Committment cost

Hi Friends,
                          I have created a project. I have assigned material to wbs, with cost element as cosumption a/c 40401100 ( GBB- VBR) and item as stock item. now after saving the project , PR generated with account assignment as 'Q' with g/l account 22401100( stock a/c BSX T/E key). So committment costs are not updating. If i create PR with account assignment as 'N' , then system will pick g/l acc as 40401100( consumption a/c) and committment costs are updating. I have checked costelement category for BSX 22401100, and found 90, balance sheet account. So please guide me how to fetch commiittment costs or how tofetch this stock account 22401100 at GR55 transaction...please reply.....
Edited by: k prasanna on Aug 1, 2008 5:08 AM
Edited by: k prasanna on Aug 1, 2008 12:56 PM

hi
check you commitment item category.

Similar Messages

  • Purchase Requisition Committment and Availability Control

    Hi,
    We are using availability control based on usage 1 i.e. during the budget allocation/release, the availability control gets activated.
    Now i have poject structure where a user have already created PR i.e. committment of 10000 USD and whereas i got an budget of 5000 USD. So when i go in CJ30 and CJ32, then system is not allowing me to release the budget as the existing committment is greater than the budget.
    My question is that do this PR committment is to be considered as Real comittment. My understading is that if there is no budget then the committment of any type should not be allowed at first instance. How generally it works?
    Thanks in advance

    My understading is that if there is no budget then the committment of any type should not be allowed at first instance.
    Rajesh, Not everybody will use the budgeting functionality for Project, So it is not forbidden in Std. SAP design. But, if you want to forbid posting of committment cost or actual cost before budgeting, then read these notes
    Note 599813 - Availability control before budgeting
    Note 602588 - Availability control before budgeting
    Follow the suggestions mentioned in the note.
    Is there anything by which we can avoid the committment creation by using the user status on WBS element (even though the commitment is created at activity, it gets rolled up to the parent WBS)?
    As Gokul mentioned, you can restrict creation of PR on WBSE by User Status, but you cannot restrict rolling up of Commitment cost from activity to WBSE by any user status.
    Edited by: Ahmed Rifaee on Aug 13, 2010 3:22 PM

  • Unbilled project cost

    Hi
    i have doubt with unbilled labor cost for particular project.
    My client requirements : unbilled project cost it comes from 4 place.
    1. Material committment cost (CJI5). only open items .
    2. Billing document created but not yet released.
    3. unbilled labour cost.
    above 2 points are ok.
    how i will get unbilled labour  cost.
    from CATSDB table i extract unposted labor hours. then how i will convert this hours to cost?
    Thanks
    Muthuraj.D

    I resolved this
    Logic is first we find out the unposted hours to project.
    then post the hours to pricing condition and get the value.

  • Budget/Actual/Commitments Report in PM Order

    Dear Experts,
                  I am using the scenario of PM and PS integration. In which i am creating a project with WBS elements. & each WBS is having some budget and is also released. I am using one of the WBS in PM order in additional data tab page. After that i am releasing the order and doing the time confirmation. In the cost tab of PM order the actual cost is coming . Now i am trying to see the report  Budget/Actual/Commitments  by clicking on Rep.Budget/Commit. button.
                    Here in a report no budget is appearing only actual cost is coming.
    Kindly let me know why budget is not appearing in the report , even though the budget has been assigned to WBS which has been used in PM Order and released.
    Regards
    Amar

    Hi,
    Note that WBS element used here is for rolling up cost to WBS element from work order.When you define WBS element that will act as settlement receiver for work order.There is no other connection between WBS and work order to budget/actual report on cost tab of work order.Hence, you can see only costs related to order on order cost reports and no budget from WBS.
    If you want to see budget/actual cost report on order then you need to activate budgeting functionality for work order object.This is done by assigning budget profile to order type which will act many times as internal order in FI area.Then you need to use budget functionality on order level by supplement/availability control functionality.Then only you can see budget/actual/committment cost report as it is relevant to order as an object.
    So dont get confused with this budget cost report with WBS budget.
    Reports on WBS/project objects are seen in respective PS cost reports.
    regds,
    atul

  • Commitment for Stockable materials procurement

    Hi Friends,
    I have a doubt regarding committment cost.
    Will PR and PO for "L" item category material (valuated project stock), give rise to committment cost or not?
    Please explain with justifications.
    regards
    Pratap.V

    Hi,
    Go to Material master and check the valuation class for those materials for which the commitments are not getting updated.
    Go to OBYC, Transaction BSX. click on that than get the list for all the cost elements for those valaution class.
    Tcode KA01, create these cost elements with cost element category 90, i.e balance sheet account.
    Hope its useful.
    Reward points if useful. Revert back if any other issue.
    thanks..

