Copy secondary costs from plan to plan

Hi,
I have a allocations question.
We're freezing (copying) our plan values every year to say plan version B0.
Every quarter we'd like so copy another version with the changes made to plan values since the last copy, let's call this versions A1 - A4.
Now we'd like to keep the allocated values (which are secondary costs) from version B0 and copy those to A1 - A4, without having to run them another time in A1 - A4 again.
I know KP97 can not copy secondary costs and only manually planned costs but is there a way to get the secondary costs which are still sitting in B0 into the quarterly estimates A1 - A4?
Any suggestions welcome.
Thanks for your help,
Roland

Hi,
a plan assessment cycle contains CO-version information in its header date.
You can use KSU7 to copy a plan assessment cycle from version A to version B, just enter CO-version B in the header data of the copied cycle and ensure that in "sender values" the version is initial (thus the header data CO-version takes place).
BR Christian

Similar Messages

  • Secondary cost from WBS to AUC

    Hi All,
    I am facing a problem in posting secondary costs from WBS to AUC.
    In Project systems they are considering secondary costs from the activities in the network. i settled the cost from network to WBS. and when i tried to settle From wbs to AUC system is asking for settlement costelement for secondary cost. But the secondary cost should be settled to costcenter but not to AUC.
    Please suggest how can we do the settlement from WBS to AUC. How to handle settlement of secondary costs in this scenario.
    Any help will be greatly appriciated.
    Rgds,
    Kumar.

    Through MM, contract is created (ME31N) whereby the settlement G/L accounts are identified.
    The contract then is released through MM with TCode ME21N which prompts Commitment Costs to be entered, after which the Service Entry Sheet SES through TCode ME81L which then automatically updates into the WBS.
    Through WBS, CJ88 would be the TCode you would have to use for settlement.
    Hope this helps.
    Thanks.

  • Secondary costs from WBS to an AuC

    Hi,
    1. I have executed Assessment[KSU5] that actually settled costs from secondary cost element[800099] to a WBS element [AAA]
    2. Now I am trying to settle costs [which is secondary] from WBS element [AAA] to an AuC using CJ88 and I am getting below error
    3. Just for info in allocation structure Z1, I have given settlement cost element for WBS, but still I am getting below error
    Any advises/ideas, thanks
    Complete allocation structure Z1
    Message no. KD503
    Diagnosis
    During settlement, the system puts the sender debits into groups (assignments), which are settled using the same settlement cost element. The settlement assignment is made in the allocation structure, which is stored in the settlement rule for the sender (under settlement parameters).
    Cost element 800099 cannot be assigned to a settlement cost assignment in allocation structure Z1, and therefore it cannot be assigned to a settlement cost element.
    Procedure
    Possible solutions are as follows:
    If the posting under cost element 800099 was made to the sender because of an incorrect entry, and you can reverse the posting, and do not need to update the allocation structure. You only need to reverse the incorrectly assigned posting before repeating the settlement. Exception: For an investment measure with a line item settlement, you need to extend the allocation structure, even after the reversal.
    If the posting was made correctly, you can do the following:
    a) You can assign a different allocation structure to the sender: In the master data maintenance for the sender, choose "Settlement rule -> Goto -> Settlement parameters" and then enter a different allocation structure.
    If necessary, also check whether the correct allocation structure is entered in the settlement profile. The allocation structure is defaulted in the settlement profile when you create sender master data or when you maintain the settlement rule.
    You can update allocation structure Z1
    Regards,
    Sri
    Edited by: Sridhar Nagavarapu on Jul 4, 2008 12:45 AM
    Edited by: Sridhar Nagavarapu on Jul 4, 2008 12:47 AM

    Through MM, contract is created (ME31N) whereby the settlement G/L accounts are identified.
    The contract then is released through MM with TCode ME21N which prompts Commitment Costs to be entered, after which the Service Entry Sheet SES through TCode ME81L which then automatically updates into the WBS.
    Through WBS, CJ88 would be the TCode you would have to use for settlement.
    Hope this helps.
    Thanks.

