Distribution Receipt (Planned) orders w/o source of supply

Hi guys,
How can I get all SNP Distribution Receipt (Planned) orders w/o source of supply in APO?
BR,
Alper

Hi,
You can still create Distribution Receipts (Planned) orders, for this you have to maintain transprotation lane b/w vendor location (soruce) and plant locations (destination). Also you should have maintained the procurement type of the product as 'F' external procurement or 'X' both inhouse/external procurement. To run this create a test scenario  by maintaing 2 locations(Vendor and plant location) and a product. Assign the product and locations to active model. Create some forecast using transaction /n/sapapo/rrp3. Enter the product, location(Plant location) and quantity(with negative value). and save. Check the forecast in interactive planning table. Now run the Network heuristics by selecting the vendor, plant location and product. You should be able to see the distribution receipts (PR) created for product.
There is no need for maintain the PDS/PPM as source of supply.  Hope this is what you are expecting. If not let me know what actually you are looking for.
Regards
KRN

Similar Messages

  • Prevent Planned orders creation in Sourcing Org

    Hi,
    We have a customer requirement as below:
    Supply Chain : Org1 <-- Org2 <--Org3
    Item Name: X
    Item X has demand in Org1 procured from Org 2 by Sourcing "Transfer From"
    Item X in Org2 has planned order demand which triggeres a Planned Order in Org2 and to be procured from Org 3 by sourcing type "Transfer From" and it will create a Planned Order in Org3 which has sourcing "Buy from" External supplier.
    Org1 : Sales Order -->Planned Order1 for Item X
    Org2: Planned Order Demand2 -->Planned Order2
    Org3: Planned ORder deamand3-->Planned Order3
    Planners are different for Org2 and Org3 wan to do releases indivudually on their own schedules.
    Planner in Org2 want to ensure Planned order3 in org3 not to be released earlier than ISO creation in Org2 for item X.
    How to prevent planned order creation in Org3 having transfer planned order from Org2 to org3 for ISO creation.
    Need your valuable inputs.
    Regards,
    Kumar Kancherla

    Hi Kumar
    If I understand your question, the requirement is not truely about Planned Order Creation but releasing a planned order in Org3 before ISO is recieved in Org2 from Org1?
    This is more of a business process issue than planning since plan will provide a replenishment suggestion when there is a requirement based on sourcing rule. I'm assuming that these 3 orgs are planned in single ASCP Plan.
    One way to enforce this business process is by using "Auto-Release within Time Fence". Since lead times for Item X will be longer in Org1 vs. Org2 and Org3, planned order in Org1 will be released first triggering Internal Req/ ISO between Org1 & Org2 first and then between Org2 & Org3. While this may be OK if you plan to implement all suggestions from ASCP without manual intervention, it may not be acceptable to some planners who may want to control the release process manually.
    You may try it out with a limited set of items initially before rolling it out for all item/ orgs.
    I re-iterate that this issue is more of a discipline that planners need to use their discretion and due diligence to collaborate with other planners to ensure that lower level supplies are released only after a firm demand is released from higher level.
    Please feel free to let me know of any further concerns in this respect.
    Thanks
    Navneet

  • Intercompany stock transport order purchase requisition source of supply?

    Hi friends,
    I wanted to know for the intercompany (NB) sto PO what is the determination field in source of supply TAB of pr... is it supplying plant or vendor?
    Regards,
    Krishna

    Please confirm me whether for this item category U will be there or not... because if i select item category U in this PR then automatically field selection only suggests the supplying plant in source of supply tab and not vendor.
    Kindly give more details on the same

  • SNP Planned Order without PPM

    Hi Gurus,
    I have a small confusion, Some of my products in a Production Plant donot have a  SNP PPM. and when i run network heuristic on that location product. It creates SNP Planned orders.
    Just for information the product location master has procurement type E (In House Production).
    Please help me out if this is a normal behavior of the system.
    Thanks,
    M