  • Cost Center Committment-Budget Check Error

    Dear All,
    I have created costcenter budget KPZ2 : Rs  10000
    and activated committment management. But while passing expense entry more than 10000  system is not giving error/warning message.
    I want to make error message. Any help on this.
    Best Regards,
    Sainath Padamwar

    Hi,
    There is no availability control for budget in cost centres. The budget serves purely for reporting purposes.
    However, you can pull a trick, by creating statistical internal orders, linking them to relevant cost centres, making budget configuration for those I/O and, then, creating a validation in OKC7 not allowing posting to the relevant cost centres without those I/O.
    Regards,
    Eli

  • Report KSB2 - CO Committment line item  for Cost center

    When the report is executed, system provides the Fiscal year as next year data.
    Can some body help me in understanding why system behave like this.
    regards
    ARvind

    I got the solution from COEP table.

  • Committment is still showing for closed purchase order

    Hello Team
    We have a purchase order with cost center for last financial year, We did the GRN and MIRO. Also we did the payment to vendor, However, the committment is still showing.
    Kindly advise the possible reasons for the same
    Regards
    Anil

    HI
    Refer note  Note 158892 - Commitment for purchase order without account assignment
    152571 - Composite SAP note: Missing or incorrect commitments
    Execute Program RKANBU01 and check if it helps
    BR,Ajay M

  • Transfer from cost center to cost center

    Hye,
    I have purchased some cost center purchase and assigned to one cost center 1000 and relevant fund center is also 1000.
    Now I want to transfer part of the cost to another cost center 2000 with another fund center 2000 through controlling transaction KB11n.
    My question is how to transfer the committment from from 1000 to 2000 fund center.
    Regards
    Suresh A

    Hi
    You can achieve this by defining a derivation rule in FMDERIVE.
    Note 666322 should help you to trace the FMDERIVE when KB11N is running. Then you can check the log and see if your target objects (Commitment item, Funds Center, etc) are correctly derived
    Kind regards
    Mar

  • Configuring requirement : ordered item to absorb cost of free goods

    Hello Friends,
    I need to configure this in SAP SD.
    The main item should accumulate the cost of the free goods.
    I have  set the cumulative indicator and deactivated pring for this item.
    Do i still need to configure the stock value for the free goods as cost free item? Or is this step only applicable for
    another scenario, like,
    If I were to activate Pricing such that free goods is displayed as subitem and VPRS configured as cost and discount set to 100%
    1. Set  Item category to TANN using FREE usage   AND
    2. use condition type RL00 with requirement 55.
    3. use pricing type B.
    regards
    Ravi

    Read this SAP help at http://help.sap.com/saphelp_47x200/helpdata/en/dd/55fa4e545a11d1a7020000e829fd11/frameset.htm and the topic Free Goods in Sales and Distribution Processing for details.
    Also go through each step of the configuration of the path at SPRO->Sales and distribution->basic functions->free goods.
    Regards,

  • Cost(vprs) of free goods with batch managment

    Dear Gurus,
    I have a problem ahout free goods with batch management.
    Cost(VPRS) is not accumulated in billing(free goods is not relevant for billing).
    My configurations are shown as below:
    Ordered goods (and batch) item category :zta1(copied from tan)
    Free goods (and batch) item category :zann (copied from tann) pricing:B ;not relevant for billing;dermination cost:X
    copy control(from delivery to billing):
    ztan: accumulation cost :X
    If I use the material without batch management,Cost of free goods(without batch) is accumulated to main item(ordered goods).
    So, what can I do?
    Thanks and Best Regards,
    Lykin Kan

    Hi,
    These notes are useful:
    SAP Note 1365939 - VPRS logic and Customizing settings in SD
    SAP Note 547570 - FAQ: VPRS in pricing
    If you have the problem in the transfer from SD conditions to CO-PA, check if you transfer only invoices to COPA, if you don't invoice the deliveries of free goods, then you don't transfer this 'sales' or costs of 'gifts' to COPA. You can check the customizing of COPA in tcode ORKE (IMG for COPA). SAP Note 74486 - INFO: Overview of consulting notes for CO-PA is a good summary about this issue.
    I hope this helps you
    Regards,
    Eduardo
    PD: I forgot SAP Note Number 33968 SD/CO-PA: Characteristics from sales doc tables
    Edited by: E_Hinojosa on Sep 10, 2010 9:44 AM

  • Cost of free goods in header

    dear all
    i have configured free goods,in the order the cost is coming for free goods at item level and it is not adding  to the header cost total.
    for eg:i have 2 items and 1 free item.costs r 300,400,500 respectively.
    in the header it is showing only 700 as cost.
    i observed the inventory doc is posting correctly with 1200(which includes free goods cost). 
    can anybody tell weather it should add up or not and how it can be done??
    thanks
    reddy

    Dear Yugandhar
    Check
    SPRO->Sales and Distribution->Basic Functions->Free Goods->Control Free Goods Pricing->
    Control Pricing For Free Goods Item Category you will find statistical value
    or in VOV7 below pricing you find statistical value
    Statistical values                                                                               
    Indicates whether the system takes the value of an item into account 
        when it determines the total value of a document.                    
    There are three options                                                              
          System will copy item to header totals                  
    X     No cumulation - Values cannot be used statistically     
    Y     No cumulation - Values can be used statistically                                                         
    Check if it is initial for your item category
    Standard for TANN is initial and pricing is B     Pricing for free goods (100% discount)             
    Do give your feedback
    Regards
    Jitesh

