BOM and Routing with Dependencies
Hi,
I have created BOM,Routing and dependencies.
I know we can link BOM and dependencies using BDC programming.
MY QUESTION : Is there any FM or BAPI which does link BOM and dependency & routing and dependencies where it takes Material,component and name of the dependency and link directly to respective BOM's and routings.
I would appreciate any inputs.
Best Regards,
Mark
Hello,
Please check the following DI Program/LSMW:
0170/0001/RCPTRA01/B
and the Structure BIPMZ would allow us to link the components to an Operation.
Also the BAPI: BAPI_ROUTING_CREATE
and structure: COMPONENTALLOCATION
Hope this helps.
Best Regards, Murugesh AS
Similar Messages
-
Looking for BOM and Routing objects created with a BAPI
(I ran this one up the flagpole in the data forum and didn't get any responses. Maybe someone here has see this phenomon?)
I'm invoking BAPI_MATERIAL_BOM_GROUP_CREATE from an external Java program. I believe my code matches the example I find here and in the SAP documentation (transaction BAPI). When it finishes, I get a successful return (type=I, number=000), and a message of "BOMGroup 00000070/TAM1/1 has been created. External reference:" But I can't find anything back on the SAPGUI - the material number still says it has no BOM (on CS02); I don't see any new BOM Groups (on CS06). By the way, the "00000070" number seems to be assigned by SAP: I t increments each time I run my test, so I must be doing something; the TAM1 in that message is the plant, and the "1" is the BOM Usage I assign in my BAPI (both in the BOMGroup structure and the MATERIALRELATIONS structure). I do a commit transaction at the end too, although the BAPI to create the material created it without me doing a commit, so I don't think that was necessary.
(Update since I posted this on the other forum: I tried to create a routing and have the same result - 000 message number, and a message including an SAP-assigned number, making me think I've created an object, but I don't see it anywhere. Any idea which tables I can look at to find them, and maybe see what's missing (e.g., with SE12 or some such)?)
Any thoughts on what I AM creating? Or some little thing I'm missing here?
Thanks for any insight!
Thomas.check the post:
BOM and Routing with Dependencies
-Murugesh AS -
Duplicate Routing with dependencies
Hi all,
I'm trying to copy a Routing changing the Application (VERWE = 'C' instead of '1')
I'm using the FM CARO_ROUTING_READ to take the original Routing and then call FM BAPI_ROUTING_CREATE passing tables TASK, MATERIALTASKALLOCATION, SEQUENCE and OPERATION .
It works fine: duplicate all from the original but it doesn't copy the dependencies allocated in every single operation inside the routing.
Anyone have an Idea to copy these dependencies? maybe another FM, Bapi, or doing a select from a table? which one?
Thanks!
Best Regardscheck the post:
BOM and Routing with Dependencies
-Murugesh AS -
Standard cost with material with alternate BOM and Routing
I have a set up where the same material can be manufactured in 2 different production lines and each production line has two different BOMs and Routings. If I want to have a blended standard cost for the material what are our options?
We do not want to do split valuation.
thanks a lotHi
You can different PCC (Product cost collector) for both lines of the same product (Product cost by period).
You can define a production process within a product cost collector for each line of production with a combination of BOM and Routing. TCode KKF6n. It would generate a order number for each production process.
You can use each order within the PCC for each production line to capture the costs for seperate lines.
Regards,
Suraj -
Production Order for a material without BOM and Routing
Is it possible to create a production order for a given material without routing and BOM, I know we can
create a production order for a material without a BOM (with a default routing) just wanted to check with
the above criteria
Thanks in Advance!!Members:
Thank you for your valuable replies and time
Santosh:
Tried what you have mentioned, but system still picks up a default routing
Kaushik:
Maintained Default values in OPJG for the given order type, but system still picks up
default routing
Mangalraj:
have no issue in creating a production order without a BOM, but I am trying to see
is there a way where I can create a production order without a BOM and routing (not
even default operation )
Any suggestions on how to create a production order for a material without a BOM
and routing (not even default one ) -
Selection of BOM and Routing in Cost estimate
Hi
I have an issue with the cost estimate run. We are using CK40n for cost estimate.
