How to control to complete maintenance order ?

Hi Experts,
i want to control maitenance order ( generated from prventive maintenance ) activities should not be performed before its due to date. in case of 100 days cycle period maintenance plan and  95% call horizon, system has generated maintenance order five days before as per standard. i want to keep a control that system should not allow to perform any activity on this order till we reach 100th day.
Kindly suggest the wayout.
Regards,
Murthy.

Dear krishna murthy
You can restrict the order release unless & untill the execution date has been reached. This you can code using user -exit at the time of order release/save. Prevention of Release of order can restrict printing of order & in result you can prevent pprocessing of order till the actual planned date.
Regards
Makarand Gurjar

Similar Messages

  • How to check, when the Maintenance Order was deleted

    Hello Experts,
                          Can you please tell me of how to check for the maintenance order that when it was deleted and who has deleted that.
    If any T-Code is there or at the Table level also to check the requirement.
    Regards,
    Yawar Khan

    If you want to track when you have put deletion flag, you can track it using above mentioned techniques.
    If you archived (deleted) permanently, then using archival history only, you can check I guess.
    Check these links. While deleting maintenance order, we can hisorical order with same number. Using that creation date, you can track.
    http://help.sap.com/saphelp_nw04/helpdata/en/8d/3e6552462a11d189000000e8323d3a/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/8d/3e4d2f462a11d189000000e8323d3a/frameset.htm

  • Table control View in Maintenance order Services tab

    Hi Experts,
    I am trying to change the table control fields of the services tab of the maintenance order , when we use PM03 control key to generate services PR.
    I try to remove some check box which are earlier defined as invisible to make it visible. However after saving the system variant system doesnt take the changes. It is coming back to the original .
    Here are couple of fields I would like to change the setting. As of now I am trying to change the below mentioned field to visible . Presently it is in invisible mode.
    Fields
    Formula::ESLL-FORMELNR,
    Form values: ESLL-FRMVAL1 to ESLL-FRMVAL5 and
    User field3:  ESLL-USERF1_TXT
    program name SAPLMLSP
    Control TC_VIEW
    I am following the below. Kindly let me know whether I am following the right step.
    1) Click on tbale setting
    2) CLick on administrator
    3) Select the field and do the necessary change to make visible or invisible.
    4)Activate
    5)Close
    6) save.
    RG
    Vinod
    Edited by: vnodpm on Feb 6, 2012 7:07 PM

    Hi,
    The IMG customizing will have greater priority than the screen table controls (also specific program logic can supersede the table controls). Check the customizing for service screen at following path:
    SPRO - Materials Management - External Services Management - Define Screen Layout
    -Paul

  • How to control ship-complete in STO process

    Hi Experts,
    The issue as follows and it is urgent.How can we convay the suplying plant to ship completely at PO Level.user don't want partial delevey in STO process.
    how to ship all together in the STO process. I am going to place a purchase order in the system. In my understanding, system creates delivery automatically partially if there is some items are in stock NOT all together. However, this time the purchase order has to be shipped all together because it will go to the customer directly without unpacking when it is arrived in warehouse.
    Thank you very much in advance.
    -Chitti
    9930154536

    Hi Amit,
    Thank you very much for your quick response.
    i have tried this also. while doing delevery(VL10B) it is accepting partial delevery in background and in purchase order at delevery tab-> delevery completed indicator getting active.No further deleveryies allowed.
    Hence it is not convaying the requirement.
    please suggest if any solution.
    Thanks&Regards,
    Chitti
    9930154536

  • How to control goods receipt for order by mb31 if order is not confirmed

    Hello friends,
    I want to restrict the goods receipt for process order if order is not confirmed or partially confirmed.
    Through user status i can control that if order is confirmed than whether to allow goods reciept or not.
    But how to achieve my above requirement.
    Thanking you guys in advance.

    Dear Jitendra,
    Check this link
    How to stop the goods receipt before issueing the goods for production orde
    Regards
    Mangalraj.S

  • How to control navigation flow in order using tab and shift tab key?

    In JDeveloper 11.1.1.3, how to set the focus on ADF components in order while a tab key is clicked.I dint find any useful articles so far but I think Javascript is the only way to acheive this.Can anyone give me any ideas on this pls?
    Thanks,
    Swathi Patnam

    Swathi Patnam wrote:
    In JDeveloper 11.1.1.3, how to set the focus on ADF components in order while a tab key is clicked.I dint find any useful articles so far but I think Javascript is the only way to acheive this.Can anyone give me any ideas on this pls?Javascript is possibly one way to achieve it. Take a look at an extract from Frank Nimphius' book [url http://books.google.gr/books?id=wlXyDIEyIHEC&pg=PA615&dq=Nimphius+%22tab+order%22&hl=en&ei=D6bATJqgMYb54Ab06cnTCw&sa=X&oi=book_result&ct=result&resnum=1&ved=0CCMQ6AEwAA#v=onepage&q&f=false] here suggesting an implementation based on JavaScript. Of course you will have to buy the book to see the complete solution. ;)
    Since the tab order is from top to bottom, the other solution suggested - check this post: Re: How to set tab order in ADF - is to keep each horizontal "line" of components in a af:panelFormLayout with its rows attribute set to 1. This is a work-around not based on a tab index but it would do the job if you can consistently group your components inside panelFormLayouts as mentioned.

