In process Inspection Lot generation

Hi Experts,
To create '03' type inspection lot the prerequisites are
1. material master maintained with '03' inspection type
2. order type is maintained with '03' inspection type. 
Now if the routing do not have operation with control key 'QM02 or 03'  OR
at the time of creating the production order, if the user deletes the operation with control key 'QM02 or 03' the system will still create inspection lot.
Is there a way to avoid the this inspection lot creation ? (since some the routing in different plants or some production orders need not have inspection lot created. ie can it be controlled by control key assignment ?) 
Regds
Jomy

Jomy
you can't restrick based on control key.
If you don't want system to create automatically better don't assign inspection type to Order type
or if you don't want 03 inspection for some material & Plant - don't activate
these the std solution
or You have to devlop some logic based on your requirement before creating inspection lot check the control key qm02/03 and create lot- give to devloper
let me know if this is helpful or not
Thanks
Sami

Similar Messages

  • Inspection Char without Inspection lot generation

    Hi
    We are trying to model a customer requirement in PP for which a few production steps have a few characteristics to be monitored (status checked); for example - in a process of "spraying fertilizer", qty of 4 fertilizers have to be noted in the operation. Now these cannot be included in the BOM for some costing issues. We are apportioning the cost using an internal order in FI.
    Can these be modelled in PP as inspection char. for which values (readings) have to be noted without generation of inspection lot?
    Any ideas?
    Deepak

    Hi Deepak,
    One thing you need to clear is that without inspection lot generation you cannot record the values. Instead, you can create the inprocess inspection lot which does`nt effect the actual production, you can record results such as quantity etc.. for each operation for ur reference.
    The secong thing you can do is select any field or the text box that you are not usingit currently in the confirmation and enter the characteristics in that field.
    Final option is to create a document and save it with reference to ur order no. , bom etc..
    Reward if cleared and close the thread.

  • Error while processing inspection lot

    Hi ppl,
    While processing the inspection lot thru QA11 , in the production system " Inspection lot <Number> is being processed by <user name> error is triggered.
    Could anyone tell me the possible cause of this error and how to rectify it.
    Moderator message : Not enough re-search  before posting. Thread locked.
    Edited by: Vinod Kumar on Aug 30, 2011 2:19 PM

    Hi
    Can you please tell me what is the 5 digit code of the error message?
    Regards
    Olivia

  • Calibration process : inspection lot not created

    Hello,
    When creating a maintenance order (PM05) , i can not get the inspection lot created .
    There has been some thread about this process , i believe i followed the instructions :
    -equipment category is production ressource/tool
    -master inspection characteristics created (released)
    -sampling procedure created for PM
    -equipment task list created with inspection point at header level , with control key including inspection characteristic , with master inspection characteristic , with sampling procedure
    -configuration for inspection type and order type is done
    then when creating the order manually (or via a maintenance plan) : the order is created and released but with no inspection lot assigned...
    does anyone have an idea where the error might come from?
    Thanks again,
    Pete

    Hi Pete
    Weather this is correct or not for your scenario but please check the below spro setting.
    Plant Maintenance and Customer Service --> Maintenance and Service Processing --> Functions and Settings for Order Types --> Assign Inspection Types to Maintenance/Service Order Types
    click on the symbol
    in Change view " Assign Inspection Types to Maintenance/Service Order Types" :Overview screen assign inspection type against plant and order type combination. for PM 14 is inspection type.
    please confirm.
    regds,
    Venkat

  • Control Inspection Lot Generation

    Hi Experts,
    I have a requirement where I need to use Inspection Type 04 in 2 ways.
    1) For FERT material types inspection lot should be generated automatically.
    2) For HALB material types inspection lot should not be generated. The client will generate the inspection lot manually if he finds any problem with the lot.
    A step by step guide to configure this in SAP System would be highly appreciated.
    Thanks,
    Rahul

    I think you will have to use the user QPL10001 exit to suppress the HALB inspeciton lots.  The coding shouldn't be hard as long as this iis consistent across the business.  You'd simply suppress the lot for all HALB material types that are not manually created. (QALS-QSTAT01 is the field to detrermine if the lot was manually created or not).  But as soon as one HALB anywhere in the business requires automatic inspection lots your user exit would get in the way.
    So if you go this route, you might also want to create a new material type, something like "ZALB" that would allow automatic inspections.  Another option is to use a special field like the cross-plant material status field if you aten't using it.  Set up one code for inspection, and one for no inspections.  Code the user exit accordingly.
    Another option, which I don't know if you have considered, is to allow the automatic creation of your HALB 04 inspection lots. Just create them all as skip lots with posting directly to unrestricted inventory.  That way, if a problem arises, you can go into the created inspection lot and use it, or if it has been processed already by the auto UD for skip lots, you can create a new 04 lot manuallly.  This would require no development and is all standard SAP.
    FF

  • In process Inspection  Lot Qty and Actual Lot quantity difference.