The selection method in MRP 4 is defined as 3 (only by prod version) and the version indicator is maintained in the costing views also.
When we run the cost estimate the system is chosing a different BOM and routing other than the ones defined in the prod version.
Following are the details of the prod version defined.
0010 Prod version
Lot 0 to 99999
BOM Alt 1 usage 1
Routing Grp 1234 counter 1
0020 Prod version has
Lot 0 to 99999
BOM Alt 2 usage 1
Routing Grp 1234 counter 2
0030 Prod version has
Lot 0 to 99999
BOM Alt 3 usage 1
Routing Grp 1234 counter 3
Ideally system should choose the first prod version.(alt 1 and usage 1 and Routing 1234 grp coutner1). This is not happening.
System for some reason is choosing the BOM with Alt 1 and usage 1 defined in 0010 prod version but the routing from a different prod version 0020 grp 1234 counter 2.
I have checked with all the relevant settings but i am not able to understand why this is happening.
This is not the same when i create a prod order. System chooses the first prod version when i create the order.
I have checked the priorities defined in the customising, and also the details in the costing varaint using CKC1.
What settings do i need to check to ensure that it works fine? Can you please let me know.Vithal,
While doing the costing run, SAP checks if you have maintained the "Production version to be costed" [MARC-FVIDK] field in Costing View. It will use this Prodn Version for cost estimate.
If you have not maintained the prodn version field, then it will use the values maintained in the "Quantity structure data" section on costing view. i.e. it will use the BOM alternative..and recipe information from here.
If you have not maintained above values then system picks up the first BOM alternative (MAST table) and first recipe information (MAPL table) it finds for the material-plant combination.
Might be this is what is causing the problem for you. Also according to my knowledge SAP cannot decide the Lot Size for Prodn Version while doing the costing run. You need to tell the system what data to be used for costing.
Try and revert back.
Swapnil -
Bom And Routing Import interface errors Help needed
Hi All,
I am using bom and Routing Interface to load the Bom and Routing Header.papulating the BOM_INVENTORY_COMPS_INTERFACE,BOM_OP_SEQUENCES_INTERFACE,and BOM_OP_RESOURCES_INTERFACE tables BOM header and Components are created sucessfully but routing is failed with process flag 3.the errorr i am getting is You cannot update or delete operation sequences when there is no routing for the assembly item &ASSEBLY_ITEM_NAME. (ASSEMBLY_ITEM_NAME=TESTITEMBOM) (ORGANIZATION_CODE) and
This record received an error status since a severe error occurred in the operation sequence 10 while performing user unique index conversions."
please let me know any api is avilable to load ROUTING Components
Thanks in advanceHi,
Try following
step 1. Insert routing header (bom_op_routings_interface) : Run Interface
step 2. Insert routing lines (bom_op_sequences_interface) with correct reference to routing_sequence_id: Run Interface
step 3. Insert all resource lines (bom_op_resources_interface) with correct reference to operation_sequence_id, routing_sequence_id , Run Interface.
Thanks,
Hrishi -
BOM and Routing import is not populating data in base table.
BOM AND ROUTING INTERFACE Import Prog is not populating base table with interface data.Even the Interface table data is not processed.I am passing process flag as 1 and transaction_type as INSERT,still the ROUTING INTERFACE TABLES are not getting processed.
passing the below details.
