I have a question related to Evidence of Insurability under Insurance Plan.
The requirment is that when an EE enrolls into an Insurance plan within 30days of DOH then EE doesn't need to provide EOI otherwise if EE enrolls into the plan after 30days then its mandatory to provide EOI. Could you please help me on how to set this condition when configuring EOI?
Thanks,
Raj.

Hi DF, Thanks for the comment.
Actually the requirement is, the EOI to be provided by EE is determined by DOH. Under garce period it determines the period when the EE should return EOI.
In our case, the EE don't have the provide EOI when they enroll within 30 days of DOH and they must provide if they enroll after 30days.

Similar Messages

  • How is the Basic Coverage amount calculated in IT0168 for Insurance plans?

    Hi All,
    I am in the process of configuring benefit plans for IT0168 -GB can anyone of you help me with the below?
    How is the basic coverage amount caluclated - can you please advise configuration for the same?
    Many thanks in advance.
    Regards,
    Anjali.

    1. Configure the Plan Type for the Insurance Plan.
    2. Configure the Insurance Plan
    3. Coverage Grouping ( if needed )  - Different coverage based on Employee IT0001 information / IT171 Grouping.
    4. Configure the Coverage Variant - If coverage varies by ( Parameter grouping ) Gender, Age, Smoker, Length of Service,
    5. Configure the Coverage where one specify the actual cost per unit of coverage ( example 0.25 cents per $ 1000 coverage ).
    Path for above items...
    Personnel Mgmt ---> Benefits ---> Plans -
    > Insurance Plans....

  • Help, please - Combined Limits and Expressions for Insurance Plans

    I seem to be configuring something incorrectly using the Combined Limits and Expression in the IMG.  I was wondering if somebody has used this successfully and can give me some pointers?  I've used it successfully when I've limited a plan to coverage of not more than 50% of the coverage for another plan, but I can't seem to get it to work for my current requirement.  Here is my current requirement:
    I have 2 life insurance plans, one basic and one supplemental.  The supplemental can only be elected if the basic plan is elected, so the basic plan would be the priority plan.  The individual maximum allowable coverage amount for each plan is $3,000,000, which is configured under the coverage rules.  However, the combined limit between the 2 plans is also 3,000,000.  A person can have the basic plan only and have the full 3 mil, or they can have both plans and must not go over the 3 mil between the 2 plans.  The basic plan is 1x but the supp plan can be 1x - 8x so it is very possible that the basic will not hit the limit, but the supp will. 
    I tried to set the combined limit of 3,000,000 for the 2 plans using the 2 pieces of the combined limits config, but I've tried everything, and it does not cut them back.
    Can anyone tell me step by step how to configure this, or do I need to enable and develop a user exit?
    Thanks!
    Lisa

    Hi, Lisa
    This should not be a problem.
    Firstly, have you set the Basic plan as a corequisite for your optional plan?
    Benefits--> Flexible Administration -->Prerequisites and Corequisites --> Define Corequisite Plans;
    Choose your secondary plan from the drop-down; then define your primary plan as the corequisite.  In most instances, selecting the 'Any plan required' radio button  should to the trick.
    Now for the combined limits:
    This is a 2-step process.
    1:  Define Combined Coverage Limits.
    Choose your Optional life plan, and enter the following:  Limit Amount -- 3,000,000; Rel. Operator :  >=
    REPEAT FOR BASIC PLAN AS WELL!!!!
    When you save this, your resulting screen should read something like this :  OPTL     Optional Life Limit   3,000,000   0.000  >=
    2:Define Combined Coverage Limit Expressions
    Select your Optional life plan.
    Enter the following in the table:
    1.00  |  Basic Life Plan
    1.00  |  Optional Life Plan
    Again, do the same for the Basic plan.
    the combination of these two steps  creates the following equation:
    3,000,000 >= 1* Basic Life + 1* Optional Life.
    Feel free to ping me if you have questions.   Contact details are on my business card.
    Rob
    Select your Optional life plan

  • Benefits userexit for insurance plans

    Hi,
    I am working on modifying an benefit userexit (ZXPBEU08). To evaluate the EECost and ERCost, I need to obtain the service years for the employee, it comes from infotype 41. How can I grab that information in this userexit?
    When I added the code related to infotype 41, it resulted in error saying that this infotype and table has been declared in another userexit ( related to infotype 41 - ZXPBEU20).
    Any ideas as how to go about it?
    Thanks in advance,
    VG

