Hi Experts,
I am looking for the stabdard extractor for the Planned order, Basically I need the fields from the table PLAF.
Please let me know any standard extractor available or any extractor need to enhance.
Thanks
sai

Hi Sai,
Take a look at 2LIS_04_P_MATNR and see if it is usefull:
http://help.sap.com/saphelp_nw70/helpdata/en/88/7fc73c0c52085be10000000a114084/frameset.htm
Else it seems that you should create a generic extractor directly on the table according to this thread:
Re: Extractors for Planned orders and Proces Orders
Hope this helps.
BR
Stefan

Similar Messages

  • User exit/ badi needed for planned order create/change,collective ATP check

    Dear All,
    I'm looking for a user exit/ badi which can be used for planned orders at the stage of
    mass collective availability check (COMAC tcode) update; or at some other relevant stages of mass update of planned orders.
    I need after collective availability check to perform the following:
    1) to copy date from "total comitment" field on header tab of planned order and paste it (replace old date) to order finish date on header screen
    then
    2) to start a scheduling.
    Very appreciate your help.
    Best Regards,
    Andrey
    Edited by: Andrey Kruglov on Apr 15, 2010 3:06 PM
    Edited by: Andrey Kruglov on Apr 15, 2010 3:07 PM

    Dear,
    Use the BAPI : BAPI_PLANNEDORDER_CHANGE
    Or use the function module MD_SET_ACTION_PLAF for Schedule planned order.
    and the transaction MDAC Execute action for planned order
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Please refer this thread,
    Re: MDVP for collective orders
    Regards,
    R.Brahmankar

  • Creation of Reservation for planned order

    Hi Team,
    Is it possible to create reservation for planned orders after MRP run?
    My opinion was the reservation can only be created with reference to production order after MRP. The reservation can not be created with reference to planne dorders after MRP run because planned orders are intermident document which will not exist in the system always. The planned order details will not be available in the system once it get converted into production order.
    How the reservation will be processed which was created with reference to planned order after converting the planned order to production order?
    Kindly need ur guidance.
    Thanks
    psk

    Dear PSK,
    In a typical discrete manufacturing setup production orders are the promised receipt for which reservations gets generated as
    soon a production order is created.But only if the order is released goods movements can be posted against the reservation
    details through MIGO/MB1A for 261 movement.
    It's not required to create any reservation at the planned order level or which may not help you in any means to your business.
    But however in a REM scenario MF60 is used to create stock transfer reservations for 311 movement where planned orders
    are used for production backflush.To explain in detail even without any planned orders you can do a stock transfer reservation
    for a production quantity.
    Check and revert back.
    Regards
    Mangalraj.S

  • How to connect MAPL and PLPO to derive work center for planned order

    Hi,
    Anybody know how to derive work center using MAPL and PLPO for planned order (PLAF). Is there any connecting table between MAPL and PLPO.
    Please help asap.
    Regards,
    Mitali

    I guess u r trying to view the detail scheduling info (tab in MD13) for a planned order . In that case -
    1. Go to PLAF and enter the planned order number. (PLAF-PLNUM) and get the ID of the capacity requirements record (PLAF-BEDID).
    2. With this PLAF-BEDID go to KBED. pass the value here. KBED-BEDID. The KBED-ARBID values are your work center ID.
    3. To get the work center texts ( the way is appears in the screen) - Pass this value to CRHD . CRHD-OBJTY = 'A' ( i.e Type work center) and CRHD-OBJID = KBED-ARBID.
    Hope it solves ur prob.
    Cheers
    SKC

  • Extractor for Re-Order Point from MARD

    Hi There,
      Is there a standard extractor for Re-Order point (Field MINBE) from Table MARD ?
      I know we can obtain ROP from MDMA, but we would like to use the ROP from MARD
      The reason I ask is because if there exist a standard extractor for this, then i dont have to worry about the capturing the delta`s for ROPs

    Thanks guys,
      However, the reason I ask for a standard extractor for ROP in MARD is because there are some bespoke developments being done in ECC which only populates to the Field MBIELN in MARD
       Although I can create a customised view on the table MDMA and MARD to get this, however how can i create Delta which is triggered based on the change of the ROP ?
      Any thoughts on this please ?

