Individual Capacity production rate

The scenario is a work center with 2 machines, which are having different production rates. One machine has production rate of 1 hour / piece and another has 2 hours / piece.
In the work center these 2 machines are maintained as individual capacities.  But how to maintain the different production ratesfor these individual capacities?

Dear ,
Based on your requirement , please note my suggestion  to map this in SAP :
Option 1:
1.There are two individual capacity for your Work Centre having different production or drilling rate ( more specifically ) .They will assinged to CR02-Work Centre (Drilling ) -Capacity Tab  Header Details-Available Capacity -No of Individaul Capacity .
2.Do not assing any Machine Activity Type in your Work Centre -Costing tab .(You may be having Set up activity type with Formula key  as well as Labor also ) .
3.Create Two different Activity Type in KP26 under same Production Cost Center with propoer validity with different rate asisnged in the Activity Type .Take the Help of CO/FICO guy who will create the Activity Type  with two different rate .
Activity Type : Automatic machine : 100 pc/100 min means 1 PC /MIN. Define the Miniute wise rate for this machine in KP26
Activity Type : Non-Automatic machine : 100 pc/50 min means 2 PC /MIN.Define the Miniute wise rate for this machine in KP26
4.Create Routing with two operation Line item : Drilling Automatic and Non Automatic  and assing the Work Centre , activity type as applicable ( refer my earlier reply ) .Here keep Required Spillitng option with No of Split as 2 ( 33:67)
5.Create Production Order with 100 PCs  which will processed as per the splitting  and machine hrs
Option : 2
Otherwise , best option will be two different Work Centre with two different Machien Activity Type assinged with same Setup , Labor   and work centre will be having single individual Available Capaicty in CR02.Follow point 2, 3 for the same
Regards
JH

Similar Messages

  • Cumulative Individual Capacity  in CM01

    Hello All,
    can anyone let me know how do i get Cumulative Individual Capacity  for a workcenter and a plant as i am getting in CM01 tcode.
    Actually i am writing a method with import parameters as workcenter , plant, start_date and end_date.
    and i need to fetch all the avaliable capacity for that workcenter for the given dates .
    but the output should be same as when i check from tcode CM01 for Cumulative Individual Capacity  .
    I hope i am clear ....
    Regards
    Ravi Aswani

    Dear ,
    Bssically , it goes from KBEZ Add. data for table KBED -CRHD(Work Centre )-AUFK/AFVC(Operation details at Production Order ) .
    Refer this thread : PP Tables
    Individual Capcity comes from Work Center Addtional Capacity Tab and seats into Operation Overview of Production Order .
    Hope it clarifies
    Regards
    JH

  • Process order confirmation at individual capacity level

    Hi Guys,
    I want to select the individual capacity of the resource while confirming the process order , is it possible if possible please enlight me how to do the same?
    Thanks and regards
    Thamizhchelvan G

    Is HU enabled for your location? if that case, you could post by pallet.

  • Table for Individual capacity of Workcenter

    Hi friends,
    I am working on one requirement for which I need table which is used for storing 'Iindividual capacity' . I could not find the table. Please help.
    I am not intrested in Capacity table like KAKO , need table for 'Individual capacity' (which we do enter on cap header screen of work center - goto - individual capacities)

    Hi,
    you can get the Individual capcity in following table for work center.
      KAPA - ANZHL                      
       KAZY - ANZHL                      
       LDLBC  -AZNOR       
    Regards,
    Sundaresan

  • BOQ and Resource productivity rate

    hi there everyone i am so honored to share information with you guys...
    i have project with the following given information::
    project BOQs
    Resources productivity.
    my approach at least "theoretically" with this project was as following:
    getting the "Project Cost" from BOQ
    and getting "Activities Duration" based on productivity of the resources assigned .
    so i rolled up my sleeves ..and opened up Primavera p6 and did the following:
    Duration type =fixed units.. to go with the fixed BOQ that i have "although i feel like even fixed units/time works as well" ..but whatever ...
    i defined the BOQ as material resources.
    and i defined resources (labor &non labor) units/time as per productivity requirements not calendar requirements which is 8h/d
    for example:
    for my steel fixer team i assigned thier units/time=225h/d
    as if 225kg/d
    Now my questions:
    is this a good practice.
    how does that affect my resource usage profile in terms of overallocation units.
    your prompt response will be very highly appreciated
    best regards

    But why aren't you loading Labor and Material Resources separately into the same Task? And if you want to show productivity rates, you can use a custom curve to show the gradual increase in output. The labor still has to work the same hours/day, so that can be a straight curve.

