ChooseFromList on Production Order (Sales Order) which ID?

Hello,
I want to add another condition to the system CFL on production order, where you can select a sales order (ItemUID = 32). The object ID "17" for sales orders does not work, I get the error message: "Invalid Choose From List  [66000-104]"
Is it a special CFL or is it maybe inaccessible?
Thanks
Sebastian

Hi,
I found out the CFL UID, it is "5" .. the object ID is "17"..
SAPbouiCOM.IChooseFromListEvent oCFLEvent = (SAPbouiCOM.IChooseFromListEvent)pVal;
                        string test = oCFLEvent.ChooseFromListUID;
My problem is, that the CFL remains its behavior in excluding all closed sales orders. I tried to avoid it by adding a new condition, which would allow to show sales orders with DocStatus = "C", without success. All efforts for nothing, I couldn't fool SAP... another UDF after all.
Thanks
Sebastian

Similar Messages

  • How track changes in production order which is already Read PP master data

    Hi Gurus,
    Due to some unavoidable reason my client has to do Read PP master data time and again, now my client having a requirement that want to see what has been changes in Production Order.
    We already created 1 report for that which tracks whatever has been changed in Production Order but having a constraint in it.  That It could not be able to distinguish to which order READ PP MASTER DATA done.
    So my query is how to map that in report. As sytem Status directly changed to CRTD phase.
    Any table which can track the changes once the order been through with READ PP MASTER DATA?
    As there are huge number of Production Order so we can go and open each order to see the Status changes in each and every order.
    Hope to get a reply soon.
    Regards,
    Sap User

    Hi,
    A suggestion:
    Change the specification as, log changes at each save instead of Read PP Master Data, as the changes would become effective only upon save. So if this is acceptable then 2 options, 1. Go with OCM feature or 2. Refer note - 390635
    Revert if you face any issues.
    Regards,
    Vivek

  • Production Order which is link with DMS    CO01 & CO02

    Hello,
    I have a requirement where I need to populate the Material Documents (Drawings) in the Document Overview of the Production Order while creating using tcode CO01. I was able to populate the document for the header material but not able to find ways to populate Material Documents (Drawings) for the component materials.
    Please let me know if there is any configuration settings for this or is there any Userexits??
    Thanks in advance,
    Ravi

    Hello Ravikumar
    From your question it seems that you are able to see documets attached to header material.
    Let me explain you
    PO 10000493
    Material 
    Line Item        Material                       Document No              Doc Type
    10                 MAT001                       DOC001                      DRW
    20                 MAT002                       DOC002                      DRW
    30                 MAT003                       DOC003                      DRW
    You said that you are able to view DOC001. Am I right ?
    Now Please Check whether you have linked the Documents created DOC002  & DOC003 respectively to MAT002 & MAT003 in Document Info Record in bject link tab.If you have not done this you will not see the documets in PO.
    You will have to seleeted the line item and the clip symbol button to view document.
    If info found usefull please grant me points
    With warm regards
    Mangesh Pande

  • How to find out the list of Production orders created for sales orders

    Dear All,
    Our company wants to generate a report for a List of Materials sold out in a particular Product Hierarchy. Along with that we want to know the list of Production orders created for the sales orders.
    How to identify the production orders which are created based on Sales orders.
    Kindly suggest.
    Regards,
    Mullairaja

    Check these threads
    [Sale Order & Production Order|Sale Order & Production Order;
    [Re: Linking Production Order against a Sale Order MRP run|Linking Production Order against a Sale Order MRP run;
    thanks
    G. Lakshmipathi

  • Changing the Assignment of production order in sales order in MTO scenario.

    Hello all!
    I have following problem:
    After the MRP a production order was created for a sales order. Because of the production in another plant
    the production order which was created automatically had to be technically completed and a new one
    created.
    If you want to check now the availability, the sales order finds nothing, because it's linked to the one,
    which was technically completed. Now is the question how can I change the production order for this
    sales order. (In the production order the correct sales order is connected!)
    As I found out it's connected to the field AUFNR in the table VBEP. But how can I change this
    field within a transaction and not in the database?!?

    No replies

  • In  sale sorder based production order can i consume unrestirced stock

    HI,
         i am creating Production order using co08 with respect to sales order.the
    ( bom items)components to be cosumend for that production order should be sales order stock compulsory.
    if i want to consume against sales order how can i consume stock which does not have sales order assignment. i think only through 231 movement type.
    if there any possibe pls sugggest
    regards
    madan mohan

    Hi madan,
    Other than the way of converting the unrestricted stock to the sale order stock which is the normal course of working, you can also consume the unrestricted stock to the production order which has a assignment to the sale order by manually changing the assigment of the material  to blank in the production order components.  If you enter into the production order components u will be able to see a column called "Spec procurement" where in by default it will be '1' if the production order is w.r.t a sale order.  you have to remove that and make it blank.  then proceed with material availability check, if the unrestricted stock is avl for the material / storage location then the same will be commited to the production order.
    reg
    Kiki
    award points if this is helps