INSERT INTO bom.bom_op_routings_interface
(organization_code, assembly_item_id, completion_subinventory, routing_sequence_id, organization_id,
routing_type, common_routing_sequence_id, last_update_date, last_updated_by, creation_date,
created_by, last_update_login, alternate_routing_designator, assembly_item_number, process_flag,
transaction_type) ;
INSERT INTO bom.bom_op_sequences_interface
(operation_seq_num, department_id, department_code, option_dependent_flag, operation_lead_time_percent,
implementation_date, effectivity_date, disable_date, count_point_type, backflush_flag, minimum_transfer_quantity,
operation_sequence_id, routing_sequence_id, organization_code, assembly_item_number, last_update_date,
last_updated_by, creation_date, created_by, include_in_rollup, alternate_routing_designator, process_flag,
transaction_type);
INSERT INTO bom.bom_op_resources_interface
(resource_seq_num, resource_code, resource_id, basis_type, usage_rate_or_amount, usage_rate_or_amount_inverse,
assigned_units, schedule_flag, resource_offset_percent, activity, standard_rate_flag, autocharge_type, organization_code, assembly_item_number,
operation_seq_num, effectivity_date, last_update_date, last_updated_by, creation_date, created_by, alternate_routing_designator,
operation_sequence_id, routing_sequence_id, process_flag, transaction_type);
Where am I making a mistake.
Thanks in Advance.
Sambit PradhanHi,
Try following
step 1. Insert routing header (bom_op_routings_interface) : Run Interface
step 2. Insert routing lines (bom_op_sequences_interface) with correct reference to routing_sequence_id: Run Interface
step 3. Insert all resource lines (bom_op_resources_interface) with correct reference to operation_sequence_id, routing_sequence_id , Run Interface.
Thanks,
Hrishi -
CK11N , bom and routing not copied
Dear all,
At time of costing run through CK11N , bom and routing not copied I have checked all validity/ status /uses / lot size of bom and routing also . but when i will run costing for next month system has copied bom and routing .
plz guide meDear Surendra Patil,
Check the costing variant that you use for executing CK11N, is it PPC1?
If this is correct means check in T code OKKN and choose PPC1 and check for the quantity structure
control and check the BOM apllication and the routing selection ID.
This should match with your BOM that you have created and also the routing that you have created.
1. Check the BOM status in CS03---> header.
2.Check the status & usage of routing in CA03,generally it will be
Usage 1 Production
Status 4 Released (general)
3. If you are using Production version check whether have you assigned proper routing group & counter
and along with the BOM.Also check whether is the production version locked?
Check & Revert back.
Regards
Mangalraj.S -
How BOM and routing is selected for Planned order and Production order?
Hi,
Can any1 plz tell me how BOM and routing is selected for a planned order and production order. ?Hello Mathisuthan,
BOM and Routing selection for the planned order and production order through production version, If u have more than one BOM and more than one Routing then u can maintain this information as Production Version in the system.
Production version you maintained
MM01/MM02 -- MRP4--- Production version
Or you can create Production Versions in Mass also with Transaction Code "C223"
In the case no production version maintained/created for the material, then system by default will pick the first BOM and routing.
I hope this information helpful to you.
Regards
Umesh Mali -
Hi
I have requirement to update BOM and Routing . Please suggest me BAPI or functional module to Update BOM and Routing .
Thanks
UdayDear Shankar,
For BOM use the T Codes CS20 or else CEWB for making mass changes or else check with this Functional Module,
CS_CL_P_BOM_MASS_CHANGE
For routing use the T Code CEWB or else check with these Functional Modules,
CP_CL_S_OPR_MASS_CHANGE
CP_CL_S_TSK_MASS_CHANGE
EWB_MASS_CALL_OPR
EWB_MASS_SAVE_OPR
EWB_MASS_SELECT_OPR
Regards
Mangalraj.S -
Hi Gurus,
Can anybody tell me How to download BOM and Routing for all semifinish and finish materials with multilevel bom components with header as well as component quantity.
Thanks,
MaxDear Max,
1.At T.Code level for routing details you can execute CA51(by selecting suitable check box in the input screen as business
required).
