ICal only displays a single line for entries in month view.

This means I can't see what my diary entries refer to.  Can I change it to show two lines or the full entry, as iCal did in Snow Leopard?

Hi Guys, thanks for getting back to me.
the problem is purely about design view display and not about coding.
Below is how CS4 displays borders with two lines which I find difficult to decipher:
Then below is Macromedia DM 8 and this how I want the borders to look, with single lines to display the tables.
This may just be the way Abobe have decided to display tables in design view and there may not be any option to change it but if you know any way to change it I would be most greatful.
Thanks again.
G

Similar Messages

  • ICal not displaying old (before Oct 2010) entries in List View

    I have just noticed this. I don't know if it is a new issue, or one that I have never noticed before. Other views (Day, Month, Week) all show my old entries. Is there a problem?
    Edit: I found some other posts listing this problem. It seems as if it is a known issue, but obviously nothing has been done to address it.

    Hi Alex,
    Thanks for your response, There is a column in list named EffortDate (Date Time). this is Indexed column in the list and filter criteria is built on this column only. There is no calculation happening on this column, and users are able to edit the values
    at any time in the week or following weeks.
    I understand screenshots are more helpful in this scenario, but it has client data so i can't provide screenshot too.
    Anything that you can suggest based on the provided information that would be really helpful.
    Thanks!

  • Text frame only shows a single line / always overset

    I have an InDesign CS 4 file that I'm trying to open in CS 5.5. When I try to edit the text in any text frame (e.g., in Story Editor), it tells me the text is overset and only displays a single line even though the field is clearly tall enough. Basically, it won't wrap the text onto the next line. In fact, trying to create a new text frame is always overset. It works correctly if I create a new document though.
    Any help is appreciated. Thanks.

    This means the frame is too narrow to hold the line, which can happen for a variety of reasons. IF text shows on the first line as you start to type, then disappears after a number of characters, you've got a setting that is preventing the text from breaking at the end of a line, possibly No Break applied to all text, or you have hyphenation turned off and are using non-breaking spaces (I see that a lot in imported Word files). If you never see any text, then it's probably an indent problem, either a frame attribute, or more likely the paragraph indent settings for the style or applied to the text as local formatting (saw that one the other day, also in an imported Word file).

  • Mail doesn't display full email text, only displays the subject line

    Mail doesn't display full email text, only displays the subject line.
    My preview shows first three lines of email, but when I chose the email specifically mail doesn't display any lines of text.  Been this way for about ten days.  Please help.  Ben

    Awesome.  Rebooting the phone worked.  I had never turned the phone off before (for the next guy - you hold down the "sleep" button for longer than you'd think and that'll do a full shutdown).  thank you for your help.

  • TS4337 Icloud only displays "..." for my calender events

    Since the update to the ios7 style, my iCal on Icloud.com doesn't display the text of my event names if they are longer than 22 characters.  Once my event becomes 23 characters long icloud will only display "..." for the event.  Prior to the update it would display the first part of the event title, regardless of the length.
    Obviously this made it much easier to simple glance at the calender to see the events.  Is there any way to have the current icloud calender display this partial text?

    Go to Settings>Mail,Contacts,Calendars and scroll down to the Calendars section, tap Sync and set this to a longer time period.

  • If my application is free to download, but requires my user to purchase a monthly subscription, will Apple collect a 30% fee every month that user is billed?  Or will Apple only collect a 30% fee for the first month?  If so, is there anyway around this?

    Hi!
    I am looking into developing an app for the App Store and my question is regarding Apple's 30% in app purchase fee.  If my application is free to download, but requires my user to purchase a monthly subscription, will Apple collect a 30% fee every month that user is billed?  Or will Apple only collect a 30% fee for the first month?  If so, is there anyway around this? 
    What all does Apple collect a 30% app store fee on?  What does Apple not collect a fee on in the App Store?
    How does Amazon get billed if someone purchases something from Amazon from within their iPhone application?

    Any in-app purchases are subject to the 30% withholding.
    No way around it.
    Amazon purchases are physical items (not digital) and do not go through in-app purchase so they are exempt.

  • Why multi day events are shown only on the first day in calendar (in month view)

    Why multi day events are shown only on the first day in calendar (in month view)?

    Figured it out - the event has to be marked as full day event in order to be shown in monthly calendar. Disregard my question.

