first we registered our system as develop. after that we have to change its status to productive. on service.sap.com we changed the system status to productive. in transaction USMM we changed the system type to production. as far as i concern also we had to change the mandat status to productive.how can we do it? can you help me with the documentation or to write how to do it.
thanks in advance

Hi Andrey,
You can change the client status to "Production" in SCC4. Is this what you mean?
Gary

Similar Messages

  • FM for changing system status in Service Notification

    Hi all,
    I have a tough situation here.
    To change the system status in service notification, the system use "IQS4_CHANGE_STAT_NOTIFICATION".
    CALL FUNCTION 'IQS4_CHANGE_STAT_NOTIFICATION'
      EXPORTING
        i_qmnum                  =
        i_vrgng                  =
        I_CHECK_ONLY             = ' '
        I_SPRAS                  = SY-LANGU
        I_BEZDT                  = SY-DATUM
        I_BEZUR                  = SY-UZEIT
        I_POST                   = 'X'
        I_COMMIT                 = ' '
        I_WAIT                   = ' '
        I_REFRESH_COMPLETE       = 'X'
      IMPORTING
        E_VIQMEL                 =
        E_STTXT                  =
        E_ASTXT                  =
      TABLES
        RETURN                   =
    2 main fields are required; i_qmnum and i_vrgng.
    I am able to provide i_qmnum (as this is the service notification number that i need to change).
    However, i_vrgng is a field in table (TC33-VRGNG). The values in the table does not make sense to me.
    Example. To change the status to NOPR (Put in progress), the FM uses PPM2 or PPM6 for i_vrgng. If we take a look at the table TC33, it doesn't indicate in anyway how NOPR is related to PMM2 or PMM6.
    Is there a guideline (ie, to change status to OSTS, i use a certain value in TC33-VRGNG to run the FM)?
    Please see BAPI_SERVNOT_POSTPONE & BAPI_SERVNOT_PUTINPROGRESS for a clearer picture of what I'm saying.
    Thanks,
    Earl

    Please try using FM STATUS_CHANGE_INTERN for changing System Status as i was not able to find any link between status and the field provided in FM in ur post.
    This FM directly changes system status of any object.But this FM requires System Status Value not Text.
    NOPR, NOCO etc are system texts.The main table for system status  is TJ02T which will give u the status value for the status text.
    For eg NOPR status text will have status value as 'I0070'.
    Reward Points if useful
    Edited by: Pratyasha Shishodia on Mar 14, 2008 11:07 AM

  • MTO; change system status of sales order lines after settlement to "Closed"

    HI
    Is there a program (or transactin), to do mass change of system status for MTO sales order lines to "Closed" ?
    Thank you, Dejan

    Try using transaction "MASS" and object type "BUS2032".
    Shail

  • Change System Status of SO item dynamically based on Reason for Rejection

    Hi ppl,
    Our SAP user has raised a requirement as described below:
    In sales order (in creation mode (VA01) or change mode (VA02)), if at the item level, the reason for rejection is mentioned, then the system status for that item should be automatically set to Technically Complete SET (TECO); and if the user removes the reason for rejection for the item, then the system status Technically Complete should be RESET automatically.
    We are looking for any user-exit or BADI available which would be allow this dynamic change of system status based on the reason for rejection field. (No manual interaction for setting or resetting the system status).
    Technically, the functionality is based on the below fields:
    Reason for Rejection: VBAP-ABGRU
    System Status: JEST-STAT
    Please provide suitable inputs.
    Thanks,
    Dawood
    Edited by: Dawood.S.Ghasletwala on Jun 29, 2009 3:14 PM

    program: SAPMV45A
    User exit: USEREXIT_SAVE_DOCUMENT_PREPARE.
    loop at xvbap where updkz NE 'D'.
      if not xvbap-abgru is initital.
        "set your system state here.
      else.
       "reset your system state here.
      endif.
    endloop.
    hmmm you can as well try if you got all you need to know already in userexit: USEREXIT_CHECK_VBAP.
    Edited by: Florian Kemmer on Jun 29, 2009 11:53 AM

  • Change system status from PDLV to DLV

    Hi All
    Please help me with this error. Already tick the delivery compeleted in Goods Receipt Tab but then system status won't change from PDLV to DLV. Is there any other way wherein I could change it?
    Thank you
    Jesielle

    Hi Jesielle,
    We're facing the same issue with you. The status remains at PDLV even though we had set the "Delivery Completed" indicator. This only happens to Production Orders that having multiple Items.
    Please share on how you resolved this issue?
    Thanks.
    Regards,
    Hooi Chia

  • How to change system status of order created in IW31

    Hello All,
    I created a maintenance order in IW31. System status of that Order is like this,
    Now i have a requirement to change the system status.
    But the BAPI : BAPI_ALM_ORDER_MAINTAIN has option to change user status. Please suggest what i have to do?
    Thanks in Advance

    EXIT_SAPLBSVA_001 will fulfill your requirement.
    Try to change your system status inside this exit.
    You will get both User status and System status.