  • Reg.Stock transfer from Sale order into Production order

    Dear All
    We want to transfer the sale order stock in to production order.
    What I have to do ? Pls help me.
    Thanks
    Rajakumar.K

    Hi,
    Could you please explain in details?
    Other than the way of converting  sale order stock which is the normal course of working, you can also consume the unrestricted stock to the production order which has a assignment to the sale order by manually changing the assigment of the material  in the production order components. If you enter into the production order components u will be able to see a column called "Spec procurement" where in by default it will be '1' if the production order is w.r.t a sale order. Then proceed with material availability check.
    Regards,
    R.Brahmankar

  • MRP-Delivery Schedule for Sales order is not updating in Production order

    Dear Experts,
    I have created Sales order and maintained delivery scheduling, Then Run MRP through MD50,
    We received Planned order then through this we have converted to Prodcution order.
    When we observe the delivery schedule for sales order under assignment Tab in Produciton order which is showing zero instead showing line item of Delivery schedule.
    I am able to see Sales order and Line item but i am not abel to get any delivery schedule line item.
    Please suggest where settings are missing.
    Thanks in advance
    Regards
    Don

    Dear Experts,
    Please provide me solution.
    after Running MD50 transaction against Sales order.
    If I maintained different Scheduling Line Item for First Line item of Sales order.
    The Respective Scheduling Lines should update against Each Production order which has converted from Planned order.
    Thanks in advance.
    Regards
    DON

  • Assembly to order: change in sales order with change in Production order

    I want to activate change in the sales order data when a production order(which is created w.r.t the sales order) data is changed (Strategy 82 used); I have de-activated "No Update" for the corresponding requirement class 201; also the material for which SO created ,is not a part of any Delivery group.
    But when I am changing the production order (date/qty.), SO isn't getting updated accoringly.
    Please tell me the reason why it isn't happening!!

    Hi
    The sales order requirement can be made as the production order receipt once you save the order in the system.
    so it is possible to change the receipt according to the sales order reqmt if any changes made in the sales order,
    in every entry or changes in the sales order ( if you use the stategy 82) . in back end system explode the BOM and the create the production order as per the order reqmt,
    even while you do the changes mad in the sales and save that time sytem re explode the BOM once again and change the production order qty.
    but if you change the production order , system not re run or explode the BOM , Routing . such setting is not made in the system . so obviously updation will not happen for the sales order .
    Edited by: raj on Jun 9, 2009 11:22 AM

  • Wrong production order connected to a sales order - how to change?

    Hello all!
    We are using ERP ECC6 - I now I'm in SCM but this has to do with PP and there was no other forum.
    I have following problem:
    After the MRP a production order was created for a sales order. Because of the production in another plant
    the production order which was created automatically had to be technically completed and a new one
    created.
    If you want to check now the availability, the sales order finds nothing, because it's linked to the one,
    which was technically completed. Now is the question how can I change the production order for this
    sales order. (In the production order the correct sales order is connected!)
    Is there a way / transaction to reconnect the wrong one?
    As I found out it's connected to the field AUFNR in the table VBEP. But how can I change this
    field within a transaction and not in the database?!?
    Help urgently needed,
    Thanks Barbara

    Hi Nandha,
    actually this causes the problem. We use special procurement key 80 - production in another plant.
    The problem is that we don't want to produce all orders in this plant. And SAP doesn't allow us,
    to use the special procurement depending on for example a special order type.
    We have an order type which is used for rebuilding the completed machine, but this needs to
    be done in the other plant. This are just a few orders a day, but there has to be a "clean"
    solution for them.
    Thanks,
    Barbara

  • How to track/check on which production orders are not confirmed yet?

    Dear Experts,
    Is there any transaction or processes to check,only those production orders which are not confirmed yet?
    Besides the transaction code, I would kindly like to request you to provide me a small overview of it. Your support will be really  appreciated.
    Thank you in advance!
    wishes,
    jeevan

    Hi,
    Please refer the below screen for COOIS report. Please check on Sys status as CNF Excl. It will show you all the orders which is not with CNF.
    COOIS/COOISPI (For process industries) is very useful report where you can see entire details of orders. You can see report both on planned order and production/process order. As well the report can be seen in several level like header, component, operations etc..
    Different layout for display is also possible for different users.
    Please try it by different options. You will find the functionality of the Transaction.
    Regards,
    Krishnendu.

