Horizontal Plan Suggestions and Calculations

Hi,
I am facing an issue in understanding the ASCP Horizontal Plan calculations for EBS ver 12.1.3.
I have made 1 FG Item, 1 RM Item and BOM of FG with component requirement 1 for 1 FG Item. Entered the Forecast of FG = 100 bucket type days.
Made 1 resource allocated to single department and on routing available 24 Hrs without shifts with usage 1 and assigned units 1. Means 24 units can be made in 24 hrs.
Now when i am launching the Resource constraint plan with no supplier constraint and wit no lead times option, the planner work bench is suggesting me batches with quantity 22 for 3 days and 21 for 1 day than 13 for 1 day. In horizontal plan the available hours are 24 but required hours shown are 22.
Can any one tell me on what basis the suggested Qty for Job is 22 or 21 though the available resource hours are 24. I am also perplexed in understanding the calculations of Horizontal Plan for the following Available Hours, Required Hours, Net Hours Available, Capacity Load Ratio for current day and for the proceeding days.
Also the Suggested Dates and Times shown are confusing.
Thanks in Advance
Regards,
Farhan Ahmed

Hi everyone,
Kindly help me on this issue. Please reply to my post.
Regards
Farhan Ahmed

Similar Messages

  • ASCP Horizontal Plan calculation

    Hi,
    Can anyone explain the arithmetic calculation of Horizontal Plan in ASCP?
    Thanks

    what do you mean by the arithmetic calculation?
    the HP can have many different rows of information depending upon what the user wants to see

  • Cost center planning for overhead calculation

    Gurus,
    I have a doubt regarding the cost center planning for overhead calculation.
    My scenario is:
    There is a service cost center from which a certain percentage I want to allocate to the products as overhead. Now while doing so I have created a cost center and a cost element of type 43 (internal activity allocation). This cost element is the base for overhead calculation. Also I have created one cost element of type 41 (overhead rates). I have defined the credit (of cost sheet) with the cost element of type 41 and the cost center as mentioned.
       Now I am facing a problem while planning the cost center with cost element type 43 through KP06.The system is throwing the error message: 'Cost element xxxx can only be used for activity input'. My understanding is we must carry out the planning for the cost center to allocate a certain percentage to the product cost estimate. If I am not allowed to use the cost element of type 43 to plan, what should I use for the planning?
    Request your suggestion.
    Thanks in advance!
    Snigdho.

    Hi
    Since you mentioned catg 43 cost element, I thought you are using Activuty Type
    To apply overhead on the product during CK11N, you need not plan any value on the cost center... The values planned in the cost center can not be used as a BASE in your costing sheet....
    It goes like this
    1. Your cost estimate has BOM + Routing
    2. So, the cost elements that you would see during CK11N, can be broadly classified into 3 types
    a. Primary cost ele - Material Consumption accounts for BOM components
    b. Secondary cost ele (Catg 43) - If you use any actvity type in the routing
    c. Secondary cost ele (Catg 41) - These cost elements are parasites... They need some basis to calculate the overhead value... That basis can be either the (a) or (b) above.....
    I think, what you are planning to do is Plan Primary cost ele in a cost center and trying to use the same as the Basis.. That wont work!
    What you need to do is
    a. PLan the values in the cost center, say, 100,000 USD
    b. Absorb it on the basis of 2.a or 2.b
    If 2.b is not applicable in your case, since you are not using activity types, then 2.a is the Only option left for you
    Hope it is clear....
    Regards
    Ajay M

  • Horizontal Plan question

    Hello,
    I have a question regarding the behavior of the horizontal plan. I'm new to the ASCP module.
    I have current scheduled receipts let say a Purchase order of qty 20. If i drill down on it, there is
    an action of Reschedule Out but the "For Release" and "Firm" are still unchecked. So this scheduled
    receipts becomes part of the Projected On Hand for today. The same PO quantity appears under day bucket
    on which the suggested due date falls. Isn't this an overstatement?
    thanks.
    gregg