  • Table borders in Dreamweaver cs4 design view too big, I would like to have a single line for tables

    Hi All,
    I design email templates using only tables but the design view options in cs4 only provide a huge 3px border in order to display the tables. In older versions of macromedia etc the table view is only 1px wide which makes designing a whole lot easier.
    When I add tables within tables it adds more spacing and looks way off and it also looks off in browsers, causing me to have to increase and decrease padding sure this is no way to create table even if they have no borders and the table width is already fixed?
    I have tried turning borders off in visual aids but there is no option to have just a single line to demonstrate a border!!
    I can't work like this, can anybody help me or is this just the way borders are displayed in cs4 for the pc???

    Hi Guys, thanks for getting back to me.
    the problem is purely about design view display and not about coding.
    Below is how CS4 displays borders with two lines which I find difficult to decipher:
    Then below is Macromedia DM 8 and this how I want the borders to look, with single lines to display the tables.
    This may just be the way Abobe have decided to display tables in design view and there may not be any option to change it but if you know any way to change it I would be most greatful.
    Thanks again.
    G

  • Adding Amount field in BSEG table and display it single line item?

    hi experts,
           I am doing credit / debit form now my requirement is
                                               According to BELNR , GJAHR,BUKRS i want to find credit amount for this selection cretiria.
                         so i want to add all the lines of amount filed for a particular BELNR and display it as single line.
    so i am getting data from print program like this
    SELECTION-SCREEN BEGIN OF BLOCK b0 WITH FRAME TITLE text-001.
    SELECTION-SCREEN SKIP 2.
    PARAMETERS: p_belnr LIKE bkpf-belnr OBLIGATORY,
                p_bukrs LIKE bkpf-bukrs OBLIGATORY,
                p_gjahr LIKE bkpf-gjahr OBLIGATORY.
    SELECTION-SCREEN END OF BLOCK b0.
    SELECT SINGLE *
                   FROM bkpf
                   INTO  i_bkpf
                   WHERE belnr = p_belnr
                         AND ( blart = 'DG' OR blart = 'ZG' )
                         AND bukrs = p_bukrs
                         AND gjahr = p_gjahr.
    IF sy-subrc = 0.
        SELECT  *
              FROM bseg
              INTO  table it_bseg
              WHERE belnr = i_bkpf-belnr .
      ENDIF.
      CALL FUNCTION 'SSF_FUNCTION_MODULE_NAME'
        EXPORTING
          formname                 = 'Z_CREDIT_DEBIT'    " p_name
      VARIANT                  = ' '
      DIRECT_CALL              = ' '
        IMPORTING
          fm_name                  = v_form_name
    EXCEPTIONS
      NO_FORM                  = 1
      NO_FUNCTION_MODULE       = 2
      OTHERS                   = 3
      IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
            WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
    CALL FUNCTION v_form_name
    EXPORTING
      ARCHIVE_INDEX              =
      ARCHIVE_INDEX_TAB          =
      ARCHIVE_PARAMETERS         =
      CONTROL_PARAMETERS         =
      MAIL_APPL_OBJ              =
      MAIL_RECIPIENT             =
      MAIL_SENDER                =
      OUTPUT_OPTIONS             =
      USER_SETTINGS              = 'X'
    IMPORTING
      DOCUMENT_OUTPUT_INFO       =
      JOB_OUTPUT_INFO            =
      JOB_OUTPUT_OPTIONS         =
      TABLES
        i_bkpf                     = i_bkpf
        i_bseg                     = i_bseg
    EXCEPTIONS
      FORMATTING_ERROR           = 1
      INTERNAL_ERROR             = 2
      SEND_ERROR                 = 3
      USER_CANCELED              = 4
      OTHERS                     = 5
    IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
            WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    so my I_BSEG containing all line items of particular BELNR . with the field SHKZG  iam  getting only credit line items .
      now i want to do is add all credited amount and display like this in a table.
    against ref#  (BSEG-REBZG) ! details (BSEG-SGTXT)!  amount
    124569                                   10%discount                950.00(total amount ie sum of all lines amount for a BELNR)
                                                                                    10.00(total tax amt ie sum of   all lines of tax amount for a BELNR)                                                                               
                                                                                    960.00

    hi arun,
             i used collect in smartform my procedure is like this .
                   i am getting data into i_BSEG because i declared like this in TABLES parameter
                      i created a loop .
                             in that i mentioned like I_BSEG into WA_BSEG.
                                   then i created a program lines here i mentioned like this.
                                                  COLLECT WA_BSEG INTO IT_BSEG.
               but because of BUZEI "Number of Line Item Within Accounting Document .it is not same it is varying for every credited time that means for every line of BELNR. thats why it is not adding it is just appending .
    so pls tell me any other chance to find sum .
    because i want to sum up all credted amount and display it in single line
    ie first column REBZG "Number of the Invoice the Transaction Belongs to(against ref) i want to display once .
    And Second column  SGTXT "item text(details) for amount once and for tax amount once
    And Third column Amount first line consists total amount & second line consists total for tax amount
    regards,
    satheesh.
    [email protected]
    any doubts chat me regarding this post.

