    BR
    Caetano

  • MRP run but no planned order creation

    Hi ,
    I use MD61 to create PIR , i can saw PIR in MD04 sceen.
    Then i run MRP via MD02 there is no planned order be created.
    But if i run MRP via MD43 , the planned order appear .
    Could anybody can help on the topic ? Thanks !

    Dear Denny Sheng 
    i think you are asking about two different things:
    1) you have enter PIR in md61and those are reflected in md04,but when you take MRP Run( md02) planned order are not created.This is because there must be stock of material available
    2) The planned order are created when you run md43.This means you have selected MRP Type MPS.please check .
    Regards
    Prashant

  • NB Type Planned orders are not Displayed in the Order Information System

    Dear All
    We have one material with Proc. type F.
    We have entered a sales order for that item & run MRP ( MRP type PE)
    No strategy is assigned to the material.
    MRP has created a Plan Order which is of NB type & in MD04 it is showing SDEB against Plan Order.
    Now we are not able to see this Plan Order in COOIS.
    Although it is visible in MD04,MD16.
    Can anyone tell me whether COOIS consider only those plan orders which are of E ( In house Prod ) category ?
    How can we display that in COOIS ?
    Abhishek Garg

    Dear,
    COOIS is used for production orders or planned orders olny and it will show u Order information relevent to "E" type procurement.
    You can use ME5A

  • Some of the orders are not appearing in KOC4

    Hi,
    While running the trnasaction KOC4, Some orders are not appearing.which are appearing in KKBC_ORD.
    Please guide me how to get the same in KOC4.
    Thanking you in anticipation.
    With regards
    Aniruddha

    Some pages may not have all the fields in the xml even though they are being shown on the UI.
    Possible reasons I can think of are:
    1) Beans are rendered dynamically through controller code
    2) Page is using regions or other pages by extending them. There is Extends property in Property Inspector and if filled, those attributes from the extended page can also be seen.
    3) Personalization to add elements on the page
    -- Thanks

  • After MRP planned orders are not getting generated?

    HI,
    Our bussiness is make to stock and repetetive manufacturing.
    We have a prob in running MRP, i enter the demand in MD61 on day basis and after running MRP for some materials all planned orders getting generated wrt to demand but for some materials only some planned orders getting generated means it's not taking full demand ex i have material A and paln is 1000 for 10days i entered demand in MD61 for 10days 100 each and if B material is having same 1000 demand so i enter 100 each then i run MRP and the out put is im getting 10planned orders with 100 each qty for A material where as for material B im not getting  full 10 orders only 2 or 3 with 100 each what could be the reason ?
    Thanks
    KK
    Edited by: kiran kumar on Mar 23, 2010 10:19 AM
    Edited by: kiran kumar on Mar 23, 2010 10:20 AM

    Dear Kiran,
    As your saying it is Make to Stock, system will consider Availble stock in Net Req. Calculation
    what is startegy mainatined for A & B
    if you go with Strategy 11 then system will not consider the stock & Creates the requirements
    Regards
    Madhu

  • MRP run - misalignment for planned order between Date and Production Date

    Hi All,
    We've just integrated SAP for a new plant.
    The MRP runs based on Routing Lead Time for Make materials instead on Material Master Lead Time, for Capacity Assessment purpose.
    When requirements dates lay in the past, MRP performs forward scheduling starting from current date and properly defines Production End Date according to Routing.
    By checking MD04, for the proposed Planned Order, the basic date is same as Current Date (= same as Requirement Date) instead of being same as Production Date.
    It works as it if checks stil the MAterial MAster LEad time instead of Routing. In fact if I updated the LT of MM the MD04 provides the right Date.
    For future requirements, the MRP works properly, by having basic dates (both start and end date) aligned with Production Dates of Planned Order.
    How can I do the alignment w/o updating In House Production LT?
    Thanks,
    D

    Hi Caetano,
    we have already done this configuration in OPU5 but it doesn't provide any benefit.
    Below how we configured it:
    Scheduling level: Via detailed scheduling
    Adjust dates: adjust basic dates, adjust dep. reqmts to operation date
    For capacity scheduling: Always basic dates, dep. reqmts to operation dates
    Scheduling type: Backwards.
    Regards,
    D.

  • Planned orders are not converted into process orders in ECC.

