Difference in the BOM Qty during Standard Cost estimation

Hi SAP Experts,
We are trying to estimate the cost for the material variant, but the BOM exploded during the cost estimation, the quantity differs slightly with the BOM exploded during CU50.
What might be the reasons for difference.
Please give your valuable Inputs.
Thanks
Best Regards
Siva

Dear Mr.Kumar,
<b>For any material in the material master , for Price
Control indicator in Accounting 1 View we can either
maintain S or V.</b>
<i>For In House Manufactured materials we maintain S
(Standard price) & for Sub contracted or bought out
items we maintain V(Moving Average price).</i>
<b>During cost roll up & release as far I know we cant
split like 70 & 30% and we can do the costing.</b>
So either you have to use the moving average price for
both inhouse & bought out.
<b>Because 1 material cant have both standard price &
Moving Average price.
Because bought out item's doesnot have standard price.</b>
If your vendor is ready to give the material(Finished
product) using the same amount which you spend for
producing inhouse,then no issue,you can use
standard price.But Practically it doesn't occur.
I hope this will help to clear your doubt.
<b>If useful reward points.</b>
Regards
Mangal
Message was edited by:
        Mangalraj

Similar Messages

  • Difference in the Material variant  BOM Qty during Standard Cost estimation

    Hi SAP Experts,
    We are trying to estimate the cost for the material variant, but the BOM exploded
    during the cost estimation, the quantity differs slightly with the BOM exploded
    during CU50.
    What might be the reasons for difference.
    Please give your valuable Inputs.
    Thanks
    Best Regards
    Siva

    Dear Mr.Kumar,
    <b>For any material in the material master , for Price
    Control indicator in Accounting 1 View we can either
    maintain S or V.</b>
    <i>For In House Manufactured materials we maintain S
    (Standard price) & for Sub contracted or bought out
    items we maintain V(Moving Average price).</i>
    <b>During cost roll up & release as far I know we cant
    split like 70 & 30% and we can do the costing.</b>
    So either you have to use the moving average price for
    both inhouse & bought out.
    <b>Because 1 material cant have both standard price &
    Moving Average price.
    Because bought out item's doesnot have standard price.</b>
    If your vendor is ready to give the material(Finished
    product) using the same amount which you spend for
    producing inhouse,then no issue,you can use
    standard price.But Practically it doesn't occur.
    I hope this will help to clear your doubt.
    <b>If useful reward points.</b>
    Regards
    Mangal
    Message was edited by:
            Mangalraj

  • The split (i.e., 70% & 30%)during standard cost estimation (CK11)

    Dear All,
    A component(Y) in the BOM of X is manufactured in house (70%) & procured directly from vendor (30%).
    Can we have the split (i.e., 70% & 30%)during standard cost estimation (CK11)
    Based on the cost we deside to make or buy.
    Please explain the procedural steps in arriving at this solution.
    Regards,
    Kumar

    Dear Mr.Kumar,
    <b>For any material in the material master , for Price
    Control indicator in Accounting 1 View we can either
    maintain S or V.</b>
    <i>For In House Manufactured materials we maintain S
    (Standard price) & for Sub contracted or bought out
    items we maintain V(Moving Average price).</i>
    <b>During cost roll up & release as far I know we cant
    split like 70 & 30% and we can do the costing.</b>
    So either you have to use the moving average price for
    both inhouse & bought out.
    <b>Because 1 material cant have both standard price &
    Moving Average price.
    Because bought out item's doesnot have standard price.</b>
    If your vendor is ready to give the material(Finished
    product) using the same amount which you spend for
    producing inhouse,then no issue,you can use
    standard price.But Practically it doesn't occur.
    I hope this will help to clear your doubt.
    <b>If useful reward points.</b>
    Regards
    Mangal
    Message was edited by:
            Mangalraj

