Industrial Machinery Manufacturing scenario

Dear Sir,
We are in the business of manufacturing the Industrial Machinery as per customer specific requirement . The multilevel BOM for the machine comprise of almost 1000 differnt components / assemblies . Some of the components are bought-out and some are manufactured in-house .
We run the MRP  on the basis of engineering BOM and this result into several planned orders getting generated .
The issue with our appraoch is that there are lot many Production Order getting generated and many of such production order require very small duration operation for producing their output  components  (eg  a keyway cut  in an input assigned forging) .
We think that instead of having so many production orders , there should be a better practice so that numbers of production orders gets reduced .
We seek the expert opinions from SAP Gurus as in such type of industry scenario what is the best procedure to be followed so that  organization working becomes the efficient one .
With Thanks and Regards
Sonia Agarwala

Hi Sonia,
What I understood from your query, I think you need to use Special procurement key '50 - Phantom assembly' for your requirement.
Following are the links which will explain what is Phantom assembly, how it works and how it should be implemented.
http://www.sap-img.com/production/what-exactly-is-a-phantom-item-or-assembly-means.htm
http://help.sap.com/saphelp_470/helpdata/en/ca/72d91b941b11d1801200c04fadcb73/content.htm
http://help.sap.com/saphelp_46c/helpdata/en/f4/7d2b5f44af11d182b40000e829fbfe/content.htm
http://help.sap.com/saphelp_46c/helpdata/en/ea/e9b47a4c7211d189520000e829fbbd/content.htm
Please go through it and if any futher assistance required, please revert.
Regards,
Hiren Ramani

Similar Messages

  • Suggest manufacturing scenario Discrete / Repetitve  for Iron & Steel indus

    Which scenario u will suggest for Iron & Steel industry & why?
    Product - Galvanised Plain/ Galvanised Corrugated Sheets
    Process- Pickling-Cold Rolling -Galavanizing- Cutting /Corrugation
    but the product is varying in THK & Width so how u can go for repetitive?it works on both scenario MTO & MTS
    yes sheets r of diff sizes & widths as per orders but same operation is carried out but u have control some parameters
    Kindly suggest manufacturing scenario Discrete / Repetitve ?

    Hi
    If u say that the sheets are of different sizes and shapes, will the different sizes have different workcenters or in one machine all the different sizes can be produced. if all the sizes and shapes come out of the same machine, i think discrete will be the best suited(as per my knowledge) or if only the last operation of cutting is different and other operations are same, then u can go for the combination of Repetitive and discrete.
    Chandra

  • Cubes related to Industrial Machinery & Components

    Dear Friends
    Some of you may already worked or working on the IMC industry(Industrial Machinery & Components) . can anyone suggest me. what are the cubes you have used and what cubes can  be used from BI conent .  if you have any doumnets related to IMC industery for BI can u please email it to [email protected] . we have demo were we need some help from you guys .  all the information shared is appericated and awarded . thankyou . look forward to your replies . raghu

    Hi Sonia,
    What I understood from your query, I think you need to use Special procurement key '50 - Phantom assembly' for your requirement.
    Following are the links which will explain what is Phantom assembly, how it works and how it should be implemented.
    http://www.sap-img.com/production/what-exactly-is-a-phantom-item-or-assembly-means.htm
    http://help.sap.com/saphelp_470/helpdata/en/ca/72d91b941b11d1801200c04fadcb73/content.htm
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d2b5f44af11d182b40000e829fbfe/content.htm
    http://help.sap.com/saphelp_46c/helpdata/en/ea/e9b47a4c7211d189520000e829fbbd/content.htm
    Please go through it and if any futher assistance required, please revert.
    Regards,
    Hiren Ramani

  • List of Industrial Machinery companies

    Dear SAP friends,
    I would like to get a hold of Industrial Machinery existing client list, can anybody help me please?
    Thank you.
    Banu

    Hello.  We typically do not give out customer information.  Please contact me via private SCN message or SAP email and provide more details about your request.  Thank  you.

  • Industrial hygiene safety scenario

    Hi Team,
    Please write me steps involved in "Industrial hygiene safety scenario".
    What are the T-Codes.
    What master data is required.
    Thanks

    Hello,
    Please ask specific questions. There is no specific answer to questions like "steps involved".
    Please refer to SAP help documentation for these sort of generic questions. The link is as follows:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/a5/3adda043be11d188fe0000e8322f96/frameset.htm
    Regards,
    Pavan

  • BTO,BTS,CTO and ETO Manufacturing Scenarios impacting MES or not?????????

