BOM explosion - problem in transferring based quantity from R/3 to APO

Gurus,
i would like to know if what are the reason why sometimes theres a failure in tranferring chnages done on based quantity header of  certain SKu going to APO.  we usually do by running RIMODGEN/RIMODAC2/RIMODDEL program and then lastly the DELTA PPM program..
For this scenario, we manually fix the issue by manually running CFP3 and this is unsually process. May i know if what are the parameter that causes of this failure?
Any help would greatly appreciated. Thank you in advance.
Regards,
kne3ow

Hi kne3ow,
CFP3 is the SAP standard transaction to send any changes at the PPM level.
The programs RIMODGEN, ACT etc., will transfer any changes overall at
the product level.
I would suggest you need to revise your process by incorporating
CFP3 for transferring PPM related changes in your system.
Regards
R. Senthil Mareeswaran.

Similar Messages

  • Hi.. i am finding problem in transferring .avi file from dektop to itunes

    hi.. i am finding problem in transferring .avi file from dektop to itunes

    iTunes does not support .AVI files. However, you can use iSquint to convert the file to an Apple-Friendly format (Its free, and really easy to use) http://isquint.en.softonic.com/mac

  • BOM Explosion problem

    Hi,
    I have multilevel BOM (almost 10 levels with around 1500 materials), in which many materials repeat at different levels.
    I am facing problem in one of the material during MRP, This material is used at 10 different levels. Altogether to produce a FG it requires in 36 numbers. In different levels quantity of it required is different. Say 8,1,4,2 etc but total qty is 36.
    When MRP is run the requirement generated for this material is same at all levels i.e 36(total qty) / 10  (BOM levels) = 3.6
    But actually system must generate requirements as per BOM quantity. Not sure what is wrong.
    Requesting you all to reply quickly for this issue.
    Regards,
    Pavan

    Hi,
    Below is the little knowledge i have which want to share with all the august people around.Hope it would be helpful enough for you to get the results.
    A BOM is not exploded in the following situations:
    - No BOM is effective:
    -- On the explosion date and in the given area of validity
    For the given effectivity parameters
    - The BOM has a deletion indicator.
    - The BOM is a multiple BOM, and has no alternative that matches the lot size for your required quantity.
    - No BOM matches the selection criteria of the BOM application you selected.
    - This is possible in the following situations, for example:
    -- The application does not take all BOM usages into account.
    For example, the application only takes BOMs that are relevant to production into account, so a BOM that is relevant to sales and distribution is not exploded.
    -- The application selects a specific alternative on the explosion date you require. The material master record supports alternative determination by Explosion date.
    If the specified alternative is not valid on the explosion date, the BOM is not exploded.
    -- The application takes production versions in the material master record into account, but no production version has a BOM that is valid on the explosion date you require. The material master record supports alternative determination by Production version.
    The system only explodes the BOM defined for the production version that matches the alternative and/or usage entered on the explosion date required.
    -- The application only takes BOMs with certain status indicators into account.
    For example, the application for MRP only explodes BOMs that have at least the status Explosion for MRP.
    Further checks:
    - Do the proper Scheduling in Routing (Backward/forward). In md61 give the requirement in next month.check your in-house production, planned delivery time in md02 give MRP Control parameter Rexplode BOM and Routing.
    - Check BOM explosion data in MRP4 view of material master view ( Individual/Coll data).
    Please revert with your response
    Thanking You in Anticipation
    Regards
    Chandra

  • Problem with transferring garageband track from iPad2 to macbook

    Hello,
    I have a problem with transferring track from Garage band 2.0 on iPad2 to a new macbook pro (oct2013).
    I saved a track on macbook via iTunes but when i`m trying to open it on Garageband it shows an error.
    I have updated all soft recently. So it couldn't be true.
    Could you please help me to solve the problem?
    Thank you very much!

    What software are you running on your MBPr? Are you using MacOS X 10.8.5 or MacOS X 10.9?  Probably you need to update your MBPr to Mavericks and GarageBand 10.0.0.

