when we do the availability check in production order Transaction co02 we get a screen which shows Reqmts Quantity and Committed Quantity. I just need to know in which Table these quantities are getting stored

Not sure you asking about, but give a try to look at OITW table...

Similar Messages

  • Update commitment quantity in production order

    Dear Expert,
    I have a case which i have created a production order and it has created the reservation document for the material which is available. So when i run the missing part list, it will show which part is not available.
    I have do some update on the missing part list stock, lets say i have GR for one of the missing component. But when i run the missing part list, it is still showing the same missing part list although this the component has been added to stock.
    I have check the overview of component in Prod Order, the specific component committed quantity still not update although i have add the stock and and posted it before the requirement date.
    Question is: how to update the missing part list?
    Regards,
    LY

    Lukas,
    You can see the elements that are reducing your available stock in CO09.  Enter the matl number, plant, and the checking rule.  You will see the display.  The quantity you are interested in is the one at the right, ATP qty.
    Hit the "all details" button.  Now, on the rows, you will see the details of all of the supply and demand elements that are contributing to your 'negative 1' qty.  In the column titled Rec/Reqd qty, there will be a minus sign for each requirement, and no sign for each supply element.  ATP uses its internal arithmetic to then calculate the ATP qty.
    You can review which elements are being considered by hitting the 'scope of check' button.
    It is hard to troubleshoot from a distance.  However, if you can give us details of the detailed CO09 display, we can probably point you in the right direction.
    A common problem is is storage location.  If your prod order ATP is 'storage location specific' (this is common), and the stock and the requirements both exist in different storage locations, it can cause symptoms similar to the ones you have described.
    Rgds,
    DB49

  • Issue in committing material for production order

    Hi, we are facing an error situation that when we try to release production order there came an issue that few component committed quantity is less than required quantity. When we check the stock of the components they were having enough stock to consider for this production order.
    What could be the other reasons or cause for this situation. Can any one suggest for the correction action.
    would reservation cause this problem when i check the component availability overview it has ATP 0.   will it cause this.
    When i look in to the system there were several Orders that were in CRT state that were using same components as used in the current order under discussion.
    Edited by: kkr_chandran66 on Jan 6, 2011 3:16 AM

    Hi All
    Even MD04 also seems to be showing as if the material is available.  Pl. see the data against 13/12 hereunder.
    06.01.2011     Stock                                                            6,370/      6,370
    08.12.2010     Ord.DS     4604767106/00100                         80-/     6,290
    09.12.2010     OrdRes     420252                         2,740-/     3,550
    13.12.2010     OrdRes     420268                         3,420-/     130
    availability overview CO09 shows as follows for the component:
    13.12.2010     OrdRes     Totals record     3,420-(receipt/req)       0(confirmed)
    13.12.2010     OrdRes     420268                          3,420-(receipt/req)        0(confirmed)                       0(ATP quantity)
    scope of check:
    to include
    purchase order
    include dependent requirements
    sales requirements
    deliveries
    include shipment notifications
    all reservations
    check releases for transport orders only
    take all productions orders into account.
    With this scenario what can i do get it working.
    Edited by: kkr_chandran66 on Jan 6, 2011 6:46 AM
    Edited by: kkr_chandran66 on Jan 6, 2011 6:59 AM
    Edited by: kkr_chandran66 on Jan 6, 2011 7:00 AM

  • Change Alternative Item Quantity in Production  Order BOM

    Hi Gurus,
    I woould like to ask how can I make the Alternative item quantity to become editable. As of now, the system will calculate the percentage in the BOM and default it in the Production order.
    Now I have a requirement that in the Production order Change, the user can change the quantity of the Alternative Item based on the situation with out changing the BOM. Just change in the production order. What settings do i need to change?
    Thanks,
    Raymond

    Hi,
    Can you let us know why you want the user to make the changes manually ?
    Not in front of the system at the moment, but just do an Av. Check to see if you're able to get the switch if the stock situation has changed for the alternative items.
    Based on what i know, the field will not be editable & there is no specific setting to make it editable.
    Regards,
    Vivek

  • Find the table name for Delivery quantity in production order

    Hi,
    Pls can you tell me what is table name for delivered quantity field in General tab for that production order number.
    With Regards,
    P.Arunkumar.