    09-aug-10 | ....|...............................
    Current
    Scheduled
    Receipts 20 (action is Rescheduled out
    w/ future date like 02-FEB-11)
    Proj
    OnHand 20
    02-FEB-11|...
    PO 20 (drilling down the same po that are shown under sched receipts)
    It looks like this, there is a duplication the current schedule receipts are counted in the projected on hand, etc
    and then the rescheduled PO is counted once again.
    Edited by: Apps Devel on Aug 10, 2010 10:03 AM

  • Open planned orders and production orders

    Hi friends,
    I have one issue with my client.
    Client has 1 lac materials in sap .Now he wants extract all materials open planned orders and open production orders with quantity and dates.
    Please tell me the process how i can extract the data from sap for above requirement.
    Thanks,
    Manoj

    Hi Manoj,
    For open planned order and production order select the respective box.
    But one suggestion. Try to convince client that this report will take a lot of time as you have mentioned 1 lac materials are there.
    You can exclude system status and get it with below screen as mentioned already.
    But my suggestion is to run the report at night when the system load is very less. Please create a background job one for planned order and another for production order. Then run it in midnight as per the customer requirement in background. You can automate the process by sending automatic mail to customer. Please refer the below link to trigger mail.
    Mail Trigger with TEXT file via JOB run
    Regards,
    Krishnendu.

  • Horizontal Bar Chart and Overlaying Line Chart

    I am using SSRS 2008 and developing my reports in BIDS.
    I have a report with two data points. I want to chart the first as a bar (horizontal) chart and then the second as an overlaying line chart.
    I created both data series, originally, as a bar chart. I have clicked on the second series in the "Drop Data Fields Here" area and changed the chart to a line chart. When I do that, it changes both series to a line chart.
    However, if I use the column (vertical) chart for the first series, it will let me make the second one a line chart.
    Is this a limitation of SSRS 2008? Can I not have one data point be the horizontal bar chart and the second one a line chart?
    If so, are there any suggestions how to get around this?
    Thanks.

    Both charts for SSRS 2005/2008 are very limited when it comes to horizontal charts and are infact supporting only left-to-right bar charts, with no ability to combine them with other charting types (lines, areas, points etc.). For a SSRS charting solution that supports all types of charting type combinations in left-to-right and right-to-left horizontal fashion you can use Nevron Chart for SSRS - www.nevron.com. Besides a huge number of charting types and subtypes (most of which are not available in the MS Chart for SSRS 2008) it also provides better image quality in 2D and 3D modes, more settings, has support for rich text formatting in texts, has image filters, ability to customize via C# code and implements many more large and small charting related details.
    Best regards,
    Crank

  • Suggestion and Comments for a w530 unit

    Hello Everyone,
    I've been using macbookpro for almost 4 years, and since I heavily use AutoCad, Sketchup and Lightroom on a daily basis it has been a bothersome to rebooth from one OS to another. I have been looking at the W530 for quite sometime and decided to make the swtich. I hope someone can enlighten me on how to go about the purcahsing of W530. From Lenovo site, i intend of getting this specification and minor upgrade of some specs:
    Lenovo w530 Intel Core i7-3940XM Processor Extreme Edition (8M Cache, up to 3.80 GHz)
    Window 7 pro 64 bit
    Lightroom 4
    15.6" FHD (1920 x 1080) LED Backlit AntiGlare Display, Mobile Broadband Ready
    NVIDIA Quadro K2000M Graphics with 2GB DDR3 
    16 GB PC3-12800 DDR3 (4 DIMM)
    500GB Hard Disk Drive, 7200rpm
    Bluetooth 4.0
    Third Party Source Items:
    Additional 2 8gb Ram, so total of 32GB 
    msata AData XPG x300 256gb 
    2.5" sata ssd 512gb
    Hard drive caddy from new mode us. com
    Questions:
    1.   If in case, I need to add additional ram, would it be okey to just buy an additional 2 pcs of 8GB of Corsair Vengance, or do i need to buy a new 4 pcs of 8GB? so the total ram would be 32GB. Or would it be wise to just get the 32GB of Ram from Lenovo?
    2.  I plan to use the 500gb HDD in the hard drive caddy and use the msata and 2.5" ssd for primary drive, What would be the best way to copy the Windows and Lightroom from the HDD to msata drive (256gb adata)?
    3. How come some unit with the w530 comes with a color sensor option and the higher w530 specs does not? would it be wise to get the Color sensor/ calibration from Lenovo or Just get other calibration software? and can you suggest in your experience a good calibration software for w530?
    4.  and lastly, does all w530 whether it be lower end specs or high end spec has a msata connection? Sorry of the ignorance.
    Really sorry for a long post and questions.  I hope someone could enlighten me before i purchase this unit. Any suggestions and comment would be highly appreciated. Thanks