  • Suddenly my iCal has begun showing two lines for each birthday in my address book

    Suddenly my iCal monthly view has begun listing two lines for each birthday from the address book. I didn't make any changes to the preferences. How do I return to one listing per birthday?

    I've noticed this as well. I think it started with 10.7.4.

  • ICal not showing entries in month view

    I have entered a entry that starts on the 22nd July at 0600 and ends on the 29th July at 0900. In the months view the only entry visible is on the 22nd and it just says 0600 not the title i have given the entry, in the day and week views the entry can be seen okay. If I change the entry type to all day event, then ical displays the title and it puts it in each day on the month view!! However as this is a timed event I don't want to change it to an all day event, I just want it to display each day in the month view....
    I hope this makes sense, as I can't work out if this is a bug or if I really am doing something wrong, in Outlook/Entourage this would display as I need it to!
    Cheers
    Nick

    Ko be,
    Application UI issues are in many cases, caused by a corrupt plist file.
    Quit iCal, and try removing the com.apple.iCal.plist file from your Macintosh HD/Users/yourusername/Library/Preferences Folder. Since that Library is now hidden, you have to use the Finder>Go Menu>Depress the "Option" key>Library. Drag the .plist file to your desktop, and log out/in or restart and check iCal for functionality.
    Also read Apple iCal 5 Office Software Review | Macworld for a description of Lion iCal.

  • Faulty line for over a month now but BT says it is...

    Has anyone got any suggestions, please?  I reported a faulty line on 22nd April - it had an increasing amount noise on it (which it has had for ages but had become unbearable) including clicking, and my broadband kept dropping.  I had done all the usual checks, disconnecting my home equipment and reconnecting it individually, and so on, and had checked my router which was fine.  My ISP insisted that it was due to a faulty line and said that I should report it to BT.  We have already had a fault repaired on the external line this year and one or two last year. 
    BT sent out an engineer on 24 April who traced the fault to 143m out from the junction box on our house.  He went to junction box two halfway down our drive and found an absolute mess of old cabling which had been patched and cut into and bundled up and patched again, in the 50 pair cable feeding our telephone service 35 pairs were unuseable and the cable very old and damaged. 
    He put in a report saying that the manhole in the street needed investigating and also drew up a plan to have the cable from the street supplying our property to be replaced as it is really unviable it is in such a mess, including the JB2 cabling which has various unused and dead cables involved as well as those supplying our house).  He contacted me to let me know that his manager had approved the cable replacement.
    On April 30 two engineers attended and found the cable lying in water at the bottom of the manhole with our wires all corroded.  They cut the wire back and recrimped it and then tied the cable up out of the water with a bit of blue nylon rope that was already down the manhole.  They also looked at JB2 and agreed that the cabling needed to be sorted out.  The engineers told me that someone would be out to sort out JB2 and left.  After their recrimping our wires in the manhole our voice service has improved - there is still some hissing but no clicking - but the line is still unable to carry data consistently and our broadband continues to drop. 
    However on my BT online account later that day the fault was shown as having been fixed.  I confirmed that the line was still faulty, however the case was closed anyway by 5th May even though no further work was done.  I rang customer services (again - another hour or two on the phone!) and they were very apologetic and said they would reopen the case.  However they did not - instead they opened a new case on 6th May, even though it is the same fault as reported on 22nd April.
    Later on 6th May my account showed that the line had been fixed and the case closed, which I saw on the 7th and reopened it.  On the 8th it showed that BT was going to investigate the fault and an hour later they shut the case again, saying it had been fixed.  On the 9th I reopened it again.  I rang customer services again, and they said that as the case had been closed I would have to start all over and have an engineer come out to check my equipment and line at my property.  We were going away on holiday for a week so I booked the appointment for the first working day after our return - 20th May. 
    On the morning of 20th May I checked our online account and it showed that the case had been closed again.  I rang customer services and sure enough the engineer's appointment had been cancelled.  So I made a new appointment for 23rd May.  The engineer has been today and tested the line from the junction box on the outside of our house (which is a good distance from our master socket) and said that while the line could carry voice it was not good enough to carry data properly.  He looked into JB2 and the manhole in the street (which of course he is not allowed to go into to do anything so he can only look) and said that the cable was old and damaged and need to be replaced! 
    I watched him type up his report and upload it to BT Openreach, stating that the fault was not repaired and that the cable needed to be replaced.  A couple of hours later I looked on my online account and found, with no real surprise, that the fault was showing as having been repaired and if I agreed they would shut the case down!
    The engineer and I have worked out an inexpensive way of replacing the cable which requires a minimum amount of excavation along the tarmac'd drive (which we only have a right of way over anyhow), instead of which the cable could be continued along the wall down to the pavement and then taken down and into the nearest manhole which is two feet from the wall.
    He has sent the A55 form in to his manager stating that the cable should be replaced in this way, (just as the last engineer did), so how can this fault be showing as fixed?
    In the meantime my broadband provider Demon can see that the broadband keeps dropping, but they apparently can't do much about it.  They buy ADSL provision from Cable & Wireless, who rent the line from BT, but Cable & Wireless can raise a fault with BT if the case is closed.  But the BT Openreach engineers are all in agreement and reporting the line as faulty, yet BT is pretending that it has been fixed.  Meanwhile my BT bill has arrived as usual and I am being asked to pay both BT and my internet provider as normal for a faulty service.
    A month in and I am really at my wits end as to how to get BT to make the necessary repair.  BT has claimed the fault has been fixed and closed the case several times since I first reported it on 22nd April, and shows no intention of doing what the engineers are all recommending which is to replace the old, faulty cable.  In the meantime I am being hotly pursued by BT to buy BT Infinity Broadband, yet the line isn't fit to carry it, since the copper which runs from the cab in the street is unfit for purpose.  Please let me know if you have any suggestions - we have been suffering with this old faulty line for some years now and it is just getting worse and worse.

