Hi i have this question:
i have PP order to deliver. Material to deliver is Make to Order in particular for WbE, price control S.
It's the first time a deliver it in the sistem, so Qbew is clean.
I have calculate the standard cost for the material only with ck11n so at divisional level so only Mbew as the standard value that is 100.
My planned cost for the PP order are 110.
What i want to realize is to have a good receipt (MB31) at Mto stock evaluated at standard price 100 and not with planned value 110!!!
The process run as i want if the sistem has already a record in Qbew, but not when is clean!
Thanks.
Paolo

hi, try to be clear.
I have MTO business scenario, but  i don't calculate standard cost with CKW1 but only with ck11n,a nd i released with ck24.
So,for istance, i have an article with:
control price S and  standard price released 100,and procurament type E, dependent requirement indicator= 1.
so i create an PP order to produce this article linked to a WbE, so i have an MTO order. After saving this ord and realising it, planned cost are valuated and for example are 110.
Then i confirm all activities... labor... picking... external... Mh etc...my total actual cost are 120.
Now i want to deliver this article to valuated stock, it's MTO so in my case i have the production order that is assigned to the account of the project.
So when i deliver it movement 101 Q , the stock of the WbE linked to PP order should increase of a standard value so i suppose 100, but this doesn't happend the stock increase of 110, the planned value. Infact after this in Qbew i have 1 quantity and 110 value stock!
How could i have an increase of standard price 100 of my stock instead of planned cost 110? so the next PP orders makes consumption at standard? 
is it more clear now? i hope.
What i should do? Because in the case of cost planned is equal to cost standard released i have the luck and moviment to stock is done at hte right value but it's luck.
Thanks!

Similar Messages

  • Good receipt and Inventory value

    I have a material which need's to be received in liters but valued in IU for inventory and payables.
    IU value is not known at the time of good receipt.
    There is a time lag to determine the IU value. Is it possible to get my inventory numbers based on IU when the IU values is known. There is no standard conversion for liter  vs IU. Each receipt may be different. How should this be handled?

    Hi Elam24,
    I have checked fs00. and for Cost cneter it's already Optional Entry.
    HI Rajesh Satope,
    yes i have checked the cost center and the cost center should not be used. so how to change the cost center, so when i created GR system will not send an error for this material.
    NOTE : when i do GR for another material. it goes fine.
    Hi Bijay Kumar Barik,
    Thanks. it work. GR related to Cost Center from GL Account. and like Rajesh Satope said. "There are cases where some accounts do require a assignment to CO object". and to Change the cost center for certain GL Account(in my case it's Gl Account for Cost Difference) use T-Code KA03 at Tab Default Account Assignment. change the Cost Center and it's work :).
    Thanks.

  • Project Stock - goods receipt with ZERO value

    Hi all,
    when WBS element is assigned in production order, for a specific material Goods receipt is posting with ZERO value.
    When there is no WBS element assignment , it is posting normally. I have checked QBEW and QBEWH tables, there also stock is updated , but value is ZERO.
    what could be the reason?
    regs,
    Ramesh B

    You have to set in  via customizing:  Project System -> Structures -> Operative Structures -> Work Breakdown Structure (WBS) -> Create Project Profile
    In Project Profile / tabstrip "Control" /  section "Project StocK"/  set valuated stock

  • Net Value in ECC differ from SRM Value in Goods Receipt

    Hi All,
    We are creating Goods Receipt in SRM.When we create Goods Receipt  in SRM Goods Receipt shows correct value, where as in ECC it shows Wrong.
    Ex: In SRM  Goods Receipt value is '1000', where as in ECC  it is '1' instead of '1000'. Could any body tell me what would be the reason.
    and
    could anybody explain me, How SRM replicates the Goods Recipts data to ECC  Goods Receipt automatically..means is there any BADI/IDOC etc...what is the exact procedure...
    Thanks in Advance...

    Hi,
    SRM replicates the GR data to ECC through ALE/IDOC concept
    Check in BD64 Distribution model will be created with message type MBGMCR for GR postiong
    check in WE02 ( idoc display) inbound idcos in SRM and in ECC for outbound idocs for message type MBGMCR and also check the data records for that perticular GR.
    Thanks
    prasad s

  • Goods receipt reversal - material valuation

    Friends can any one explain the goods receipt reversal scenario
    and how it will affect the material valuation.
    I am going through SAP HELP but i did not understood, the concept behind it and how it affect the material valuation once  the goods receipt is entered and
    after cancelling the good receipt in case of "moving price" and the material valuation carried out.
    Please help me
    and also i want to know transaction for goods reciept reversal .....
    Edited by: VENKATESH MADANAGOPAL on Dec 15, 2008 7:29 AM