  • Can we give name to individual Capacity

    If yes where we can give it
    in cm27 we have idividual capacity wise capacity planning table, so where to give name to that one.
    in cm27, left clomn individual capacity colomn is there.
    as we are defining IN. Capacities in work center ny numeric no. in capacity view, but I want to give name to individual capacities.
    Help Me Out
    Thanks Gurus
    Edited by: Samir Momin on Mar 20, 2009 12:18 PM

    Hi
    You create capacity using Tcode CR11.
    Capacity name
    Description by which the capacity (for example, a machine capacity, a labor capacity or a move capacity)
    is to be created in the system (when creating the capacity) or
    is known in the system (when changing, displaying or using the capacity).

  • Individual capacity is not taken into account

    Hello,
    I have the following situation:
    A work center (workers) works 8 hours per day, and consists of 3 workers (3 individual capacities).
    So, it provides 24 hours capacity per day.
    Now, I want to (automatically) dispatch operations via the dispatcher with a finite, forward scheduling strategy.
    Lets say we have 4 operations, each of which requires 8 hours. Which means a total capacity requirement of 32 hours.
    When I use the dispatcher it dispatches all 4 operation to the same day, which is, ofcourse "impossible". I would expect the 4th operation to be scheduled for the next day.
    Has anyone encountered such a problem? What would you advise please?
    Regards,
    Doron Oded.

    Hi,
    Thanks for you answer.
    The operations are simultanious, and should be carried out the same time according to initial planning. As for the individual capacity, we defined in the WC the value 3 in the "Individual capacity" field, and 100% utilization. Is there another setting required?
    In this case, we expect the scheduling (by the automated dispacher) for the 4th operation to be forwarded to the next day due to lack of availabe capacity in the first day. Note that the first 3 operations should consume all the 3 individual capacity available in the first day. Our problem is that the dispatcher schedules all 4 operations to the first day although there isn't enough capacity.
    Maybe the formula for the capacity / scheduling we used is not the right one (the formula uses "duration")? If we use individual capacity should we use different formulas?
    Thanks,
    Doron.

  • Capacity planning requirement by individual capacity wise

    Is it possible to get the report of capacity planning requirement by individual capacity wise. (Individual capacities assigned to work center).
    I have checked Tcodes CM01 to CM07, but unable to get the same.

    Hi
    What i understand from your query is you want Individual capacities to work center means  report as per capacity category wise..
    In CM01  go to  menu select Planning->selection-> capacity category wise enter your capacity category, slection list window will appear, click Detailed Capacity List...
    Regards,
    MSH

  • Split Individual Capacity for Work Centers

    In Capacity Leveling for Individual Capacity (CM27 & CM28), what is the process in setting up individual "persons"?
    What I would like to do is take an individual work center and divide it up into several different areas.  I would like to treat the individual 'persons' as listed in Individual Capacity as those different areas I would divide my work center up into.
    However, I have no current setup for personel available and when I go to assign a 'Person' to a specific quantity for my work center, there is "no persons found for the work center".
    Where do I go to setup individual "persons" for my work center, and is this a realistic way to divide my work center up?
    If not realistic, what method would you recommend to split up the work centers?
    Edited by: Cameron on Sep 21, 2009 3:06 PM

    Hi,
    The best way to learn all these settings is studying the documentation in the IMG itself.
    Still id you need the link or documents to read
    "http://help.sap.com/saphelp_47x200/helpdata/en/b1/c03e4a439a11d189410000e829fbbd/frameset.htm"
    Read the documentation step by step....
    I hope this will help you.
    Thanks
    Raja

  • Do individual Adobe products need to be uninstalled before installing creative cloud?

    I am deploying user licenses to several users in a department where a lot of individual Adobe products are installed and already in use. Will these individual products need to be uninstalled before using or installing Adobe Creative Cloud?

    U-96,
    When you install different versions, you should always do so in order from first to last. With a different order, you will (almost certainly) overwrite crucial files with older versions.

  • Individual Capacity in production order

    Hi all,
    In which table can we see the individual capapcities maintained in production order.
    Path >>> Production order > operation details > cap reqt assignment
    Regards,
    Yogesh

    Dear ,
    Bssically , it goes from KBEZ Add. data for table KBED -CRHD(Work Centre )-AUFK/AFVC(Operation details at Production Order ) .
    Refer this thread : PP Tables
    Individual Capcity comes from Work Center Addtional Capacity Tab and seats into Operation Overview of Production Order .
    Hope it clarifies
    Regards
    JH

  • Capacity utilization rate (percent)

    Experts,
    If I set up a shift 6:00:00 to 14:00:00:00, length of breaks 00:30:00, cap. util. 100% I get 7,5 hr Operation time / Capacity.
    If I reduce the cap. util. to 80% and leave the start-, end- & breaktimes as they are I get 6,0 hr Operation time / Capacity.
    My question is how does the reduced operating time influences the start and end times/dates in regard to scheduling ?
    I am Looking for the logic behind.
    Thanks in advance
    Jörg

