How to avoid actual cost error log while confirm production order activity

Hi
I dont want to post actual activity cost via production order activity confirmation. But i want standard value keys for my production duration purpose. So,i defined activites(strd value key) in work center without assigning cost center to that work center. While i confirm in CO11N, system throws erro log as Actual cost calculation contain errors and allows me to confirm the activities. I am doing MB31 and all CO settlement activities also. But when i try to close the order it says error log exists,so closing of order is not possible. How to overcome this problem as i dont want to capture any cost of activites via production order,but i want confirmation only for production analysis.

Hi
Issue is resolved thru PP forum. Thanks for ur reply.
Solution lies in Control key of routing and BOM costing relevancy.

Similar Messages

  • How to avoid Cost error log  while confirming production order

    Hi
    I dont want to post actual activity cost via production order activity confirmation. But i want standard value keys for my production duration purpose. So,i defined activites(strd value key) in work center without assigning cost center to that work center. While i confirm system throws erro log as Actual cost calculation contain errors and allows me to confirm the activities. I am doing MB31 and all CO settlement activities also. But when i try to close the order it says error log exists,so closing of order is not possible. How to overcome this problem as i dont want to capture any cost of activites via production order,but i want confirmation only for production analysis.

    Sudhar,
    You can make the operation not relevant for Costing by using a Customized Control key which is not relevant for Costing or else in the operation details you need to leave the "Costing relevancy" field blank.
    Regards,
    Prasobh

  • Error message while confirming production order.

    Hi Gurus,
    I would like to know if it is possible to get an error message when we try to confirm a production order if there is not a cost for each component.
    Please provide details if any.
    Thanks for your understanding.
    Naveen.A

    Hi,
    You can have setting for error message for incorrect costs in confirmation as below :
    Go to OPK4 ( Parameters for order confirmation) select plant & order type--> General individual entry ( tab)-> Error handling/logs
    Maintain tick in check box for Termination for Incorrect ActCosts.
    This will fulfill your requirement.
    Revert in case any doubt.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Apr 6, 2009 7:17 AM

  • How to avoid XVBPA line item values while creating sales order

    Hi Friends
    I am creating Sales order using function module IDOC_INPUT_ORDERS, for that I am passing partner details through segment E1EDKA1.If I pass the same partner details(Partner number, name1,name4,city,postel code) which is same like customer master,
    I can able to book the order and entries are coming only one time in VBPA table(Header Item level).But if I change any value for the particular partner in the Input(For example Name4, there is no value in customer master but I added through program).Now its creating an order but its showing the entered partner informations in header level.When I checked the same in line item level, its not picking the values from header, its picking the values from customer master for that particular partner.
    So this line item also coming in VBPA table, because its different from header data.
    Anyone guide me, how to avoid this problem while booking order through program.
    Thanks
    Gowrishankar

    I am updating Ship-To-Party value in segment E1EDKA1 and calling IDOC_INPUT_ORDERS function module to create the sales order.
    In this case for the particular partner there is no NAME4 value in KNA1, I am passing some value through this segment E1EDKA1.
    So its creating an order with this new addresses , so its generating new ADRNR in VBPA header level.Thats fine.But the same time
    its not copying the same value from header to line item.
    In Line item level again its picking the address details from KNA1 for the particular partner number.So its showing Blank value in NAME4 field of line items.Its creating and spllitting issue, while creating delivery.
    Thanks
    Gowrishankar

  • Actual Cost is not updating in Production Order & WIP

    Dear All,
    I have issue in production order and Work in Process not getting Target Actual cost in costing view CO03 & KKAY.
    Is there any settings or transaction missed out? Please guide me how to sovle the issue.
    Thanks & Regards,
    Venkat.

    Dear,
    Please check,
    For Target cost
    1. Your std cost must be released before Goods Receipt
    2. There must be goods receipt posted on the prod order
    3. You must calculate variances in KKS1/2
    For Actual Cost
    1. Post Goods receipt and Goods issues
    2. See if any mat movements are pending in COGI
    3. Ensure that operation is confirmed in PP and no entry is lying in COFC
    Also in CO03GotoCost-Analysis--Here change the lay out and check it.
    Regards,
    R.Brahmankar

  • Price error message while creating production order- Urgent

    In past i was getting warning message of 'No price could be determined for material/batch and Plant" message no CK 465 at the time of saving the production order after creation but now it has stopped even though there is no price in material amster.
    I changed the configuration to Error message (TC: OPR4_PPCO) and it works but why not for warning message?
    Thanks

