Can anybody explain to me which functionmodule (follow up action) to use for creating a PM notification from an inspection lot UD.
Thanks in advance
Peter

Hello Nehal,
thanksfor your reply.
I have linked the inspection type to a PM notification type and i want the Notification to be created on the Equipment.
I can already create if manually, from the inspection lot, but i want to do this automatically. In the selected set for the Usage decission, you can define follow up actions, but when checking the follow up actions I'm not sure which function module to use.
So which function module should i use? or are you saying that there is no standard function module and  that i should write the function module from scratch?
There is no way to create a PM notification from the inspection lot with standard SAP?
If somebody knows, please let me know. Thanks
Peter

Similar Messages

  • Triggering of Notification from Follow Up action

    hi
    SDN,
    in calibration order. if i reject inspection lot ,system should trigger notification as follow up action.
    Can any one suggest the name of functional module that can be assigned in follow up (QM customizing)action so that system trigger notification as inspection lot get rejected.
    All other follow uop actions like.. order teco, equipment status change, etc. i have done and tested.
    Regards,
    amit

    hi,
    Thanx for promp reply. i have tried to assign these functional module in followup actions but system throwing en error . it's given below -
    Function module QFDL_INIT_NOTIFICATION does not have E_SUBRC parameter
    Message no. QM403
    Diagnosis
    The interface of the function module you entered is not compatible with the interface of the sample function module.
    Procedure
    Check the function module and add the missing parameters to the interface.
    suggest how to proceed.
    regards,
    Amit kushwaha

  • Quality Notification: Create Task as Follow-Up Action

    Hi QMu2019ers
    I have a requirement from my business, to create tasks as a follow up actions from completed tasks. Let me explain the process.
    We have a catalog with 4 codes e.g. ZTS1 u2013 0001 to ZTS1 u2013 0004
    When the user assigns ZTS1 u2013 0001 to a task in the notification and that task is set to complete, we want the system to automatically create the next task in the catalog, i.e. ZTS1 u2013 0002, when that task is complete the next task from the catalog is added and so on.
    I have looked into follow-up actions for tasks, but there does not seem to be a standard option for this.
    Does anyone know how I can implement such a solution?
    Many thanks for any advice given.
    Neil

    follow-up actions of  tasks is triger when the tasks are assigned into the notification, not when the task are completed.
    Try user-exit QQMA0014, you can assign additional tasks before notification is saved.

  • If Quality notification as follow up action fails

    Dear all
    I have a situation where Quality notification is configured as a Follow up action once the UD is made.
    So I am getting Create notification screen once UD is filled and SAVE button is clicked.
    In Case some wrong data is entered in the Create notification screen and I am coming out of Notification without saving the notification.
    The status of the inspection lot is getting flipped to UDed as expected.
    But is there any setting where i can define if the Followup action is not successful( Notification not created), then wont make the UD of Inspection lot also. (OR some user status will get updated saying Notif not created etc..)

    Hi Navdeep,
    Thanks to Anand for his correct feedback.
    Please note that as per standard SAP, unless and otherwise there is a defect created, there can't be a 1:1 link with inspection lot with the notification, though in the notification header table there is a placeholder available (QMEL-PRUEFLOS) to capture this inspection lot field. You are trying to use a follow-up action wherein, after UD you are always creating a notification based on business case. I believe, the FM you are using in follow-up action, is not presently populating QMEL-PRUEFLOS. So there can't be a link to find out when there is failures in notification creation, but UD happening successfully.
    You can try out the below approach -
    Approach - 1
    During the UD save process, there should be additional checks happening. Ask the follow-up FM to update QMEL-PRUEFLOS or TEXT field with inspection lot for all successful notification creation and UD update, and send a confirmation email to approver or task processing partners, or the UD processing user ID (This email part can be skipped in case if this is not required). In case of any failures in notification creation at save, it should truncate the UD save process too and send a message to UD processing user for this failure.
    Approach - 2
    You can create a batch job running at the background to validate for which inspection lot there is no notification created, even though UD is done. Send a mail to the UD processing user to create a notification, as that is not created. User can then create it manually it by updating TEXT field in notification in foreground.
    Thanks,
    Arijit

  • Notifications created as follow up action from a notification????

    Hi all,
                I am creating a Quality Notification as a folloup action of a MAintenance Notification.
                The Quality Notification is craeted in the background.
                Now I want which are the Quality Notifications created from a Maintenance Notification.
               In short I want the relation between Reference Notification and Notification created as Followup Action.
              How I can see the notifications creted with reference to current notification in IW220r IW23.
              Also how I can see which is the reference notification for current notification in IW22,IW23.
    With best regards,
    Narendra

    Hi,
    In IW22 or IW23 click document flow button or press CTRL+F4 you can get both  PM & QM Notification no.
    In QM notification you can see the PM notification no. as reference.
    Regards
    Chandru

  • Send mail from follow up actions for tasks in service notifications!

