Creat Cost center assig activity type, cost center need to be tras to COPA
Dear All
I have created a Cost Center, and Assigned Activity Type by KP26
Now this Cost Center need to be transported to COPA
Plz let me know the procedure what are the steps need to be followed.
With Regards,
kamal
if you want to run an assessment of cost centers to CO-PA, you should create and run a cycle in KEU5.
Dude
I have gone to this particular transaction code, I have given period from
1 to 12 and fil year 2007
and given test run,
and given Detal list
its asking me the cycle , and date
where i there is no cycle being defined and date given as 22.02.2008
Its throughing the error msg cycle has not been created.
With Regards,
kamal
Similar Messages
-
Hi,
how can I link a cost center to an activity type ?
RegardsHi..
You can defined a activity type to a cost centre category not a particular cost centre.
Suppose you have one activity 99xxxx you can defined it to cost centres cat "P" for prod
you can defined it in KL01 activity master creation.
If you want to assign one specific activity to be used for a particular cost centre then creat the cost centre under spl cat and creat master data for activity type for that cat.
kkumar
Edited by: kkbdsp on Mar 29, 2011 10:03 AM -
CA03 tcode customization of workcenter, activity type
Hello Expert,
In CA03 Transaction Code, there are fields like Operating,workcenter, plant , control Key, Activity Type etc..
I just want to know where these all customization can be done want to check cost center and activity hours for one article.
where we assign operating, workcenter,plant, control key, Activity type ???
Thanks in Advance.
SujeetDear Sujeet,
1.Work center and routing are also the master datas for PP Module.
2.Work center is the place at which the individual operations are carried out and its created using CR01.
3.Each work center will be linked to a cost center in the costing tab.
4.Before making this assignment, for a combination of cost center and activity type the activity per hour
rate will be maintained in KP26 for the periods.
5.If for the same activity type different rates are to be maintained means,then it can assigned to a
different cost center only.
6.One work center can be linked only to one cost center.
7.one cost centers can be linked to several work centers.
8.Cost centers will be created using KS01 and activity types using KL01.
9.While creating routing using CA01,for each operation a work center must be assigned.It means that
particular operation will be done in the mentioned work center.
10.Control key can be assigned either directly in the work center or else in the routing manually it can
be added or changed.
11.A control key tells the whether an operation is relevant to scheduling,costing,capacity
requirements,qualtity insepction characteristics.
12.Control key configuration can be made in OP67.
13.OP5A is for configuring the routing.
14.OPFA is for configuring the work center fields.
Regards
Mangalraj.S -
Creation of Sales Activity type
Hi,
I am creating a new Sales activity type (say: ZEEE)
In SPRO I have defined this sales activity type but few fields are greyed out. I have to fill 'TextDetermProc' under TEXTS section and 'Partner det' under PARTNERS section but both are greyed out.
Can some one pls guide me how to fill these two fields?
Thanks and regards,
Pankaj Bist.Hi Marcin,
Text determination Procedure and Partner determination procedure is already defined in BASIC FUNCTION.
But my problem is: how can i assign a particular text/partner determination procedure to my activity, as these two fields are GREYED-OUT in the sales activity creation screen.
Regards,
Pankaj Bist. -
Required entry field "Trip Activity Type" is empty
In Travel management , when I create a travel request, Activity Type is a required field, I select a activity type when I try to save the travel request I get this error.
Required entry field "Trip Activity Type" is empty
Message no. PTRA_WEB_INTERFACE078Hi,
I think you have to maintain activity type for that year. check KP06 and KP26.
Regards -
Pls advice a Activity type price report to get full fiscal years ( 12 period ) activity prices at one for all the activity type.
We need of doing the comparison but in KSBT it gives only one period value at once.
ThanxHi,
Execute the following report
S_ALR_87013646 - Activity Types: Period Breakdown
Regards
Balaji -
Activity Type with no dollars.
We have a situation where we would like to charge hours quantity to a project but we don't want to pull any dollars into the project based on the hours. The dollars will be charged directly off Vendor Invoices. I thought that using Category 4 Activity Types could accomplish this zero charge but we ran into problems not being able to allocate Cat. 4 Activity Type. Does anyone know how to get hours charged into a project without pulling in dollars as well. You help would be apreciated.
Here is what I have ocnfigured:
Activity "CONLAB" for contract labor is set up with the following fields populated-
Activity Unit = H
CCtr categories = 8
AtypCategory = 4
Every thing else is blank. When I attempt to set this up on the project I get the following error message -
Activity CONLAB cannot be allocated to 2009
Message No KL008
Diagnosis
Activity type CONLAB was planned in fiscal year 2009 as non-allocatable. That means other objects cannot input any activity through this activity type.