    I tried it. It throwed an error that table declaration that I had done for infotype 41(PA0041)  in the benefit userexit is not applicable. The message was the table has already been declared in ZXBEU20. But if do not declare, my existing code in the benefit userexit does not work.
    Also my question is, am I adopting the right approach, because this userexit(in the debug mode) only stops when I am in the benefit infotypes like 167, 168 for an employee. Being in infotype 168, am I able to grab the infotype 41 data for that employee?
    Let me know,
    Thanks,
    VG

  • Benefit Salary for Insurance Plan

    Hi Experts,
    I need your help. I have a requirement to show the benefit salary in PA30 till the end of the month when an employee is terminated on any day of the month. Currently, the benefit salary in Insurance Coverage tab in PA30 is getting dispalyed only till the termination date of the employee but I need this to be extended till the end of the month. For example, if an employe is terminated on 4th of April, the benefit salary on 30th of april should be same as it is on 4th of april. But currently, if I change the calculation date in PA30 from 4th to 30th of month (or any other date after 4th), the benefit salary becomes zero. When I debugged, I found out that the FM 'HR_BEN_GET_PLAN_SALARY' is reading IT0000 and if the employment status(PA0000-stat2 = 0) is withdrawn, it is returning zero as benefit salary. Could any one please advise how to handle this so that I can extend the salary till the end of the month? Any help is greatly appreciated. Thanks so much in advance.

    Hi Raj,
    You should create a termination rule and attach it to the plan. You need do the following...
    >>> Go to "Flexible Administration" under benefits - go to "Participation Termination"
    1. Define termination groupings - You need to do this if the termination rules are different for different employee groups.
    E.g. PT  employees may be terminated immediately from the plan but FT employees till end of the month.
    2. You define termination variants - these will be based on how many different possiblities you have. E.g. Immediate, End of the month...
    so after 1 & 2 - you will have term groupings FTEE and PTEE and you will have two variants IMMD, EOM (end of month)
    3. Here you will define the actual rules for the combination of grouping and variant - this is where you actually define what is the rule....
    so here you can say EMO/FTEE - here enter 31 of day of the month - to take care of of your requirement. Hope this helps.
    Cheers,
    MK

  • Question on potential configurations for resource cluster as virtual machine server / beowulf / render farm

    I am looking for a starting point on where to focus my efforts in researching a desired configuration.  Of course anyone who spends anytime researching in forums knows that one thing that people hate is for people
    to ask questions that can be easily answered with a simple Google search, so let me start by saying I have done many hours of research on this already.  The problem I am having is that although there is a huge amount of information out there on what I
    am looking to do, I don't believe many people have attempted this on as small of a scale as a single user system.  Also, the amount of routes to go down seems endless, which for me so far has led to many hours of wasted trial and error.  So keep
    in mind that I am not so much looking for a handout on answers but rather a more narrowed path of searching and researching.
    What I am looking to do is take the current equipment that I have and consolidate it into a 9-12U server rack using mounted 2 or 3U atx cases so that I can have a more organized, space saving setup.  That is the
    easy part, what I have been looking into though is the combining of cores and processing power to make a "super computer" yet I use this term very loosely.  From what I have read, the closest thing I can compare the idea in my head to is referred
    to as a Beowulf Cluster, or a Render farm but I believe as the name suggests that this is more dedicated to a single task of rendering.  I like the idea of a virtual machine server where I would never actually locally use this machine but rather set up
    many virtual machines that I can remote into.  I started to compile a ProxMox Server, and this was the right idea, however when running a VM, that VM is constrained to the hardware resources of the single node that it is assigned to.  If there is
    a way to be able to have a machine that would utilize the 20 some odd cores that I would have in the cluster, along with the 40-50 gigs of ram, well that would be ideal but sounds too good to be possible. Also, ProxMox isnt quite there in compatibility for
    a home/home office user. I understand that the programs that are used have to be written in a way where the architecture allows for such, but if it could even be used for speeding up my render time with Adobe and Autodesk (which I know do have such functionality)
    that would be wonderful. 
    So without writing a whole book I am looking for suggestions on how to proceed.  Can I literally build a "super computer" that is not really that super... more mediocre super... or am I better off just consolidating the hardware but not the
    OS's and programs.   Also, I do currently use three or four different distros of Linux, mostly for ethical hacking and security type work like pen testing.  One thing I have never been a fan of though is dual booting.   Perhaps investing
    in a hot-swap HDD chassis that I could load all the different OS's on where I could just pop in whatever OS I am looking to use.  As you can see I am far from knowing where to spend my efforts in research.... THANK YOu for ANY help.
    I was recently suggested Microsoft HPC Pack as a platform?  Anything?
    Here is what I currently have:
    these are all fully built)
    Intel i5 3.7 quad core
    Nvidia (ASUS) GTX-760
    16 Gb DDR3 @ 1600 Corsair
    ASUS Sabertooth Z87 MoBo
    Autodesk - Inventor, Revit, 3Ds Max, Maya, Fusion 360, Flow, etc.
    Adobe - PhotoShop, After Effects, Dreamweaver, Illustrator, etc.
    Basically as you can see this is used for my work in 3d modeling, rendering, and drafting along with 3D printing.
    Sys. #2
    AMD 4.7-5.0 8 Core
    Nvidia GTX 760 (Same as sys #1)
    16 Gb DDR3 @ 2400 Mhz
    ASUS Crosshair V Formula Z
    Various programs for programming, app development, gaming, etc.  (This is my daily driver)
    Sys #3
    AMD 4.5-4.7 8 core
    16 Gb DDR3 @ 1600 Mhz
    Asus Crosshair V Formula Z MoBo
    Not currently using this one but is fully functional.
    Sys #4
    HP built i5 3.4 quad core
    12 Gb DDR3 @ 1600
    Nothing Special - this is the one I was using for school work but being that school and programming became one and the same I have all but abandoned it.
    THANK YOU AGAIN TO ANYONE WHO HAS MADE IT THIS FAR in reading this.