    Hi Experts,
    In case of  In process Inspection
    Scenario : 1. Production Order created, released but before saving the qty is changed.
                    2. Production Order created released and saved. Then qty is changed in Change Prod order txn.
    These scenarios are causing a discrepancy in  Inspection  Lot Qty and Actual Lot quantity. Is there any method to avoid this ?
    This can be made correct in  Inspection lot by resetting the sample calculation. But once confirmation has started for Prodn Order (not necessarily QC operation) or  RR has been done  resetting is not possible.
    Is this the std behavior ? Disallowing the resetting once RR done seems OK, but even if any of the operation in Prodn Order is confirmed it still give status error while resetting. Canceling all the confirmation all the way back  also does not solve the problem.
    Any suggestions ?
    Regards
    Joe

    Hi
    Although your suggestion is valid, it is not practical from user point of view.
    Moving this thread to QM forum.
    Rgds

  • Inspection lot generation after every 5th goods receipt

    Dear Gurus,
    There is a scenario in my project. There are some materials for which the inspection is done on every 5th goods receipt. The inspection of the material will be done for the first time it is coming in the company's premise and for the next four time it will be forwarded directly to the production without any quality inspection. Is it possible in sap to create inspection lot after every 5th inward delivery? Or can anyone suggest me a way to capture this scenario in sap..
    Regards,
    Abhishek

    Hi
    This is possible by using DMR in Task list.
    Go to tcode QDR1-->Create a DMR with
    follwoing steps;
    Dyanmic modification : on Lot level
    F5
    Stage 10 Inspection seviarity :4 Skip :balnk ist: tick  Text:first stage
    OK
    No of Inspectin:1
    Max. skip duration:Blank
    New insp. stage:20
    NOT OK
    Rejections           1
    New insp. stage:10
    Stage 20 Inspection seviarity :blank  Skip :tick  ist:blank  Text:second  stage
    No of Inspectin:5
    Max. skip duration:Blank
    New insp. stage:10
    NOT OK
    Rejections           1
    New insp. stage:10
    SAVE
    Now use this DMR in task list header at Lot level.
    Attach this task list to inspection lot
    make sure that you have ticeked on Skip & Auto UD in QM view.
    Then in QA16 schecule for Auto UD after every 10 mins or 30 mins.
    at plant level also make auto UD & skip 30 mins.
    This will skip the 4 lots & UD will be taken in background.
    After that it will come to QI
    Revert back for More querries.
    Regards
    Sujit

  • Inspection lot generation during 322 movement type

    Hi Experts
    whenever we clear inspection lot from Quality we are having one issue first time user has given wrong UD code as Accepted,but that wasactually wrong,what he does is he will reverse the Lot through 322movement type,And again actually the material had to be sent for reprocess as shade is not matching,
    So the user will send the same material for Reprocess to Storage location-PF09.
    while doing 322 a new inspection lot is getting generated.while doing 322 movement why system is geenerating a new lot.Can we not make 322 in same inspection lot.
    Regards
    sandeep Patil

    Hi sandeep,
    You would have maintained inspection type -08 for making 322 movement type as otherwsie i dont think its possible to reverse the material to quality stock
    As you have maintained inspection type -08 so it will cerate a new inspection lot to execute 322
    Hope i have made it clear
    Regards,
    SVP

  • Inspection Lot Generation

    Hi Gurus,
    I want to generate inspection lot numbers plant wise while doing goods receipt.  Is there any user exit available to do this or can we do this in standard transaction?

    Hi,
    If you want to view the inspection lots plant wise (eventhough the number range is same) then you can do so by entering the plant number in the initial screen at transaction code QA32 / QA11 / QE51N. These inspection lots are generated / reported / analysed plantwise eventhough the number range is not plantwise.
    Regards,
    Prashant

  • Auto Inspection lot generation

    Dear All Experts,
    I have created new inspection type as Z01 by copying the 01 and I have maintain Inspection Lot Origins and Assign Inspection Types under 01. After that I have assigned my new inspection type Z01 to material master and activated it with material post to quality. Up to this it is working fine but after GRN system is not creating the lot. Even thou material is posting to the quality stock but no lot is in QA32.
    But if I Create the lot wih QA01 it working fine and I'm able to do the UD also. But for no automatic lot generated for purchase order.
    Please provide the details how to resolve this issue?
    Thanks and Regards,
    Manish
    Edited by: manish gurnule on Feb 17, 2009 5:39 AM

    Dear,
    Yes it is there and I have copied insp type 01 to Z01. and material master setting are also there.
    Please help.
    Any others inputs
    Regards,
    Manish
    Edited by: manish gurnule on Feb 17, 2009 7:26 AM
    Edited by: manish gurnule on Feb 17, 2009 8:21 AM

  • MFPR - Processing Inspection Lots for Production versions issue

    Hello,
    User are not able to seeing line item to create inspection lot for a specific part number.
    I checked inspection set up in  material master, rate routing, and compared with similar part numbers.It all looks good to me.
    Any help would be greatly appreciated!!
    Regards,
    Owais

    In REM Inspection lot for Inprocess is generated for header material for which you actually define "production version".
    Line items can not be seen in MFPR.

  • Inspection lot generation for 343 movement type.