    Thanks for your reply John, but while the immediate problem is with the broadband the actual voice fault when it was reported was old damaged cable.  All we have been given is a temporary fix, which is what yesterday's engineer put in his report.  He showed it to me before he submitted it so I know that is true.
    Both engineers who have attended in the last month have come to the same conclusion - that the cable is in a shocking state and needs to be replaced.  We may not have a voice problem currently but we have had two repairs for voice this year alone and several over the past few years as our line keeps breaking down.  The engineers are working their way through the cable as it corrodes and degrades trying to find clean pairs of copper wire to use.  In the meantime we have ongoing problems with our broadband dropping - all because BT won't just get on and replace the cable. 
    It may be expensive for BT to replace the cable - although the engineer and I have worked out a cheaper way to do it by continuing the wire along with wall down to the street rather than trying to dig up the whole run of cable under our neighbour's newly laid tarmac on the shared drive - but actually since we have to go through this performance of BT engineers followed by Openreach engineers attending our property every few months it seems a false economy to me! 
    The broadband is just 'hitching a ride' with the copper line, and two engineers have agreed that the copper line is shot to bits.  Once again the A55 has been cleared by the local team and passed to planning, because Openreach thinks that the cable needs to be replaced.  But the BT computer system keeps shutting it down.  I don't think on this occasion that it is reasonable for BT to refuse to deal with me as end user and just hand the problem on to my ISP - there is nothing they can do until the cable is replaced except reiterate what I have already told you.  If we are forced to go there, that will simply necessitate another bunch of engineers coming out and looking at the problem all over again - extra expense to BT - why not just get on an fix the problem that we all know is there?
    We have considered changing to BT Infinity as our area has fibre, but until the copper between us and the fibre has been replaced there is simply no point in giving even more money to BT for a service that will not be able to run at a good speed.  If BT mans up and treats us decently by agreeing to replace the cable we will certainly be looking at Infinity again.

  • No BT line for a full month - does anyone at BT ac...