  • Changing system status depending on user status

    Hello All,
    What I need to do is, when the user sets the user status to, let's say, "Finished", I have to detect it and change the system status to "Concluded".
    Does anybody have any idea about how could I manage this situation?
    Thanks in advance.

    If you set the system status from within the transaction online, the solution by Richard is indeed correct. However, if you change a user stauts using an action, you have to perform two actions: set the user status (FM CRM_STATUS_CHANGE_EXTERN) and set the system status (FM CRM_STATUS_CHANGE_INTERN) as well.
    In this case, you also must check if you have to set this status only on header level, or also on item level, but a good developer can help you out on this one.
    Hope this helps you.

  • I can change system status without canceling lot,,"CRTD CHCR SPRQ"

    HI
    A insp lot have (System status) "CRTD CHCR SPRQ" system can not allow for any recording at the lot,, But Question is that i want to change status without cancleing this lot, Have any idea for this lot status.. "CRTD CHCR SPRQ"
    thanks Expert
    regards
    kazz

    Hi kazz, i can't tell if your issue was resolved but if not then you should check the 'valid from' date on the ECM used to setup the inspection plan.  this is assuming that you are using ECMs to create inspection plans and maintain revisions on the material.  the valid from date on the ECM used to create/assign the inspeciton plan to the material must have a date that is equal to or before the valid from date on the ECM used to assign the revision to the material.
    for example,
    ECM 123 has a valid from date of 01.01.2013 and was used to assign revision A to the material
    then the ECM used to create/assign the inspection plan to that same material must have a valid from date of 01.01.2013 or prior...otherwise SAP will not find a valid inspection plan that's valid on the date for the inspection lot and revision of the material in the inspection lot.
    hope this helps!
    nicole land

  • Change system status

    Hi all!!
    Can any one please tell me how to chenge the system status of the object number from "ACTIVE" to "INACTIVE" ?
    Can anyone please suggest a function module to do that?
    Thanks,
    Sachin.

    check the function STATUS_CHANGE_INTERN , try to pass OBJNR and status to the table parameter

  • Don't post hrs or cost after TECO System Status in Internal Order

    Dear All,
    We want to don't post cost and hrs after System Status - TECO in Tools - capitalised as Assets.so pls tell me where we can restrict posting in System Status - TECO.
    Abhinay Sachan

    Hi
    It would not be possible to enter any cost with status TECO. TECO itself mean Technical Complete.
    You need to remove the status TECO in order to enter any cost to the Internal Order.
    Regards,
    Suraj

  • Change system status in Product Master - Urgent

    Hi,
    How to change the Sales Status in Product Master for the products which has been downloaded from R/3 to CRM?
    Sales Status field is appearing in Gray colour and it is not allowing for changes of the status?
    It is urgent.
    Thanks in advance

    Hello,
    When you download a product from R/3 to CRM, R/3 remains the 'master' for your product. Since there is no two-way synchronization of products between R/3 and CRM you should change that field in R/3 and perform a new initial load.
    This is only true for R/3 related fields, CRM specific fields (like links with accessoiries, related products....) are always changeable in CRM since they do not occur in R/3. This mechanism is to protect desynchonization of your product master in a distributed environment.
    Hope this helps,
    Reward points if useful!
    Regards,
    Joost

  • System status change of WBS element

    Hi everyone,
    We need to change system status of WBS element programmatically.
    So can anybody suggest me which function module can I use?
    Thanks & Regards,
    Anirban