    Hii Everyone...Wish u all a very happy new year 2011.CAn u all pls help me get some informations on different manufacturing startegies and regarding the same my query is mentioned below:-
    How does different manufacturing Scenarios like BTO,BTS,CTO and ETO impact implimentation of MES system.
    How is the interface of MES with ERP,LIMS,PDS,PLM,Equipments and SCM,CRM systems.Whether the interafce changes considering the scenarios like ETO,BTO,BTS,CTO.

    Hi KRajiv,
    I would say that either of those production strategies can be maintained in SAP ME solution, however, this tool is responsible for technical implementaion of the strategy rather then for its design. So, you will not find a document with step-by-step instructions for each of those strategies with pointing to difference between them.
    Currently, SAP ME has interface with ERP only.
    I would suggest that you consult "Business Scenario Description SAP ME 5.2" available on SMP:
    https://websmp209.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000722058
    Regards,
    Sergiy

  • Best Practice for manufacturing Industrial Machinery in batch size

    Dear Sir,
    We have a scenario where we need to manufacture Industrial Machine in a Batch Size of 10 nos . These machines have multi level BOM and total manufacturing cycle time is approx 3 months .
    We request you to kindly suggest us about the best manufacturing practices related process we should follow to address this scenario .
    At present , we have been manufacturing these Machines on individual basis ( It means MRP run is done for individual machne and production orders generated are also on individual machine manufacturing basis) .
    We would be highly greatful for the suggested solution pl .
    Rgds
    Sonia Agarwala

    Dear ,
    Please use the following functionality in your case :
    1.If you are particualr to have 10 pc in each batch qty then keep the Lot Size as Fixed Lot Sixe -FX with Fixed lot size qty as 10 in material master MRP1 view .
    2.As your approximate manufacturing cycle is 3 motnhs , then you can have MRP run once three months for FG   and plan your dependent accordingly through MRP .
    3.If you are following MTS cycle , then create demand in MD61 or you can create direct Sales Order in VA01 for MTO process
    4.Run MRP with NETCH ,1,1.3,3,2 , planned order with FG qty 10 pc will be generated  and you can convert them into Production Order in MD04-Planned order-convert to PO
    Regards
    JH

  • Repetitive Manufacturing Scenario

    Dear All,
    I would appreciate it if you can provide me with a FLOW of REM, a walkthrough guide with transactions to test the REM scenario and pre-requisites of each transaction.
    Thank you

    Dear,
    Reporting Point Rem
    Steps are as,
    1)You must assign a suitable repetitive manufacturing profile in the material master record to be able to backflush a material using either the mandatory or the optional reporting point backflush function.
    2)You must set the optional or the mandatory reporting point backflush in the repetitive manufacturing profile.
    3)This type of backflushing corresponds to the milestone confirmation in make-to-order production. Therefore, in the routing, you must select a control key which has indicator 1 (= milestone confirmation) in the confirmation field.
    4)You must enter the routing in the production version of the material. The system first looks for the routing entered in the detailed planning section. If no entry exists here, the system then uses the routing from the rate-based planning section.
    5)You must carry out a version-specific or a standard cost estimate.
    6.You are recommended to use the version-specific cost estimate which can be carried out in shorter intervals than the standard cost estimate.
    Reporting point is a concept for REM. This is to be set up just like Milestone operation.
    Select the Control key which is relevent for Milestone confirmation like PP01
    or select a control key which is having the confirmtion selected as *1 - Milestone confirmation
    You need to select REM profile 003 or 004 from sttd REM profiles to have Reporting Point and in OP67 (Control key for Operations) you need to set confirmation to 1 - milestone confirmation .
    Please try and come back.
    Regards,
    R.Brahmankar

  • Process manufacturing scenario

    Hi, Pls explain process flow of PP-PI Manufacturing? not SAP point of view, but just general manufacturing point of view.

