I am facing problem after scheduling splitted operation in process order. The scenario is as follows.
In process order there are 5 operations. 10, 20, 30, 40 and 50. Out of the above operations 30 is splitted and two different resources are assigned to it. Control key assigned to splitted operation (30) is also scheduling relevant. Now the flow of operations will be as below.
1. Operation 10
2. Operation 20
3. Operation 30 - Operations is splitted (Resource used is A), qty to be produced - 10 kg.
a. Operation 32 - Quantity of operation 32 is changed to 5 kg. Resource used is B.
b. Operation 34 - Quantity of operation 34 is changed to 5 kg. Resource used is C.
4. Operation 40
5. Operation 50
Relationship exists between opearion 10-20, 20-30, 40-50 and between 30,32, 34 with 40. But there is no relationship exists between splitted operations 32 and 34 with any of the previous operations for eg. 10 & 20.
Issue is after scheduling all operations relationship remains maintained between operations 32, 34, 40 & 50. As operation 30 is splitted to two different operations equally total time for scheduling gets reduced but after scheduling of all operations all previous operations before operations 30 does not get resceduled? Scheduling type maintained for order is Backward Scheduling.
Please check this and guide me how all operations before operation 30 can be rescheduled as per changed timing of operations 32 and 34.
Best Regards.
Edited by: Avinash Mohite on Mar 19, 2010 12:43 PM
Edited by: Avinash Mohite on Mar 19, 2010 3:14 PM

Hi,
I hope u r doing in this way:
In the capacity header screen enter individual capacity as 2. then click on Got( on top of same screen) and go to individual capacites. Enter the names of two individual capacities, for example 1 and 2. These are the names of two work centres where u r splitting ur operation.
Double Click on operation 0030 and go to tab 'splitting' . Tick on ' required splitting' and enter maximum no. of splits as 2.Then go to capacity requirements assignment tab. enter the individual capacity as 1 and 2 and enter the splitted quanitites.Save and reschedule .
Check and revert.
Regards.

Similar Messages

  • Confirmation for Split operation in Production order

    Hi Experts,
    I have one production order say order no. is "100000000000" and its order qty is 100pcs and in operation no. "20", i have splitted the operation into two individual capacities and allocated 50pcs to each individual capacity. Now can any one explain me or tell me the steps required for confirming the operation quantity by individual capcity.
    Regards,
    Satya.

    Hi,
    Thanks for your response on my post.
    As you mentioned I am using T-code CO11N for Production confirmation, but in this screen if I select operation no. 20, by default, system is read work center from production order "operation overview" screen. Now I want to capture the confirmation quantity against "induvidual capacity" and want to see some reports based on "induvidual capacity" level of the same work center.
    Could you pl. advise on this.
    Regards,
    Satya.

  • How to analyse actual cost for each operation in Process/Production Order?

    Hi all,
    IN SAP, I know that we can analyze plan cost for Operation in Process Order/ Production Order.
    However, I can not analyze Actual cost for Operation .
    I know the object when I good issue material is ORDER, not OPERATION.
    But, as requirement of users, they want to analyze actual cost for each Operation.
    CAn SAP do this analyze?
    If Yes, What should I do in SAP to have this reports?
    THanks in advance,
    Emily Nguyen

    Hi Emily,
    as I see from one other message that you're using material ledger. Then your expectation is apparently to also see the actual costs of materials in your production order by operation.
    This is not supported. Actual material costs are handed up in material ledger multi-level settlement from one material to the next, bypassing the production orders.
    That means the production order will always contain the material costs valuated at plan price, not at actual price.
    For activity prices that might be better, when you revalue the orders at actual activity prices with CON2. But even there I am not sure that it will always be assigned correctly to the operations.
    There is currently an enhancement in development, the operation level costing. But that will affect more the planned cost side not the actuals. Might be interesting to learn more about your requirements and the use case behind.
    best regards,
                      Udo

  • Custom exit or badi for changing the user fields in operation of process order

    Hi all
        I want to find a exit or badi to set default value to the user fields in operation of process order when COR1.
        I have tried exit 'PPCO0001', but this exit is call after commit work, so I can not change any thing
        I also tried to use badi 'workorder_update', 'before_update', but all parameters in this BADI are importing, can't be changed, I've tried to change it and then program dump.
        Do you have any solution for this question?
    Thanks

    Do a Implicit Enhancement at the PBO of this subscreen.