  • Problem with transfered user sessions from a 10.4 system

    On my new MacBook pro with ML, I tranfered the user sessions of my previous mac (power book G4 working with OS 10.4).
    With these "old" users accounts,  part of the trackpad features (like scroling up and down with 2 fingers) does not work, whereas it is working with new users.
    Any idea on how to solve this?
    Thanks in advance

    That was a good idea, I tried to delete the com.apple.finder.plist and the com.apple.systempreferences.plist but that did not work.
    Eventually to solve the problem, I transferred all the files I needed to a session created with the new system. I'm waiting a week or two just to see if I have not forgotten something important and then I will delete the "old session".
    Thanks anyway for your help.

  • Problems in transferring Scheduling Agreements from ECC to APO

    Hi All
    We are facing a strange problem in transferring scheduling agreements to APO.
    When we create the integration model, it shows the selected scheduling agreements and vendors. On activating the integration model in CFM2 or CFM3, we do not get any error.
    But when we check in APO, we do not see any scheduling agreements.
    Can any one tell us what could be problem or where should we check to identify the issue ?
    Best Regards
    Mitesh

    Hi Mitesh,
    Did you try deleting all the integration models in CFM7 and trying again ? You could also try deleting the blocked queues in SMQ1.
    Regards
    Mukundan

  • Problem in transfering the Document from CRM to R/3

    Dear CRM Experts,
               I am working in CRM 2007.
      we connected the CRM 2007 with R/3.
    In CRM we creating the Service order -> Service Confirmation -> Return Order.
    When  we create the Return Order in CRM it Copies the Document and creates the Same Return order in R/3.
    But in our case it is not creating the return order in R3 and  i am getting the Error message
    "An error has occured in the system R22CLNT787 while copying the document
    Message no. CRM_ORDER_MISC 020
    Diagnosis
    Errors have occured while transferring the document into another system. Remove the error messages from the enclosed log.
    Transmission log
    Object link not known in CO (Notification E IAOM 019)"
    Please help me to solve this problem.
    Thanks & Regards,
    Ashok

    We had a similar error in transferring documents in the other direction, from R/3 to CRM.  During the transfer, SAP carried out the following steps:
    1.  Transfer R/3 object to CRM
    2.  Create 1Order Object in CRM
    3.  CRM send BOR object (log sys, GUID, obj type) of 1Order Object to the R/3 object
    4.  R/3 attaches the BOR object under linked objects
    5.  R/3 sends a response with the success/failure of the operation in Step 4.
    6.  CRM receives the message and writes it to a log
    We were missing Step 4.  (We are using Case Modeller in R/3 FSCM Dispute Management, so we had to attach/activate the link between R/3 and CRM in that step).
    Check CRM transaction SMW01 to see your message logs.  Perhaps they will offer more insight.
    Thanks,
    Ben
    We found that we were missing table entries in the

  • Problem With Transferred Music Files From External HD

    I have two external drives, both of which have music stored on them. One I use as my library for iTunes, the other is basically just stored as a secondary because I didn't really listen to it much. I decided to move all of the music together on one drive, obviously as my iTunes library, but everything I moved over from the secondary drive doesn't show up in iTunes. It does, however, show in my iTunes Music folder with the rest of the music. Any ideas?

    Figured it out.

  • Have problems with transfering iTunes library from Windows to Macintosh

    Good afternoon!
    I had before Windows PC, where i had iTunes with all my music. And now i bought macbook pro. I tried to transfer iTunes library as it is described in a lot of sites in internet. But maximum what i could made - just to transfer all songs. And if before i have in iTunes folders with different music (David Garrett, Jason Mraz, music for baby, etc) now i have all songs (about 2 000) just in one list.
    Could u help me please to transfer all music with folders like it was in iTunes in Windows PC.
    Thanks in advance!