System Response
No activity input can be posted
Procedure
Choose an activity type.
We need to plan these statistical hours but it's not letting us track them in the Project. I sure hope someone has an idea on how to fix this. -
How to set activity type for a cost center
i was practicing the split valuation topic and for the that i was making a routing for a product so that i can have that product for inhouse production.
while using ca01(to create routing), i am facing a problem with the activity type.
when i am setting up the operation i am getting an error " activity type # is not set up for cost center 10004220 in year 2007"
can you please tell me how should i come out of it.
thankyou very muchhi Nandha, i am sorry but i could not do it. i am new in this. let me make my problem more clear to you.
i was creating a routing using ca01
after puttig all the details i switched to operations tab and in operation tab i put workcenter as (1111 - lathe, may be i am wrong as i told you i am just practicing).
i did not put anything on that screen and then when i pressed enter it took me to another screen with name Operation check.
here is the layout of the problem on that screen
std val unit activity type efficiency
set up min 1422
machine min 1421
labor min 1420
and then curser being on the std value i am getting this error "activity type 1422 is not set up for cost center 1000 4220 in the year 2007.when i am ignoring it it is switching to next std val coloumn and the same error.
thankyou for your time -
Error Activity type 502000 not set up for cost center 1000 cc111
hi all
While creating a work center (CR01) I need to enter a cost center and activity type for machine hours. However, while entering the activity type the following message appears:
Message no. CR 061
You are attempting to assign activity type XXXX to the work center. However, this activity type has not yet been set up in controlling area 1000 for cost center xxxxx.
while creating the activity type in KL01 i have already given * in cc category so it should go for all cc
What could cause this problem?
Thank you in advance,
Kind regardsHi,
Check whether the activity type is maintained at the correct controlling area via KL03. If not, then create the activity type (KL01) in the corresponding controlling area.
Regards,
Darrel -
Activity Type ENGINE not set up for cost center
Hi all,
Currently, we have set up a work center in our system, which has the following intergration:
- Controlling Area --> TECH
- Cost Center --> TECH001
- Activity Type --> ENGINE
- Plant --> PN01
- Work Center --> PL01
Based on the above, the work center PL01 has the relationship of where Activity Type ENGINE and Cost Center TECH001 are linked together, where Cost Center is tied to Controlling Area TECH.
However, when a user tried to create General Task List (Trxn IA05), under Work Center PL01 and Plant PN01, and inserted Activity Type ENGINE in Operation item. It gives the following error:
Activity Type ENGINE not set up for cost center
I have also checked KP26 that everything is setup correctly.
Please can someone shed some light on the above?
Many thanks and regards,
Patrick
PS: Full point guaranteed for helpful answer.Hi all,
I have solved the issue by changing the Start Date of the Work Center. Now everything works well.
cheers,
Patrick -
Activity Type set up for cost center
Hi All ,
While creating a task list i m getting a message
Activity type is not set up for cost center in the year 2008
Message no. CR062
How could i set the activity type for cost center? Plz tell the procedure.
regards
sunil
Edited by: sunil gupta on Sep 19, 2008 10:12 AMDear Sunil,
Check out this,
1.Create a Cost center using T code - KS01.
2.Create an activity type using T code - KL01.
3.Assign the Rates for an activity type & cost center combination using T code KP26.
4.In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
Year as 2008,enter the cost center, activity type click on overview screen (F5)---> enter the per hour Rate
under Fixed price and set value as 2 for distribution key and plan price indicator as 3.
5.After performing this ,while creating the work center ,this combination of activity type & cost center
should be assigned.Then while creating routing/task list this work center can assigned for performing
operations.
Check with this & revert back if you need any further help.
Regards
Mangalraj.S -
Master record for cost center/activity type
Hi all;
How create a master record between an cost center and activity type?
Thank youHi
You can create master data between cost center / activity type.
You can link the two by planning for activity qty the combination of a cost center / activity type in KP26. Then you do a detailed planning for costs for the cost center / activity type / cost element in KP06.
I hope it is clear..
Regards,
Suraj -
How to Create New Activity Type for Assiged to work centre Costing in Acti
Dear Sir,
We have four activity type to assigned in workcentre Costing Activity. Details are as under
AIRJET 2010 AIRJET
DONIER 2010 DORNIER
SULTEX 2010 SULTEX
SULZER 2010 SULZER
in addition one more loom is comming in our unit and require new activity type.
How can i create new.
Please guide.