    Jorg,
    Capacity utilization is more frequently used with referance to viewing available capacity against requirements on CM01 screen.
    It helps determine if there will be a capacity overload due to capacity inefficiency.
    For ex. On Cm01 screen for Work center say W1, if a production order requires 7.5 hours to complete an operation on W1
    & if Cap ultil=80% at W1, system will show that order with RED overload view as available cap is reduced to 6 hours.
    However if your using finite scheduling then this cap util rate would be cheked to determine scheduling.
    You control the capacity availability check and the finite scheduling with the help of the overall profile that you entered in Customizing for the availability check.
    Hope this gives you some insight on this concept.
    thanks,
    Ram

  • Capacity -Product costing

    Hello,
    How capacity is influencing the product costing.Are there any configuration required for  it.
    Thx in advance

    if u had planned for 100 unit capacity which req 1000 machine HR as most of your exp on machine are fixed except elecity your activity raet reduce as ur planned activuy increase.
    This activy rate change affect ur product costing.
    Reward point if useful.
    Nitesh

  • Individual Object - Products

    Hello,
    I am looking for creating Individual Object in CRM, please let me know the transaction code and also how to associate it with the products.
    Regards,
    Sanju

    Hi Sanju,
    you can try this CRM_ICSS_CREATE_COMPONENT or check this FM inside u can get some ideas. We are using this FM, but it's important to know that the CRM_IBASE_SAVE which is included in the above mentioned FM can cause a memory consumption problems if you use e.g. in a mass upload. So we use it in a separate program and call this program via SUBMIT.
    I hope this helped.
    Kind Regards:
    Pal

  • Fonts bundled with Creative Suite 2 (and individual CS2 products)

    The attached PDF lists all the fonts bundled with Creative Suite 2 and the individual CS2 applications.
    Enjoy!
    T

    We had somebody spend a few hours looking into this. He found that on Windows only, if Bickham Script Pro and/or Warnock Pro is deleted after install, further installs won't get them back. It seems only a complete uninstall and then reinstall gets them back.
    Sorry for the delay in posting this. I lost track of the thread....
    DETAILS
    I did some playing around with the CS2 installer and found something interesting that might be related to some customers not finding Bickham Script Pro or Warnock Pro.
    On both the Macintosh and Windows platform, using the Suite installer to install even one app from the Suite (e.g., GoLive) installed Bickham and Warnock--no surprise.
    On the Macintosh, if I manually deleted those fonts files from the Application Support: Adobe: Fonts folder, then used the Creative Suite installer to install another application from the Suite (e.g., Photoshop), those fonts got reinstalled--again, pretty much as I would have expected.
    On the Windows side, however, if I manually deleted those font files from the Program Files\Common Files\Adobe\Fonts folder, then installed another app (e.g., Photoshop), the fonts DID NOT get reinstalled.
    Even more interesting, if I manually deleted the entire Fonts folder from Program Files\Common Files\Adobe, then used the Creative Suite installer to install an application from the Suite (e.g., I removed Photoshop, deleted the Fonts Folder, then reinstalled Photoshop) the Fonts folder got reinstalled as did the reqd folder inside of it (and the contents of the reqd folder) but Bickham Script and Warnock Pro were NOT reinstalled.
    On a fresh machine, I tried using the Suite installer to install only Photoshop from the Suite, just to make sure it actually installs Bickham and Warnock, and it does. I then removed Bickham and Warnock and installed GoLive with the Suite installer--still no Bickham or Warnock. Then I installed Acrobat with the Suite installer--still no Bickham or Warnock.
    If I use Add/Remove to completely remove ALL Creative Suite applications and support files and preferences, then reinstall an app, I DO get Warnock and Bickham.
    His theory: On the Windows platform, if customers are removing those fonts, or for whatever reason they don't get installed in the first place (though I couldn't reproduce a problem here), they may not get the fonts unless they do a full removal of the entire Creative Suite package (all applications) before reinstalling.

Maybe you are looking for

  • TypeError: #1009 Issues

    Okay. I'm trying to make a popup alert modal window thing with an external class. I have a simple swf set up with just some random sample text, a rectangle, and a button (just so I can tell if it's working or not). What I want to happen is for the "a

  • Difficulties with Skura platform

    I have a client for which I am developing solutions with Edge Animate CC, give it solutions structured way which so request me but in the past I manifest that there is incompatibility between Edge and Skura (platform contracted by the company). They

  • How To Remove SID

    Hello i hv installed 2 to 3 times Oracle 9i and each time during installation i hv to give new SID. I have Deinstalled it before Installation if installed. Some Services of Oracle are removed but not all. I hv restarted after deinstalled. My Question

  • CRM 2007upload to ISU, SI_CONNOBJ address change

    Hello everyone, I have a problem with  connection object address replication. I can correctly create and replicate connection object but when I try to change address of the connection object in CRM the notification Bdoc and the validation Bdoc still

  • Iphoto 2 dates incorrect on photos

    I've just discovered that iPhoto 2 is putting incorrect dates on my photos. Is there a way to correct that? iMac G3   Mac OS X (10.3.9)