  • Settle Secondary Cost from WBS to AUC

    Hi Sapiens,
    Business Requirement --> Budget Control for all Material Procurement, thereafter settlement of cost thus booked under WBS to AUC or Asset as the case maybe.
    Current Setup --> Material/Inventory/Balance Sheet A/c has been made Statistical i.e. CE category "90". This is enabling AVAC during procurement and budget control. However when trying to settle the WBS it is NOT settling, error - "no cost available to settle".
    How to resolve the matters.
    Regards,
    GM

    Here is what SAP help says for cost element category 90:
    90: Cost Elements for Balance Sheet Accounts in FI
    Automatically assigned when you create cost elements in CO whose general ledger accounts in FI are asset reconciliation accounts (special balance sheet accounts), not income statement accounts. You cannot change this category in CO master data maintenance.
    FI does not require CO account assignments to cost elements of category
    90. However, if you enter an account assignment, it is only recorded statistically for true objects.
    Category 90 cost elements enable you to check the budget of an order or project when you acquire fixed assets that can be directly capitalized. To do this, enter the capital investment order or the WBS element in the corresponding field of the asset master data. Asset Management (AM) ensures that the specified order or WBS element is automatically entered in the document during the asset acquisition.
    In CO the order or WBS element is debited statistically. This statistical debiting is checked by the system using the budget during availability control.
    Notice the words in bold above.  Apparently, CE category 90 is when you acquire fixed assets that can be directly capitalized.  You need to specify the WBS element in the corresponding asset master data.
    I think your candidate is CE category 22.
    22: External Settlement
    Used to settle order costs, project costs, or cost object costs to objects outside of CO. These objects could be assets (Asset Management), materials (Materials Management), or general ledger accounts (Financial Accounting). The R/3 System creates an accounting document when the costs are settled.
    Cost elements of this category cannot be used for settlement within CO (cost centers, orders, projects, and so on). Use secondary cost element category 21 for this purpose. The system does not create an accounting document when costs are settled within CO.

  • Error message [3569-3] when copying landed costs from another landed costs

    I tried to correct already existing landed cost by creating another landed costs and copy from the original one.
    When add the document I have got the Error message [3569-3] and I am not able to find where the problem is.
    Please help.
    Thanks

    Dear Gordon,
    sorry for the pictures in local language. This question has been created during my holiday and I had no chance to log in my customer environment so I modified the documentation from my original file.
    Nevertheless I thing that I discovered the problem: The correction by using u201Ccopy from landed costsu201Dcannot be full (I mean not 1:1 with the original one).
    I made reasonable changes then everything worked properly.
    Thanks for your help.
    Regards
    Jaroslav

  • What planning generates secondary costs?

    Hi Everyone!!!
                    I´m studying to certificate in FI CO and I have a question that my instructor asked us, which was in a recent exam.
    What planning areas generates secondary costs?
    a.Inventory planning in PCA
    b.Periodic posting in the plan
    c.Activity input planning
    d.planning of SKF that are used as basis for plan allocation.
    e.activity type planning
    I hope that anyone who knows CO can help me in my certification...
    Thanks a lot!!!

    Nicolas
    Welcome to SDN
    The answer is "Activity Input Planning" and
    Check this link in the last line
    http://help.sap.com/saphelp_47x200/helpdata/en/08/5148e543b511d182b30000e829fbfe/frameset.htm
    Hope this helps
    Thnaks
    Sat

  • Cost Center Distribution in Plan

    Hi All,
    I am looking for a solution how I can do a (plan) allocation for cost centers? In the standard I can only create distribution rules and run a overhead distribution for the actual data.
    Kind regards,
    Wolfgang

    Hi Andreas,
    we have several distribution rules. E.G.
    distribute cost center 1 to cc2 (20%), cc3 (40%), cc4 (40%) and
    distribute cost center 5 to cc2 (30%), cc6 (50%), cc7 (20%) ….
    We want to use this rules for our cost center planning. This reason ist that we only plan our primary cost. The secondary cost should than be planned by using the distribution rules. This means that after planing our cost center we want to distribute the values of some cc to other cc. Because only if we are doing this we can than use our cc-planing for comparison of plan and actual data.
    As far as I know is the use of the distibution rules not possible in the planning.
    Best regards,
    Wolfgang