    Hi
    You can find it GR qty via following 2 Tables.
    Table AFPO Order item
    Field WEMNG - Gr Qty
              Or
    Table AUFM
    Field SHKZG (Debit Credit Indicator ) Select Debit Indicator - S
    Field KZBEW Movement type ind.- Selct F Goods movement for production order.
    Regards,
    Dhaval

  • Control cost and control quantity in production order cost analysis

    Hi,
    When I checked the WIP value, I found there are two field, control cost and control quantity, in the cost analysis of production order which has some relationship with WIP calculation. But I do not know where the control cost from and by what the control quantity is controlled. Could anyone who know advise please?
    Regards

    Anyone who can help please?

  • Issue about requirement quantity in production order

    Hello:
    Requirement quantity shows negative number when I am creating production order, as I checked its BOM it is ok,what's wrong?

    Allen,
    Check in CS03 in the item level details of that component for Co-Product check box activation. Also check in BOM whether its maintained in negative quantity. This component would also be defined with Co-product check box in MRP views.
    If the above are not true then manually someone would have changed., so would suggest you to just try creating a production order manually to check.
    Regards,
    Prasobh

  • Component quantity in production order

    Hi,
    For my finished product component quantity in BOM is 1.386 for the base quantity 100.When am creating the production order for 100 in my component overview of  production order screen it is showing component quanitity as 2 instead of 1.386.
    Since am not using any rounding value,rounding profile and scrap nad upto 3 decimals allowed in CUNI for particular UOM.
    Thanks
    P.Srinivasan
    Edited by: srinivasan ponnurangam on Dec 23, 2011 12:33 AM
    Edited by: srinivasan ponnurangam on Dec 23, 2011 12:35 AM

    As I understand even if production order screen it is showing component quanitity as 2 instead of 1.386 ,Internally it is stored as 1.386 only.
    So as per knowledge it should not affect anything.
    Refer Note 931971 - Decimal places in stocks and stock postings
    Also refer
    Problem with item/component quantity in BOM

  • Track changes to Quantity in Production Order

    Question.
    Is there a way to track changes made to the quantity field in the Production Order. I can only find changes the order status, not to the order, or any other field for that matter.
    I also checked tables CDHDR/CDPOS but no change is recorded there either.
    Is this a missing feature?

    Fernando Garcia ,
    Try using ORDer chnage management for your production orders. I am not sure if order qty change is tracked there.
    Thanks,
    Ram

  • Change quantity in production order

    Dear Expert,
    I've done production order for multiplication last year with expected quantity 22.000 kg. This year we received from subcontractor 50.000 kg. Would you be so kind and advice the best way to updated this? It's allow to go to CO02 and change quantity from 22000 to 50000? I afraid because in component overview the component will change according to new qty but has to be the same. The GI 261 on this component was done last year
    Thanks in advance,
    doti_781

    Hi,
    If you do not want the quantity to be changed, then tick the check box of Fixed Qty for each component, this will ensure that the qty will not increase or decrease when the header qty is changed.
    Hope it clarifies your query.
    Regards,
    Vivek

  • 'Delivered quantity' in production order header

    Dears :
      when display production order by CO03. There is a field named with 'Delivered' .
    Is there any best way to get this value ?

    hi
    select from table- AFRU field- GMNGA by aufnr.
    then add all the gmnga selected entries.
    regards
    Usman

  • Automatic production order creation for remaining sales order quantity

    Hi All,
    My requirement is to create automatic production order for a particular material when the available quantity ( Stock in MD04) is less than the sales order / Delivery quantity.Automatic production order should only be created for deficit quantity.
    For example if i have stock of material A 100. I have recieved a sales order for 120 pieces. Now automatic production order should be created for 20 pieces only.
    Any inputs/ suggestions, please let me know.
    Thanks in advance !!
    regards
    Pawan.