  • Item cost not found for one or more items - Inventory Posting

    Good Day Mentors,
    My user has encountered an error during Inventory Posting and its "Item cost not found for one or more items".
    The specific Message ID from SAP's System Message Log is 10001287.
    I found a similar post which addresses this error here.
    But unfortunately it did not help me solve my user's problem.
    I already checked if the items had a defined "Item Cost" in the Item Master Data Inventory Tab, and they all have "Item Cost" defined.
    I'm not sure if this will help, but below is the Inventory Audit Report of one of the items that is throwing the "Item cost not found" error.
    I am not a business consultant neither am I literate in accounting, so thanks for the patience.
    SAP Version: 9.0 PL5
    Valuation Method: Moving Average
    Thanks in advance!
    Sean

    Hi Augusto and Raviraj,
    I've already verified in our production database the points you made:
    - Is the "Manage Item cost per warehouse" selected in the Basic Initialization Screen?
    YES
    - Is the "Manage Inventory by Warehouse" ticked/checked in the "Inventory Data" tab of the "Item Master Data" screen?
    YES
    * I apologize for not have been able to give this information upfront.
    Anyway, the database only has one warehouse at the moment.
    I've checked the items, like the item in the screen shot above, and it does have an item cost.
    Below is the screenshot of the sample item from my original post,
    Thanks in advance!
    Sean

  • I have a 27 in. iMac with the latest version of Snow Leopard. When Lion comes out, will it be software I purchase and download online? I am trying to prepare for cost and don't have a point of reference, having been a Windows guy until last summer.

    I want to know what to expect in terms of moving from one OS to another. Having been a Windows guy until last summer, my only experience is going from one version of Windows to another, which is usually a fairly costly purchase. I will want to go to Lion, but as a retired teacher, my income is fixed. I am not looking for a specific price, I am sure that is unknown, but I would just like to know help Apple does these things so I won't be sadly surprised.

    Historically Apple has sold OS X upgrades via DVD media however with the advent of the Mac Apple Store that throws another possibility into the mix. That's about as much as I can say as these forums don't allow us to speculate about future products. As for the cost historically Apple has priced OS X upgrades between $29-$129, the last upgrade (Snow Leopard) was only $29 but that was an exception. Again we cannot speculate on these forums about that. The good news is that Apple is unlike Microsoft which makes OS upgrades expensive and complicated. The choice with OS X is do you want a server version (most users don't need one) or a single computer license. The users that buy server versions tend to have a number of Macs they manage from a server, most consumers don't have this issue.
    Keep reading the news, as you know Apple has announced a Summer release for Lion.
    Upgrades on OS X are usually very simple. I've upgraded from Tiger to Leopard to Snow Leopard and each transition has been very easy. With any major OS upgrade there are some basic rules to follow, for example always, always, always backup prior to any update. When Lion is released to the general public post again for what to do to prepare or even do a Google search on "How to prepare for OS X upgrade" and you will find a number of articles that will provide some suggestions and valuable insight. You can also re-post here and users will be happy to assist.

  • Report  for bom wise target and actual cost as well as qty at line item

    Dear Experts,
    Is there any standard tcode for bom wise target and actual cost as well as qty at line item level for the month.
    there is one tcode s_alr_87013127 but user has to double click in order to get line item details.
    I want to see line item wise breakup/bom wise target and cost cost as well as qty.
    Thanks in advance.
    regards
    RK

    Dear experts,
    I am still looking for a revert.
    regards
    RK

Maybe you are looking for

  • External Drive UNMOUNTING On Its Own...

    Hello. I have a quite-brand new Iomega External Drive FireWire 800 2TB, bought recently to replace my old failed drive, to be a Time Machine Drive for my iMac. For the past few days I have observed something very very strange: This TM Drive will for

  • OCCI working in VS6.0 and giving error in VS2005 - Please help

    I am trying to recompile one of the OCCI program I have created in VS6.0, in VS2005. I am ending up with errors. During env = Environment::createEnvironment (Environment::DEFAULT); lot of DLLs (oranro10.dll, orantcp10.dll,oranhost10.dll, ORANCDS10.DL

  • .and suddenly java.io.IOException: Server returned HTTP response code: 500

    I have this code for a long time and it always works:      URL url = new URL("http://www.infoamistades.net/load.do");                     URLConnection urlConnection = null;           urlConnection = url.openConnection();           urlConnection.setR

  • Nokia N97 Mini Problems

    I have had a few problems. The touchscreen doesn't respond, but the other buttons and the keyboard still work, and let me go through menus. When I'm typing a message, and use "*" to change a word, it keeps coming up with the Symbol Menu, even though

  • Oracle in Loop Evaluation

    Hi, I have an assignment to check the consistency of Oracle database for different conditions.I am having some 200+ columns i a table i need to populate data using prepare statement in .net and check the conditions how it works for each loop values.I