  • Copy standard cost with Cost Component from another material

    Hi,
    I need to copy standard cost from another material not only total price but also details of cost component split. I try to used transaction CKUC with procedure of "explode material cost estimate" but the reference material use "mixed costing" and isystem stop explosion.
    There is another procedure in order to make this copy? I can not use special procurement because are different codes (material A / Plant XXX copy froma material B /Plant XXX).
    Thanks for your support.
    Mic

    Hi Chandra,
    thanks for your suggestion, it works but only if I explode a level ... material "B" contains two mix codes  that also contain their mixes. So system shows this message "Mixed cost estimate explosion in level 2 for material xxx" and "Mixed cost estimate exists: maximum of 2 explosion level (s) possible".
    So Is not possible to copy and esploded a standard cost with multi level mix?
    Thanks
    Michela

  • Secondary cost element in KB11N

    Hello.
    I'm not allowed to use a secondary cost element in a reposting.
    What do I have to modify?
    Thank You

    Hello,
    You cannot use secondary cost element. You need to use primary only.
    Please go through the following:
    DISTRIBUTION =========== Distribution was created for transfer primary costs from a sender cost center to receiving controlling objects. During distribution, only cost centers or business process can be used as sender. A distribution receiver can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary Postings (such as, energy costs) are collected on a cost center, and allocated at the end of the period by means of the user-defined key. You can only distribute primary costs. During this process, the original cost element remains the same. Line items are posted for the sender as well as for the receiver, enabling the allocation to be recorded exactly. You can reverse distributions as often as required. You use the Cycle-Segment method to define sender-receiver relationships. PERIODIC REPOSTING ================= Differences between periodic reposting and distribution are due to information content and performance. For periodic reposting, no separate credit record is written on the sender for the cost element in the summary report. Instead, the totals record for the cost element is reduced on the debit side, which means that the original debit amount can no longer be checked there (u201Cunclean creditu201D). However, during distribution, the system writes a totals record for the credit (u201Cclean creditu201D). The information on the receiver is the same for periodic reposting and distribution (u201Cclean debitu201D). Compared with periodic reposting, during distribution, the system also updates the partner in the totals record for the sender. This means that the partner can be displayed in the information system on the totals record level. As fewer totals records are written during periodic reposting, performance is better than during distribution. ASSESSMENT =========== Assessment was created to transfer primary and secondary costs from a sender cost center to receiving controlling objects. During assessment, cost center or business processes can be used as senders. The receivers for an assessment can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary and secondary posting are allocated at the end of the period by the user-defined key. During assessment, the original cost elements are summarized into assessment cost elements (secondary cost element category = 42). As the system writes fewer total records, the assessment has a better performance than periodic reposting and distribution. The system does not display the original cost elements in the receivers. Therefore, assessment is useful if the cost drilldown for the receiver is not important. Similar to distribution, the partner is updated in the totals record during distribution You can reverse assessments as often as required. You use the Cycle-Segment method to define sender-receiver relationships. Regards, Ravi

  • Unable to copy Actual cost to Planned cost via CJ9CS

    I am trying to copy actual cost to planned cost for secondary cost elements via CJ9CS; currently there is a variance.
    How can I match my planned cost with the actual cost.
    We have already applied OSS note 304119 and we are on ver. 4.7.
    Has any one used enhancement COOMKPT4 and function exit EXIT_SAPMKPT4_010 Or is there any other way to copy the actual cost to the planned cost?
    Thanks
    Amit

    Hi Sudhir,
    Thanks for the quick reply.
    CJEN won't work for us, we are trying to find a way to fix CJ9CS.
    When we do CJ9CS the price is getting copied over from the price defined in KP26 instead of the Actual price.
    We have to find a way for the system to disregard the plan price while copying and just take the actual price.
    Any clues how we can do that?
    Regards
    Amit

  • New plan version - Copy from plan to plan

    Hello,
    I copied a new plan version X from plan version 0 with KP97. Now I realized that only planning primary costs were copied. Is it possible to copy also the secondary costs (resulting from assessments) to the new plan version. If not, is it possible to copy the plan assessment cycles from version 0 to version X. Or can the existing plan cycles (KSUB) can be used for both versions (hoever I could not find a selection field where I can choose the required plan version)?
    Thank you in advance for your feedback.
    Ali