    Hi Pawan
    In Material Master MM01 / MM02, you need to maintain 20 in MRP3 --> Planning --> Strategy Group.
    If you maintain this, items can be produced only against sale order you are creating.
    Dont forget to reward if this helps you.
    Regards
    G. Lakshmipathi

  • GR quantity check against Production Order in MB31

    Hi Experts,
    How to check GR quantity against Production Order (101) can not be greater than Confirmation quantity for the Production Order in MB31.
    Regards,
    Praful Mankar

    Hi Praful,
    Use user exit MBCF0002, here put condation that check AFEU table (confirmation table) and allow
    that quantity only to do GR
    and it will triger at the time of MB31
    Regards
    Girish

  • Changr HU quantity generated via PRoduction order confirmation

    Hi gurus,
    I have created GRN of 112 quantity via production order confirmation.
    My plant andstorage location is Handeling unit managed so with GRN handeling unit gets generated.
    but packing had done for 1 quantity only.
    now how to change this quantity?  I tried HUCANC t code and gave the HU number but system is giving error that HU can not be cancelled.  first cancelled material document
    but GRN has made 112 quantity which is correct then how HU got packed with 1 only?
    I stuck up pls help

    when I am trying to change Hu in humo i am getting following error
    Storage type 111 does not allow repacking - HUs cannot be changed
    also getting following error if I am changing the quantity or emptying the Hu
    Handling unit 10016000800120555 has status "cannot be changed" - Process cancelled
    Edited by: vrunda on Jul 9, 2010 10:57 AM
    If I tried to delete
    Handling unit 10016000800120555 contains items that cannot be deleted
    Edited by: vrunda on Jul 9, 2010 10:58 AM

  • Missing part list is incomplete while creating Production Order and 2 components are not shown in the list.

    Hi Team,
    We are facing issue for availability check. During creation of Production order, the missing part list is not complete and it should show componenet A in the Missing part list. Below is the details:
    Production Order quantity: 100 kg
    Componenet A required quantity: 100 kg
    MMBE Unrestricted qty: 1000 kg
    MMBE Reserved Quantity: 2000 kg
    So as per above figures component A should come as missing part during availability check. But it is not coming as missing part. Please check and give your inputs.

    Hello
    The results of availability check should NEVER be compared with MMBE. As already mentioned, transaction CO09 is more appropriate.
    Also, this issue has been already discussed on hundreds of threads in the past. See some examples below:
    Problem with missing parts list during production order creation
    issue in committing material for production order
    Material Availibility check in Production orders
    availability check
    order is not released
    As it is stated on the The SCN Rules of Engagement you should do some research before opening a thread. Therefore, please use the search tool or even google to search for similar problems before opening a thread.
    BR
    Caetano

Maybe you are looking for

  • How do I reset responses (and summary report data) and use my online form for a new application?

    I created my online form, distributed it and captured the responses - worked well.  Now I want to use the same form and start over (track the responses separately from the first time). How do I reset the results / responses? Thanks for any help you p

  • Modify ztable from internal table

    Hi, I have a Ztable in which i have 4 diff fields....1 2 3 4    and an internal table in whch i have same number of fields... Internal table :     1 2 3 4     a w x 9     a w x 10     a w x 11     a w x 13     a w x 12 When I am using Modify it only

  • PL/SQL not working (error starting at line 1)

    Good day, I can't seem to get any PL/SQL commands to run in a SQL sheet. I am using SQL Developer with Oracle Express 11g and can run general SQL statements. Do I need to be running PL/SQL in a different form? I am copying the HR Schema Queries from

  • Another Grep query

    I have a style that is all small caps for a table of contents.  Part of the text being pulled through is text like c1900.  The "c" of the c1900 looks very silly in small caps, expecially with oldstyle numbers.  I want to try some GREP styling that wi

  • Need to use a webservice, which expects a Java Forminput class, in Apex

    Hi, I'm fairly new to webservices in Apex but have successfully created and used one. We now need to use a webservice that was created for a legacy system and expects a Java Forminput class as its second parameter. msg = webServ.request_Str(sessionId