  • Table For Planned Order Details From PP Module

    In our organisation we are taking Plan Vs Acheivement from Production. So, intialy we taken Plan details from "PLAF" Table and Acheivement details from "S225" Table. But After running MRP at month end. Previous month plan get deleted and new order create.
    how to get history data for Planned order.
    Please help us.
    Regards
    Naga

    I don't think that there is any history in regard to planned orders.  PLAF will get rebuilt according to your MRP parameters and I don't believe that the data is stored.
    Regards,
    Rich Heilman

  • Changing MRP controller for planned order

    Hello experts,
    Is there any way the planner could change the MRP controller of a planned order within MD12 ? We are using ver 4.7 and this field is not enabled. Currently the planners are creating prod orders much in advance and are looking to move to a process where they firm planned order. We are using project stock planning structure so more that one planner may create orders for the same material. So when one planner review the material planning for one project he would firm the planned order and assign it to him for leater conversion.
    Note: I the config I didn't saw any field selection control for planned orders.
    Thank you in advance for sharing your wisdom.
    Francois Paquet BPA
    aeronautive industrie

    Francois,
    Very interesting question. However I never had to change those fields in either planned or prodcution orders.
    Both orders master data fileds are disabled.
    However since your are working with project orders ( or netwrok orders ) system would be giving you specific planner order hard tied to the project order ( similar to Made to order scenario).
    Planner could use MD51 ( project planning ) & MD4C ( option for Netwrok or WBS element ) for monitoring progress of his /her order.
    This way planners do not have to go by MRP controller data.
    Hope this provides some new thoughts.
    Thanks,
    Ram

  • Release status for planned order

    Hi All
          I am running MRP weekly,system is generating the Planned order  once MRP is completed.Here my requirement is i want release status for planned order, at the same time once planned order is released i dont want user to change any data in planned order.
           Somebody explain me about the settings of action control of planned order.
    Regards
    Srinivasan.P

    Hi,
    Sorry to say but there is nothing like system status for Planned orders.
    Check below thread,
    [Release of Plan orders|Planned Order Release]
    Regards,
    Dhaval

  • Scheduling for planned order

    When I choose leadtime scheduling in MRP RUN then system does forward scheduling always.
    Then in planned order change mode when i do manually do scheduling then it does backward scheduling as  per settings in OPU5.
    How to get backward scheduling in MRP.??

    Dear,
    MRP do the backwordscheduling but The system always determines the basic dates for planned orders using backward scheduling.
    The system automatically switches to forward scheduling if the determined start date lies in the past.For this you have to maintain 2 settings.
    1)In OPPQ - Plant parameters maintain the indicator for start date in the past allow. 2) In OPU3 for your plant & order type , maintain the no. of days for start date in the past.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • ATP Rule for Planned Orders

    Hi Experts,
    I have configured the ATP rule for Planned Orders. So I only want to check the component stock and Production Orders when running ATP check for the Parent Material.
    In OPJJ, I only selected the following options.
    Include Safety Stock : Ticked
    Check without RLT : Ticked
    Incl.production orders : X (Take all production Orders into account)
    No other options or boxes have been selected
    Also I have included the relevant Checking group in MRP 3 for the Parent Material (Checking Rule has been assigned to that Checking Group in Config) and also maintain the Plant Parameters for MRP (assign the checking rule to the plant)
    So, For an example :
    Parent : A
    Components : B and C
    Parent Material A has only 5 Planned Orders starting on same day 20.05.2014 each qty 5
    Components B got stock 300
    Components C got stock 1
    When I ran ATP Check for the Parent material A using COHV, qty 1 has been allocated to all the planned orders as committed. Why is this happening ?
    I also checked in CO09 for the Component Material C, and it says ATP Qty is only 1. I expected the system would allocate that stock 1 to one of the Orders but it seems to be not working as I expect.
    Any explanations will be much appreciated and will not hesitate to avoid the points.
    Kind regards,
    Ishara

    Hi DB49,
    Appreciate your reply. Please see the following comments.
    Right now I have been assuming that you have performed an availability check manually for one of the planned orders, and you got the same results (overconfirmation).  Please confirm.
    Yeah I have performed for one order and it gave me the same result.  Also, when I perform for the 2nd Order, it allocates the quantity.
    OK, basic things you should already have checked:
    You have maintained the checking rule for planned orders (OPPQ or OPPR)
    You have maintained the ATP group for the materials (OVZ2)
    You have assigned the ATP group to the Material Master of the components (MM02)
    You have maintained the scope of check according to the rules you mentioned earlier (OPPJ).
    You have no planning strategy in the component material that would have invoked a special ATP.
    I checked everything apart from point 2 (OVZ2). I have maintained that via MRP Group and that MRP Group has been linked to Master Data (MRP 3)
    Really appreciate your support in this.
    Kind regards,
    Ishara

  • Disabling GATP for planned orders/production orders

    Hi,
    We have a scenario where we need to disable ATP check for production orders happening through GATP. That is, ATP check for production order materials should happen in SAP R/3.  This is a problem because we have activated ATP check in integration models for sales orders and it is happening through GATP.  Production Planning is happeninig in R/3 and we dont have either PP/DS or SNP in APO. ..only GATP.
    any pointers on how the ATP check for planned orders/production orders can be blocked in GATP for the same materials which are active for sales order GATP check?
    Thanks.

