HR posistion updated when person assigned to a work centre.

Hello
in SAP Plant Maintenance (PM), we are assigning persons to work centers.
Some times a strange thing happen when we assign a person to a work center.
The position for the person is updated with a wrong value in HR master data.
We are not given any position in PM, and definitely do not want to update HR master data from PM.
Anyone experienced something like this?
Best regards
Tom Saga

Hello
I have now tried to do the same in our test system.  And for the particular user I get an error message when doing this.
The screen for "Copy Organizational Assigment" pop up.
And SAP try to fill in the Work centre ID as Position.
ut with error message:
Entry in outbound table not found
Message no. E0400
Diagnosis
No partner profile (outbound parameter) could be found using the following key:
PXCCLNT100/LS//HRMD_A///
This refers to the key fields in table EDP13:
RCVPRN  Partner number
RCVPRT  Partner type
RCVPFC  Partner function
MESTYP  Logical message
MESTYP  Message code
MESCOD  Message function
TEST    Test indicator
Procedure
Please check the EDI partner profiles.
We do not understand this.  And it only happend with this user, and with all work centres we try to add him to.
Best regards
Tom

Similar Messages

  • Person assigned to a work center

    Hi,
    We are using work force planning to assign resources to activities. We have some problem with one of the work centres. When we click on the person dropdown box in the personal assignment tab then we would expect to see the individuals that are in the work centre associated with the activity. We can see six persons from project builder and when we checked work center master data we could see only four persons.
    When checked thoroughly, the data at work centre master data is picked from HRP1001 and its showing only 4 persons. At the project level, the data is picked from the same table but initially fetches with work centre as input and then capacity ID as input. Finally it combines the data (6 Persons) and show from CJ20n and its different from the work centre data.
    is this the standard behavior or we missing something
    Regards,
    Laxminarsimha

    I think you have assigned two person at capacity category level for that WC.
    Open your WC  in CJR3 --> Click on capacity header icon -->on new screen click on HRMS link button  ( check no of person assigned here  it should be two )
    With Regards
    Nitin P.

  • Since I have done the iOS 4.3.5 update the Personal Hotspot drops the Internet Connection every approx. 10 minutes

    Hi,
    I'm having the following issue: sincer i've done the iOS 4.3.5 update the Personal Hotspot doesn't work fine anymore on my iPhone 4. My Windows 7 Laptop or the ipad are loosing connection each more or less 10 minutes. I have tried to connect the phone to the Laptop via Cable (not only WiFi) and I have the same issue.
    The phone is neverlocked.
    I've already tried to reset the network settings but the issue is still there.
    Does anyone have an ideea?

    We are having the same issues on our two iPad 1's.  The only thing we have not done yet, in addition to your list above, is turn off the router. 
    From seasoned iPad users (we've only had our a few months):   how long doe it take Apple to fix this type of blunder? 
    This is so frustrating.  I used to rave about my iPad, but if this is my new life with it:  dropped connections, half loaded pages, stalled out pages, a multitude of strange error messages, this is not a product I can rave about.  I miss my "old" iPad!

  • Assign Employee to Work Center Vs Project Team

    Hi Experts,
    I would like to ask you what are the main implications of assigning employees to the project using "Project Team for WBS element" instead of assigning them directly to the Work Centers?
    Thanks

    Project team assigned to WBS element is available for use in all the work center of activities under this WBS. While if you assign a resouce to work center it is automatically available for project team if you want so.
    While when you assign people to work center,  then resource planning and capacity levelling is at more microlevel (network activity level).
    The workcenter-personnel number is more rigid assignment than assigning a project team to WBS element.
    There might be some more points which can have difference in both the process. I expect  otherw will also express their views about them.
    Regards,
    Mahendra

  • I downloading a ringtone on my phone but can't find it.  I actually did it twice.  It isn't working when the person assigned to it calls also

    I downloaded a ringtone on my phone and i can't find it.  I did it 2 times also because I wasn't sure if it worked.  When the person assigned to the song called it didn't work