    iTunes: How to move [or copy] your music [library] to a new computer [or another drive] - http://support.apple.com/kb/HT4527 - a somewhat bewildering and not always easily understandable set of options.
    Quick answer if you use iTunes' default preferences settings:  Copy the entire iTunes folder (and in doing so all its subfolders and files) intact to the other drive.  Open iTunes and immediately hold down the Option (alt) key (shift on Windows), then guide it to the new location of the iTunes Library.itl file in the moved iTunes folder.
    For the record there's this reference for iTunes 11 but it really doesn't strike me as having the specifics you need. iTunes 11 for Mac: Move your library to another computer - http://support.apple.com/kb/PH12168 
    Windows users see tip at: https://discussions.apple.com/message/18879381

  • BOM Explosion based on Production Order Creation

    Hi PP Guru,
    My client wants the BOM Explosion date to be based on Production Order creation date. Could you help to advise how to set-up this requirement?
    I have showed them these possible System Configuration in BOM explosion, but none of these options are applicable to their current business practice.
    <OPPQ> BOM Explosion:
         BOM explosion number/order start date
    1     Order start date
    2     Order finish date
    3     BOM explosion number/order start date
    4     BOM explosion number/order finish date
    Looking forward to you reply.
    thanks,
    John

    Hi Sundaresan,
    Thanks for your reply.  So do you think there's any other way to fulfill the client's requirement?  I was thinking to do the "PP Master Data" instead, in order to choose the date of explosion.
    Actually the scenario is this:
    Initially the Material XXXXXX has a valid BOM on 03.01.2011 to 12.31.9999, but then, some changes has been made, maybe the user has changed the component or added new component using 04.01.2011 to 12.31.9999 as validity date.
    For example, the user created the Production Order (manually in CO01 or from Planned Order conversion) on 03.20.2011 and the Order Star date is 04.01.2011, so the system will copy the updated BOM which is valid on 04.01.2011 to 12.31.9999 (based on Order Start date).
    However, the client wants to explode the previous BOM instead (03.01.2011 to 12.31.9999).
    Please advise.
    Thanks,
    John

  • BOM Explosion Number in Sales Order

    Hi Experts,
         For a make-to-order case, I would like to assign a predefined BOM explosion number with fixed key date to a sales order item. Instead of manually assigning the BOM explosion number to the sales order item, is there any way to let the system automatically assign the BOM explosion number?
         As I read from SAP Library under the BOM Explosion Number (Fixed Key Date), it states "The system can automatically specify the BOM explosion number when entering planned independent requirements or customer independent requirements or when entering the sales order." So is there any configuration to be done in advance to enable the BOM explosion number to be automatically assigned to sales order item?
    Thanks,
    SW

    I tried also setting up the material and its BOM determination by specifying only 1 BOM out of multiple BOMs. Still,
    1. When I add the said material into sales order line and save the sales order, the BOM explosion number value never appear automatically in the sales order line.
    2. When I run the planning on the sales order through MD50, the planned results do not have the BOM explosion number attached.
    I think your advice is more applicable to selection of a BOM from multiple BOMs instead of determining the fixed key date based on appropriate BOM explosion number, correct me if I am wrong.
    Regards

  • How to restrict other plant material assigned to SA BOM explosion

    Dear Experts
    One of our client havea issue of assigning wrong material to the scheduling agreement BOM explosion.
    Actually there are two different plant code one for manufacturing plant and another one trading.Subcontractor activity will be carried out in trading plant , but users assigning the BOM components from manufacturing plant material.
    So they are sending material to vendor from manufacturing plant and receiving material to trading plant.But finance guy don't want do like that.
    How to restrict other material (material not part of SA plant)assignment to SA BOM explosion
    Thanks in advance
    Regards
    SS

    Thanks for your reply.
    In BOM creation CS01 , if plant is differ from header to line item system will give error message M3 351
    "Material &&&&&& not maintained in plant &&&&".
    Like that i want to make it in ME38 BOM explosion also.If plant is differ from scheduling agreement line item to BOM line item system should give error message.
    For the above scenario I need the solution
    SS

  • Issue in CIF of delivery from R/3 to APO

    Hi Experts,
    I am facing an issue while transferring sales order from R/3 to APO.
    When any sales order is created in ECC, it is transferred to APO.
    My requirement is to restricted specific sales order type and respective deliveries from going to APO.
    I have written my logic in exit CIFSLS03 in FM EXIT_SAPLCSLS_002.
    But this code is working fine for sales order but not for respective deliveries.
    Here is screen shot of my logic.
    Please look into this and help me to overcome this situation.