    Dear All,
    I want to send mail to the user from a follow up action in the task assigned to a service notification.
    In customizing which function module I should select for follow up actions for tasks?
    Thanks and Regards,
    Satyajit P

    Hi,
    You can use function module QM06_FM_TASK_SEND_PAPER or QM06_FM_TASK_SEND_PAPER_ATTACH.The document is sent only after the associated notification is saved.You need to enter the function module "QM06_SEND_REPLY_STEP2" in Customizing of the action box as "FM when saving".

  • Follow up action in QM

    Hi All,
    Could any let me know what is the use and process of followup action in QM during notification.
    Regards,
    Satyajit

    It is applicable for the tasks that you perform in QM notification.
    In QS 42
    code group catalog = 2
    code group = *
    in side select any code froup and then click on codes
    for each code you can give follow up action, if this code is sellected in QM notification then system will trigger the follow up action assigned,
    Std follow up cation given by SAP are
    ABGLEICH     Comparison: R/3 notif. w/ SAP
    AWE     Change request
    CLAIM     Create claim
    CLMMAIL     Mail from claim
    CLMSIMUL     Create simulation version
    DELIVERY     Create outbound delivery
    EXAMPL_1     Example (dummy function module)
    G_MOVE     Enter goods movements
    REP_ORD     Create repair order/dep. follow-up func.
    REP_VE     Record decision in repair order
    SR_ECR     Create EngChangeReq./dep.follow-up func.
    SR_ECR2     Create EngChangeReq./dep.follow-up func.
    SR_PCRFL     Document flow for PCR
    UD     Record usage decision
    VL02     Change outbound delivery

  • Post serialized part from free to block stock with a follow up action

    Hi,
    I try to post a serialized part from free to block stock, but the standard function modules QMLR_FREE_TO_BLOCKED_STOCK,  QMLR_FREE_TO_BLOCKED_STOCK_ST2 work good with not serialized parts, but it doesn't works with serialized one.
    I create quality notification with serial number reference in RQM00-SERIALNR field, when I execute the follow-up function the M7175 error message appears.
    Someone know a solution to this issue?
    Thanks
    Marianna

    Hi The standard FM will not update the serial no for the material. So when you are doing the material movement through follow up action system can not move the material with out serial no. So you can change the functional module aith help of abaper to fetch the data from quality notification field.
    Regards,
    Smruti

  • Changing the status of Equipment in a follow up action

    Hi All,
               I have a requirement in which a function module will be triggered for a particular Follow up action.
    In this FM we have to determine the equipment and the Maintenance Order , if both are available , status of the equipment
    should change to 'A' , status of maintenance - order = 'Technically completed' and Maintenance Notification = 'Notification Completed' .
    How can this be done.? I am able to change the status of Maintenance order and notification but can anyone help me in
    determining the equipment and changing its status to 'A'. ?
    Thanks in advance.
    Vasuki

    Hi Gajesh,
                     The process is as follows :
    1) During Calibration of a product,depending on the technician's User decision , 3 follow up actions are created.
    2) Each follow up action has one FM associated with it, which is customised in      SPRO > Display IMG > Quality Management > Quality Inspection > Inspection Lot Completion > Define follow-Up Action .
    3) In the first case ( first Follow up action when the inspection is successful) the first FM is triggered. In this FM we have to perform the following steps :
                                   a) Determine the Maintenance Order and the equipment.
                                   b) Incase both are available, status of equipmnt should be changed to 'A',
                                       Maintenance Order should be changed to 'Technically completed' and
                                       Maintenance Notification to 'Notification Completed' .
    If you need further info pls let me know.
    Thanks,
    Vasuki

  • Follow-up action : please help - Inspection Lot related

    Hi,
    I am having the following trouble:
    Through MB02, a printout is generated to the local printer (LOCL).
    However, through QA11, when we save, we have a custom follow-up action attached that pops-up a
    dialog screen.
    The follow up action is triggered when a usage decision is changed for the inspection lot.
    The follow-up action (configured in IMG) calls a Function Module and a screen, which in turn populates
    a value into a custom DB table (based on the buttons, on the screen, sending either to LOCL or to a
    zebra printer).
    Now, what has to happen is that after inserting the value into a custom table, it should also open a sapscript and output.
    The Sapscript and print program are there, with the print program being created 3-4 years ago by someone
    else. However, even though we have code in the print program to update nast, in turn creating a message
    for output (1st the custom DB table is checked to see if the values match, MATNRCHARG), It does not update
    NAST. When we go through MB02, it does, but this should happen automatically after selecting one of the radio
    buttons on the original pop-up & selecting print.
    Please help. I don't know what to do and can't enable a debugger from the pop-up and if going though QA11,
    I can't get it to stop inside the print program (only inside the custom FM).
    Cheers,
    John

    hi
    kindly check whether this FM will work for you QFOA_OBJECT_STATUS_SET
    regards
    thyagarajan