    Many ways to eject:
    -dragging and dropping the icon for the CD into your trashcan
    - Restart the computer and after the chime press and hold down the left mouse button until the disc ejects.
    - Press the Eject button on your keyboard.
    - Click on the Eject button in the menubar.
    - Press COMMAND-E.
    - Open the Terminal application in your Appl/Utilities folder. copy & paste the following:
    /usr/bin/drutil eject
    If this fails then try this:
    - Boot the computer into single-user mode (hold down command - s through the boot process.)  At the prompt copy & paste:
    /usr/bin/drutil eject
    Restart the computer enter reboot at the prompt or shutdown
    - restart hold down trackpad button

  • Project- Builder: Person Assignement tab for Activties

    Hi All,
    Pls help on the following:
    1.In the 'Internal' tab for activities, there is a field 'Number' where we can specify the number of capacities required. But there is no validation against this when I actually assign resources to the activity in the 'Person Assignement tab.
    i.e I can assign 5 people for this activity even though I mentioned Number as 1 in the internal tab.
    Is there a way to enforce a validation here?
    2. Resource allocation has two different behaviour when I do through Person Assignment tab and 'WorkForce Planning' screen. Is there any specific reason for this?
    3. If i want to replace the WBS actual dates by the actual dates of activity, I need to go to Edit>Reconcile Dates>Determine Actual Dates in the Project Planning Board. Can I automate this while saving the project?. I checked the user-exits and BADI - PROJECTDEF_UPDATE. But found out that the date fields cannot be updated using these. IS there some other way?
    4. In the Workforce planning: Project View, Can I split the work in the duration based on my working hours from HR? Now I have to manualy do the split.
    Appreciate your response on any of the above doubts.
    Regards,
    Remya.

    Hi remya,
    My reply is limited to point No.3 of your posting.
    SAP's logical construct is such that WBS is more than the sum of activities assigned to it. That is why, system doesn't allow automatic updation of WBS actual dates based on confirmation of all activities assigned to it. Please remeber that the given WBS could have subordinate WBS elements with different statuses  apart from the activities assigned.
    Basic rule is as below:
    You can maintain actual finish date for a WBS only if all the subordinate WBS elements have actual finish dates and all activities assigned to the WBS have status "Confirmed".
    However, when activities are confirmed "Tentative actual finish date" is updated at WBS level which can be subsequently copies as actual dates manually.
    From the above, I hope, it is clear why defaulting of actual finish dates for WBS is not permitted.
    For the remaining issues in your posting I need more time.
    If this clarifies the issue, please acknowledge the same.
    Muraleedharan.R
    091 9880028904

  • I can't get the page numbers in my table of contents to update when I update the book.

    I'm using Framemaker 11 and I have two TOCs in my book: one in English and one in French. Each TOC links to different documents in the same book. The reference page for each TOC is set and correctly displays the heading 1 and 2 I've told it to display, but the numbers do not update when the content in my document files changes to a different page. I've checked the conditional text settings in my document files; they are correct. When I update the book, I choose to update Numbering, All Cross-References, All Text Insets, OLE Links, Generate Table of Contents, Lists, and Indexes. What am I doing wrong? Thanks.

    I just tested this out and saw the same result as Rick - a book with child books ignores all generated files within the child books. This applies to adding content from them (e.g. their titles) to actually including them in the output. This applies to all versions of FM since v.9!
    However, there is a workaround for this. You need to use the hierarchical book structure in the parent book and create Folders for each book that you want to add. Then manually add the generated files (TOC, IX, List of..., etc.) and book to the respective folder. This is what it looks like for two child books in a parent book:
    Note that the child book generated files (TOC, IOR) show as just regular files at this point in the parent book. To get the page numbering to be continuous throughout the parent book, you will need to make a couple of passes. First set folder, files and books to have the Numbering continue from the previous (if you want all sequential page numbers). This will set the page numbers correctly except for what they were in the respective book TOCs. You will need to use the starting page number of the child TOC files in each folder (it shows in the Book status bar when click on the TOC file in the master/parent book).
    To set the individual book TOCs to be correct in the parent book, open the child book and set the TOC Numbering to start at the page stated in the parent book (status bar). Now update the child book to set the correct (parent book) page numbers in the child TOC. [This is a necessary manual step, as the page number assigned in the parent book is ignored when th child book is individually updated and FM uses 1 to start off the sequence in the child book.]  Repeat for each child book in the master/parent book.
    The final step is to Update the parent book and create the PDF. You should now have all of the files included in the PDF and the child TOCs should show the correct page numbers of the master book.
    This whole process of books within books seems a bit borked and one shouldn't have to be jumping through hoops to include child generated files. Please report this as a bug via: https://bugbase.adobe.com/index.cfm

