BAPI for complete details of Process Order including characterstic

Hi All,
I need a BAPI for getting complete information of Process order including characterstics and its process instruction. I have got BAPI BAPI_PROCORD_GETDETAIL which returns all the information except order operation characterstics and "characterstics process instructions".
Is there is any BAPI which can return these 2 details for a given process order.
Thanks ,
Abhishek

Thanks Rajesha for your reply , but here i need Process instruction and its corresponding characterstics for a particular process order.
Let me explain you the scenario , I have a Process order PO-001 , for PO-001 i have defined 1 operation OP-001 and a phase PH-001.
For the phase PH-001 i have assigned process instructions PI-001 (You can assign process instructon by selecting a phase and then click on the button Process Instruction below).
By double clicking on PI-001 you can get process characterstics for that selected PI-001.
Now i need a BAPI which can return me PI-001 and its corresponding characterstics if i pass PO-001 in that BAPI.
Thanks & Regards,
Abhishek
Edited by: ABHISHEK BAJPAI on Sep 29, 2010 7:30 AM

Similar Messages

  • Query on open planned orders details with process order GR details

    Dear Experts,
    I need to create a query in SQ01 where the requirement is as given below,
    Query output should display the open planned orders  (Planned orders which is not converted to process order details) details for a material like Planned order number, Planned order quantity, Start date, Finish date and also  the details of the list of process orders created for the same material with its details like PO qty, GR qty, Basic start date, Finish date, Actual finish date, BOM Component material codes, component quantity.
    But i tried creating this query by joing the tables PLAF+ AFPO+AUFK+ AFKO+RESB . My input parameter will be the Material Number for which Planned order and Process orders are being created.
    But i am unable to generate the output when i create a query by joining these tables
    Is it possible to obtain the output for open planned order details and process order details in a single query ?
    I am failing in my repeated attempts
    Please provide your suggestions for developing this query
    Regards,
    J.Balakrishnan

    Dear Bala,
    as alternative , for use a query report and not a custom abap report, you can try to read data from MRP tables MDKP and MDTB . In these one tables you can find both elements (planned order and production orders) for to start to research all details that you need.
    You can also use MDTB-DELKZ to filter only planned order (PA) and Production order (FE).
    With the number order you can read the RESB table in order to define components details.
    With this table would you the advantage to have always the opened orders.
    If the following table are empty you should make a little customizing modification so that once MRP run will write them.
    Give me feedback if i have been useful for you.
    Daniele

  • Cost Analysis Report - For a range of process orders

    Dear all,
    Is there a standard report available to get the cost analysis for a range of process order? COR3 --> Go to --> Cost --> Analysis. Here I can see the cost analysis for one report. But I wanted to get the cost analysis report for a range of process orders. Please help.
    Thanks
    Nagarajan

    Dear
    You can use cost analysis report like
    1.S_ALR_87099932 - Variances Between Costing Runs
    2.S_ALR_87099931 - Price vs Cost Estimate
    3.S_ALR_87099932 - Variances Between Costing Runs
    5.KOC4
    Regards
    JH

  • Batch determination for raw materials in process order

    I have defined a sort rule, batch search strategy and assiigned this strategy to process order type.classification for batch is also defined with charecterstic mentioned in sort rule.But when i am doing BD for raw materials in Process order , it is barnching into some other screen saying, no selection criteria and no strategy info defined. what are the necessary settings to make BD possible for all the materials having batch management.