    Dear Venkatesh,
    Most goods movements in Inventory Management lead to changes in stock quantity and therefore in stock value: In the case of goods receipts, the stock value increases and in the case of goods issues, the stock value is reduced.
    For materials valuated at a moving average price, the material price can also change in the case of goods receipts for purchase orders. This is the case if the purchase order price differs from the material price.
    Planned Delivery Costs for a purchase order are also included in valuation when goods are received. When the goods receipt is posted, provisions are created for planned delivery costs; thus the material is immediately valuated at the expected price. A subsequent debit/credit when the invoice is received is only necessary if there are variances between the stipulations of the order and the invoice.
    It is also possible to post the net value of goods received. In this way, cash discounts that have been agreed upon are taken into account in valuation at this point. This means that when a goods receipt is posted for a material with moving average price control, the value of the order minus the cash discount is debited.
    Material price changes can also occur during the following transactions in Inventory Management:
    Regards..... Sri

  • No. of containers not updating in QALS table from goods receipt

    Hi all,
    I am working on below requirement for client.
    I am releasing a process order and then saving it. With this, an inspection lot is created in QALS table automatically.
    Then I am doing Goods receipt through MIGO.
    While doing goods receipt, I am entering no. of containers in quantity tab on item level (GOITEM-ANZGEB), but the same is not getting updated in QALS table (QALS-ANZGEB).
    Is there any configuration setting needs to be done to activate the update of no. of containers in QALS table from MIGO transaction?
    P.S. - Sometimes we use MB31 also to do goods receipt. In that also, there is no. of containers field.
    Thanks in advance,
    Sachin

    Hi Sachin,
    what is the solution for this .? Can you explain?
    Ram

  • 2LIS_02_SCL: goods receipt and invoice document number

    Hi,
    the BI Content documentation for the [Purchasing Data (Schedule Line Level) (2LIS_02_SCL)|http://help.sap.com/saphelp_nw04/helpdata/en/8d/bc383fe58d5900e10000000a114084/frameset.htm] DataSource reads:
    The DataSource also provides information about the documents that are posted with regard to the purchase order, such as goods receipts and invoices.
    The point is: where are the documents' numbers ?
    When I test the extraction, I get the expected number of records, provided that those records with ROCANCEL=X (cancellation of Data Record) are taken into account.
    For example, for a Purchase Order (PO) Schedule Line that has 3 Goods Receipts (GR) and 1 Invoce (IR), I get:
    - 1 record with BWVORG=1 (SAP BW - Transaction Key) and ROCANCEL blank, for the PO document;
    - 6 records for the 3 GR documents (BWVORG=2);
    - 2 records for the 2 IR documents (BWVORG=3).
    Therefore the DataSource provides the needed level of granularity. Just the field I need is missing, i.e. BELNR!  Is there any trick to get it or the only way out is enhancing the DataSource?
    Thanks, [Davide|https://wiki.sdn.sap.com/wiki/display/profile/Davide+Cavallari]
    Edited by: Davide Cavallari on Jan 18, 2008 5:38 PM

    I think I would choose the option that takes advantage of 3 DataSources:
    - 2LIS_02_SGR, for GR number;
    - 2LIS_06_INV, for IV number;
    - 0FI_GL_4, for document amount, as well as some other informative characteristics, such as document type (useful when the document is an invoice), referred document (the field that contains the supplier's document number), document date, posting date
    The Logistic DataSources would basically provide the link between GR and IV, while the General Ledger DataSource would provide the financial information.
    In fact an analysis for controlling purchase expenditures at a detailed level is required. Not just a simple analysis of expenses for vendor, or even purchase document, but for any financial document posted to the General Ledger. This analysis has sort of a financial perspective. Probably it's not the kind of strategic analysis best suited to BI. It has a more tactical, operational nature. And maybe BI is not the best platform for developing this kind of application.
    Anyway, if you have better ideas or any suggestion on this topic, please feel free to comment!
    Cheers, [Davide|https://wiki.sdn.sap.com/wiki/display/profile/Davide+Cavallari|My wiki profile]
    Edited by: Davide Cavallari on Jan 19, 2008  8:16 PM

  • Need to add a field in Goods receipt txn MIGO

    <i>Hello Friends,
                  I like add a field in the goods receipt txn screen - MIGO.
    Since there is no screen exit's in SAP 4.7, How to do this.
    Please come up with your suggestions.
    Thank you,
    Senthil </i>

    HI
    then you have to modify teh SAP standard layout. for that you need the access key.
    regards
    kishore

  • Goods receipt from PP order

    I need to make the goods receipt in Standard price. When I change for example time operation in routing PP order this changing price for goods receipt from PP order.
    I create PP oder from SD. I need if urgently.
    Thanks.