    Default behavior is to generate Orders without a source of supply.
    "If there is neither a valid transportation lane (for procurement type F; external procurement) nor valid PPM/PDS (for procurement type E; in-house production), the system creates an SNP stock transfer or SNP planned order with no reference to a source of supply. The same applies if there is no product at the source location of the transportation lane"
    if you dont want planned orders there,
    Try using the SDP relevance indicator for the location - product . Am not sure but you can use option 1 in it (though it sounds like it will not plan in DP too)

  • Donot want Planned Order to be created for STO in supplying Plant

    Hi Gurus,
    We have material A which in being produced in Plant 1000. This Material A is being used as a Component for a product in plant 2000. By Using Stock Transport order we get the material from supplying plant 1000.
    when we run MRP for the plant 2000, schedule line is generated for the plant 2000. at the same time planned order is generated for the Material A in plant 1000.
    My requirement is i dont want planned order to be created in supplying plant i.e plant 1000.
    Afzal

    Hi,
    Let me Clarify my requirement again.
    Material A is being Produced in plant 1000(supply). The same Material A is being used as Input material in plant 2000(Demand) for product B.
    <b>Master Maintained.</b>
    <b>Material Master</b>
    I maintained Procurement type as F and Special Procurement as 40 in Plant 2000 for Material A.
    I maintained Procurement type as E for Material A in Plant 1000.
    <b>Schedule Agreement</b>
    Schedule Agreement created in Plant 2000 referring plant 1000 as supplying plant and agreement type as LU.
    <b>Source List</b>
    Source List Created based on the schedule agreement and maintained MRP indicator as 2.
    <b>MRP Run</b>
    During MRP run for Product B in plant 2000, It creates schedule line for the Material A in plant 2000. At the same time it creates planned Order for material A in the supplying plant 1000.
    My Requirement is we don't want the planned order in supplying plant 1000. The reason behind is that we want to run MRP in plant 1000 seperately at a different frequency.
    Running MRP in plant 2000 should limit the requirements raising in plant 2000 only and the MRP run for 1000 should limit to plant 1000 only.
    Message was edited by:
            afzal ahmed

  • Consolidation of Planned orders after CTM planning run

    Hi everyone,
    We use CTM planning engine and create planned orders for the unfulfilled demand. Since Demand is coming from various locations multiple planned orders are created at the supply location. But the requirement is that all these planned orders need to be consolidated to 1 planned order.
    How can we acheive this without disturbing the existing pegging relationships?
    For example:
    Current scenario:
    3 planned orders at location X based on the demand from locations A, B and C. Then a pegging relationship exists (Purchase Requistions) between A and X; B and X; C and X.
    Requirement:
    Above 3 planned orders need to be consolidated to 1 Planned order and still the pegging relationship to supply the demand locations should exist.
    Please let me know if anyone has similar business scenario and has working solution approach
    Thanks

    Hi,
    You can increase the lot size to club your demand requirements.  You can also try using period type lotsize to club daily, weekly, monthly requirements.
    Regards
    R. Senthil Mareeswaran.

  • Report to redetermine SNP Source of supply

    We configured Planned Order integration model to show up R/3 planned orders as SNP Planned orders in APO. However when the planners on R/3 side intervene the orders in terms of some of the fields, it passes on to APO as a planned order without source of supply. This is due to the design, the PPM information is manually maintained in APO and is out of sync with the information in R/3 side. The system thus chooses to keep a blank source of supply for the orders rather than redetermining the source of supply in APO. From some of my recollections, I understand that there are ways to run a report in APO that redetermines source of supply for planned orders with blank source. Can someone pass on this report information to me ? (We do not want to run user exits/BADIs to do this determination, and rather would prefer a standard report)

    It is by design that PPM is not synced. There are tens of resources in R/3 side which we have summarized and kept as a "aggregate" resource data in APO manually. So there is no point in deleting APO orders and re-CIFing. It is by design that the orders come into APO without source of supply. Some of these orders are NOT solver dependent and is manully managed by planners in R/3 side. So we do not want to run the solver to change that data. We just want the PPM to be picked up in APO so that we can correctly load the resources.
    If anyone has a Z program for this, it will be great if it can shared.