  • Routing during Standard Cost Estimation

    Dear all,
    We are executing the Standard Costing using t_code CK11N for a finished product,,,for the same we have maintained BOM, but no routing has been created,,
    so, during execution of Standard Costing system is prompting a msg: No routing could be determined for material AUBF0018 (green indicator not an error msg), so if we try save the costing a success msg: "The cost estimate is being save" is being prompted,, but the standard cost did not get updated in material master.
    what would be the cause? Is routing essential prior to standard cost execution,,, as our Client says that without routing also they could excute/update the standard cost earlier,,, why this problem is occuring? is there any thing need to be defined in customization for routing not to consider during standard cost estimation,
    Please help us in this regard,
    thanks
    Kumar

    Dear Urendra,
    1.After executing the costing run with quantity structure in CK11N and saving the datas,it only saves the cost estimate.
    2.Marking and release should be done using CK24.First the same has to be marked and then using the same T Code you have to
    release it,only after this steps it get's updated in the material master.
    3.In your case you have done only CK11N and not CK24.
    4.Moreover the routing get's picked automatically by the costing variant that you use,in your case even though there is no
    routing,the systems throws the message before saving,but the status will be saved with errors.
    Check with this and revert back.
    Regards
    Mangalraj.S

  • Kindly Explain the Process of Releasing Standard Cost

    Hello SAP Gurus....,
    Kindly Explain the Process of Releasing Standard Cost..
    Thank you very much!

    Hi,
    Once you save cost estimate without error, then you need to run ck24 .
    Check marking allowance is given for company code for current period.
    then first mark the material/s,plant/s to be mark & execute in test . it will show number of materials sucessfully marked. & remove test run & execute.
    Then release cost by clickin on release button for same selection.
    regards,
    Deepak

  • Standard cost estimation after goods movement when material ledger is activ

    Hi!
    our client is activated material ledger, for some materials standard cost estimation is done till marking but not released.
    goods movements have been posted for those materials.
    Now system is not allowing to release the standar price for those material in the current period, as material ledger expects same price for entrie period.
    what is the alternative way to update the standard price for those materials ( with out reversing the goods movements).
    regs,
    ramesh

    Hi Ramesh,
    When you are using Material Ledger, after goods movemnets for materials, no need to change the standard cost estimate as Actual costing run will take care to derive the PUP price.
    If there is no standard cost estimation release for sold materials (e.g.FG), you will get an error message duirng the billing document release to accounting. To aviod this error, if you are using split valuation (valuation types) and mixing ratios (CK91N & CK94), try with the below steps:
    Create a new valuation type for the same material
    Crate CK11N & CK94,
    Run CK11N
    Run CK24.
    Then release the billing document.
    Let me know if you need more details.
    Thanks & Regards,
    ADI

  • Standard Cost Estimation Functionality removal from S.O.

    Hi Friends,
    I would like to know, is in SAP system there is an option to remove funcionality of auto Stadard cost Estimation i.e. we don't like to make Standard cost Estimation at the time of Sales order creation.
    Can you Please tell me about this feature.
    Rgds, Krishan Raheja.

    Hi,
    I am talking about the Cost Estimation happens, as it shows the cost via menu path---> Extra --> Costing. Further, the system will make the accounting entries for consumptions/Receipt w.r.t. to cost calculated vai this estimation. VPRS condition is not having the same prices as calculated in Costing. Further, the stock will also remain with same prices as calculated in price.
    Can you please suggest, if there is any option, so that we can omit this costing calculation and system make consumption/receipt entries with the values in material master.
    Rgds / Krishan Raheja.

  • Difference in Price per unit and Standard cost between COPA and PCA

    Hi
    I did a comparison between COPA and PCA for January. For few products,there is a difference in the Standard cost and PPU between the two reports(product wise). What might possibly be the reason for the difference. And how to analyze the root cause of this difference.
    Thanks
    Jaswanth

    Hi
    By PPU - Do you mean PUP i.e. Per Unit Price of Material Ledger??
    If yes, then you are not comparing apple to apple.. Std cost is bound to be diff than actual cost
    br, Ajay M

  • Whats the difference between the combo update vs. standard update?