  • Automate follow up action in opportunity

    Hi,
    Would like to know the set up required to automate follow up action in an opportunity based on phase change. We are using CRM 5.0
    any step by step document would be of great use. you can mail at [email protected]
    many thanks
    Kumar

    Hi Kumar,
    You need to follow steps mention below:
    1) Create an action defintion to create a follow up document and in that use method 'COPY_DOCUMENT'
    2) In action condition scheduling, you have to specify the followup transaction type and scheduling condition as the phase of the project.
    Best Regards,
    Pratik Patel
    <b>Reward with Points!</b>

  • Follow-up action in IW42

    Hello.
    I'm currently using a notification task (linked to a follow-up action) to generate a notification N3 from a notification N1.
    It works perfectly in transaction IW22.
    When I try to use the same task in IW42, the notification gets updated but no follow-up action is triggered....
    Any idea?
    Thanks,
    Nicolas

    Hi,
    Copy the function module in customizing under Quality Inspection -> Follow up action and modify the standard functional module as per your requirement by the help of ABAPer and assign the same functional module to same IMG.
    Regards,
    Babu.S

  • Follow Up action for UD

    Hi,
    My client uses inspection type 89 for creating inspection lot. They have HU/SU management active in warehouse. When inspection lot is created for production batch, material stock and HU's are shown in quality inspection. When UD 1000 (Accept) is made, they have a follow up action FM linked to it which posts the HU's to unrestricted stock using VLMOVE 321 movement. The process works correctly through QA11. But when I do UD using BAPI BAPI_INSPLOT_SETUSAGEDECISION in custom program, the follow up action is not triggered. The stock remains in QI. Do I need to call the follow up FM also in program? Why does BAPI not trigger follow up action?
    Thanks,

    Please see OSS note 1865492.

  • Follow-up action for partial lots

    Guru's - Need your valuable input in the scenario below
    The requirement is to send an email for the partial lots based on the valuation or UD code from the selected sets using follow-up action.
    I know as per standard SAP we can send an email based on the UD code at the inspection lot level using function module QFOA_UD_LONGTEXT_SENDING
    Please suggest me the function module or available options that i can use for sending an email at the partial lot level.
    Thanks,

    Appreciate your Quick response.  I dont see any standard function module(FM) that can be used for partial lots.  I did try to assign the standard FM for insp. lot to the partial lot & its giving me a dump error(Parameter Missing).
    We did create a custom module to send an email for multiple users based on the UD at the Insp. lot level but i dont see any standard FM available that i can use for partial lots. Please Help.
    Thanks,

  • Mapping the Follow-up action to the Usage-Decision

    Hi All,
               I have a the following requirement in my development:
    The Usage decision needs three function-modules for the three cases of the follow-up process.
    In addition to that this ,service shall have a control table in Customizing, where the customer is able to decide which follow-up action should be made. (not standard customzing). The function-module for this process is not standard.
    1) Does the second requirement also require FM?
    2) Please give me the steps to map the Follow-up action to the Usage-Decision in SPRO
    Thanks,
    Vasuki

    Hi
    First create the follow up action which you want, and assign the same in QS51 t.code to your UD code group.
    Thanks
    S.Murali

Maybe you are looking for

  • App-V 5 SP2 (RDS) application integration with multiple office versions - general question

    So I have been testing Office 2013 with app-V 5 SP2 and the package size is a hefty 1+GB with Visio and Project thrown in and I am not convinced by the speed and efficiency of delivering office 2013 this way (shared content mode) so I am thinking of

  • SAP SNC Server Side Trust Setup Problems

    Single Server BOE instalation of BOE 3.1 SP4 to Windows 2008 R2 machine Sap version 720 Patch level 7 We have used kbase article 1500150 and 1396213 to run thorugh the configuration and testing and all has checked out. We are unable to have the "role

  • Layer names invisible in pallet

    I know this has been brought up in the past but didn't really see an answer. I have one user, that all of a sudden, over night, now has layer names that are invisible. If you roll the mouse over the layer it will show up but doesn't stay. I have rein

  • Analysing Dataservice Audit

    Hi, For one of our dataservice which is having slow response (around 1800 ms ) , the audit is showing the following info: query/wrappers/file time: 906 it is NOT showing the name or source info like query/wrappers/file name:ld:PhysicalLayer/XXXLookUp

  • MacBook Pro Slow Boot / Login?

    Hi, I've recently upgraded my computer to an SSD (OWC Mercury Electra 6G) using the data doubler, with the SSD in the system drive and my old HDD in the optical bay. I did a fresh install of OS 10.9.5 onto the SSD. The Laptop is a 2011 MacBook Pro 15