    Please confirm where i should check for Activity price?
    But then why we are able to get error message.
    Reexplain:
    Creating a production order which do not have standard cost in material master.
    While saving, getting a error message'No price could be determined.......'
    Now changing the message to Warning through configuration using TC: OPR4_PPCO
    Now again creating the production order and saving
    Expectation to have same message as warning but not getting anything.
    Thanks
    Edited by: vineet garg on May 1, 2008 12:14 AM

  • Error message while creating production order with KMAT material strategy25

    Hi PP Gurus I am running variant configuration cycle...Strategy 25, Custermer Req KEK (KMAT Matrl)
    Sales order & MRP Picked the components correctly as per the dependencies
    written. So Planned order generated against sale order.
    When I tried to convert planned order to Production order...I am getting the
    below error message..
    Error Message:
    You cannot make an assignment to make-to-order stock Message no. CO684
    Diagnosis The component cannot be allocated to an individual stock because
    make-to-order production and engineer-to-order production cannot be executed
    with this order.
    A possible cause is that you are trying to create an order with reference to a
    sales-order/project, where an account assignment to a sales order/project is not
    allowed in the settlement profile that is assigned to the chosen order type.
    This is inconsistant.
    System response The following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure Choose another order type.
    I used order type with SD1 as settelement profile.
    OVZG: default 046, settlement profile = SD1
    OPJH: Settlement profile = SD1
    Plz through some light on this if u have worked on Variant Configuration/MTO
    settlements.
    Question:
    1) Is creation of production order with KMAT material supported by SAP?
    2) If yes, why the above error occurs?
    Waiting for Ur reply
    With Best Regards

    Dear R.Brahmankar,
    I have check on the note, but it is not relevant to ecc6. The current system default setting is :
    Standrad setting for reqt class 046
    Special Stock E
    Acct Assgt Cat. M
    Valuation M
    Settlmt Profile SD1
    However if I change the Acct Assgt Cat. from M to E. It resolve the problem. I would like to know is this the right solution?
    Config in Acct Assgt M
    Consumption Posting = E
    Config in Acct Assgt E
    Consumption Posting = '  '
    In F1 key of Consumption Posting field it shown following:
    To flag the sales order item as cost- and revenue-carrying, enter an "E" (settlement via sales order).
    If you do not wish to flag the sales order item as cost- and revenue-carrying, do not enter anything.
    Dependencies
    If you are working with nonvaluated sales order stock, always flag the sales order item as cost- and revenue-carrying.
    If you are working with valuated sales order stock:
      In the case of complex make-to-order production, flag the sales order item as cost- and revenue-carrying
      In the case of sales-order-related mass production, do not flag the sales order item as cost- and revenue-carrying
    Should we change to E?
    Regards,
    Ong

  • Actual Costs are not captured in Production Order

    Hi Experts,
    I'm not able to see the actual costs for a production order. We made the cost estimate for a material for this month. We created the production order and partial confirmation also done. In production order i'm able to see the target cost only. I'm not able to see the actual cost for the production order after confirmation.
    In routing costing relevancy tick mark is available and in work center i maintained the cost center and activity types also.
    Can you please share anything is missed for getting actual cost for a production order.
    Naren

    dear friend,
    you would finally confrim order (set CNF status) and try again.
    also chack out you master data:
    -material master (possible Acc1-2 and Cost1-2)
    -work center (say,did you set a valid Cost center there?), are activities set up? usage? validity?..
    -routing (header data and control key at item level)
    check out your control key against the 'Cnf' and 'PrtCnf' checkboxes...
    good luck!