    Our phone line, together with those of a couple of neighbours, was reported faulty on 17 April AND ITS STILL NOT BEEN REPAIRED.
    Some effort was made to initially repair the service but the line suffered increasingly from interference until it stopped working altogether.
    30 April – fault reported again.  Fault No VOL012-xxxxxxxxxx5.  Status according to My BT page is ongoing and the fault is on the BT network but the summary states it was closed on 10 May.  The timeline has not been updated since 6 May (we are working on your fault).
    10 May – reported again (can’t find a way to contact).  Fault No VOL012-xxxxxxxxxx2.  Summary says it was closed on 11 May but the timeline gives an estimated repair date of 15 May at 5.00pm.  No update since then.
    10 May - Complained to Customer Services via BT website Code of Practice link (so no copy) and received an automated confirmation email reference xxxxxx-xxxxxx but no actual response to the complaint.
    10 May – received a text from 61998 at 17.42 apologising for the fault delay and gave an estimated repair date of 15 May.  It said to text if I had any questions and they would answer them within 4 hours during normal working times.  I did text that day with a number of questions at 17.45  (automated acknowledgement at 17.46) but have received no answer to any of the questions.
    13 May – sent a text again at 11.44 asking when I would receive a response to Friday’s questions – automated acknowledgement but nor response.
    No contact from BT other than they have sent the bill!!!!
    At the current time we have no dialling tone (have tried the phone elsewhere so its not the handset) but there is a sound of wind or air blowing down the line.
    So in summary, for the last month we have had:
    No landline telephone
    No internet
    We live in countryside so to compound matters there is no viable mobile signal so, effectively, we are cut off.  I realise this bit isn't BT's fault but it does add to the very significant frustration.
    To make matters worse my 83 year old mother lives with us.  She suffers from dymentia.  The telephone is her main daily contact with the outside world but it is not there.  Should she need urgent medical help there would be no immediate way of getting it.
    Additionally, we have two children who are going through the GCSE system.  Homework is now regularly posted online but they have no access to it.
    Today I have spent a significant amount of time trying to contact the complaints department at BT but trying to speak to a human appears impossible.  I have eventually went through the automated process and confirmed the line was mine to which the automated response was 'we are trying to contact the owner' then the line went dead.  It had just been verified that owner was on the line.
    What on earth do I need to get through to get something actioned?  Tomorrow, 17 May, will be the start of month 2 without a phone line or internet. 
    Frustration isn't the word.
    Chris Patzelt

    your posts do not go to BT this is a customer help customer forum    try Live chat and if they can't help then contact the forum mods 
    contact mods
    can take up to 3 working days for mods to contact you
    live chat http://bt.custhelp.com/app/contact/c/2902/?s_intcid=con_intban_sanda_contact_us_chat_from_forums
    If you like a post, or want to say thanks for a helpful answer, please click on the Ratings star on the left-hand side of the post.
    If someone answers your question correctly please let other members know by clicking on ’Mark as Accepted Solution’.

  • Is there a way of displaying all events in a day in month view on Lion ical.  There is when viewing on the cloud (by clicking the bottom RH corner of the day)

    The reason beingthat I often want to drag events into the next week so I need to have month view open.  But if I can't see them in day view then its impossible to do this.

    Sorry.  Only after posting did I see that this question has been asked already and the answer given.  Please ignore this post.

  • Is there a way to get iCal to put the time of each event on Monthly view without going in and editing each event?

    When I enter a new event on iCal with the time, it leaves the time off of the Monthly view and in order for me to glance at the times of the day's events I have to click on each event or go into the event and edit it again putting the time on, for it to show.  Is there a way to get it to show without doing this?

    Sorry.  Only after posting did I see that this question has been asked already and the answer given.  Please ignore this post.

Maybe you are looking for

  • Converting packed signed decimal to either double or string

    I have S9(13)V99 -COMP-3 format which I want to convert to either double or a string. Does any one knows how I can do it. I have browsed the net but did not find what I am looking for. If you have any code please post. Thanks in advance,

  • Overloading the Firewire Bus?

    I am having troubles with having a Canon GL2 video camera being plugged into my iMac G5 via Firewire and a LaCie 250 GB external harddrive being plugged into my iMac G5 via Firewire at the same time. If they are both plugged in via Firewire at the sa

  • OSM orders getting stuck at particular task

    Hi, I am facing problem with OSM cartridges . Orders are getting stuck at particular task. I can see in OMS web client that particular task is still in Accepted state whereas it should have gone to completed state and proceeded to next task. I can al

  • Database slow response

    Hi Guys, I am running Oracle Database 11g Enterprise Edition Release 11.2.0.3.0 - 64bit Production on Solaris 10. I upgraded my database from 9i (9.2.0.4.0 - 64bit Production) to 11gR2 (11.2.0.3.0 - 64bit Production)--now I am experiencing slow respo

  • My isync vs 1.5 doesn't recognize .mac account.

    Tried to sync and it tells me I don't have a .mac account. I have 2. Need help. G4   Mac OS X (10.3.9)