    The cluster works only for standalone webcache and httpserver installations types.
    If you want to do this you have to use dcmctl command to change from one farm to another.
    try checking with dcmctl command with out options an dyou will get a full list of options.
    then run dcmctl usage(orhelp) option to see what you need.
    As far as I remember
    you have to check the farm id of the server you want to be the master
    then in the second, you have to run dcmctl joinfarm or something like that.
    Regards.

  • Benefit - EOI configure

    Hi,
    How to configure to have the infotype 168, with the following fields defaulted and flag?
    a) Statement Required - flag
    b) End of Grace Period - defaulted a date
    c) Locked record
    I have Define Evidence of Insurability Conditions:
    a) Action field - set to 2 (create a pending record for the chosen option
    b) Grace Period - set to 45 days
    Perform the enrollment of the insurance plan via HRBEN0001. But the above  the statement required is not flag, end of grace period is blank and record not locked.
    Thanks
    Nikki

    Regardless of what value you configured for EOI action (e.g. create active rec, create pending record, ...), if it determines that
    EOI is required, EOIRQ field in IT0168 WILL be flagged (SAP standard).
    As for choosing option '2' to create pending (locked) record, this logic is ONLY applicable if the record is created through ESS (Employee Self Service), and not within SAP GUI environment (i.e. logic to lock record if EOI is required is done through SAP function 'HR_BEN_GENERATE_INSU_EIO_SELEC', and this function is only called if ee's is enrolling benefit through ESS). I aslo noticed this behavior earlier, and don't see any SAP documentations mentioning about this neither.

  • Benefit Insurance Plan

    Hi,
    Iu2019m new on Benefit.  We have different benefit programs maintained in the table V_T5UBT.  All benefit programs share one insurance plan (Insurance plan 1) through the table V_T5UBU. Now, we get a change request for the insurance plan 1, but this change request is only for one of the benefit programs. 
    Question:
    Is there any way NOT to create new insurance plan , but just change the Insurance rule or variant for one of benefit programs only?  Thanks.
    Regards,
    Jim Xin

    Thanks for your reply.
    But i have question like in which field i need to enter following  details -
    Age Min  Max. female-NonSmoker  Female Smoker      Male-Non Smoker  Male - Smoker
         1     24     0.0500                          0.0700                 0.0500                     0.0700
    What is this amount exactly 0.0500,0.0700,0.0500,0.0700?Where i need to enter this amount in cost rule?
    I assigned grouping but i am confused here.I received employee cost,cost factor,base unit ,employer credit,credit factor details in cost rule node.
    Where i need to enter above coverage details???
    Thanks waiting for reply.
    Seema.
    Edited by: seema sapkal on Feb 3, 2009 4:43 PM
    Edited by: seema sapkal on Feb 3, 2009 5:02 PM