  • Direct link between planned/production order & Stock transport order

    Hello,
    We have the following situation.
    Plant A = ordering/receiving plant
    Plant B = producing/selling plant
    Material is stock material in plant A (reorder point planning). If required, plant A creates intercompany purchase order with plant B as vendor.
    Standard SAP behaviour: MRP run will create planned order in plant B but there is no direct link between the intercompany purchase order and the planned order. It can as well be that this planned order combines several requirements.
    Our requirement: Have a 1 to 1 relationship (and a direct link) between the intercompany purchase order and the planned order (and also with the production order which will be generated afterwards). The solution we think about: After creation of the purchase order, create firmed planned order (or immediately production order) by means of a bapi.
    My question is whether there are standard SAP solutions for this?
    Best regards
    Kurt

    When customer give order and then it creates sales order.
    depends on material - I mean Finshed good or Comapny own product ,
    If it is outside material ,it creates Purchase req and then Purchase order.
    if it is company material ,it creates Planned order and then production order.
    Check the transaction you will get better idea.
    MD04
    MD02
    MDBT
    LS24
    LS26
    MMBE
    CO01
    CO02
    CO03
    CS03
    ME51N
    ME52N
    ME21N
    ME22N
    VA01
    VA02
    VA03
    Reward Points if it is helpful
    Thanks
    Seshu

  • Strategy 82----How to stop creation of New Production Order

    Hi All,
    My client is facing problem with the material which having Strategy 82- Assembly to Order,  As when they make a sales order  , w,.r.t that a Production order is made automatically by system,. User complete the production process and deliver this material , now when ever the Sales user change "Credit Block: in that particular sales order again a New production order created to this sales order, How to control his creation of new Production order? As if new production Order create it brakes the link between Sales order and the previous Production order which is already in delivered status.
    Your Prompt response will be appreciated.

    HI ,
    I am closing this thread , as I know how to got a control on trhis, As of behaviour, startegy 82 says every time u change in sales order it will create a new Production order during saving, if the previous order is not been in ONLY REL status.   So the only option to control this is in S.O ,change the Item category to "CN" i.e NO MRP when if required there has been any modification to S .O.  In std SAP system item catageory has to be congiured , in SPRO SALES we can do the necessary settings.

  • Rescheduling production order.

    Hi, I am using a custom strategy which is similar to planning strategy 82. whats happening is . when the delivery date in the sales order is getting rescheduled its automatically rescheduling the production order.
    but when the production order is rescheduled its not rescheduling the sales order automatically.
    what am  I missing.
    when i release the production order( which is having a past date) its changing the confirmed quantity in the sales order to 0. but its not rescheduling it.

    Deepu,
    Most of this is standard functionality for strategy 82.  In this strategy, the master document is the Sales order.  Performing an availability check in the SO will have the effect of rescheduling the production order, and possibly changing the Basic Start and Finish dates. 
    When you change the production order, the sales order will normally not be affected immediately, until the next time that you run a Sales order ATP.
    If you wish to change the Production order dates, and have the Sales order 'align' with the ProdOrder dates, you could consider running SD rescheduling (V_V2).
    I have never released a past due production order, so I cannot say how the SD order would behave under these circumstances.  It doesn't seem to make much sense to me to release a production order with 'impossible' dates.
    Rgds,
    DB49

  • Copy purchase order text to production order text

    Hello,
    purchase order text should be copied to production order text so that the end user can see and edit the text before saving the production order. I'm trying to do it with exit PPCO0006. I can read the purchase order text with read_text but cannot show it on prod order long text tab page. And cannot save it because the production order does not have a number yet.
    How should this be done? If I copy the text to clipboard can it be pasted to production order long text somehow? Or is there a long text object in production order which I could call and insert the text in it? Or what?

    Hi,
    The problem is solved.
    In SD side, there's a transaction VOTXN. Change the configuration for Sales Order Item.
    Add a Text ID 0006 (Production Memo) in Textprocedure with Access Sequence 21 (Material Sales).
    In Access Sequence 21, map Text Object VBBP (Sales Order Item Text) to ID 0006 (Production Memo).
    Save it.
    When you create your sales order, in the item text level, you'll be able to see an additional text type of Production Memo. Enter your text here and save the sales order. When production order for this Sales Order is created, Production Memo tab will automatically appear (as mentioned by Peter earlier).
    Thanks.

Maybe you are looking for

  • Problem in deleting backup job in Grid Control

    Hi, The topology and versions are as follows: 1 windows 2003 server with Oracle Grid Control 10.2.0.4.0. 1 windows 2003 server with Oracle Databases 10.2.0.3. 1 windows 2003 server with Oracle Databases 10.2.0.3 - Data Guard setup I have tried to sto

  • HT3951 I purchased a tv show on my iPad, and it shows up on desktop but not on my phone or Apple TV

    I have checked for downloads on the Apple TV but do not see anywhere where I can re down load purchased items. When I asked the iPad to play on the Apple TV it didn't work (it found it and said it was playing, but it wasn't on the screen)

  • If myText.text == any value in a datagrid column

    Hey guys, in a simple form, I am trying to achieve what's in my title. I have a text box in which you type in a value (number). I have a submit button which inserts the value into my data-grid which  is populated by a data provider to display that in

  • Mavericks - Clean Install & Copying back Old Software

    Hi I have a late 2008 macbook pro 15" and want to do a clean install on it of mavericks to speed it up I can clone the hard drive with all the software first but can i copy back the some of the purchased software into it MS office and photoshop from

  • Join Nodes from different XML strings

    Hi, Please can you help me in joining 2 similar XML documents such that required nodes are appended. Need to combine the nodes of XML (input source:String) A and B as below: A: <?xml version="1.0" encoding="UTF-8"?> <ns0:MSG_Cont xmlns:ns0="http://xm