Thanks in advance
Regards
AjitDear ,
To create new Activity Type , you need to follow the below steps :
KA01 - Create Primary Cost Element for the new activities type.
KL01 - Create Activity Type tied to the primary cost element.
KP26 - Change Activity Type/Activity Price Planning - maintain the Variable price
Assign the activity type to cost center using T code KP26.
In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal Year as 20xx.
Click on Overview tab on top and key in costing details in this screen.
After performing this ,while creating the work center ,this combination of activity type & cost center should be assigned.
At work centre level , you should have
1.Create Standrad Value Key -OP19 and Formula Key in OP49.
2.Create Formula Parameters in OP7B or u can use existing one to assing in the Standard Value Key
3.In CR02-Assing the Standard value key in Basic Data and select the Formula Key in Costing tab with cost centre assingement .Save
Try and check
Regards
JH -
Assign the desired activity type to cost center 1102 within cost center acc
Dear all,
I am facing the problem mentioned as subject during entering the activity type.
please guide me to overcome this problem.
rgds,
Vijay MankarHi Vijay,
The problem is as expected by me it is due to assignment and acitivty price details missing. This needs to be created in KP26.
Once you enter txn KP26 you need to type active version generally "0", then enter period 1 to 12, Fiscal Year "2007" and populate field "Cost Center" and "Activity type" now use "F5".
In the overview screen populate the value "Fixed Price" and "Variable Price" and save the transaction. (We are entering price for individual period but same across all period)
Now try creating Workcenter and assigning the Cost Center and Activity type. It should work.
Reward your points,
Regards,
Prasobh -
Resource - cost center - activity type
Hello,
I can see the link Resource - Cost center (in the resource master data)
I can see the link Activity type - cost element
I can see where the activity type's planned cost is done, for such or such cost center
I cannot see the relationship Resource - Activity type
isn't there any direct link or is it only an indirect link, through the cost center
Thanks for your help
KR - LoïI need to post 2 diferent type of costs to 2 different accounts (cost elements) my question is what impact is if I mantain in one resource with cost center 1000 2 activity types, one is also linked to CC 1000 but the 2nd is linked to CC 2000
In the costing tab at the Resource there is a field for the cost center so my question is what are de implication with this cost center and the link between the activity types and the cost centers
you can maintain 2 cost element for two activity.
But you can't combine two cc in one resource
then you need to create two resource, one with cc 1000 and other with cc 2000,
the second question is, I have to maintain these 2 different cost at the time of confirmation, Is it correct that I mantain the cost of an HOUR in KP26 so when the confirmation happens I just have to say in COR6N that 15 hours were used so based on rate given in KP26 system will calculate and allocate that cost properly, Is this how it works?
as per the formula in OP54, assigned in resource with respect to activity.
at the time of actual booking, system will calculate the actual cost of the activity ( as per the formula maintained in resource)
Also I want to ask if like the activity described before I can have 2 of these attached to the same work center and same phase? I know I can have up to six per Resource but how is the confirmation done, in one step at COR6N you give the 6 parameters to each of the activities or you have to go one by one and saving in this transaction??
In resource for each activity ( parameter) you need to assign formula and activity type, while creating process, system will copy all the parameter and formula in process order, while booking in cor6n system will copy all the parameter.
Maybe you are looking for
-
Logical AND in MDX Reporting Services Parameter
Hi, I would like to implement logical AND on a cube parameter. I have seen examples of hard-coded logical AND in MDX. (http://salvoz.com/blog/2013/12/24/mdx-implementing-logical-and-on-members-of-the-same-hierarchy/) But I'm not sure how to apply thi
-
Rogue AP Countermeasure in WLC
WLC detects rogue AP in their environtment, WLC also have some action to do with those rogue AP, by changing Update Status in Rogue AP Detail to Contain. It will make the AP that detect rogue AP launch the management frame (deauthentication frame) to
-
Encore CS6: Rebuilding audio tracks | PROBLEM
Hello, guys. Greetings from Brazil. I'm having a problem with Encore CS6 during the authoring process and thought you guys could help me out with this. My Blu-ray project contains 29 video files (total of 2h 22m) and I have 5 psd menus (with an audio
-
Support for Office 2007 files (especially docx) ?
Hi, can you please give me a hint if it's possible to use ora-text with the current office 2007 file formats ? I need to have support for word 2007 (docx) format very soon Is it already available ? If not, is there a plan to support those formats ? T
-
Last newb project of the night
Thx for the help so far, I've been able to get most of this one by myself thanks to the help I received earlier. It seems I am having one very small issue with my code, maybe you can see what it is If user input =6 desired output= 6 5 4 3 2 1 5 4 3 2