    system stauts is set when some function is executed e.g.
    REL is set when WBS is set to REL - CJ20N edit->status-> release
    SETC ise set when settlement rule on WBS is creaed
    BUDG is set when you carry out budgeting via txn CJ30
    so it depends on what system status you want set, then execute the following business transaction manually or via program/ development.
    However for setting REL or TECO you might be able to use some function modules
    For WBS elements I would check out the following
    CNIF_STATUS_2054               Set/Read Status for BUS2054                                     
    BAPI_BUS2054_GET_STATUS        Read Status for BUS2054 (Work Breakdown Structure)              
    BAPI_BUS2054_SET_STATUS        Set/Reset Status for BUS2054 (Work Breakdown Structure)         
    CNIF_STATUS_2054_CANC_AALK                                                                     
    CNIF_STATUS_2054_CANC_CLSD                                                                     
    CNIF_STATUS_2054_CANC_DLFL                                                                     
    CNIF_STATUS_2054_CANC_LKD                                                                      
    CNIF_STATUS_2054_CANC_MDLK                                                                     
    CNIF_STATUS_2054_CANC_TECO                                                                     
    CNIF_STATUS_2054_CANC_USER                                                                     
    CNIF_STATUS_2054_SET_AALK                                                                      
    CNIF_STATUS_2054_SET_CLSD                                                                      
    CNIF_STATUS_2054_SET_DLFL                                                                      
    CNIF_STATUS_2054_SET_LKD                                                                       
    CNIF_STATUS_2054_SET_MDLK                                                                      
    CNIF_STATUS_2054_SET_REL                                                                       
    CNIF_STATUS_2054_SET_TECO                                                                      
    CNIF_STATUS_2054_SET_USER

  • USEREXIT / BADI to get WBS elem system status before&after for WBS in CJ20N

    Hi friends,
    Please help me out to capture the WBS element system status after and before the changes  in CJ20N tcode, the status has to be posted to the P I system.
    Please let me know if any user exit exists for CJ20N.I am not able to find any in CMOD.
    I have tried using the BADI's WORKBREAKDOWN_UPDATE and
                                              PROJECTDEF_UPDATE  .
    but was not able to capture the changed system status .
    Is there any other way to capture the system status and post them to PI.
    Thanks and Regards,
    KC
    Edited by: Krishna Chaitanya  G on May 7, 2009 7:19 PM

    Hi Afzal,
    The User wants to get it posted to the PI system as soon as the system status of WBS element is changed.
    I am already done with RFC FM for this purpose which gets  the changed status of  all PROJECTS-WBS elements.
    Our team is facing some probs with connecting to PI through RFC.
    Getting  'SYSTEM_FAILURE' error, when executing the RFC with PI system's destination.Not able to trace out the probs, they have tested the connection with IDOC which was a success and able to post the PI.
    They want me to capture the data in USEREXIT/BADI and some how trigger the IDOC with back ground job scheduled.
    Thanks and Regards,
    Krishna Chaitanya G

  • How to change user status in maintenence order

    Hi all,
    I want to change system status in maintenence order by customizing kindly share how we can change it.

    Once you print the order, system status will get changed automatically to PRT.
    What else you are expecting to change?? You can't change the system status by any business transaction as per your wish. System status changes have been defined by SAP directly.

  • PS -  system status

    hi all,
    in PS is it possible to change system status from release mode to again created mode once you release the project.
    if possible kindly be elaborate and provide the procedure.
    regards,
    dipankar

    The WBS can certainly be deleted, after the status is changed to Released. According the normal business process, the main chain status should be created, released, closed, then to be deletion. You may see the archiving captial for the project system for more information.
    Kind regards,
    Zhenbo

Maybe you are looking for

  • Need Single Billing Document for Materials and Services in Sales Order

    Hello Friends, I am selling FERT items and DIEN items in the Sales Order. Document flow as follows: Finished goods - Order-Delivery-Billing Services - Order-Billing In this process 2 seperate billing documents are created i.  Delivery Related Billing

  • How to control the size/posit​ion of LabVIEW DLL front panel in MFC applicatio​n?

    I would like to make a MFC application which loads a DLL generated by LabVIEW application builder. How can I control the size and position of the front panel in my MFC application? Thanks.

  • Zen Micro - Installation CD error mess

    Hello there... I just bought the Zen Micro today, and as I was attempting to load the installation CD, I received the following error message: "Exception occurred: Stream write error" Does anyone have a fix for this problem? Thanks very much! ZB

  • How to Setup an ACL over a Command in solaris 2.6

    Hi all, Has anyone have an idea on how to setup an ACL over a command in solaris 2.6 . i.e: to force a user (or a group) to enter a password to run a command (like mount and others). Thanks for your help. haed98. [email protected]

  • Guest user available after lion 10.7.2 update

    I yesterday installed the 10.7.2 update. I now find that on the login screen I have a guest account that wasn't there (and which I don't want). Also the picture of my user was changed. I fixed the picture in the address book (was also changed) and on