Hello,
I haveve three issues/questions regarding distribution rules and projects:
- Are we able to implement an automatic control which does not allow bookings without distribution rules? The
control already exists for booking which we'll be entered manually. But for automatically generated postings
is not always in place. For example by closing a production order when the appropriate distribution rule is
missing in the BOM.
- Additional for projects: Either the distribution rule which is defined in the project master data should be
proposed automatically and/or only the defined distribution rule is allowed for any bookings. This is mainly
necessary for invoices which are registered only in SAP and not in PM (for example sales commission invoices,
transport costs etc.). There people often use distribution rules which are not suitable.
Our understanding is that once a project is set-up with a distribution rule and an entry is posted against
that item, the distribution rule can not be changed. Is this correct?
With kind regards,
Amine Z.

Closed so I can open a new thread

Similar Messages

  • SMS and Fax automatically check on answer

    When you answer a message, all the checkbox automatically are check (Int, Mail, FAX, SMS)
    The result will be always check Int. and check only the user have mail or SMS or FAX, because if you check all and don't have data the message never is send and have a error and the status is Error.
    Is possible to make this in a future patch on SAP Business One 2007.

    Se lo posteo donde corresponde:
    SAP Business One Product Development Collaboration
    Con el link:
    SMS and Fax automatically check on answer
    Saludos,

  • Distribution Rules in Project Type

    Hi All,
    What is the significance and impact of Distribution Rules. Where to define Distribution Rules (navigation )?
    waiting for ur valurable information.

    Hi,
    Distribution rules are seeded ones. They are used to defines the revenue accrual and invoicing methods.
    For eg: WORK/WORK, WORK/EVENT, EVENT/WORK etc
    Please see projects billing user guide which has explanations.

  • Firefox will not let use any checkboxes on any sites, like when you read the rules and want to check the acceot checkbox. We just started using firefox alot because IE is running incredibly slow on our computer. Any ideas

    Our computer has been running terribly slow, so we switched to using Firefox and it will not let me use any checkboxes on any website. Is there a setting or anything that needs to be changed

    Many of your points are totally legitimate.
    This one, however, is not:
    …To put it another way, the design of the site seems to be geared much more towards its regular users than those the site is supposedly trying to "help"…
    The design and management of the forums for more than five years have driven literally dozens of the most valuable contributors and "regulars" away from the forums—permanently.
    The only conclusion a prudent, reasonable person can draw from this state of affairs is that Adobe consciously and deliberately want to kill these forums by attrition—without a the PR hit they would otherwise take if they suddenly just shut them down.

  • Differerence betwin distubution rules and settelment rule

    < MODERATOR:  Message locked.  Please post this message in the [Controlling forum|SAP ERP Financials - Controlling;. >
    Hi gurus any doby explain the difference betwin ditibution rule and settelment rule.

    Hi friend,...
    The distribution rule is part of the settlement rule. You specify the following for a settlement sender:
    Settlement receiver
    Settlement share (percentage or proportional)
    Settlement type (periodic or cumulative)
    Validity of the distribution rule
    The system automatically assigns a settlement rule to the production order when the order is created. The assignment is carried out via the default rule defined in Customizing.
    The settlement rule includes one or more distribution rules for the production order. The distribution rule consists of a cost receiver, a settlement share and a settlement type:
    The settlement receiver determines to which cost object the actual costs of the production order are to be settled. Possible receivers include
    a material
    a cost center
    an internal order
    a sales order
    a project
    a network
    a fixed asset
    The settlement share determines the percentage rate or the equivalence number to distribute the costs to the individual cost receivers.
    The settlement type determines whether all the costs are settled which were incurred for the order (full settlement) or whether the costs collected on the order are to be settled periodically (periodic settlement).
    for more details u may go the following link...
    http://help.sap.com/saphelp_47x200/helpdata/en/e9/7a0716cde011d19eb4080009b0db33/frameset.htm

  • Behaviour of Distribution rules of an Investment measure

    Hi,
    For Investment Measures (Internal Orders or WBSE) which are in REL status & AUC got created automatically, the distribution rules also get automatically created taking the AUC as receiver.
    Any observations on the condition as mentioned below? :-
    "Over a period of time, lets say after the 1st periodic settlment (or before also), distribution rules disappear (both in change / display modes of the object) but when you run respective settlements system behaves normally & settles the value to the same AUC".
    regards

    REL status & AUC got created automatically, the distribution rules also get automatically created taking the AUC as receiver.
    Settlement rules will not be created automatically when AUC is created. it will be created only during first settlement run.
    Over a period of time, lets say after the 1st periodic settlment (or before also), distribution rules disappear (both in change / display modes of the object)
    If you dont see the settlement rule before first settlement run, it is a std behaviour. But I dont think it will disapper after you run settlement.