  • Color coding in the "Date" and "Time" field in "Person Assignment"

    Hi,
    What does it mean when the color of the values for the "Date" and "Time" fields under the tab "Person Assignment" on an activity element in the project builder (CJ20N) turn red?
    Regards,
    Petter Kvalvik

    Hi,
    I dont suppose we have any option to achieve this at Query Designer level. Your requirement can be achieved in Workbook,
    Insert text template in one of the cell in your workbook, context menu--properties-Constant Tab----Check Display last Refreshed. Doing this you will get Date and Time of last refreshed data.
    Thanks,
    Vishnu.

  • PS Workforce planning, Person Assignment in internal activity.

    Hello PS colleagues!
    I’m trying to use the workforce planning functions but I can not get the screen for person assignment in the internal activity.
    I have done this, IMG I go to this path:
    Project System -> Structures -> Operative Structures -> Network -> User Interface Settings -> Layout of Activity Detail Screens -> Define layout activity detail screens
    Then I create all tab, I copy the standard to my network profile and there is tab 8, in standard is call ”Admin.” then when I try it out it do not appear in the project, I use project builder.
    Does any one what more I need to do for this to work??
    Please help me out with this.
    Best Regards
    Jose Marin

    Check the consulting note 543362
    This note explains the steps/configuration node that needs to be in place for workforce planning
    Regards
    Sreenivas

  • Plan cost of IW31 not updating when MRP4 of Material master is individual requirement

    Hi,
    When Individal/coll of MRP4 tab of Raw material is 1 Individual requirement, plan cost is not updating in Tcode IW31 Repair order. It is updating when MRP4 is 2 collective requirement.
    Please let me know the possible reasons.
    Thanks

    Yongguo
    The behavior you are seeing on your system is correct system behavior.                                                                               
    The system rolls costs/revenues up to the assigned wbs element                
    if an order or network activity is flagged for deletion so you                
    can archive orders/networks while the project is still 'alive' without        
    loosing information on costs/revenues.                                        
    The logic is that costs of deleted networks should not get lost but are       
    rolled up to the superior wbs-element.                                                                               
    SAP has the understanding that released activities are used immediately,      
    carry actual costs and, therefore, can not be deleted. To keep the            
    objects clearly arranged the reorganization run can be used to move           
    some objects (those with status DLFL) to the archive without losing           
    data (in the meaning of costs).                                                                               
    If you want to remove these costs of the WBS elements you have                
    to cancel the deletion flag of these networks, remove the planned costs       
    start network costing and save. You can then set the DLFL again and           
    the costs will not appear in the structure report.  
    Hope this helps.
    Best regards
    Martina

  • Person assignment table

    Hi all,
    Im looking for table which shows the relationship of person assignment to wbs.
    when we assign through edit....wbs...Project teamfor WBS.
    Is their any report or table.
    Regards

    Hello
    The list is available in HRP1001 table. You can retrieve the employee number from there and collect the First name and Last names from PA0002 table.
    Regards
    Renjith
    Chandra - the above has been copied from the message Ahmed has suggested.
    Virendra

  • Person assignment with workforce planning

    Dear All,
    I plan activity for one day 8 hours & assigned person to activity in CMP2 & distribute work for same day & for same hours,
    when i assign same person with diffrent activity with diffrent project with in CMP2 system not showing any message with same person is assigned same day with diffrent project.
    How same person can work two project with same time,
    Kindly share yours experiance.
    Regards
    Gajjen

    Hi,
    I tested with without person assignment in work center, yes you can assign any person to any project if have capacity but when we distribute work in workforce planning by assignment of person with day & time then same person how can assign to other activity ,because his working hours are fixed,if working time is 8.5 hours & person assign for 8 HR to activity then same person should not work to another activity more than 0.5 hrs,system should not allow.
    May i know Standard SAP allow it or not?
    Regards
    Gajjen