    Hi
    Config Setting In Batch Management
    This will help you for config setting:
    Logistics general - Batch Management
    1.1. Specify Batch Level
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Specify batch level and activate batch status management Transaction  OMCT
    1.2. Batch Number - Activate Internal Number Assignment
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Number Assignment --> Activate internal batch number assignment Transaction  OMCZ
    1.3. Batch Creation - for Goods Movements 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Creation of new batches --> Define batch creation for goods movements Transaction
    1.4. Characteristic Value Assignment -- Update Standard Characteristics 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Characteristic Value Assignment --> Update Standard Characteristics Transaction
    1.5. Activate Batch Classification for Goods Movements in Inventory Management 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Characteristic Value Assignment --> Valuation for goods movements --> Activate Batch Classification for goods movements in Inventory Management Transaction  OMCV
    1.6. Batch Determination u2013 Condition Table(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Condition Tables --> Define production order condition tables Transaction  OPLB
    1.7. Batch Determination u2013 Condition Table(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Condition Tables --> Define SD condition Tables Transaction  V/C7
    1.8. Batch Determination u2013 Access Sequence(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Access Sequences --> Define Production Order Access Sequences Transaction  OPLF
    1.9. Batch Determination u2013 Access Sequence(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Access Sequences --> Define SD Access Sequences Transaction  V/C2
    1.10. Batch Determination u2013 Strategy Types
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Production Order Strategy Types Transaction  OPLE
    1.11. Batch Determination u2013 Strategy Types
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define SD Strategy Types Transaction  V/C1
    1.12.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define IM   Search Procedure Transaction  OMCY
    1.13.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Production order Search Procedure Transaction  OPLG
    1.14.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define SD Search Procedure Transaction  V/C3
    1.15.  Batch Determination u2013 Batch Search Procedure Allocation
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Allocate IM search procedure/activate check Transaction  OMCG
    1.16. Batch Determination u2013 Batch Search Procedure Allocation
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Assign Search procedure to production order Transaction  OPL8
    1.17.  Batch Determination u2013 Batch Search Procedure Allocation(SD)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Allocate SD Search procedure Transaction  V/C5
    1.18.  Batch Determination u2013 Activate Automatic Batch Determination(SD)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Activate Automatic Batch Determination in SD -->For delivery item categories Transaction  V/CL
    1.19.  Batch Determination u2013 Batch Selection Class
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Selection Classes Transaction  CL01
    1.20.  Batch Determination u2013 Sort Rule
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Sort Rules Transaction  CU70
    1.21.   Batch Determination u2013 Make Settings for Batch Where-used list
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Make Settings for Batch Where-used list Transaction  OMBB              
    regards
    Faisal

  • FM or BAPI for Create/cancel  stock transfer order invoice

    FM or BAPI for Create/cancel  stock transfer order invoice
    Thanks and Regards,
    Srinivas P

    Hi,
    use BAPI_PO_CREATE, po_header-doc_type = 'UB'
    Thanks,
    Reward If Helpful.

  • BAPI function module to get process orders for certain material

    Dear experts ,
    kindly , I need my vb application to get all CRD , but not DLV Process orders for Material X.
    Into SAP , I use the COIO , then set material to X , then display flag CRTD included , and Exclude DLV.
    Question now , What is the function module that does this. what is the table name , and how to set search parameters.
    my code will be like this
    theFunc = functionCtrl.Add("BAPI_PO_GETDETAIL") ' get po data
       theFunc.exports("purchaseorder") = t.Text
                 returnFunc = theFunc.call
            returnParam = theFunc.imports("po_header")
            retTab = theFunc.tables("po_items")
            For Each rr In retTab.Rows
                tt1.Text &= (rr("MATERIAL")) & vbTab
            next
    Thanks
    Waleed

    Hi,
    Check if the below helps:
    1.  BAPI_SALESORDER_GETLIST for VA05
    2. BAPI_QUOTATION_GETDETAILBOS for VA25.
    Regards,
    Vivek

  • Bapi bapi_goodsmvt_create for goods receipt of process order

    Hello All ,
    I am trying to a GR with MIGO for a process order .Its giving me error like
    Content of order 2000002339: 100001374 transferred to interface (IMSEG): 100001374
    I am not able to trace the error out .I am passing the below parameters .pls check
    gmhead-pstng_date = sy-datum.
    gmhead-doc_date = sy-datum.
    gmhead-pr_uname = sy-uname.
    gmcode-gm_code = '02'.   "01 - MB01 - Goods Receipts for Purchase Order
    itab-move_type  = '101'.
    itab-mvt_ind    = 'F'.
    itab-plant      = '1AAE'.
    itab-material   = '100001374'.
    itab-entry_qnt  = '1'.
    itab-move_stloc = 'B100'.
    itab-stge_loc   = 'B100'.
    itab-orderid  = '002000002339'.
    append itab .
    CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
      EXPORTING
        goodsmvt_header             = gmhead
        goodsmvt_code               = gmcode
      TESTRUN                     = ' '
    IMPORTING
        goodsmvt_headret            = wa_head
       materialdocument            = lv_mblnr
      MATDOCUMENTYEAR             =
      TABLES
        goodsmvt_item               = itab
      GOODSMVT_SERIALNUMBER       =
        return                      = errmsg
    Pls reply ..
    Thanks .

    HI ...
    Since this is a production order ,i used the GM code as '02'.bcoz the documentation says the same .
    There are the following types of transactions/events:
    1. GM_Code 01: Goods receipt for purchase order
    2. GM_Code 02: Goods receipt for production order
    3. GM_Code 03: Goods issue
    4. GM_Code 04: Transfer posting
    i also tried changing it to '01' ,its not working still...
    Pls reply
    Thanks .