    Dear All,
    The issue is that Planned orders with conversion tick are not publishing in ECC as manufacturing orders. We did check the relevant master data consistency between APO and ECC and it seems fine.
    We have tried to send the conversion from APO to ECC,all the orders stuck in the R1P inbound queue with error - Order no. XXXX does not exist
    Message no. C/006.
    Based on above message and error we found SAP Note 515740 - Inconsistencies in table CIFORDMAP for this issue.
    Used the transaction SE38 and created RCFORDCH report and 'Checking inconsistencies in table CIFORDMAP'
    Here it shows order series stuck in queues no longer exists.
    But not sure how to reconcile the inconsistency in the CIFORDMAP table.
    Would appreciate your advice.
    Regards,
    Sajit SIngh

    Hi Sajit Singh,
    Could you take some sample items struck for order conversion and check
    whether active PPDS & SNP PPMs available. 
    In some cases, conversion will be affected for want of PPMs.  If it is the
    case with you, try generating the PPM first for that sample item and retry
    converting the orders.
    Could you please check and confirm this.
    Regards
    R. Senthil Mareeswaran.

  • Planned Orders Are Being Created In The Future Period (About Six Months onw

    Dear All,
    We are facing a problem that when we execute the product heuristics for a particular location - item, planned orders are not getting generated as per the demand element in the current period but they are getting generated in future period say six months from now... We could NOT understand that Why the system is pushing the orders in future period. We have checked the following parameters :
    Calendar is active for  the period upto DEC"2012.
    Time Streams have been genereted for the particular resource.
    Resource(s) do exist in Live Cache.
    Sufficient capapcity is available in the current period (as viewed from the resource planning table).
    Please advise that what other parameters should be checked in order to get the planned orders in current period. In this regard, we shall like to confirm that we are facing this issue since last 8 - 10 days, earlier, there was NOT such an issue.
    With Best Regards,
    Sanjeev Chugh
    06-JAN-2012

    Hi Sanjeev,
    Did you maintain any value for planning time fence, and if yes, how big is it? This could be one possible reason why system is not able to plan the orders (also depends on what Heuristics you are using).
    In RRP3, double click on your planned orders and check out the start date and the end date. Is your start date also lying in the future, or is it that due to long time in your operations (somehow your PDS/PPMs got messed up?), orders availability got pushed to the future.
    I am not an expert in PPDS, but I can only think of different lead times coming into picture which could possibly push your planned orders availability to the future.
    See if this helps.
    Thanks - Pawan

  • Restrict Product Allocation if Planned order is not getting created

    Hello All,
    We have a scenario that when ever a Sales Order is getting created, Product allocation assignment will be done automatically and planned orders will be created for that requirement in APO.
    There are some cases where in because of wrong Variant Configuration, Planned orders wont be created. Our requirement is to delete the Product Allocation automatically or to stop the product allocation assignment if the planned orders are not created.
    Do we have any standard setting for doing so or Kindly suggest me some BADI's which can be used for it.
    Thanks in advance.
    Best Regards,
    Srinivas.D

    Srinivas,
    A rather odd requirement.
    Have you tried in SCM APO 'Maintain check instructions' to perform the product check first, then allocation?  I would think that if the product check failed, then allocation would not be consulted, and no allocation therefore assigned.
    IMG > APO > GATP > General Settings > Maintain check instructions
    Best Regards,
    DB49

  • MRP setting for Purchase (Planned Order ) Requirement date

    Dear Sir,
    During the MRP run , we desire that the genertaed Planned Orders for the Purchase related items , should have requirement date as either the current date or the current date plus procurement lead time defined in the Material Master against the item .
    To achive the abobe requirement , we request you to pl guide us as what setting / parameters are required to be set in the MRP setup .  Or if there is some other alternate approach , pl suggest the same .
    With Thanks and Rgds
    Sonia Agarwal

    Dear
    Generally , during MRP run , system will genarted Planned order for Purcahsed item if it is opening period .
    The opening period for the planned order represents the number of workdays that are subtracted from the order start date in order to determine the order opening date. This period serves as a time float, which is available for the MRP controller when converting a planned order into a purchase requisition.
    You define the opening period for the planned order in Customizing for MRP in the IMG activity Define floats (scheduling margin key) and assign it to the material in the Scheduling margin key field (MRP 2 view) in the material master
    Now if you want to have Planned order for purchased item with requirement date as current date , then maintain Demand date like Sales Order requirement date as curent date in VA01 or PIR date as current date.
    Where as MRP will consider the Planned Order based on planned opening date , lead time , GR processing time from MRP2 view .So for current date requirement , u should keep Lead time and GR processing time as 0.
    Regards
    JH

  • Extra plan order are created

    Hi PP expert
    I am facing  following prob.
    *Mrp type- M3*
    *stategy-30(LSF)*
    *lot sze procedure - Fixed  (1500)*
    When  cust. Req. come and we run Mrp sytem create extra plan order (3 nos.) after plannig time fence.
    So plz tell me why ?
    Nitu....