  • Benefit - Insurance Plan not display at enrollment screen

    Hi,
    The issue is unable to see the configured Insurance plan at the enrollment screen (HRBEN0001).
    What possibility that could caused this?
    Thanks
    Nikki

    Ted,
    Notice that in enrollment screen, I've clicked the adjustment reason, the plan screen is blank, I click the "error" button - there is message indicating that "wage type for salary calculation base does not exist".
    Thanks

  • How to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM

    Hello Guru's,
    Request for information on smart documentation on the integration between Trade Promotion Management and SCM-Demand Planning from an architecture perspective how to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM and from TPM promotions values can be considered in to APO demand planning: can anybody give me some insight on it.
    Thanks in advance.
    Kumar

    Hi Praveen
    There are several ways you can connect a DP system to a TPM. How are your interfaces and systems setup?
    Option1:
    Extract the baseline from APO to a BW cube, extract the data out of BW, may be using infospokes/open hub and pass it on to TPM.
    2. Have a custom program written in APO-DP to extract the selected keyfigure data at the aggregation level into an interface or a .txt file into APO directory and use some data transfer service such as EDI to take this data and send to TPM.
    In my experience it is simple to define an integration process. The much larger and complicated aspects are the date adjustments and the aggregation levels.
    Date adjustments:
    Understand the basis of the data in APO and TPM. APO is usually at the requested delivery date or material availability date ( when the customer like a store wants the product). However TPMs are usually at the consumption date ( when an end customer like you and me but from store shelf). Depending on the product and business style this can mean several days difference. Let's say it is 25 days on average, you need to add 25 days to APO base line date to get the TPM consumption date.
    Aggregation level:
    This can be product or customer. If the planning in DP is at product sku level and the TPM is at packs or brand level, you need to aggregate the data up before loading to TPM. The same with customer.
    To me the most complex part of the integration is to understand and transform the data in a meaningful way and a strategy to sustain this integration by keeping both DP and TPM in sync in terms of master data. Also important to have a process for identifying exceptions and failures. you send baseline from DP to TPM and if it fails, how do you know? how do you trouble shoot?
    Hope these help.

  • Is Oracle Configuration Manager Available for Hyperion Planning Servers?

    The "My Oracle Support" site (https://support.oracle.com) describes the values of installing the Oracle Configuration Manager on servers.
    Question: is this available for the Hyperion products or just Oracle databases? If available for Hyperion products, does it add value to tech support?
    Any comments would be appreciated.

    John
    This is partially correct. If you user12136418 are looking for a way to monitor health automatically and get access to web ex session technical support from one console OCM is a great tool. The fact that it is not a thick client in nature nor a windows service makes it ideal for having agents monitor network traffic SNMP and still have all hyperion health monitored without having to run a tool like SCOM. I have been waiting for this tool for a year . Now if only Hyperion would work with IE8. But we all can not have egg in our beer.
    Thank you
    Michael Worthylake
    Systems Analyst
    DJO, LLC
    1430 Decision St.
    Vista, CA 92081-8553 U.S.A.
    Direct: 760-734-5631
    Cell: 760-445-0746
    www.djortho.com
    [email protected]

  • Configuring Automatic Failover for EPM Planning Cluster

    We are trying to test automatic failover using a Planning(11.1.2.2)/weblogic cluster containing 2 physical servers and a Weblogic proxy plug-in for OHS.
    I understand that to enable this we must configure in-memory replication of HTTP session states and to do this, (according to various sources including ID 779350.1) the weblogic.xml file must include a descriptor set up as follows:
    <session-descriptor>
       <session-param>
        <param-name>PersistentStoreType</param-name>
        <param-value>replicated</param-value>
    </session-param>
    </session-descriptio>
    Where should weblogic.xml be created or amended (if it already exists) for a Planning cluster in a standard scaled out EPM deployment in order to effect failover between the two servers.
    Thanks

    yes, it can be load balanced in hyperion registry i believe, seen it once only drawback is ,if a JVM goes down while processing a request it needs to be manually started, however the url will switch automatically   

  • Doubt in sequence of steps in configuration of Insurance Benefits Plan..