  • Goods Issue To Each Operation Of Production Order?

    As we know, in SAP ,when we create and realse the production order,we could posts good issue to the production order ,using MB1A. And in SAP , the components can be assigned to the operations of the finished product.
    But in our company, the production order will take long time,and during production,different materials will be used in different phase of the production order,that means different components will be used for different operations.
    And for some reason,we don't want our material to be backflushed during production.
    So I want to ask can we post goods issue to each operation of the production order,not to the whole production order? Can SAP support Post Goods Issue To Each Operation Of Production Order?
    What shall we do if we want do this?By ABAP development ? Or there is third party software
    can do this with SAP? 
    Thanks for any reply!
    Edited by: Fei Liu on Mar 14, 2009 4:56 PM

    Hi Fei,
    As explained above, i think the concept of releasing the individual operations instead of releasing the order at header level would work fine for your requirement.
    Steps:
    1. Go to operation page in co02.
    2. Select the first operation, at the bottom of the screen you would find a Green Flag, click on the same.
    3. You will now find that the status of the first operation has changed to REL, while the others are still not.
    4. At header level you will find a status PREL, indicating partial release.
    5. After completion of the first operation, confirm the same & select the second operation & click release, & the process follows in this manner
    6. Please do not click the green flag at the header level as this will release the entire order.
    Pre-requisite:
    1. You have assigned components to the respective operations.
    You might also want to consider the usage of trigger points. This you can assign to each operation, where-in if the status changes to CNF, you trigger the release of the following operation. But before opting for this flow, first do it manually to ensure it meets your need.
    Also if the components assigned to the same operation, needs to be issued at different date, then you can use the lead time offset in BOM. In cs02, go to item details, here you can specify the same. Eg: If your operation stats on 15th March & you want this component to be issue only on 17th March, then specify the offset as 2. But if you want the components to be issued 2 days in advance of 15th march, then specify as 2-.
    Hope the above helps.
    Regards,
    Vivek

  • Splitting batch in process order

    HI friends,
    How I can split bach in process order ?
    Regards,
    Chetan

    Hi.
    Please Refer Below SDN thread.
    [Batch split|Batch determination for component  in co11n;
    Pradeep
    Edited by: Pradeep Kumar on May 24, 2008 10:49 AM

  • Cost Analysis Report - For a range of process orders

    Dear all,
    Is there a standard report available to get the cost analysis for a range of process order? COR3 --> Go to --> Cost --> Analysis. Here I can see the cost analysis for one report. But I wanted to get the cost analysis report for a range of process orders. Please help.
    Thanks
    Nagarajan

    Dear
    You can use cost analysis report like
    1.S_ALR_87099932 - Variances Between Costing Runs
    2.S_ALR_87099931 - Price vs Cost Estimate
    3.S_ALR_87099932 - Variances Between Costing Runs
    5.KOC4
    Regards
    JH

  • Phases/operation in process order does not exist

    phases/operation in process order does not exist  this error coming when cor6n is using.why?

    HI
    After creating Master recipe in C201, under the operations tab you need to define the operations involved in recipe . along with the operation column  there is phase indicator column is there which is to be selected whether this operation is phase or not...
    Check and revert
    Regards
    Anupam Sharma

  • HT5228 I am running OS 10.5.8 on an iMac. There is no security update issued for this operating system - it only covers 10.6. Is my comuter vulnerable? Do I need to do anything?

    I am running OS 10.5.8 on an iMac. There is no security update issued for this operating system - it only covers 10.6. Is my comuter vulnerable? Do I need to do anything?