  • Distribution rules issue

    Hi,
    Could anybody explain what is distribution rule and where it comes into picture. Your help is highly appreciated.
    rgds
    srikanth rvs

    Hi
    Periodic repostings, assessment, distribution, and indirect activity allocation are defined using cycles. In a cycle you define the sender-receiver relationships and the corresponding distribution rules.
    During periodic repostings, assessment, distribution, and indirect activity allocation, all sender-/receiver relationships defined in a cycle are processed together iteratively. If you want to process hierarchies separately, you must define a cycle for each level of the hierarchy. You then process the cycles in succession.
    Use
    Distribution:
    Reposting of primary costs
    Sender cost centers are credited with a primary cost element
    Receiver cost centers are debited with a primary cost element
    Information on senders and receivers contained in the document
    List of origins not maintained in the CO document
    See TCodes S_ALR_87005903 - Define Distribution
    Cheers
    Srinivas

  • How to join two distribution rule together in one distribution rule

    how to join two distribution rule together in one distribution rule,and every dist. rule has many cost center.

    Hi,
    Welcome you post on the forum.
    You can create a new rule to include these two rules.
    Thanks,
    Gordon

  • Table COBRB,  Distribution Rules Settlement Rule Order Settlement

    Hi Experts,
    Could you help me?
    I would like save every modification of COBRB Table,
    Because we want to keep control of  Distribution Rules and its modifications.
    Thanks in advance,
    regards,
    Ignacio

    Hi Mrinal,
    Thanks for your answer.
    Our problem was to have a detail about any change of this table...
    But If we cant as you said... I ll give up to try it.
    Regards,
    Ignacio

  • Automatic events for COST/EVENT distribution rule

    Hi,
    We are using 11.5.10 in our organization and we are using the following distribution rules
    a) WORK/WORK
    b) WORK/EVENT
    c) EVENT/EVENT
    d) COST/EVENT
    The COST/EVENT projects generates automatic event and that too these events are passed in functional currency.
    a) Is there a way we can stop these automatic generation of events?
    b) If not, is there a way we can make the system to generate events in Project Currency?
    Thanks
    ARS

    Hi
    By standard functionality system will not allow you to update the distribution rule of an active project. Here are three ideas to overcome the issue. Note those are not solutions that Oracle will give you, so be sure to test them carefully before implementing on real system.
    Please note the COST formula is calculating: ITD actual costs/total Approved Cost Budget X Total approved Revenue Budget. The billing extension called COST has as setup the name of the budget types for revenue and costs. It is possible to update the names of the budget types on the billing extension setup form. You might try setting a special budget types names which you designated only for that calculation. Enter budget cost and revenue values that will force the system to always get a zero result, so it will not create any new automatic event from that billing extension.
    Another option is to go on and modify the SQL code of the billing extension COST (some times named COST_TO_COST). By modifying the code you prevent it from generating new events.
    Another option is to update the distribution rule (Revenue Method) of the individual projects from COST to EVENT or WORK. Such update cannot be done from the front end, but you could easily do it by direct update on the database table.
    Dina

  • Changing the automatic Distribution Rule from Per to Full

    Hello SAPians,
    I have a scenario where the Customer is maintaining the Moving Average Price (I know this is not SAP suggested, I am in the process of convincing to move from moving avg to Std) for the Semi-finished goods and finished goods.
    It is Product Cost by Order scenario where Process Orders are using and the settlement rule to the Material and distribution rule is "Per" (Periodic). The main reason Customer had this Per was they would not be able to settle the Order once they settle it in full.
    But due to increased issues in month end atctivities due to thie 'Per' settlement (settlement of Process Orders not settling properly in the last month due to the failure of Batch jobs and other reasons). I want to suggest them to use Distribution Rule 'Full' instead of 'Per' because of the following advantages considering the above scenario.
    1. The 'Full' settlement can be settled if the Order is not in Teco or closed status any number of times as long as there is the Variance sitting on the Order.
    2. The 'Full' Distribution rule will not create issue if the variance is sitting on the Order in the closed period because when you do the settlement in the next period, system will allocate the variances from the last period to the Material Receiver in the current Period(I have not yet tested this scenario) and has not been. (Yeah I know there will be issue if the Material has been moved out of inventory before the settlement happens, they have another set up to update the Material prices manually by keeping the track of cost of Material).
    3. So the config change will be the Product cost by Order -> Manufacturing Order-> Define Cost-Accounting-Relevant Default Values for Order Typ --> change the Default rule from PP1 to PP2 'Process orders (periodic settlement)'
    Please let me know if what I am thinking is wrong based on this sceanrio and also please give me some more insight if I am missing any points.
    Thank you very much for your time!
    -Harter.