    Hi Associates,
    In Insurance plans,I defined Insurance plan genral data,coverage variants,coverage rules,cost variants,cost rules.Finally I have done the step Assign Insurance Plan Attributes.
    I struck up at this point.please help me out.Inorder to complte the configuration part of Insurance Benefits what are the sequence of steps i have to configure here.
    Thanks In Advance.
    SAIRAM

    Hi Friends...
    In the step "Define Cost rules",i have some doubts,please clarify..
    1.What is meant By Base unit.
    2.What is cost factor.
    3.What is meant by Steplimit.
    4..According to my clients company policy,the insurance cost is provided by company only.Here my doubt is should i use Employee costs or Provider costs.
    Please clrify me.
    Sairam

  • Hard Drive configuration for speed

    I've got a question regarding the best hard drive configuration for my mac pro. I'm looking to increase the boot speed, application load speed and particularly the speed with which hard drive intensive photoshop processes complete. Right now I'm just using some normal SATA II drives. I'd appreciate it if you could give me some feedback on the various options I am currently considering.
    -2x 64GB SSD in a RAID 0 for OS X and applications with some large SATA drives for storage
    -4x 300GB VelociRaptor 10k RPM SATA HDD in a RAID 0
    -2x 147GB SAS 15k RPM HDD in RAID 0 with some large SATA drives for storage
    I am particularly in the dark about the controllers I'd use for each solution. Clearly, I would absolutely require a PCIe card for the SAS drives, but would there be a marked advantage to using a hardware RAID card for the SATA drives over the software RAID in OS X? Also, how easy is it to get the mac pro to boot off drives connected to a controller card rather than the standard setup? And lastly, if there is good reason to use a card, are there any in particular that you would recommend?
    Thanks a lot!

    2. No. Do not make two partitions unless you do not plan to use Boot Camp Assistant to install Windows on that partition. If you plan to create a Boot Camp partition then you must partition the drive as one Mac OS X volume. Boot Camp Assistant will then create the Windows volume.
    3. This drive must be repartitioned and reformatted as follows:
    Extended Hard Drive Preparation
    1. Open Disk Utility in your Utilities folder.
    2. After DU loads select your hard drive (this is the entry with the mfgr.'s ID and size) from the left side list. Click on the Partition tab in the DU main window.
    3. Set the number of partitions from the drop down menu to two. Use the graphic resizer to set the desired sizes for each volume as you want. Set the format type to Mac OS Extended (Journaled.) Click on the Options button, set the partition scheme to GUID (only required for Intel Macs) then click on the OK button. Click on the Partition button and wait until the process has completed.
    4. Select the first volume you just created (this is the sub-entry under the drive entry) from the left side list. Click on the Erase tab in the DU main window.
    5. Set the format type to Mac OS Extended (Journaled.) Click on the Options button, check the button for Zero Data and click on OK to return to the Erase window.
    6. Click on the Erase button. The format process can take up to several hours depending upon the drive size.
    7. Select the second volume you created and repeat Steps 4-6.
    4. Now here I don't know what you think is your best option. You can buy any two hard drives you want. The ones I identified were only an example of what you could purchase for under $300. There are others, slightly more expensive, that would work, and you would still be under your $300 budget. The Samsung drives are good drives and reasonably priced, but they are just one of several alternatives. You should do some checking on your own before making your decision. I'm just giving some guidance, not trying to tell you what you should do. I've provided three sites where you can read reviews and benchmarks before you decide. You need to "own" your decision.
    As for how you configure these two drives that's a secondary issue. I would recommend using them for backup. Two possible arrangements are a Mirrored or a Striped RAID array. A mirrored RAID array would create one volume that has a 1 TB capacity. Everything saved to that volume is essentially saved twice - once on one drive then a copy is mirrored to the other drive. This is not what you described in your Item 4. That's not how it works. Anything saved to the mirrored RAID array is saved the way I described it just above. It makes no difference where the files come from.
    Now you can use the mirrored RAID array as a Time Machine backup drive if you want, but then you should not use it for other data storage. You would need the entire capacity as backup for both of the 500 GB drives you currently have. A mirrored RAID provides some data redundancy by having a copy of everything one each drive. Thus, if one drive fails the other drive still functions and your data backup is intact. Mirrored RAIDs are generally no faster than an individual drive that makes up the array.
    The second suggestion was to make a Striped RAID array. This type of array produces one volume that is twice the size of the the two drives that make up the array. Thus, you would have a single volume that is 2 TBs in size. You can use this volume for your Time Machine backups also. Striped RAIDs do not provide any data redundancy. If one drive fails all the data stored on the RAID will be lost. However, Striped RAIDs are nearly twice as fast as either drive that makes up the array. This would give you very fast storage and backup.
    You could also just leave the two drives to operate independently. Use on for Time Machine backups, use the other for more storage space.
    Other possibilities abound. It's pretty much up to you to decide what will fit best into your needs today and in the future. Don't feel obliged to do what one person tells you. Five different users on the Discussions will give five different opinions.
    I suggest you educate yourself a bit on backup and restore by reading the FAQ about backup and restore at The XLab FAQs.
    Following is more information on RAIDs:
    RAID Basics
    For basic definitions and discussion of what a RAID is and the different types of RAIDs see RAIDs. Additional discussions plus advantages and disadvantages of RAIDs and different RAID arrays see:
    RAID Tutorial;
    RAID Array and Server: Hardware and Service Comparison>.
    Hardware or Software RAID?
    RAID Hardware Vs RAID Software - What is your best option?
    RAID is a method of combining multiple disk drives into a single entity in order to improve the overall performance and reliability of your system. The different options for combining the disks are referred to as RAID levels. There are several different levels of RAID available depending on the needs of your system. One of the options available to you is whether you should use a Hardware RAID solution or a Software RAID solution.
    RAID Hardware is always a disk controller to which you can cable up the disk drives. RAID Software is a set of kernel modules coupled together with management utilities that implement RAID in Software and require no additional hardware.
    Pros and cons
    Software RAID is more flexible than Hardware RAID. Software RAID is also considerably less expensive. On the other hand, a Software RAID system requires more CPU cycles and power to run well than a comparable Hardware RAID System. Also, because Software RAID operates on a partition by partition basis where a number of individual disk partitions are grouped together as opposed to Hardware RAID systems which generally group together entire disk drives, Software RAID tends be slightly more complicated to run. This is because it has more available configurations and options. An added benefit to the slightly more expensive Hardware RAID solution is that many Hardware RAID systems incorporate features that are specialized for optimizing the performance of your system.
    For more detailed information on the differences between Software RAID and Hardware RAID you may want to read: Hardware RAID vs. Software RAID: Which Implementation is Best for my Application?
    OS X has software for creating RAIDs by using Disk Utility. Open Disk Utility and select DU Help from the Help menu. Search for "raid" without quotes. You will find information on how to set up mirrored and striped RAIDs using Disk Utility.