  • Split of activities and quantity while confirming production order

    hi gurus,
    Our scenario is that suppose if we have to confirm 10 nos of a finished product.
    and 10 operations are there.
    here we have to confirm each no. for each operation. and quality checks are there for these operations .
    now the quality people has to confirm the quantities and production people has to confirm the timings of activities(like set up , machine and labour ) .
    i will be thank ful to you if some one helps me regarding this
    thanks in advance
    Kalyan

    Hi Kalyan,
    Do as below:
    In OPK4, do the following for your order type--
    1) On the second tab page (general individual entry), select 'partial confirmation' as the confirmation type.
    2) On the third tab page (operation indiv.  entry), tick 'propose' quantity and 'propose' activity.
    Now, go to OPK0. Here, either change in the existing active profile or create another profile and tick it as active. Then, inside the profile, do the following:
    1) On the first tab page (are selection), for the detail area 'activities' select "Activities: activity 1 - actitivity 6 (table control)
    2) On the second tab page (default), select 'partial confirmation' as the confirmation type. Also select 'immediate proposal' for quantities and services
    I am assuming that the production would carry out confirmation in CO11N.
    After doing this, whenever QM would do the confirmation of activities, then proportionately the activities would be confirmed. This would be partial confirmation. After this, production people would access CO11N and do final confirmation. At this time, enter anmy changes in the activity values. You will be able to see a table giving actual and planned values for activities. If there are no changes, then just post the final confirmation.
    Make sure that when QM confirms, it is a partial confirmation.
    Carry out the process now and tell me in case of any issues.
    Regards,
    Shrenik

  • How to analyse actual cost for each operation in Process/Production Order?

    Hi all,
    IN SAP, I know that we can analyze plan cost for Operation in Process Order/ Production Order.
    However, I can not analyze Actual cost for Operation .
    I know the object when I good issue material is ORDER, not OPERATION.
    But, as requirement of users, they want to analyze actual cost for each Operation.
    CAn SAP do this analyze?
    If Yes, What should I do in SAP to have this reports?
    THanks in advance,
    Emily Nguyen

    Hi Emily,
    as I see from one other message that you're using material ledger. Then your expectation is apparently to also see the actual costs of materials in your production order by operation.
    This is not supported. Actual material costs are handed up in material ledger multi-level settlement from one material to the next, bypassing the production orders.
    That means the production order will always contain the material costs valuated at plan price, not at actual price.
    For activity prices that might be better, when you revalue the orders at actual activity prices with CON2. But even there I am not sure that it will always be assigned correctly to the operations.
    There is currently an enhancement in development, the operation level costing. But that will affect more the planned cost side not the actuals. Might be interesting to learn more about your requirements and the use case behind.
    best regards,
                      Udo

  • Resrtict -  copy from option while creating Production order

    Dear all,
    I want to know how to  Block  the "copy from" option while creating Production order(CO01).
    Regs.
    S.R

    Dear Ramesh,
    You can do this Via SHD0
    Just check the below link
    [Regarding Backflushing(MFBF) fields making display;
    Regards
    kumar

  • How to avoid time out error in abap program

    How to avoid time out error in abap program
    based on performance wise i want please help

    Timeout occurs when a statement exceeds its time limit.To avoid this we need to tune the statements.
    I can give give you few tips for tune a select stament.
    1.The order of the feilds in the select statement should be same as the order of fields in the database table.
    2.It is always advisible to use the key fields when you are using the where clause.
    3. Sort the internal table while using the for all entreis statements.
    4.Use index in where clause if necessary.
    5.When you have a read statement user binary search but before this a sort statement should be there.
    6. Check your program with the Tcode ST05 and check which statement takes much time based on that tune that.

  • Reason for Actual Cost Error in Production Order

    Hi,
    I have Convert the planned order to Production order but error message coming "Actual Cost Error".
    what procedure that error avoid.
    plz, Advise me.
    By,
    Jeevan.S

    Hi
    1.problem could be with the activity type costing.
    check KP26 data maintained or not (for activity and costcentre assigned to work cneter)
    2.IF order having CSER status then do the cost caliculation in the order, so that the status will go.(do thsi after correcting the KP26 data)
    if still facing check the error
    -ashok

  • How to get the last error for while loop?

    How to get the last error for while loop? I just want transfer the last error for while loop, but the program use the shift register shift all error every cycle.

    What do you mean by "get" and "transfer"?
    If the shift register is not what you want, use a plan tunnel instead.
    Typically, programmers are interested in the first, not last, error.
    Can you show us your code so we have a better idea what you are trying to?
    LabVIEW Champion . Do more with less code and in less time .

  • How can we create the error log in a ABAP program

    Hi all,
    How can we create the error log in a ABAP program
    Thanks,
    srinivas.

    Hi,
    Refer to FM's in the Function Group SBAL. For a change most of the FM's have been well documented. Also have a look at the DEMO pgms. Se38---->SBALDEMO & F4.
    Regards
    Raju Chitale

Maybe you are looking for