    I'm curious to know which update to use. So what is the difference between the two?
    Thank you

    The standard (called a 'delta' update) can be applied to one version back, e.g. the 10.5.7 delta update works only if you are running 10.5.6. The combo update will update from any previous version of the main OS release, e.g. the 10.5.7 combo update works if you are running 10.5.0 through 10.5.6 (but not, for example, 10.4.11).
    The combo update can also be reapplied as a troubleshooting step (i.e. if you are having problems with 10.5.7, you can download and run the 10.5.7 combo updater).
    If you use Software Update, it will apply the appropriate update (the delta if you are running the immediately previous version, the combo if you are >1 version back).

  • Standard cost estimation along with departmental transfer

    Hi Friends,
    I will like to have the overview of the
    1. departmental transfer price.
    2. CKM3N (i.e. material price analysis, what is the difference between activation and non activation of it.)
    3. KB21N (Direct activity allocation)
    What are their connection in estimating the standard price.

    Hi Friend
    1) Transfer prices
    Transfer price is a price used to valuate the transfer of goods and service between profits centers. Precondition is that you have Material Ledger active
    Legal View = Company Code
                                                 Parallel  Valuation Approach
                                                /                       |                     \
                                        Group                Legal               Profit Center
    -  If currency type 32, transfer price is active
    -  Internal moves are always valued at procurement price
    2) CKM3N
      Before you activate Material Ledger you would have the option of S or V Price control, however when you activate ML  you   can value Materials at "periodic unit price", this price takes into account all the transactions of a material in a period(i.e goods movements, procurement etc..) and then at the end of the period revaluates the Material with a new periodic unit price.
    3) KB21N
    Allocation in general means taking cost accumulated on one object and allocating it to another, usually a cost center.
    Direct Activity Allocation is where you use transactions KB21 (KB21N) to manually allocation costs from the cost collector (e.g. Order) to a specific Cost Center. The activities can come from PS or from CATS Activity Recording. These activities are assigned to an order/wbs/network. And from there via the transaction KB21/KB21N they are allocated to a specific cost center.
    I hope the above information helps.
    Regards,
    Declan

  • Standard Cost Estimation

    Dear All,
    Yesterday we taken the costing run for all 5 plants, in this 5 plants we have problem with 3rd plant.
    During costing result the price is Rs. 69 Rs.
    However it is release with Rs. 2.8 only in Material master
    Previous price in Material Master is  Rs. 12,500/-
    But in Material master shown Rs. 500/-.
    So, Any one could you guide me how can i solve this problem.....
    Thanks for Advance....
    Thanks & Regards,
    Chandrababu.B

    Dear Adi,
    Exactly your right.....,
    The Costing Lot Size = 25 in Material  Master
    Before Marking  = 69.97
    After Release  = 2.80
    Here the calculation is  69.97/25 = 2.80
    As per your  suggestion  i checked it.....
    Thanks a lot Adi....
    Thanks & Regards,
    Chandrababu.B

  • Standard cost error..

    Hi Friends
    We have a material with diffrent valuation type per say MFG and procurment etc. During standard costing I found that standard cost is updated only at header level not at child material level, which cause of a loss of the difference cost.
    Stock value is based on the individual valuation type i.e. is correct. But the problem in valuation type -MFG which having price control "S" having rate  which was uploaded at the beginning of the SAP live . Now the standard cost of material has increased  The stock which we are having in plant, evaluated at lower rate where it is consuming all raw materials at inflated/higher price. Why does its happening?
    Please help us in solving this.