    Hi,
    While you do a goods receipt ( thru confirmation or thru MB31) an accounting document will be created in the back ground.
    To find this,
    In MB51 transaction give your user ID,posting date, movement type (101 for GR for a pp order)  as selection .
    Double click on the relevant document ( posted by you).
    In the next screen you ll find a "Accounting Documents" button. Click on that , it ll give a pop up..select the G/L document in that.. It ll take to you the account document..there verify the price.
    And check whether it matches with the material master.
    Thanks & regards
    Mahesh Babu

  • Inconsistency in IW8W transaction - Refurbishment goods receipt

    Hi All,
    I have a problem which is as follwos:
    Refurbishment order (order type PM04) was created for a material with target quantity, say 10 EA.
    Due to change in priorities, goods issue (MB1A) for that material was done only for quantity, say 5 EA.
    Order was processed and when the material is returned to stores by using IW8W transaction for that refurbishment order after refurbishment, the system automatically proposes the quantity that was entered as target quantity during maintenance order creation (say qty : 10 EA).
    To circumvent this problem, I have maintained the over delivery tolerance as 1% in work scheduling view in the material master. I have used T. code MB31 for doing the goods receipt. Still the quantity proposed by the system is the target qty that was entered during order creation. Here the system does not allow more than 1% of the qty proposed by the system (i.e: qty 10 EA).
    Automatic proposal of target qty during goods receipt, causes incorrect entries being posted in system, i.e: say if qty  10EA that was automatically proposed is posted system accepts the entry and creates the document.
    In material stock overview, the qty of C3 val. type material was reduced by 5 EA; whereas the qty of C2 val. type material was increased by 10 EA.
    This is incorrect posting apart from incorrect proposal qty in goods receipt transaction by the system.
    There seems to be an error in system design. The system should automatically propose the qty that was issued through goods issue and also should not allow more than the qty issued. Less qty is acceptable.  Automatic proposal of target qty is incorrect.
    Kindly furnish solution so as to overcome this issue.
    Thanks in advance and with best regards.
    Kannan J

    hi kannan
    i also checked it is behaving as you said only, i think you can have control by consulting MM perople. since the movment will allow unplanned material.i thnik there will be some settings for the movment type which will not allow unplaned material to be posted.in maintenance order if you check carefully suppose you have made the reservation for 5 material and taken only 2 materials,if you try to post 261 then the system will propse the remaining qty only say 3 materials, whereas if you want to reserve the taken 2 qty, the system will not propose the 2 quantity you can specify whatever qty in this field still the system will accept and post the goods receipt.
    regards
    thyagarajan

  • G/L Accounts in Goods Receipt PO and AP Invoice

    Hi Experts
    I created purchase order and i want to receive the order based on the P.O but for a segmented account. i have picked the g/l account in the form settings window and the account has dropped into the goods receipt PO document. when i add the goods receipt po, the values of the goods in the goods receipt document hit the default account i have created for the item group in administration. But i want the values to hit the new account i have picked in the form settings which is showing on the goods receipt document.
    Any help?

    Hi,
    Only service type PO you may assign G/L Account. For item type, you have to change item G/L account determination. It cannot be done through document.
    Thanks,
    Gordon

  • Third party credit update with goods receipt

    Hi Experts,
    I need to know how customize the credit control management in the following situation:
    In third party flow without SD delivery: Sales Order -> Purchase requisition -> Purchase
    Order ->Goods Receips from supplier.
    The credit control has to be done with the delivered amount not
    invoiced. But in this flow the SD delivery is substitue by MM Goods
    Receipt in order to deliver products to the customers. When goods
    receipt is done the delivered credit amount isn't updated.
    it's necessary to check the amount delivered not the amount ordered (as it's done with the current customization)
    The customizing is:
    the item category:
    billing relevance 'B': Relevant for order-related billing - status
    acc.to order qty
    o Copying control -> invoiced quantity indicator 'E': Goods receipt
    quantity less invoiced quantity
    Schedule type: u2018CSu2019
    Credit control area update group: 00012
    Automatic control check : 'D', flag in open deliveries.
    We have checked note 410685 but not solution has been found.
    Example: Customer has a credit limit 1000 euros.
    1) Create a sales order with an total amount 900  euros.
    2) Create purchase order with the purchase requisition created
    automatically by the sales order and release it.
    3) Do goods receipt for an total amount 800.
    4) Create another sales order with a total amount 150 euros.
    Now, the new sales order is blocked, because the calculated credit is
    100 (credit limit - ordered amount). If the credit is calculated with
    the delivered quantity, the credit will be 200 and the new sales order
    won't be blocked.
    Thanks in advance,
    Laura