2.At T.Code level for BOM there is no standard T.Code for getting the BOM components details in mass,you have to use tables
MAST,STKO,STPO or if you need only for few materials check CS11,CS12,CS13,download it into excel format and print the
same.
Regards
Mangalraj.S -
Production order creating without BOM and Routing
create the production orders without bom and routing
they confirm the order
they want to stop confirmation if production without bom and routing
is it possible to set error or warning message
my first doubt is how can we confirm the order without bom and routing
i think it can be solved by production order type
please replyHi,
You can make it mandatory by following ways :
Go to OPPQ -> Select your plant-> Go to BOM / Routing Selection in that you need to maintain BOM Sel ID & Routing Sel ID which is having selection ID with usage 1 Production which will make it mandatory to create BOM & ROuting with usage 1 & need to be selected while creation & saving Production ORder.
Also, you can maintain another config. for making routing mandatory at Order type level :
Go to OPL8 -> Select Plant & Order type-> Routing Selection
Maintain 5 Routing/ref. op. set mandatory (manual selection)
or 6 Routing mandatory (automatic selection)
This setting will ensure without routing your order will not be saved.
Hope this helps.
Regards,
Tejas -
Dear Gurus,
For a oil refinery wht will be the BOM and Routing.Input is crude and out put is 32 FGs at differnt level.The routing seems to be complex and how to structure the BOM ?How the product costing is done in refinery? Any body have implmented in refinery?Please share your experiance.
Regards
GunaHi, Guna R
Same industries we are going to implement sap PP-PI module , can you share some document, they are consumed Crude oil (Raw) and finally produced Refined Soya oil , in between that produced some By-product ,So how can we map process in sap and how the costing will done,
What will be the Recipe ,
What will be the Resources
What will be Activity for costing
If you have any document
please share on my mail ID [email protected] -
Planned order not selecting BOM and Routing.
Dear All,
I am runing LTP, but for all simulative Planned order system is not selecting Routing and BOM.When i change it manually its selecting the correct BOM and Routing.
Please let me know what needed ....
Regards
SathishDear,
First check the OPU5 setting for routing selection ID for your pant and order type?
Check setting of OPJM fo the selection ID linked application?
OS32 setting for alternative selection.
BOM is selected by the system based on the setting in MRP plant parameters(OPPQ) and in material master MRP view BOM explosion type. I. e based on the validity date, lot size. so on
Regards,
R.Brahmankar
Edited by: R Brahmankar on Apr 3, 2010 11:11 AM
Maybe you are looking for
-
I have trouble reading in Black and White. changing the background color for all
I have trouble reading in Black and White. On my PC I can change the background color (and I am not just talking about for a word or pages document) but for eveything so anything that was a white background I can put in what ever color I like but it
-
How do I install Firefox on a computer with no current browser on it?
I have a laptop with a corrupt browser (Explorer) and I want to install Firebox. But, because the current browser won't launch I have no access to the download site.
-
LDAP users Faicng Error While Accessing the ESS Iviews in Portal
Hi, My Portal is SAP EP 7.0 SP20 And ECC 6.0 SP16. UME users able to access the ESS MSS Iviews.But only one LDAP User only access ESS/MSS Iviews Other getting the Below error. Critical Error A critical error has occured. Processing of the service had
-
Adobe acrobat pro 9.2 crashes in windows xp sp3 when closing a pdf
Adobe acrobat pro 9.2 crashes in windows xp sp3 when I close a pdf. This means that if I have multiple files open, all of them close. I get an error message from windows that the problem is due to windows' Data Execution Prevention (DEP). I tried mak
-
Connected to iTunes and lost all music and random new songs were added but I can't delete them
I connected my iPod into Itunes (Windows not Mac) and for some reason all my music were deleted. I synched my music again and the default songs that are aready on iTunes were added in my iPod. I can't even delete the default songs now.. Help...