    Hi Balaji/Ajay,
    Could you please help me in understanding the effect of Variances if I change the Order type to FULL in this scenario (Moving Average price for Finished good Material)?
    I checked the configuration and the Variance is only Total Variance that is settling to FI and COPA.
    Also client is more concentrated on Variance accumulated per year and not per month.
    Let's say I have Order in Period 9 where the actual debits on the Order are $1000 and actual credits are $1200 where balance (variance) is $200 and suppose I missed the Period 9 settlement and I want to settle this Order in Period 10 where I had $100 variance in that Period 10
    Period         Variance on Order                Status
    9              $200                   missed
    10              $100                   not yet
    So now when I settle the Order in period 10 (with FULL as settlement type), it settles $300 instead of $100 variance. So if this is the case, if I look at the Variance data, yes the variance data is wrong but if I look at yearly perspective, it looks right but I think I am missing something here, right?
    Also what happens if the Order is open more than one year and the same scenario happens, the Variance will be posted to new year which is again issue, right?
    Am I in the right direction?
    Please advice.
    Thank you,
    -Harter.

  • Projects Release  - Error: Enter a Distribution Rule for Asset without val

    Hi Experts ,
    While Releasing Projects , we got error :
    Enter a Distribution Rule for Asset without a Validity limit.
    Message No : KD059.
    Diagnosis:
    The settelement Profile used requires you to define a distribution rule for asset . For period 005 , 2009 , however not created a distribution rule for Asset.
    We gave checked Settelement Profile , still we are not clear what settings is causes for this error ,
    Please throw some light on if some one come across ...
    Regards,
    Sujana

    check out OSS note 115618

  • Distribution rules in Incoming payment and Outgoing payment

    Hi,
    Did anyone know the purpose of having distribution rules in all the outstanding invoices in both Incoming and Outgoing payment.
    I try to attach the distribution rules to specific invoice and post incoming payment but it did not appear in the bank journal entry row.
    I also try to attach profit center in AR Invoice row but after posting and do Incoming payment, the distribution rules also never show for that particular invoice.
    Really wonder how the distribution rule works?
    Regards
    Thomas

    Hi Thomas,
    From the SAP help, you can know what is the use of this rule.
    Defining Distribution Rules
    Use
    For cost accounting, this setting is mandatory.
    Use this procedure to define distribution rules to distribute amounts between different profit centers.
    Prerequisites
    You have defined profit centers.
    Note: If you delete a distribution rule for one profit center (100%) this does not automatically delete the profit center.
    You can also look up this key word to find more info. For examle, you can find SAP note 1236348 to see if it fits you.
    Thanks,
    Gordon

  • Cost Centers and distribution rules

    I need to allocate costs to profit centers and would like to have the costs be allocated first to the department cost center then distributed to product profit center by %.
    Example:  An invoice is first allocated to the sales department, then the distribution rule will allocate the cost between 4 product lines (33 % chemical A, 33 % chemical b, 17 % chemical c and 17 % chemical d).
    How would I setup the profit centers, cost centers and distribution rule to accomplish the above task.
    Thank you,
    Wayne

    Hi Fred,
    I assume you using 8.81?
    1. Administration - General Settings - Cost Accounting : Tick "Use Multidimensions" option
    2. Financial - Cost Accounting - Dimensions : Tick "Dimension 1" and "Dimension 2".
    Give proper description to each dimension, in your case maybe "Department" to Dimension 1 and "Product" to Dimension 2
    3. Financial - Cost Accounting - Cost Centers : Create your intended cost centre, "Sales" cost centre with dimension "Department", "Chemical A" to "Chemical D" with dimension "Product"
    4. Financial - Cost Accounting - Distribution Rules :
    As for your intention to allocate the invoice to Sales Department, since you want to allocate it 100% to Sales Department, you don't need to create a distribution rules, since B1 will automatically create a distribution rule with 100% allocation for each cost centre you created.
    As for your production cost allocation, create a distribution rule with your code "DR-P01" as an example, choose dimension "Product", set the Total with "100". In the detail section, choose each cost centre (Chemical A to D), enter respective value and click "Add" button.

  • Profit Centres and Distribution Rules

    Hi, Is there someone who can help me about a problem with cost accounting?
    I've set profit centres, distribution rules (created and linked to profit centres), I've linked accounts to distribution rules so the "profit centre report" shows all the expenses related to each PC/DR. I also can see the table with all the parameters I set. My question is: how can I check (or is it possible to check) if a specific cost (account) is more than the limit I set in the distribution rules? In other terms: If I set 10.000 EUR on DR called "training expenses" with account linked "040001" and then I charge this account with 20.000 EUR; is it possible to have a notification or something in the "profit centre report" or in the "table of PC and DR" who tells: "ehy man, you spent too much!!!" (or at least the possibility to have DR values in the PC report?).
    Thanks a lot in advance and sorry about the length of my post.

    No but you can use the Budget features of B1 to do something similar. If you turn on Budgeting from the System Initialization>General Settings>Budget   You can warn on devations from Budget or block devations from budget, on PO, GRPO and JEs