  • Capacity over load message with Persons assignment in Maintenance order

    Hi experts,
    I have maintained the system with the following parameters and system is showing capacity detail / finite popup when capacity find overload in maintenance order screen.
    Work center number of individuals: 1
    HRMS assignment in work center: only one person is assigned
    Settings maintained in OIOI transaction (check availability during order creation): Overall profile under capacity availability, SAPPM_G013 and Collect. Conversion, 1
    Settings maintained in OIOI transaction (check availability during order release): Overall profile under capacity availability, SAPPM_G013 and  Release order, 3
    My query is when I assign more than one, number of individuals in work center and then plan those persons in maintenance order operations data and assign persons in Operation general data --> Requirements Assignments --> Assign persons from work center assigned on operation and maintained work for each person.
    In this case, system does not show any capacity overload message and I am free to create orders in same date and time with the same work center assignment in maintenance order operations.
    Can anyone tell me where am I doing mistake or where should I maintain configuration ?
    Please also tell which transaction must be used to dispatch person wise operation like transaction CM25 ?
    What is the correct profile ID of transaction CM25 in both cases of 1 / multiple persons assignments in operations?

    Dear Experts,
    What I am doing. I assign number of individuals in work center capacity as 2 and create work center in by clicking HRMS button and I assign 2 person in PERSON folder.
    Further, I assign work center in maintenance order operations, enter number of person as 2, then I press internal button, click on button Requirmnt Assignment and I assign persons those are attached in work center.
    When I create 2 order on same date, time with assignment of same work center and persons on operations, In this case system is not showing me the capacity popup.
    Please advise, what should I do?

  • Can't update my personal informations

    Hi there,
    I haven't used my Itunes since a short time, but now that I'm back, when I try to buy music, I'm redirected to a screen to update my personal and billing information. The thing is that I can't fill the form because it consider it to be uncomplete. It ask me to fill the country but there is no country field in the form. it's already and automaticly printed in the form.
    Have any idea?
    Thanks.
    MB

    hmmmm. i'm still seeing a "Belgique" option in my change country screen.
    it might be worth reporting the issue to the Music Store. the form at the bottom of this FAQ would probably be the best one to use:
    iTunes account and email address FAQ

  • Person assignment  for activity

    Hi All,
    I'm looking for  a function  to get the person assignment and update the data.
    We are using ECC 6.0 EH4, Does anyone have any idea which function  does  this functionality ?
    Please advise,
    Amit Yosha

    Hi Amit ,
    There is a consulting note 543362, which clarifies your questions.
    Essentially there are following points:
    1. the work center need to linked with HR.
    2. Enter the work center for the activity.
    3. Maintain the work of the activity and run the scheduling, so that the capacity is determined.
    Now you see additional tab 'person assignment' of the activity.
    kind regards,
    Zhenbo

Maybe you are looking for

  • Select  a specific  number of rows in query

    How can a specific number of rows be selected in a query? For example, a query retrieves 30,000 records and I want to retrieve the output by groups of 5,000. I want the query to retrieve the first 5,000 records, then the next 5,000 records etc. I tri

  • Problem in Fetching data using RFC FM from NON SAP system

    Hi All, Need help from experts on data transfer using RFC from a non SAP system/database. I have creasted the destination in sm59. I have created a function module too which has an import parameter as a query and export parameter as an internal table

  • Workflow - Help in Condition Task

    Hi, I have a Workflow that in the all Conditions tasks appear the expression: <FRAMESET rows="*" frameborder=0> How to modify this for to appear the reals conditions of task? best regards, Daniel

  • How can I revert back to Mavericks?

    I use my MacBook Air for work. After upgrading to Yosemite, I cannot receive email from my company's Exchanger server (I can send email from it.. and my iCloud email seems ok). I've tried disabling/enabling the account, I've tried setting it offline,

  • Automation Open: the specified object can not be creatable

    Hi, When i try interfacing TestStand with labView 7.1,the Acrivex Automation open  is throwing the error mentioned above. The object its refering is "Sequence Context" of Test Stand.I could set other properties of TestStand from LabView 7.1 FDS, only