    I'm still not clear why Apple only issued security updates for 10.6 and later. I assume they think we should all update our operating systems or maybe they are just focusing on the majority of users?
    Apple has had a long standing policy of only supporting the current and previous operating system releases.  Whether they decide to make an exception for even older releases is anyone's guess.
    You can send them feedback to express your opinion.
    Or does the new Trojan not affect older OS? I'd like to know , if anyone has information.
    As far as is known, it does affect older unsupported releases.  Disabling Java in your web browser is the current preventive approach (and that is a community derived approach)

  • Batch determination for raw materials in process order

    I have defined a sort rule, batch search strategy and assiigned this strategy to process order type.classification for batch is also defined with charecterstic mentioned in sort rule.But when i am doing BD for raw materials in Process order , it is barnching into some other screen saying, no selection criteria and no strategy info defined. what are the necessary settings to make BD possible for all the materials having batch management.

    Hi
    Config Setting In Batch Management
    This will help you for config setting:
    Logistics general - Batch Management
    1.1. Specify Batch Level
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Specify batch level and activate batch status management Transaction  OMCT
    1.2. Batch Number - Activate Internal Number Assignment
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Number Assignment --> Activate internal batch number assignment Transaction  OMCZ
    1.3. Batch Creation - for Goods Movements 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Creation of new batches --> Define batch creation for goods movements Transaction
    1.4. Characteristic Value Assignment -- Update Standard Characteristics 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Characteristic Value Assignment --> Update Standard Characteristics Transaction
    1.5. Activate Batch Classification for Goods Movements in Inventory Management 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Characteristic Value Assignment --> Valuation for goods movements --> Activate Batch Classification for goods movements in Inventory Management Transaction  OMCV
    1.6. Batch Determination u2013 Condition Table(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Condition Tables --> Define production order condition tables Transaction  OPLB
    1.7. Batch Determination u2013 Condition Table(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Condition Tables --> Define SD condition Tables Transaction  V/C7
    1.8. Batch Determination u2013 Access Sequence(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Access Sequences --> Define Production Order Access Sequences Transaction  OPLF
    1.9. Batch Determination u2013 Access Sequence(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Access Sequences --> Define SD Access Sequences Transaction  V/C2
    1.10. Batch Determination u2013 Strategy Types
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Production Order Strategy Types Transaction  OPLE
    1.11. Batch Determination u2013 Strategy Types
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define SD Strategy Types Transaction  V/C1
    1.12.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define IM   Search Procedure Transaction  OMCY
    1.13.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Production order Search Procedure Transaction  OPLG
    1.14.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define SD Search Procedure Transaction  V/C3
    1.15.  Batch Determination u2013 Batch Search Procedure Allocation
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Allocate IM search procedure/activate check Transaction  OMCG
    1.16. Batch Determination u2013 Batch Search Procedure Allocation
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Assign Search procedure to production order Transaction  OPL8
    1.17.  Batch Determination u2013 Batch Search Procedure Allocation(SD)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Allocate SD Search procedure Transaction  V/C5
    1.18.  Batch Determination u2013 Activate Automatic Batch Determination(SD)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Activate Automatic Batch Determination in SD -->For delivery item categories Transaction  V/CL
    1.19.  Batch Determination u2013 Batch Selection Class
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Selection Classes Transaction  CL01
    1.20.  Batch Determination u2013 Sort Rule
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Sort Rules Transaction  CU70
    1.21.   Batch Determination u2013 Make Settings for Batch Where-used list
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Make Settings for Batch Where-used list Transaction  OMBB              
    regards
    Faisal