    Let me know if I am missing any configuration settings.

  • I transferred PPT files from a windows based pc (microsoft PPT 2003), at first my macbook was able to run all animations in file, after some time it stopped running it, partly because i "switched on" something since this is my first time to use a mac ?

    i transferred PPT files from a windows based laptop to my macbook, at first it was able to run the animations in the file no problem, its my first time to use a mac also bythe way, so i started downloading freebies like the VLC, FLIP4MAC, and other plug-in players, would it be because of this downloads that my mac now cannot seem to run the powerpoint animations any more ?

    I don't think vlc would affect powerpoint.  What were those "other plug-in players" you downloaded? 
    I'm not that familiar with powerpoint so how are those animations played?  Are they windows media player files?  If so then flip4mac might affect them.

  • BOM explosion from Production Order

    Hi All,
      I understand from SAP Help files that we can explode BOM from Production Order using Read PP Master Data. But it also says, that we cannot do this if items have already been issued out. So would like to know is there anyway out to ensure that the production order is reading the latest version of BOM.
      The reason i want to know is because, at present the BOM keeps getting updated & so the work order has to reflect the new items. The BOM contains about 300 or more items, so manual changes is very tedious & error prone at the moment. Furthermore some components are outsourced. So i want to receive them back & post new materials for them. Hope my problem is clear & await inputs
    Vivek

    Hi All,
    Thanks for the inputs. I think for the situation am facing, the Order change management method, should be of help, as the BOM changes does not take place on scheduled dates, for me to fix the BOM explosion dates & assign them. As of now the BOM gets changed, depending the customer requirements, which is unpredictable.
    Clarification required:
    1. The profile which is created using OPL7 & assigned in OPL9 is unique, i.e. for any change numbers of BOM will always follow the profile entered in 'Overall Profile' in Work Scheduling view & i do not need to create new profiles for each new change number of BOM
    2. Once i run the COCM with the new change number, in the production order - components view will i be able to see any error message for those items which no longer feature in the new version of BOM? & will the materials added in the new BOM automatically feature in that list or do i have to manually add these to the order & if so, how will i know which materials need to be added?
      Hope the clarifications sought are clear, await inputs
    Vivek

Maybe you are looking for

  • Itunes application not responding when I plug in my iphone

    I am on itunes 8.2 and when I plug in my iphone itunes just goes into application not responding. I wait for a while and then unplug the phone and it goes back to working again. On the phone there is no "Sync" message. In fact with the phone plugged

  • How to choose correct domain from 2 domains

    Hi All, There are 3 domains (bmp, eai and wli) in 2.1. Can any one point me to the documentation that throws light to how to choose a correct domain for your needs? Thanks, Parag

  • After 5.1.1 sticky home?!?!

    After the update, my home doesn't work half the time. iPhone 4 by the way. I do hard reset, still same story. I have to "click" it multiple times in order to get anywhere. Some days its worse than other, then some days my phone acts perfect as always

  • Registeration

    Hi, when I try to open my photos , a message appears that I have to register the adobe photoshop album starter edition 3.0. I did but it's not accepting my details. I have tried to check on the internet but I cannot find the place to register. Could

  • Comparison of characters as dates

    HI all, 10.2.0 I have a table tbl as code, amt1,amt2,yearmon 1 10 10 2007MAR 1 20 10 2007FEB 2 10 30 2007FEB 3 10 20 2008FEB That is the amt1 and amt2 are amounts for every month belonging to different years. BUt if i want to get the amt1 and amt2 up