  • BENEFITS: CLAIMS AND INSURANCE PLANS

    Dear Experts.......
    Let's say that we have an INSURANCE PLAN in a company and on in one hand I want to watch the receipts and and the bills of the employees...
    HOW CAN I COMBINE THE SPECIFIC INSURANCE PLAN WITH THE CLAIMS?..........
    Thank you very much!!

    I tried it. It throwed an error that table declaration that I had done for infotype 41(PA0041)  in the benefit userexit is not applicable. The message was the table has already been declared in ZXBEU20. But if do not declare, my existing code in the benefit userexit does not work.
    Also my question is, am I adopting the right approach, because this userexit(in the debug mode) only stops when I am in the benefit infotypes like 167, 168 for an employee. Being in infotype 168, am I able to grab the infotype 41 data for that employee?
    Let me know,
    Thanks,
    VG

Maybe you are looking for

  • How to I get photos to show "in the last week" smart album

    The images will not show in this pre-set smart album. They do show in my son's library, but not in mine. As far as I can tell all the settings are the same. What am I doing wrong?

  • Material group hierarchy in SAP Retail

    Hi Guru's; I'm looking to load hierarchy of material group in BW. In the SAP source system the used standard transaction WG21, WG22CLWM for managing retail material group hierarchy. I suppose that from those transaction there is a BW hierarchy to rec

  • Problem in Sales Register  in XL Reporter

    Hi Experts I have a problem in Sales Register. It show double quantity and linetotal in most of invoices. I search a lot but could not find the problem. When I compose a new sales report from Sales AR module , here it show the same error, double qty

  • "thumbnail view" in package on receiver's end

    I want to email a pdf package with 4 pages in it.. I would like the receiver of the package to see the thumbnails on the left side of the view screen, so they can see there are 4 pages and toggle thru them. Is there a way to set it so that every time

  • Oracle - Query taking too long (Materialized view)

    Hi, I am extracting billing informaiton and storing in 3 different tables... in order to show total billing (80 to 90 columns, 1 million rows per month), I've used a materialized view... I do not have indexes on 3 billing tables - do have 3 indexes o