    Hi.
    I'm almost in your same boat; used a Macbook when travelling for AutoCAD and I just ordered a W530 (should arrive Thursday) after a long period of agonizing of the purchase. I'll update this thread once I've used it a bit if you'd like, but I have some comments on your post:
    1. My understanding is that RAM works best when all sticks are of the same capacity. Personally, I ordered the W530 with the least RAM possible and am replacing all factory with Corsair Vengance.
    2. Use drive cloning software.(check out this site: http://lifehacker.com/5839753/the-best-disk-cloning-app-for-windows). I'm eschewing the mSATA and going with a 500gb SSD (found the Samsung 840 for $279) as the main drive with the 500gb HDD in the ultrabay (mSATA slot vacant). Why do you need the hard drive caddy?
    3. Not sure. I didn't go top-of-the-line as you are so my config had the color sensor option.
    4. All have the mSATA.

  • Unable to see Planning application under calculation Manager

    Hello All,
    I created a Planning application in workspace and choose the Sahred Service Project as APS server.Now I want to create business rules.For that when I m lunching Calculation Manager from workspace, I m not able to see the appliaction that I had created before ,under Planning option of Calculation Manager.
    Thanks.......

    I think you created a classic planning applications. Calc manager will not recognize classic planning applications in version 11.1.1.2 and prior.
    You need to create a planning applications via EPMA and then you will see this in calc manager. If you have already opened calc manager, right click on the Planning node and do a refresh to synchronize the applications from EPMA.
    Hope this helps.
    ~SM

  • I Want to Buy MacBook Pro 15" In Installments, Can You Tell me The Plans. And I Am Indian So Please tell me Indian plans

    I Want to Buy MacBook Pro 15" In Installments, Can You Tell me The Plans. And I Am Indian So Please tell me Indian plans.. I Am really Excited About My MacBook pro .. Please... Copy Paste All The Information Please Don't Give the Link .. Please... 
    Thanks in Advance
    SANCHIT

    You're asking in the wrong place. This is a user forum and contains no official information from Apple. I suggest you contact an authorized Apple dealer in your country.

  • I need to know the difference between planned SKF and Actual SKF from business view and when I can use one of them ?

    I need just to know the difference between plan SKF and Actual SKF in business example and when I use one of them.
    thanks

    Hi Salaam,
    Statistical Key Figure (SKF) is a base to allocate the cost between cost centers. Usually, common cost centers cost should allocate to respective department cost centers on monthly basis.
    Some of SKFs are: Calculating floor rent on SFT, Telephone charges on No. of units, and employees head count is with "Each" in SAP.
    Apart from Ajay's reply, you can consider the Canteen exp in an organization. Assume Admin, Fin and Mfg departments are getting food services from Canteen. Here, total monthly cost of Canteen exp should be allocated to respective departments. Here, we use SKF as total head count of each department and distribute the cost.
    Planned SKF is what you planned on the beginning of a period. (Assume head count was planned as 30 in the month beginning)
    Actual SKF is what exactly you consumed over the period. (Actual employees provided canteen services during the month is 25)
    BR, Srinivas Salpala

  • I need to reinstall Dictionary and Calculator - Lion

    I accidentally deleted Dictionary and Calculator with a third party app, and I'd like to get them back.
    After trying a few things, I decided to just reinstall Lion, but the OSX recovery mode -- restart with command-r, or with command+option+r doesn't work, probably because the wireless keyboard connection is glitchy and holding down the keys may be pointless. I have to reset the keyboard each time I login.
    I wish I just had a Lion install disk.
    I do have Time Machine backups, but I don't know how to get those Apple Apps back, I get a message that say's I can't copy from the Library because the “Dictionaries” can’t be modified or deleted because it’s required by Mac OS X."
    Any suggestions?