  • Add component and Delete Operation in Process order Using COR2

    Hello,
    I need to update any process order (Add components in it and delete some operations of it) on the save of the process order.
    Transaction for change PO: COR2.
    I have found a badi to change in process order (WORKORDER_UPDATE) Method: BEFORE_UPDATE.
    But this badi has all the parameters as Importing. Hence we can not change them.
    If we use field symbols in this badi to change the values,will it make any other issues?
    I have also identified a user exit EXIT_SAPLCOBT_001 but this exit is called very late in the processing, and you cannot change data into that user exit ...check Note (86553 - Documentation on user exits).
    Kindly post your valuable comments and answers.
    Thanks in advance.
    Edited by: Nitin Nyati on Sep 1, 2010 1:09 PM

    Hi ,
    Possibility  , in C202 , user may have changes the BOM first and re-assign the phase  but in process order level Read PP master did not call
    Another possibility manually change the process order component and assign this in Phase in COR2 .Please check  whether it has been added manually in order level . 
    Regards
    JH

  • Bapi bapi_goodsmvt_create for goods receipt of process order

    Hello All ,
    I am trying to a GR with MIGO for a process order .Its giving me error like
    Content of order 2000002339: 100001374 transferred to interface (IMSEG): 100001374
    I am not able to trace the error out .I am passing the below parameters .pls check
    gmhead-pstng_date = sy-datum.
    gmhead-doc_date = sy-datum.
    gmhead-pr_uname = sy-uname.
    gmcode-gm_code = '02'.   "01 - MB01 - Goods Receipts for Purchase Order
    itab-move_type  = '101'.
    itab-mvt_ind    = 'F'.
    itab-plant      = '1AAE'.
    itab-material   = '100001374'.
    itab-entry_qnt  = '1'.
    itab-move_stloc = 'B100'.
    itab-stge_loc   = 'B100'.
    itab-orderid  = '002000002339'.
    append itab .
    CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
      EXPORTING
        goodsmvt_header             = gmhead
        goodsmvt_code               = gmcode
      TESTRUN                     = ' '
    IMPORTING
        goodsmvt_headret            = wa_head
       materialdocument            = lv_mblnr
      MATDOCUMENTYEAR             =
      TABLES
        goodsmvt_item               = itab
      GOODSMVT_SERIALNUMBER       =
        return                      = errmsg
    Pls reply ..
    Thanks .

    HI ...
    Since this is a production order ,i used the GM code as '02'.bcoz the documentation says the same .
    There are the following types of transactions/events:
    1. GM_Code 01: Goods receipt for purchase order
    2. GM_Code 02: Goods receipt for production order
    3. GM_Code 03: Goods issue
    4. GM_Code 04: Transfer posting
    i also tried changing it to '01' ,its not working still...
    Pls reply
    Thanks .

  • User Exit for Changing Quantity in Process Order , COR1, COR2

    Hi All,
    Can anyone point me towards the light in User exit related to COR1 and COR2.After the Creation of Process order  while saving i need to write a code that rounds off the quantity values.
    I tried to change the values in the below user exits but i was not succesfull.
    CCOWB001            Customer exit for modifying menu entries
    COIB0001            Customer Exit for As-Built Assignment Tool
    COZF0001            Change purchase req. for externally processed operation
    COZF0002            Change purchase req. for externally procured component
    PPCO0001            Application development: PP orders
    PPCO0002            Check exit for setting delete mark / deletion indicator
    PPCO0003            Check exit for order changes from sales order
    PPCO0004            Sort and processing exit: Mass processing orders
    PPCO0005            Storage location/backflushing when order is created
    PPCO0006            Enhancement to specify defaults for fields in order header
    PPCO0007            Exit when saving production order
    PPCO0008            Enhancement in the adding and changing of components
    PPCO0009            Enhancement in goods movements for prod. process order
    PPCO0010            Enhancement in make-to-order production - Unit of measure
    PPCO0012            Production Order: Display/Change Order Header Data
    PPCO0013            Change priorities of selection crit. for batch determination
    PPCO0015            Additional check for document links from BOMs
    PPCO0016            Additional check for document links from master data
    PPCO0017            Additional check for online processing of document links
    PPCO0018            Check for changes to production order header
    PPCO0019            Checks for changes to order operations
    PPCO0021            Release Control for Automatic Batch Determination
    PPCO0022            Determination of Production Memo
    PPCO0023            Checks Changes to Order Components
    STATTEXT            Modification exit for formatting status text lines
    Reason was the data related tp materials was not accesble at this point and residing in resb internal table .
    Any suggestions ? Ideas  ?
    Thanks in advance,
    Gowri