  • PP tables for relationships in phases - Process order

    Hi,
    We have a process order and phases 20,40 and 60. So We know process order number and phase numbers.
    We have linked the phases in a relationship , say, FS(Finish to start )
    How can we see the relationships defined between phases from PP tables ? Which tables hold these relationship details?
    Rgds,
    Manohar

    Hi,
    please find the tables related with operation/phases which can help you .
                        MAPL                    Allocation of task lists to materials
         PLAS                    Task list - selection of operations/activities
         PLFH                    Task list - production resources/tools
         PLFL                    Task list - sequences
         PLKO                    Task list - header
         PLKZ                    Task list: main header
         PLPH                    Phases / suboperations
         PLPO                    Task list operation / activity
         PLPR                    Log collector for tasklists
         PLMZ                    Allocation of BOM - items to operations
    Regards
    SANIL

  • FM or BAPI to Modify or Delete Process Order Operations (COR2)

    Hi Experts,
    As a part of Process Order Migration, we have a requirement where in we need to pass the confirmation quantity of the Old Process Order number to the Unloading point field (ABLAD) in the Process Order Operation details and set that operation as marked for deletion.
    Please suggest if you have come across similar scenarios.
    Thanks in advance,
    Anand

    Hi Anand
    Try This BAPI_PRODORD_SET_DELETION_FLAG and it will work for your requirement.
    Thanks,
    Adil

  • User Exit for Changing Quantity in Process Order , COR1, COR2

    Hi All,
    Can anyone point me towards the light in User exit related to COR1 and COR2.After the Creation of Process order  while saving i need to write a code that rounds off the quantity values.
    I tried to change the values in the below user exits but i was not succesfull.
    CCOWB001            Customer exit for modifying menu entries
    COIB0001            Customer Exit for As-Built Assignment Tool
    COZF0001            Change purchase req. for externally processed operation
    COZF0002            Change purchase req. for externally procured component
    PPCO0001            Application development: PP orders
    PPCO0002            Check exit for setting delete mark / deletion indicator
    PPCO0003            Check exit for order changes from sales order
    PPCO0004            Sort and processing exit: Mass processing orders
    PPCO0005            Storage location/backflushing when order is created
    PPCO0006            Enhancement to specify defaults for fields in order header
    PPCO0007            Exit when saving production order
    PPCO0008            Enhancement in the adding and changing of components
    PPCO0009            Enhancement in goods movements for prod. process order
    PPCO0010            Enhancement in make-to-order production - Unit of measure
    PPCO0012            Production Order: Display/Change Order Header Data
    PPCO0013            Change priorities of selection crit. for batch determination
    PPCO0015            Additional check for document links from BOMs
    PPCO0016            Additional check for document links from master data
    PPCO0017            Additional check for online processing of document links
    PPCO0018            Check for changes to production order header
    PPCO0019            Checks for changes to order operations
    PPCO0021            Release Control for Automatic Batch Determination
    PPCO0022            Determination of Production Memo
    PPCO0023            Checks Changes to Order Components
    STATTEXT            Modification exit for formatting status text lines
    Reason was the data related tp materials was not accesble at this point and residing in resb internal table .
    Any suggestions ? Ideas  ?
    Thanks in advance,
    Gowri

    Hi,
      Try with BADI <b>WORKORDER_UPDATE</b>.
    Regards

  • BAPI for Create PO from Sales Order Data and POST GR from PO created

    Dear,
             Can u help me how to create BAPI for Purchase Order creation from sales order Data
              what the bapi to Post GR from the PO created.
    Regards,
    Manoj

    Hello Manoj what you have to do to create PO from PR is that
    1) Use   BAPISDORDER_GETDETAILEDLIST (pass sales order number in sales_document table) and then get PR (Purchase requisition number from this BAPI.
    2) Use  BAPI_REQUISITION_GETDETAIL to get PR items
    3) Use BAPI_PO_CREATE1 to craete PO from PR then.
    to create goods movement you can use
    BAPI_GOODSMVT_CREATE
    REWARDS IF USEFUL.