    I just serched for OS X 10.7.5, OS X 10.7.2, and OS X 10.7 (which provided hits for a course and a tutorial)
    I wonder if everything has been scrapped but Mavericks. I don't want to leave Lion because I can't replace expensive software.

  • Safety Stock field/table in ASCP Horizontal Plan?

    Hello,
    I need to get the safety stock data that is seen from the ASCP's Horizontal Plan. Whiat table and field is it? Can't find it from MSC_DEMANDS and MSC_SUPPLIES. Thanks

    Hello,
    in an ASCP plan safety stock results/output is always populated in MSC_SAFTEY_STOCKS and not in MSC_DEMANDS.
    MSC_DEMANDS is populated for SS only in IO Plans
    safety stock demands can be seen in msc_demands with origination_type = 31
    HTH
    Geert

  • Photography Plan, Lightroom and Photoshop CC

    Hi Guys
    Hope someone can help me, I subscribe to Photography Plan, Lightroom and Photoshop CC, Lightroom says trial ended and the application will not work.
    Contacted Adobe, tried uninstalling and reinstalling application a cloud application to no avail, Adobe cut me off the phone whilst waiting for a Lightroom specialist, can anyone shed light on to the issue and can suggest a resolve for me, all help appreciated.
    Steve

    Hi Jim
    I tried that it stills says expired, I'm thinking the previous owner of my 2013 Imac may have had a version on and uninstalled it?? How would I remove any old registry data.
    Thanks again

  • Condition class and calculation type missing for conditions downloaded from

    Hi All,
      I have downloaded all the condition types from R/3 using dnl custcndall
    I have even downloaded the following using r3as
    dnl_cust_cnd
    dnl_cust_prc
    dnl_cust_price
    But I have noticed that for the downloaded condition types, condition class and calculation types are missing. Please suggest.

    I have faced the same issue recently.
    The solution is in adapter object DNL_CUST_CNDALL for table T685 and other tables for T685 in that objet put the filters for condition type
    for ex: KSCHL eq PR00
    This sure will work.
    But you have to set this filter for all tables T685*
    Thanks
    Sarabjeet

  • Planning suggestion issue for Project item

    Hi
    We have sales order demand and the item is assigned with project and task information.
    Planning suggest 2 planned order and 1 line with project and task and another line with project & task,
    We are in r12.1.3 version
    We are not able to identify why planning suggesting 2 separate line for the same item
    Require some input
    Regards
    VKPK

    Hi,
    You can create a WF for the same.
    Notification can be send by  - Mail Step Type..
    Actions on decisions can be taken by - User-Decision Step Type..!!
    Kindly search SapTechnical -> Tutorials -> Business WF for the same..!!
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/abap/workflow%252bscenario
    If these does not help, just let me know as I have worked on similar scenario's before also..!!
    Hope it helps!
    Regards,
    Kanika

Maybe you are looking for

  • Instant logout (WindowServer crash report & info inside)

    Ok, there are several people that have this problem it seems.  I can't figure it out.  It's the WindowServer, but why?  Here are some points: - usually (always?) happens when I have my Dell 24" LCD hooked up - usually (always?) happens when I'm runni

  • HT204655 Can you use one Photos library under different accounts?

    I, like many, have recently migrated from iPhoto to the new Photos App. I'm having one significant issue that is bothering me, using a single Photos library under two different accounts on my Mac. In iPhoto, I could easily point both accounts at one

  • [SOLVED] Default audio device no longer works after reboot

    After today's reboot, the audio device no longer works. E.g., VLC says: Audio output failed: The audio device "default" could not be used: No such file or directory. This is the console log: [0x1394138] main libvlc: Running vlc with the default inter

  • Disk Utility Reports Error, Can't Repair

    Well, I just ran a "verify disk" on my harddrive, this is the report. "Verifying volume "Macintosh HD" Checking HFS Plus volume. Checking Extents Overflow file. Checking Catalog file. Checking multi-linked files. Checking Catalog hierarchy. Checking

  • Minimum Operating Temperature?

    What is the lowest emvironmental temperature at which MSI motherboard can operate?  The same question for cpu, RAM module, HD, Video Card, DVD drive, etc ?  It appears the weakest one will set the lowest temperature for a complete hardware system. Wh