    hi Pawan /Prasun /vikas
    Thanks for your helpful answers
    @Pawan : Since we have recently gone live with production planning and its in the process of stabilizing we do not want to enable ATP check for production orders in GATP yet. Also since we are also using batch-determination with ATP check in production orders we still have to check how the system responds with the combination.  Therefore,as of now, we dont intend to switch on ATP for production orders in GATP.
    @ Prasun :  I understand there would be a user exit (EXIT_SAPLATPC_001) which would help in doing GATP check based on order type/business event.  However my concern is if the order does not belong to any of the order types will the system do a normal standard ATP check in APO or it will do a ATP check in R3 ? Our programmers are still looking how to tweak it but any pointers based on your experience will be helpful
    Thanks

  • How do I maintain storage location for Planned Orders in APO

    Dear all,
    Can you help us in maintaining storage location for planned orders in APO. The storage location from material master need to be updated in product master of APO and the same shall be automatically picked from product master during Supply Network Planning run.
    Material master CIF is live.
    We have got the following content error in CIF consistency check. How ever this is nt goging to harm any thing, but we would like to maintain in both R/3 and APO.
    Error:
    Plant and storage location in SAP APO: 2004
    Plant and storage location in SAP R/3: 2004 FGPA
    Thanks in advance
    Ram Mohan Rao Kolanupaka

    Instead of maintaining additional master data, i would rather use CCR user exits to switch off comparison of planned order at storage location level if the APO storage location is blank. This way you would not have to make changes to PPMs everytime a new scale out of the solution happens.
    In SE18 check the user exit /SAPAPO/CIF_DELTA3 (interface RELEVANT_FOR_COMPARE_ORDHEAD)
    If it is not possible to switch off this comparison then I guess changing master data is the next step. Do explore with a developer though about the first option.

  • Where we enter raw material reservation qnty for planned order in monthwise

    sir,
    as per client requirement in every month raw material reservation quantity fixed for planned order in monthwise.
    in sap Where we entere raw material reservation   for planned order in month wise nov, dec, jan and whre its show.
    is it possible after mrp run.can we check that raw material reserve stock in mmbe for planned order.
    pl guide me step by step

    Dear Prakash,
    1) in MMBE, you cannot see Reserved qty against plan order ( it is not a confirmed receipt )
    2) the reserved qty which is shown in MMBE is against production order
    3) only after converting plan order to production order ( Header material )
    4) dependent requirements will convert into reservations
    Regards
    kumar

  • Setup time not seen for Planned Orders/ Man Orders in GPB

    Hi all,
    I'm facing an issue where I'm unable to see the Setup activity(green bar) in the Graphical Planning Board for Planned Orders and Manufacturing Orders.
    At first I thought this was only happening for Planned Orders in Released status. However this behavior seems to be erratic with some orders on the same Product showing Setup whereas others are not.
    Any ideas?
    ~Rishi

    Hi,
    I am assuming you are using setup matrix .
    In case of setup matrix system will take setup time from setup matrix.
    If two planned order are created for the same product, system will consider the setup time for the first. For the second it will not show setup time (becasue most probably you have maintained product x to product x - o times).
    Regards
    Amlan

  • Datasource for Planned Order information in PLAF table

    I am looking for a extractor to extract Planned order information from R3 'PLAF' table into BW.
    If anybody knows information on this, please let me know.
    Thanks for your help

    Did you ever find a solution to this question??
    Thanks!!

Maybe you are looking for

  • Preview Text Annotation

    It seems that the flow of adding text annotations to pdf files on preview has changed on Yosemite.  Instead of allowing the user to place a text box with the cursor and then begin editing, the behavior has been updated with placing the textbox automa

  • Clearing from payment lot(FP05) and cash desk

    Hi , Background of the issue: when we post from payment lot or cash desk account clearing happens( clearing open items). Issue: My client has a requirement when the posting is done for a particular account from above two (payment lot or cash desk) cl

  • Use of a Session Variable in another session variable in OBIEE

    Hi, I want to use a session variable say A to calculate value of another session variable B. I am using valueof(NQ_SESSION.A) in the initialization block of variable B. But the result is coming blank. I know that the value exists. I have also set the

  • Does Satellite A10 and S1410 have the same hinges?

    I need to replace hinges on a S1410 and I found a seller carrying A10 hinges. Toshiba Satellite A10 and S1410 look similar in the photos so I wonder if they share the same kind of hinges. Can anyone help me?

  • AFAB DEPRECIATION ERROR (CO ACCOUNT ASSIGNMENT HAVE DIFFERENT PROFIT CENTERS)

    Hello Every One we had a user "ABC" who used to run this AFAB depreciation month end activity as a background job. and was working for her perfectly fine. But since she is no more with us. Now New users "123" and "546" when they run the same activity