  • Function Module / BAPI for Inbound Delivery from Purchase Order

    Hi,
    I need to create an inbound delivery from Purchase Order items and am looking out for some Function Module or BAPI for the same.
    The requirement is that i should be able to specify selected line items from PO for delivery.
    I tried the BDC method for VL31N , but the particular item selection is problem, since by default it shows all the items of PO and i want only selected items.
    Do reply.
    Thanks in advance.

    check these and their documentations.
    BAPI_INB_DELIVERY_CHANGE       Change inbound delivery
    BAPI_INB_DELIVERY_CONFIRM_DEC  BAPI for inbound delivery verification from a decentralized system
    BAPI_INB_DELIVERY_SAVEREPLICA  BAPI Function Module for Replication of Inbound Deliveries
    Regards
    Prabhu

  • BAPI for uploading SUBCON open purchase Order

    Hi,
    Can any one tell me a BAPI for creating SUBCON Purchase order....

    Hello,
    BAPI_PO_CREATE and BO: BUS2012.
    BAPIEKPOC = ITEM_CAT (3 - Subcontracting)
    <b>Rewrad points</b>
    Regards

  • Scheduling issue for splitted operations in process order

    Hello All,
    I am facing problem after scheduling splitted operation in process order. The scenario is as follows.
    In process order there are 5 operations. 10, 20, 30, 40 and 50. Out of the above operations 30 is splitted and two different resources are assigned to it. Control key assigned to splitted operation (30) is also scheduling relevant. Now the flow of operations will be as below.
    1. Operation 10
    2. Operation 20
    3. Operation 30 - Operations is splitted (Resource used is A), qty to be produced - 10 kg.
    a. Operation 32 - Quantity of operation 32 is changed to 5 kg. Resource used is B.
    b. Operation 34 - Quantity of operation 34 is changed to 5 kg. Resource used is C.
    4. Operation 40
    5. Operation 50
    Relationship exists between opearion 10-20, 20-30, 40-50 and between 30,32, 34 with 40. But there is no relationship exists between splitted operations 32 and 34 with any of the previous operations for eg. 10 & 20.
    Issue is after scheduling all operations relationship remains maintained between operations 32, 34, 40 & 50. As operation 30 is splitted to two different operations equally total time for scheduling gets reduced but after scheduling of all operations all previous operations before operations 30 does not get resceduled? Scheduling type maintained for order is Backward Scheduling.
    Please check this and guide me how all operations before operation 30 can be rescheduled as per changed timing of operations 32 and 34.
    Best Regards.
    Edited by: Avinash Mohite on Mar 19, 2010 12:43 PM
    Edited by: Avinash Mohite on Mar 19, 2010 3:14 PM

    Hi,
    I hope u r doing in this way:
    In the capacity header screen enter individual capacity as 2. then click on Got( on top of same screen) and go to individual capacites. Enter the names of two individual capacities, for example 1 and 2. These are the names of two work centres where u r splitting ur operation.
    Double Click on operation 0030 and go to tab 'splitting' . Tick on ' required splitting' and enter maximum no. of splits as 2.Then go to capacity requirements assignment tab. enter the individual capacity as 1 and 2 and enter the splitted quanitites.Save and reschedule .
    Check and revert.
    Regards.

  • System status for capacity availability in Process order

    Hi,
    I have activated the capacity availability check in SPRO to have a capacity check while process order  creation.
    But system doesnt provide any status in the process order for this. No status is appearing even  if I do a manual capacity check in process order.
    Is there any system status for capacity is available?.
    Thanks in advance
    Prathib

    Hi Prathib
    System will be give any status if capcity is available, but it will give a status MSCP if there is Capacity shortage.
    Rgds
    UK

Maybe you are looking for

  • Poor photo quality when exporting iPhoto slideshow

    Does anyone know which setting produces the best quality for an mp4 when creating a DVD using iDVD? I put a slideshow together using iPhoto because I wanted to use the iPhoto scrapbook theme. I exported the iPhoto slideshow using the highest quality

  • No PSA for Infosource X and source system Y. Here Y is the flat file source

    Hi, We are facing an issue while transporting from dev s/m to quality. There is no PSA for Infosource X and source system Y. Here Y is the flat file source system this issue we are getting while transporting transfer rules.We are checked in OSS notes

  • Planned delivery time in material master

    Is planned delivery time in material master considering holidays ? I mean when I say 7 days, is it one week and 2 days or only one week ?

  • ICommand utility and security best practice

    Hi All, I configured the Icommand configuration fle "BAMICommandConfig.xml" with default username and password and restarted the BAM server. I am using the weblogic administrator user as the default ICommand user. The password is clearly displayed in

  • Missed elements

    Why does acrobat X sometimes miss out elements when I print from a word 2010 document.  I have just printed a document for a client and there are whole text boxes missing from the pdf file.  Anyone else have this experience? How do I get it to print