    Hi,expert,
    My client's requirement is to generate inspection lot when a specific type of material is transferred from block stock of a storage location to unrestricted stock of another storage location i.e. movement type- 343, can anybody please explain how to generate the inspection lot and what are the settings, master data to be maintained? thanks in advance.
    rgds
    rajib

    Hi Rajib,
    In first place you need to have Quality infor record for material and vendor create through QI01 t code.
    QM must be activated for mvt type 343 in SPRO --> QM --> Qual Insp --> Insp Lot Creation --> Inspection for goods movements.
    Check the box "QM Proc. Active" in Mat master in Quality tab.
    Activate inspection type 08 in mat master.
    Then do the transfer posting you will get mat doc number.
    Go to display mode of mat doc,
    You will find Ins lot number created in Quantity tab at item level of material document.
    Thank You,
    Anand K

  • Inspection lot generation notification

    Hi All,
    when an inspection lot is genertated upon good receipt is ther anyway were i can create a notification to the concerned user for inspecting the lot.secondly if ihave 50 inspection lots generated in a day dou have any option through which i can assign the ispection lots to the concerned users or Quality inspectors.
    Suggestion willbe worth appreatation.

    Hello
    1) Alert Management is an SAP function. You will need an ABAPer to develop this functionality. You can either specify that alert should trigger to these many people or it can be particular role based so that alert to goes only to those persons who has those roles.
    please check this link for information on
    Link: [http://help.sap.com/saphelp_nw2004s/helpdata/EN/42/ed08baf3401a61e10000000a422035/content.htm]
    Link: [http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/60c24b82-6da9-2a10-5a93-f1f729d89787&overridelayout=true]
    2) What you mean assigning inspection lot to an inspector? What is the exact requirment ? Normaly who is doing the result recording is taken as the inspector. If you use inspection point you can record who was the inspector
    Regards
    Gajesh

  • Inspection Lot generation for Movement type 101-O

    Hi
    I would like to know, which config / Master data need to generate Inspection Lot for Movement type 101-O.
    I enter subcontract vendor number and set 'SC Vendor' indicator in purchase order delivery address tab and I created QM data in Material Master.(Insp.Type 01)
    While doing GR with reference to purchase Order, stock is Posted to Material provided to vendor - Quality inspection stock. But Inspection Lot
    is not generated.
    Pl suggest me, What should i do to generate Inspection Lot.
    Thanks in Advance.
    RRS

    hi
    Soln 1) Just check whether Inspection is active for 101 - O in SPRO settings if not, activate the same.
    Path: Inspection Lot creation/Inspection for Goods Movement
    Soln 2) As you flag "SC Vendor" in PO and make GR all stocks will be shown against the Vendor.
    From your question I assume that you would like to do inspection for materials coming from Subcontactor end to your Plant:
    If this is the case you dont flag "SC Vendor" in PO, make a normal Goods Receipt for the Subcontracting PO, based on Insp setup in Material Master for 01 Insp type Insp lot will be created.
    Regards
    DC

  • Process order batch number not reflecting in corresponding inspection lot

    Hi QM gurus,
    I am working on inprocess inspection for production. I am creating process order during that time batch no is generated automatically by the system. Now process order is released during this time Inspection lot generated with inspection type 03. Now the problem is in the inspection lot, process order batch number is not reflecting. I have checked all the master data seetings. All seems to be fine. what could be the problem. any settings missed can anybody help me out.
    Thanks
    Vinameath

    Hi Vinameath,
    Go to the Master Recipe (C202) of this Process order/Material. Go to Recipe Header tab and click on the Quality Management Header button.
    Now,go to the Partial Lot Assign field and maintain the value " 0 Partial Lots not supported " and save.
    Then create a new process order and in all probabilities, the batch should appear on the in-process inspection lot.
    Hope this helps you!
    Regards,
    Vinodh

Maybe you are looking for

  • How to append time stamp to TDMS file

    hello all, i would like to append time stamp to a tdms file as the 1st column of the file... the pattern should look like this.. can anyone suggest how to create such a file? Time Data 0.001 2.5545 0.002 2.653 0.003 1.215 0.004 2.6586 Now on LabVIEW

  • Request for some sample resumes on XI

    Hi, I request anyone to send some sample resumes on SAP XI and WebDynPro. regards, Ram Mohan

  • Mac Pro - Final Cut Studio 2 - Adobe Production Premium - NO FLASH PLAYING!

    I recently purchased a Mac Pro with Leopard, Final Cut Studio 2, and Adobe Production Premium suite. I got everything setup yesterday, and I exported a Quicktime reference file from Final Cut, and brought it into Flash CS3 Media Encoder. The file see

  • Transfer Userid and Password

    Dear Experts, How to transfer list of userids and passwords to New portal 9.02 iAs from portal 3.0 (on different machine)? Do we need to upgrade the portal3.0? This is really frustating since we will loose alot of people's password. Thank you for any

  • Missing waveforms in hybrid synth

    anyone seen this before, in the waveform dialogue of the synth's editing window it always says "MISSING" in front of every waveform. cannot make any other selection there.