    Dear,
    The Purpose of Planning strategy 30 is, to Produce for major customers based on the sale order lot size.
    However u can plan addtional requirements using the demand management by creating PIR. System will create planned order as in net requirement planning.
    Since Becuse requirement type for indep requirements (LSF) defined for Strategy 30 at SPRO.
    If u donot want to system allow to create PIR & Planned order create new strategy by copying SG 30 & remove thy requirement type of ind requirement (LSF). and try.
    The strategy 30 is production by lot. This falls under MTS scenario only.
    But the production plan is created depending on the lot size. Whether it is PIR or CIR they are group till it becomes the required lot size and then only the planned orders are created.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • After migrating data from Time Machine, some of my photos are not showing up in iPhoto. I get a 'dashed rectangle." When I click on it I get ' ! in a Triangle" When I click on that, I actually can see the photo. I want to see my photos

    After migrating data from Time Machine, some of my photos are not showing up in iPhoto LIbrary view. I get a 'dashed rectangle." When I click on it I get ' ! in a Triangle" When I click on that, I actually can see the photo. I want to see all  my photos in 'Library' view, and I can't figure out how these photos seem to be arbitrarily hidden. Help, please.

    Try these for the first attempt:
    First be sure to have a backup copy of the library if you already don't have one.
    OT

  • Some Sales Orders are not replicating into CRM

    Hi guys,
    when I check SMQ2 in CRM,  I find that some sales orders are not replicating into CRM, then check the error, its says check SMW01..
    when I check the SMW01 it says validation error and BDOC status is F05 (information no processing). I tried to search the sales order in CRMD_Order transaction could not find the sales order...
    *Error in SMW01*
         Processing of document with Guid E01D11C71856C4F1AEBF0024E84DD0CE is canceled     CRM_ORDER
         Validation error occurred: Module CRM_DOWNLOAD_BTMBDOC_VAL, BDoc type BUS_TRANS_MSG.     SMW3
    It's not giving much clue what's the error is...
    I tried to setup a request to replicate those sales orders.. those request also end up in the same error...
    any help on this?
    thanks,
    Ken

    Hello Ken,
    When reprocessing a BDoc(via SMW01) you might need to set a flag.
    Goto trxn. SMW01. Start the debugger using command '/h' and reprocess the BDoc. After going into the debug mode press SHIFT+F7 and put a breakpoint at 2nd Tab in : class:cl_smw_flow and method 'restart_processing'. Keep debugging(F5 or F6 accordingly) until you find the requisite flag l_retry_allowed and set it as 'X'. This will allow you to reprocess the Bdoc.
    Thanks,
    Rohit

  • Hi, I have small problem, for some time in music area I had two folders to use 1. Apple loops for soundtrack pro 2. Final Cut pro sound effects now both are gray and with out content may I know what happend

    Hi, I have small problem, for some time in music area I had two folders to use 1. Apple loops for soundtrack pro 2. Final Cut pro sound effects now both are gray and with out content may I know what happend

    I just went through this and it appears that my Focusrite Saffire was the culprit. I connected all the outputs on the focusrite according to the way the jacsk on the back were labeled and then set up the multichannel speaker setup to match. Then I went into STP, created a pink noise clip and panned it around, the LFE, center and rears were not in the right place.
    I reconnected the hardware to match the 5.1 pan pot in STP then changed the multichannel speaker setup to match. Everything appears to be correct now but I would have loved to have been able to just assigned the output busses to correct outputs in the saffire.
    Next step is to pan that pink noise around with my SPL meter to calibrate the room.

Maybe you are looking for

  • How to find the text of a viwe

    How to find the text of a view? I tried all_views but it only types the partial text. What can be the problem and the possible solutions? Naveen

  • Gamma issue... beating a dead horse

    so so confused, about this gamma shift from After Effects to Final Cut. I rendered the same clip out 4 different times and each time it has different gamma. Here are my render settings: 1. v210 Codec 2. Quicktime Animation 3. Apple FCP Uncompressed 8

  • Any way to stop facebook exporter from using version names as the caption

    I tried the Aperture 3 facebook export and it is using the version names as the caption. If I change the caption on facebook it then changes the version name in my aperture library when it syncs with facebook. Is there anyway to have it use the capti

  • Having issues with larch, documentation

    I've read the "installation/usage" of larch but I have to say I'm not getting it. Its still kind of confusing and there is no "quick" guide. eg. step 1, 2, 3. It all seems to involve either one command for usb, one for iso, and one for making from ex

  • Do you need physical hardware specifications for virtual machine

    I am currently running VMware Server 2.0. I am working with a server whos hardware specifications cannot support Windows Server 2008. My question is should I still be able to create a virtual Windows Server 2008 under VMware since all the hardware sh