    Hi,
    a plan assessment cycle contains CO-version information in its header date.
    You can use KSU7 to copy a plan assessment cycle from version A to version B, just enter CO-version B in the header data of the copied cycle and ensure that in "sender values" the version is initial (thus the header data CO-version takes place).
    BR Christian

  • Planning on secondary cost element_cost category 21(internal settlement)

    Good Day
    I would like to know whether it is possible to do planning on secondary cost element with a cost category 21
    The internal cost element is used to settle order costs or project costs to objects in Controlling (CO), such as orders, profitability segments, cost centers, and projects.  I would like to allocate a plan value to the secondary cost element because the cost element is found in a sttlement profile for a Plant Maintenenance(PM) work order and at the period end the actuals is moved from PM order to the internal order settlement cost element.  However this is a problem cause the planning values is allocated to the primary cost element and the actual values are posted to the cost element with cost catergory 21 during order settlement.
    Please advise and if possible give me a workable solution to solve my problem.
    Regards
    Ropetra

    Good Day
    Thank you for you response.  I would like some more detail on the following:
    Please can you advise me as to where and how you set up the settlement for planned values on the secondary cost element_cost category 21(internal settlement)
    Regards

  • Copy project cost planning to budget only per year (IMCCP3)

    Dear All!
    Iu2019m trying to find a possibility in SAP Projectsystem to copy cost planning (done for more years) for various projects in planversion 0 to the budget for only one year. It seems that the transaction IMCCP3 only supports the copy of all years and it can not be restricted to e.g. copy costs only for year 2011 into the budget.
    Any clues would be helpful to me.
    Regards,

    Dear Praveen,
    thank you for your reply. Budgetprofile is set to values per year. Your idea is good but I fear that this is not suitable for a normal end user. I'm searching for a solution / transaction with the possibility to copy the costplanning to the budget for a specific year for more projects at a time.
    Interesing: It is possible to copy planned costs from one version per year to another version per year for more projects at the time with the transaction CJ9B but it is not possible for the budget...
    Take care,
    Peter

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Error while copying data from infoprovider to planning area

    Hi,
    Error for COM routine using application program (return code 40,075)
    Message no. /SAPAPO/OM102
    Diagnosis
    An application program has called a COM routine. During the process, an error occurred.
    I got the above error while copying data from infoprovider to planning area using t code TSCUBE.
    How to resolve this?

    Hi,
    Is your issue resolved, If not please run MPOS consistency checks, Planning area consistency check and livecache consistency check.
    Below are the programs for the same.
    /SAPAPO/TS_lcm_cons_check
    /SAPAPO/TS_PSTRU_TOOL
    /SAPAPO/TS_PSTRU_CONS_CHECK
    Regards
    Kishore

Maybe you are looking for

  • QuickTime Error: Operation could not be completed. (OSStatus error -2125.)

    Hello there, I have recovered data from a bad disk and would like to save it as a movie with QuickTime. But it is always giving me this error message at the end, almost before it finishes saving the file: The movie "Caribou_migration4" could not be s

  • Passing the sequence as a parameter to a procedure.

    I want to use the sequence value in the call to a procedure. Something like : EXEC sp_Calling(SEQ_PASS.NEXTVAL); but this isnt allowed as the parameter declaration is a number. Can anyone tell me how I can resolve this. plus i dont wanto use a variab

  • Weird problem with BBM

    hi there, I got my Z10 in the UK a few days ago (SIM free) i used it there on my orange (with BIS service) and worked AMAZING i love it Now i am back to Israel I put my simcard and everything works great! even app world but not bbm!  talked to my car

  • Apple should make transfer for iPhone 4 users to iPhone 5c

    Old users can get for free iPhone 5c. Apple have many iPhone 5c models but they are not famous and now you get it?

  • Default screen/display output at boot.

    Hi guys, Running a dual boot with Arch Linux and Windows 8 on my laptop (Asus G74sx). I'm running Syslinux as bootloader. When i have a video cable plugged in at boot (HDMI or VGA) the image of syslinux and login is projected on one of the extended d