    Hi,
    You have to change the standard price, whenever price increase.
    t-code is MR21.
    Sudarsan S R

  • SAP allows release of Standard Cost for Material with Moving Average Price

    Hi
    We set our Raw Material to use Moving Average Price (V) and price determination 2 (single level). And we activated material ledger.
    During mass calculation of standard cost (CK40N), If user accidentally forgot to restrict the Raw Material for being included in calculation, the system calculate standard cost anyway, even though I set it as Moving Average Price. And user is able to release it too without any problem.
    Why the system does not restrict it? By giving error maybe. Although as for now I can not find the wrong effect from releasing standard cost for MAP material, by your experience, is there any side effect that I should be aware of?
    Thanks

    CK40n is mass release of all materials. The release is not dependent on price indicator of the material in the master. It will calculate standard cost of all the materials.
    Releasing standard cost estimate of raw materials does not have any side effect as long your calculation is based on moving average price.
    Regards
    Divraj

  • Logic for taking Standard cost of destination instead of dispatching locati

    Need your input regarding Intra-Company STO.
    As per STD SAP Process,the price maintained at Supplying Plant will be taken when we do Goods Receipt at receiving plant.
    Example
    Price at Supplying Plant  = Rs 10
    Price at Receiving Plant  = Rs 12
    GRN Value @10 Rs
    Is there any possibility to maintain the Goods receipt Value as receiving plant price
    The Client has maintaining Standard Cost at both Receiving and Supplying Plant.
    They do not want to maintain the price as Moving Average Price.
    Awaiting for your reply.

    you will not have a price in the order if it is an INTRAcompany stock transfer.
    from docu MM - Material Price Change that can be downloaded:
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/MMIVMVAL/MMIVMVAL.pdf
    The value of the stock transfer is posted upon withdrawal of the material. The material master
    records change as follows:
      In the issuing plant, the stock is reduced by the quantity transferred, and the value is
    reduced accordingly:
    Transfer posting value = transfer posting quantity x price in issuing plant
      In the receiving plant, the stock is increased by the quantity transferred, and the value is
    increased in accordance with the price control defined for the material.
    If the price in the receiving plant differs from that in the issuing plant, the transfer posting results
    in price differences. These differences are posted to the stock account (in the case of price
    control V) or to an u201CExpense/income from stock transferu201D account (in the case of price control S),
    depending on the type of price control defined in the receiving plant.

  • Report showing labor and machine time based on standard cost estimate

    Hi Friends,
    Ours is an Manufacturing organisation & we have a requirement of report showing machine and labor time as per part wise & cost center wise. We need to run the report before saving standard cost estimate [CK11N]  in order to see the part wise or cost center wise discrepancies in machine and labor time. If any one could help in creating such report in SAP  it will be of great help.
    Regards,
    Varsha

    Hi Varsha,
    you can jump from CK11N to a own report by
    Menu Function 'Costs -> User Exit Display'
         Cost Report 1 / 2 / 3
    The own report can be implemented via (SMOD) enhancement SAPLXCKA
    The report will be handed over the currently displayed in the program interface.
    some example coding is provided for the exit.
    compare SAP Note No. 71146
    best regards,   Udo

Maybe you are looking for

  • Hi guys can someone pls help! im gg crazy...

    Hi guys can someone pls help! im gg crazy... im doing this java prograamming project and cant seem to work the Search function. My program compiles well and runs, but after i key in the details for "Add new customer" , and i attempt to search the cus

  • MacBook Pro won't connect wirelessly after 10.5.8 update

    I have a MacBook Pro laptop, which was acquired in 2006. I have used it with my Linksys WRT54G router successfully for years but since I recently updated to 10.5.8, it was able to connect one time, which lasted for a day or so. Now it no longer can c

  • There once was a link to the updates made in a given release. I can no longer find it. Does this still exist?

    When I try to find some list of changes made in 6.0, I can no longer find that link in Firefox online support. Does such a URL still exist? Regards, Gordon Gross CompTIA A+, Network+, Security+ [email protected] http://www.facebook.com/MrTechnoWiz ht

  • PDF email attachment decoded properly

    When I save an attachment that is sent to me though email and later try to open the attachment I get a window that states the attachment was improperly decoded. How do I fix it.

  • Flash Player 10 won't download

    I'm trying to re-download Flash Player.  My spouse uninstalled it, and I'm trying to do a re-install.  When I try to download, the download box won't come up, and it's not appearing on the bar at the top of my screen to unblock the dowload.  What's g