  • GOA not picked up as source of supply in R/3 when converting PR to PO

    Hi
    We are currently using SRM 5.0 extended classic scenario. Here we are using Global outline agreements which will get replicated to backend R/3 system and can be used as source of supply while converting a Purchase requisition to Purchase order. The aim is to use Global outline agreements instead of Info records which will be more flexible.
    Once MRP run is done, based on requirement Purchase requisitions are created. Using ME57 we convert the PRs to Purchase orders by assigning source of supply. At this point I would expect the GOA to be picked up,whcih is created against this product. But this is not happening as of now.
    Please let me know if there is configuration or prerequisites that need to be done for this.
    Also when I am trying to assign the GOA manually in PR, it is throwing the error as 'Item category of contract does not match with Item category in PR', even though both has Item category as 'Standard'.
    << Moderator message - Everyone's problem is important >>
    Regards
    Edited by: Rob Burbank on Nov 15, 2010 3:15 PM

    Hi
    GOA is not source of supply Indeed.
    whatever you have distributed the GOA as a Purchasing contract is a real  source of supply.
    if the contract is available in ECC , then it is a valid source of supply for your purchase request.
    Can you use the same contract for any other manual / PM /PS purchase request?
    Are you assigning same material contract to your purchase request ?
    the problem is for only MRP PRs or all PRs.
    Muthu

  • Backend Source of Supply not supported for Direct Material in SRM

    Hi ,
    When creating S/C or PO in SRM for Direct Material , backend Source of Supply ( i..e Purchasing Info Record or Backend Contracts ) not availble to select as a sourc of supply .
    In our case, we are planning to maintain the sourc of supply (PIR or Contracts) in back end MM system only , then how can pick up the same ?
    Can anyone please suggest on this .
    Regards
    NAP

    NO Prashanta,
    It is still pending for me . i just raised OSS message to SAP ...but SAP saying that
    " I checked and found that in the classic scenario , Direct Materials cannot use backend contracts. The behavior described above is in accordance with the system design. Only local sources of supply (local contracts and interlinkages) can be
    used in the direct material scenario, as well as as in the extended classic scenario . Therefore the above error message which you get "Specify a valid contract" is valid."
    I replied with the doubt that "Thanks for reply but we are not convenience, since what we learnt from
    different SAP Blogs, Below SAP help and SRM Experts discussion forum
    is, for Ext Classic Scenario (since for direct materials it always
    tales by default Ext Classic Scenario, although we implemented Classic)
    Local SRM contract and Supplier List are the possible Source of Supply.
    As per SAP help documentation for Self-Service Procurement (Extended
    Classic) on below link
    http://help.sap.com/saphelp_srm70/helpdata/en/e0/f6be5157a24340bf7b1279854a52e1/frameset.htm u201CYou can assign the sources proposed by the
    system to items automatically (for example, if there is a single
    contract for the item being procured) or manually in the case of a
    quota arrangement, contract, or supplier from a supplier listu201D
    As per SAP help documentation for Sourcing Using Supplier Lists on
    below link,
    http://help.sap.com/saphelp_srm70/helpdata/en/d8/33ec56f17f4404806072749f7e764f/frameset.htm u201CIn supplier lists, you can also manually allocate
    back-end contracts from specific systems. This enables more effective
    sourcing for back-end contractsu201D
    In the Supplier List there is facility to enter the ECC Contract
    Number. Supplier List donu2019t support local SRM contract. It supports
    only ECC Contract /item.
    As per your reply, do you mean to say that Source List is not a valid
    Source of Supply for Direct Material in Classic Scenario (i.e. Ext
    Classic scenario)? If not, then why the backend ECC Contract displays
    as a Source of Supply, when we check the u201COrder as direct Materialu201D?
    Kindly suggest"
    Lets see.what SAP now replies.
    Simultaniously I'm looking some enhancment
    If you have nay update/soultion then please share with me.