    Hi,
      Try with BADI <b>WORKORDER_UPDATE</b>.
    Regards

  • Component materials incorrectly assigned to superior operation in process order

    One of my manufacturing facilities is having a problem with components not printing on process order output.
    In all cases, the master recipes themselves look fine when reviewed in C203.  The components are properly allocated to phases (not superior operations).  But when the process orders are generated, certain components are being assigned in the process orders themselves to the first superior operation, instead of to the phase that is indicated in the master recipe.  Here is an example.
    Here is the master recipe operation information as seen in C203:
    And here is the material assignment list as seen in C203.  Note that component material MM6030 is assigned to Phase 0035:
    But when the process order is created, that same component material MM6030 is now assigned to superior operation 0001:
    Here is some additional information that I was able to eke out of the folks at the manufacturing facility:
    The operations in the master recipe did NOT originally contain operation 0001.  It was added to the recipe in C202 after the recipe was initially saved.
    Component Material MM6030 was not originally part of the BOM.  It was added via C202 after the recipe was initially saved.  A different material was originally in its place, and was assigned to a different phase.  After the MM6030 was added to the BOM, the assignment field was blank, and the user assigned it to phase 0035.
    Has anyone ever encountered a similar issue?  If so, how was it resolved?

    Hi ,
    Possibility  , in C202 , user may have changes the BOM first and re-assign the phase  but in process order level Read PP master did not call
    Another possibility manually change the process order component and assign this in Phase in COR2 .Please check  whether it has been added manually in order level . 
    Regards
    JH

  • PP tables for relationships in phases - Process order

    Hi,
    We have a process order and phases 20,40 and 60. So We know process order number and phase numbers.
    We have linked the phases in a relationship , say, FS(Finish to start )
    How can we see the relationships defined between phases from PP tables ? Which tables hold these relationship details?
    Rgds,
    Manohar

    Hi,
    please find the tables related with operation/phases which can help you .
                        MAPL                    Allocation of task lists to materials
         PLAS                    Task list - selection of operations/activities
         PLFH                    Task list - production resources/tools
         PLFL                    Task list - sequences
         PLKO                    Task list - header
         PLKZ                    Task list: main header
         PLPH                    Phases / suboperations
         PLPO                    Task list operation / activity
         PLPR                    Log collector for tasklists
         PLMZ                    Allocation of BOM - items to operations
    Regards
    SANIL

Maybe you are looking for

  • HT1553 how to change permission for my external hard-disk ??????

    can't copy files from my mac to hard disk

  • Data Guard. My archive log files are not applied.

    I have one problem with Data Guard. My archive log files are not applied. However I have received all archive log files to my physical Standby db I have created a Physical Standby database on Oracle 10gR2 (Windows XP professional). Primary database i

  • How to scroll fast

    a lot of people on here seem to be unhappy with the performance of the thumb wheel. it's not sensitive enough and sometimes not responsive at all. my 120Gb ipod is only filled with 40GB of music but there's quite a few artists. when i want to scroll

  • Game is "incompatable" with 3rd gen ipod touch

    I've been trying to download Trenches II onto my 3rd gen ipod touch, but when I do it says that it's incompatable, the only problem is that I fufill all requirements (iOS 3.1 and 3rd gen ipod minimum)

  • Unable to create PR via SO for DIEN material type

    Hi Gurus Need yr expertise.. I have a request from user to create PR from Sales Order for DIEN material type..Is it possible to create PR from SO for DIEN material type? When I try to create I hit an error "No comsumption account".. This is because D