    Hi Nagesh,
    In any credit memo scenario, always enable the creation of Credit Memo Request and then Credit memo. When the credit memo request is to be created, make sure that it is always created with reference to the invoice document only and not reference to the sales order, as the objective of Credit memo is to correct the prices in the invoice document. This will help you in various scenarios like exchange rate where the value of sales order and the value of invoice can be different in the local currency due to ex.rate fluctuations.
    As credit memo takes care of incorrect prices, having a document flow of credit memo request with reference to sales order is incorrect.
    With reference to the error message, it is a valid message as an invoice has been created with reference to the order. You should not create a credit memo with reference to a sales order(OR), for credit memo, u shd use a credit memo request only as the reference.
    Hence the flow for your question is
    Sales order>Invoice>Credit Memo req-->Credit Memo
    OR>F2>G2W(Confirm with others on the doc type)-->G2S
    Pls lemme know if you need further clarifications in this topic.

  • Split/change line in Purchase Order after partial goods receipt

    Hi
    I have a PO with multiple lines/items. For one line there has been a partial goods receipt and for the open qty there will be a delay. Do I have any chance to either:
    - Change the delivery date for this row to match the ETD of the open qty
    - Change the initial qty of the line to the one received (that the line closes) and open a new line with the correct date for the open qty
    I just cant change anything in a line for which a partial goods receipt has been posted.
    Thanks
    Franz

    Hi Gordon,
    Thanks for the info. Another idea: How about ..
    - adding the item on a new line with the open qty and the correct date
    - simply closing the partially posted line with the open qty (is that ok from the DB view?)
    Any doubt that this could work as intended?
    Thanks
    Franz

  • PO and Goods receipt flag table

    Hi all,
    I want to select POs for which Goods receipt is not created. Is there any table which stores the PO number and GR flag indication for created or not created. And the table should contain date of creation for PO too. Thanks
    Ricky

    Hi,
    The Field EKPO-WEPOS will tell you exactly whether a GR is raised for that PO or not.
    Regards,
    Anji

  • Cancellation of Goods Receipt with Credit Memo Transaction Issue

    Dear SAP Expert and Guru,
    Normally cancellation of goods receipt cannot be done when invoice has been issued. Cancellation of Goods receipt can only be done when there is the credit memo being issued in MIRO.
    The problem now is that is there any table that can tracked the linkage between Credit Memo and the Cancellation of Goods receipt?
    The goods receipt with the invoice linkage can be found in both table EKBE and BKPF. But not the credit memo and cancellation of Goods receipt.
    Thank you
    Regards
    Leonard Tan

    Dear Jeya and SAP expert and Gurus,
    You are correct, but with the document number, how am I going to get the Cancellation of GR document?
    In table BKPF and EKBE. With the invoice number (34*******) then pass it to table BKPF to get the invoice number (52*******),
    Then get the invoice number (52*******) pass it to table EKBE to get the Goods Receipt document (61*******).
    However, this only can track the transaction goods receipt and Invoice but not the credit memo with cancellation of goods receipt.
    Kindly asvise on that.
    Thank you
    Regards
    Leonard Tan
    Note : Do not quote previous reply every time,simply reply for member you want to respond.
    Edited by: Jeyakanthan A on Jul 8, 2011 3:23 PM

Maybe you are looking for

  • Text messages won't load, visual voice mail barely works, e-mail won't update

    I've had the HTC Rhyme for about two weeks. Last week I noticed my text messages were not loading. I I turned the phone off a few times. Still no text messages loading. I spoke with Verizon CS and they tried several solutions that did not work. I fin

  • Adobe Forms in Output Determination

    We're looking at using an Adobe form to replace an existing SAPSCRIPT form in Output determination. From SPRO, under the processing routines of the output type I can see a selection where a PDF form can be supplied. I haven't done any detailed explor

  • Iphone 5 imessage still on after deactivation?

    so i recently sent in my phone to get fixed.. not to an apple retailer but to a repair shop. everything was fine up until last night. i had activated my old android device while my iphone gets fixed. i was having a conversation with a friend who also

  • 10.9.3 update "less than a minute" - 60 mins ago

    Hi I installed the updates for 10.9.3 which required a reboot.  After the reboot the Installing Software Update dialog shows and the progress bar moved swiftly towards the end, then stuck at about 95% with the "Less than a minute" message.  That was

  • Startup Issue - Blinking Earth

    When I boot up, I get a blinking earth icon for a minute or so before the usual boot up cycle begins. I have checked that the proper start-up disk is selected in the preferences: "You have selected MAC OSX, 10.5.8 on the volume MacBook. I have done a