  • How To Control Usage Of Purchase Order Type Depending Upon Material Group

    Dear All,
    Basically, we want that items belonging to some particular material groups must be ordered thru Order Type NB. Rest of all the materials must be ordered thru Order Type "ZNB". How can we achieve this....?
    Any such provision in the configuration side...? Please advise further.
    With Best Regards,
    Sanjeev Chugh

    Hi,
    Standard SAP not possible.
    This requirement will be fullfilled by USER EXITS / BADI (ME_PROCESS_PO_CUST).
    Take help of ABAP team for this as no standard configuration is available for the same in SAP.
    Rgds
    Utsav

  • Maintenance Order creation control

    Is there a way to control that a Maintenance Order could be created only if the notification is already put in progress? Not if the notification is on status u201COutstanding notificationu201D.
    Iu2019ve tried to do it by security access but didnu2019t get the way to do it either, I need to know if itu2019s possible by customization.
    Thanks.

    Dear all,
    You can do this by using User Status attached to Order.  Create User Staus , with Object Type ticking Maintenance Order & Maint Notification you get all buisness transcition , in that select " PUT NOTIFICATION IN PROCESS AGAIN " and  select "SET" Radio button ,
    So whenever you create the Order from Notification , Even if notification is in "CRTE" Status , Notifcation gets released while saving Order.
    This is similar to ur Requirement ,
    Check for Other Notification Parameter also.
    Regards,

  • Option 'Maintenance Order' missing in 'Allowed Object Types' tab in IMG of User status Profiles

    Dear All
    I have created a User Profile using T-Code OIBS.
    Now I want to assign that User Profile to Maintenance Order. But in the 'Allowed Object Types' tab, the option "Maintenance Order" is missing due to which I am unable to assign it to Maintenance Order.
    Could anyone tell how to add the option "Maintenance Order" in 'Object Types'.
    Thanks in advance.
    BK

    Hi Peter
    Thanks for your help.
    I just found that in t-code BS13, the object categories ORI and ORH exist but 'No Status Profile' check is marked against them. That is the reason why the system is not showing the 'Maintenance Order' as an option in Allowed Object Types.
    Thanks a lot !
    Best Regards,
    BK

  • Report for maintenance order equipment wise

    hi expert,
    is there any t-code fr displaying maintenance reprt equipment wise in that report i could see painding maintenance, service order & completed maintenance order & service order.
    regards,
    santosh

    hi
    you can use the T code IW38 or IW39 in that you can select in process,or completed order to display what are all the order which has not completed .
    system will not show the order which are pending because of want of material ,man etc unless you have activated the user status for the order which show the respective one
    regards
    thyagarajan

  • Plan material from Maintenance Order

    How i can plan from Maintenance order a material with accaunt category Q(special stock) for create a RDA
    Thank you

    Hi,
    I already have plan component from maintenance order but when i insert item category N for create a Purchase requisition and insert item category 2 for stock project Q the system blank the field and Don't create a purchase requisition with account assignment Q.
    Because the system put away the field blank?
    There are any way for create purchase requisition with account category Q?
    The BAPI that you suggest me can avoid this problem?
    Thank you.

  • Maintenance order header long text copy into PR header text

    Dear all,
    Can anyone please let me know how I can copy the Maintenance order header long text into the PR header text of service or component PR.
    Thanks in advance.
    Regards,
    Vineet
    Edited by: vineet sharma on Oct 19, 2011 1:23 AM

    Hi
       Please check this link Re: Copy text from PM order to Purchase Requisition
    regards
    pushpa

  • Relation Between PR item and Operations Maintenance Order

    I have a PR from Maintenance Order.
    there are 2 Operation External in Maintenance Order. usually it will create 2 item PR Service. but in my case it's create 3 PR item Service.
    I look on the IW33(Display Maintenance Order).
    Operation 10, becomes PR Service Item 10
    Operation 20, becomes PR service item 30
    and there is 1 another PR service item 20.
    I see in the Tab Account Assignment. it's refer to the same order. but i don't know where is the Operation. the question is How to delete this Item when we don't know the Operation in Maintenance Order. or maybe how to know what is the Operation.?
    Thanks.

    Hi Ajit Kumar.
    No i'm sure that PR item 20 is not with a delte flag. Actually user want to delete the PR item 20. so he try to delete the Operation 10 in Maintenance Order. but when he do this, PR item 10 was deleted and not PR item 20.
    Thanks for your Reply.
    Hi Jürgen L.
    Yes i know how to display Deletion in Maintenance Order. and i'm sure when i do that. the operation for PR item 20 are not listed.
    BTW. do you know  how to undelete the operation.
    Thanks for your Reply.

  • Plant Maintenance orders revaluation

    hi
    How I can revaluate Plant Maintenance orders on actual activity prices.
    ty

    Hi,
    Use tcode KON1 (individual orders) or KON2 (multiple orders, via selection variant) immediately after executing the KSII.
    Rgds Peter

  • Budget allocation to Maintenance orders

    Dear Experts
    Please guide How to allocate budget to Maintenance order of different types and segregate the budget into Mechanical, electrical, instrumentation etc as per client requirement.
    I created different WBS elements for different Maintenance dept budget allocation
    But My client does not want to put WBS element each time to every Maintenance Order one by one.
    Please Suggest
    Thanks

    Hi Mahes
      1.    the link you have provided gives me how to allocate budget to one maintenance order.
    I need to know how to allocate budget  to a particular type of order.
    2. In KO22 when I try to give budget to one order type, it asks for order number or order group.
    If I maintain one order group for budgeting then also I ve to maintain individual budget for 100 orders maintained in the group in KOH1.
    3.And when creating one maint order how system will know that this order belongs to a perticular order group?
    4.I want to have one over all budget for break down maintenance for a particular period. Any order I create and release
    the committed cost should be deducted from my over all budget allocated for break down order.
    5. And if alternatively  i try to assign WBS elements to allocate budget, then I need to put WBS elements to each order to integrate with project assigned to maintenance order. But my client is not willing to put WBS elements one by one while creating order.
    Please suggest if anywhere I am wrong.

Maybe you are looking for