  • Plan 1 distribution receipt each month

    Dear Experts,
    Via a STO - We receive bulk material in a ship from the US that only sails once per month.How do you set up APO to plan 1 distribution receipt each month? I added calendars but this did not work as it must only constrain the production plan.I altered the capacity but this did not work either.   In MAT1 I have set the SNP procedure on the lot size tab to 28 days but it did not create the plan we need.
    Please advise this product sell once per month

    Hello Nagaraj,
    It can be done by maintaining workday in planning calendar. You can maintain the workdays accordingly.
    Please check where did you maintain the planning calendar i.e. source location or destination location.
    Hope this helps.
    Regards
    Kishor

  • Source determination not happening during PR creation from Planned order

    Hi Experts
    We have set up source determination and we have created a sourcelist of material and a vendor is fixed, there is a inforecord alos maintined,
    I am trying to convert a planned order from MD04 to a purchase requisition, the source is not being assigned for the PR, I am alos getting an  information saying that 'the material is defined for inhouse production'
    secondly if I click the 'Assign Source of Supply', then I am getting an error 'not possible to assign  a source of supply'.
    The material is a finished material 'FERT' with procurement key 'X' so in MRP an planned order gets generated for converting a PR or a production order.
    Note - I was doing this effectively in a differnt client without any proble.  I am unable to find what I am missing, please sugest.

    Nagaraj Chaganti wrote:
    Thank you everyone for the suggestions,  The issue is resolved by testing with a new material with tproper master data.  Basically the problem occured when some user created additional inforecord for the same P,Org hence there was no automatic source detemination happening.
    >
    > Bye with regards.
    a second info record may explain that AUTOMATIC source determination ddid not work but it does not explain the error messagees you described earlier.

  • Firm Planned Order and receipt.

    Dear Master,
                         Here i am working on LTP or PP-PI industry but i am enable to understand meaning of Firmed Planned order and
    Frim Receipt pl tel me some differeinated point with sutiable example? also tel what is purpose of both.I want exact concept
    of frimed planned order and firm receipt. Pl give me your feedback early.
    Regards
    Ravi

    Dear ,
    Firmed Planned Order : It is used when you don't want certain planned orders to change during subsequent MRP runs.
    Say today you have created certain palnned orders. In a normal scenario, when you do the MRP run again, the planned order may get changed if the requirements have changed. However as a normal business practice, it is not desired to change the production plans everytime there is a change in the requirement...especially in the immediate future (maybe a week or so).
    We set this as the planning time fence depending on the MRP type settimg in the material master, you may have firm orders.
      Apart from MPS items, MRP will also generate firm planned orders for materials with MRP type P1 to P4. In addition to the above, any planned order that is manually changed is also firmed.
    Look in to Check MRP Type  in SPRO-MRP-Firming Indicator  and press F1.
    Firmed Reciept : Purchase Order , STOs, Production Order which are reciept element and adding stock to existing stock -unrestricted .
    Hope this  gives you some idea
    Regards
    JH

  • Get the supply source of planned order and process order.

    Hi experts,
    I would like to display production version (supply source) on prduct view.
    But, I don't know that how to get supply source of planned order and process order.
    APO  table is complax.
    Do you know that?
    Regards,
    Satoru

    Hello Tushar,
    Are components also plan in APO with MRP type X0?
    Does PDS or PPM contain all the components?
    Verify if the component is maintained properly in the PDS.
    Check whether there is an active integration model for the components, also execute the RAPOKZFX report for all the materials in question.
    When you convert the PPDS order to process order then conversion happens in ECC/R/3 system. This is the place BOM has to be reexploded in ECC. Please check if you have any enhancement which restrict BOM explosion. 
    Also check OSS note 1576703 suggested by an expert Caetano.
    Best Regards,
    R.Brahmankar

  • Change Receipt Quantity for Planned Order in LiveCache

    Hi Experts,
    I am very new to SAP APO and I am an ABAPer. We have got a requirement to update receipt quantity in /SAPAPO/PPT1 transaction based on some conditions. I have looked into FM BAPI_MOSRVAPS_GETLIST2 to fetch receipt data under OUTPUT_NODES, but FM BAPI_MOSRVAPS_SAVEMULTI3 is not helping me with receipt data update. I have even checked several other options, but in vain. I have tried implementing several BAdIs also, still no luck.
    Can anybody suggest if we have any way to do this? Your help is highly appreciated.

    Hi Srinivas,
    I assume, you try to change Manfacturing Order ( Like Process Order, Planned Order etc). If so, the mentioned bapis will work perfectly. However, you have to send right data to bapi BAPI_MOSRVAPS_SAVEMULTI3. Send to bapi,only what is needed, because if there is any mis-match,system will not update the order.
    Few insights from my side are,
    1) Check "ORDER_TYPE" Input Parameter.
                   -     5 Planned Order
                   -     6 Production Order
    2) Fill Only ORDID, ORDER_NUMBER and MASTER_ORDER_QUANTITY in the structure  ORDER_HEAD.
    3) Also, fill the same in the structure ORDER_HEAD_X. Put 'X' only for MASTER_ORDER_QUANTITY.
    Hope this will help you.
    Thank you,
    Santosh KB.

  • Decrete job receipts not cosidered in planned order

    recently found couple of items having MPS/MPP planning method having descrete job receipts but when MRP shows planned orders it does not consider descrete job receipts. If i change planning method to MRP/MPP it does consider those descrete job receips. I would want it to consider descrere job receipts with MPS/MPP planning as well like its doing for MRP/MPP...any hints what setup is missing?
    Thanks in advance.

    the MRP run does not convert planned order to requisitions.
    the MRP run either creates planned orders OR requisitions.
    this is based on the setting made at MRP run selection screen, and the procurement indicator in the material master.
    Assume you have made the setting "always create requisitions" for the MRP run, then SAP still checks the material master procurement indicator.
    if it is a F for external procurement, then it will create requisition, it is a E for internal procurement, then it will create planned orders. if it is an X for both procurements possible, then it will create as well planned orders, so that the planner can finaly make the decision from where it will be procured.

Maybe you are looking for

  • How many of these objects should I be able to insert per second?

    I'm inserting these objects using default (not POF) serialization with putAll(myMap). I receive about 4000 new quotes per second to put in the cache. I try coalescing them to various degrees but my other apps are still slowing down when these inserts

  • Execution of membership rules during creation event in OIM

    Hi, I have a question regarding the execution sequence of a role membership rule/s. As noted in the section "Orchestration Concepts" of the Oracle 11gR1 Developer's Guide (http://docs.oracle.com/cd/E21764_01/doc.1111/e14309/oper.htm#CCHJHFGE), there

  • Can't open any version of iTunes or use quicktime

    yesterday i downloaded and installed iTunes 7 (before i knew that there was problems with it). when i opened it massive chunks of my library were missing so i decided to revert back to an earlier version of itunes. removed iTunes 7 and installed iTun

  • Fatal Syntax Errors Unique to XCode Compile

    I am attempting to bring a Unix library into an XCode project for iPad and compile it. This Unix library compiles for i386 without any problems when I use gcc from Terminal, which is v4.2. However, when I attempt to compile those same sources from wi

  • Loading FLV via PHP

    Gang, I've been unable to find any solution - or even a solid explanation - for this problem anywhere. I've built a custom FLV player that needs to rely on a PHP script to serve it FLV files in order to control access to those files. My player uses t