    Hi Yadav,
    Just my thoughts,
    A process industry is one in which the same material which is fed at the beginning passes through several stages of operations undergoing transformation along the way & ending as the finished product if i may call it so.
    Some prominent examples would be the Oil & petroleum industry, where the crude oil is the base & this is transformed over a series of operations. These operations are combined under different phases called processes. So a series of such processes which takes place from turning crude to petrol or even high grade fuel something like aviation fuel.
    So how the flow works as in real-life, it is entirely case dependent & needs to be studied very intricately as most of these process industries are very big ones & usually follow a complex maze of processes.
    Hope the above was helpful.
    Regards,
    Vivek

  • Industry standard Manufacturing

    Hi,
    I want to know how the SD process differ in a manufacturing industry and IS Retail. Can IS- Retail  be used in a manufacturing industry? Or do they follow a different industry standard. I am not able to understand the industry standards by going thru help.sap... Can anybody please help?
    Thanks,
    SV

    hi,
    there is no IS specific for plastic but there is one for CHEMICAL as you can see in the following link.
    http://help.sap.com/bestpractices/BBLibrary/bblibrary_start.htm

  • How MES is effected with BTO,BTS,CTO and ETO manufacturing scenarios.

    Does MES really gets impacted with following different manufacturing styles like BTO(Build to Order),BTS(Build to Stock),CTO(Configure to Order),ETO(Engineering to Order)...Whether SAP ME(different/latest versions) handles its separately if the production is happening as per BTO,BTS,CTO,ETO scenario.
    If its affecting MES then how it does it and how the integartion with different systems ERP,PLM,PDM,LIMS,SCM is dealt in each scenario .

    Manufacturing Execution Systems (MES) are IT solutions that support the primary production processes in a production plant. These applications close the gap between ERP systems and production equipment control or SCADA (Supervisory Control And Data Acquisition) applications.
    MES will be used to pass the real time Data  in Shop floor in to SAP,
    In SAP ME
    Master data:
    Master data detail is transferred from SAP R/3 to SAP ME, data such as material master, BOM, routing, Production order is transferred from r/3 to SAP ME thru IDOC/BAPI
    Transaction data:
    Real time data is Collected from the SCADA or  from controller is send to SAP ME, From SAP ME, the data is transferred to R/3 by using BAPI/IDOC
    separately if the production is happening as per BTO,BTS,CTO, ETO scenario
    while transferring the prdn order from R/3 you can also send infrm such as Customer/project

  • Discrete Manufacturing Scenario

    Hi all, Can I have detailed information on customisation required to be done in discrete manufacturing.
    Regards,

    Hi Mr.Vivek,
    The following are some of the few settings done for Discrete Manufacturing.
    Please check this.
    For a Production Order,you have to use either standard order type's defined in the
    system or you can copy those order types and you can give your own name.
    <b>Some general settings for an order.</b>
    1. Define Order Type - OPJH.
    2.Define Order Type Dependent Parameters - OPL8.
    3.Define number ranges for Orders - CO82.
    4.Define number ranges for Confirmation - CO80
    5.Define number ranges for Reservations - CO83.
    6.Define number ranges for Operations - CO81.
    <b>Under Operation</b>
    <b>
    Availability Check</b>
    1.Define Checking group - OVZ2
    2.Define Checking Rule 
    3. Define scope of Check - OPJJ
    <b>under Scheduling</b>
    1.Define Scheduling parameters for Prod.Order - OPU3.
    <b>under confirmation</b>
    1.Define Confirmation parameters - OPK4.
    <b>For routing</b>
    1.Define Control Key - OPJ8.
    <b>For BOM.</b>
    1.Define Modification Parameters for BOM - OS27.
    2.Define default values - OS28.
    3.Define Allowed Material types in BOM header - OS24.
    4.Define Item Categories - OS13.
    5.Define allowed material types for BOM items - OS14.
    <b>Plant Parameters for Material Requirement Planning - OPPQ</b>
    I hope this will be helping you.
    <b>If useful reward points.</b>
    Regards
    Mangal

  • Repetative Manufacturing Scenario

    We have configured the repetitive manufacturing on our client, we are doing the backflush with referance to planned orders that created via MRP. Every thing is working ok, my question is that wht should b the size of Product Cost Collector, either it is the total planned order quantities in that month or wht? we are confused at this point and need help in this regard we also have multiple Production Versions so we will create multiple cost collector but wht should be the size of each cost collector?

    Dear Bashir,
    1.You cannot have 2 standard cost estimate in the same period.
    2.For a material if you have more than one production version, and if you want to book the confirmations using both the
    production version means,then one production version can have a standard cost estimate and the other one can be based on
    the preliminary cost estimate.
    3.In case if you want to confirm using only the standard cost estimate means,you have to cancel the existing cost estimate
    using CKR1 and then only you can take a new cost estimate in the  same period.
    4.Say based on production version1,a cost estimate has been carried out and in the mid of the period ,let us assume you want
    to post using the second production version.So in this case the first one has to be cancelled using CKR1,and then taking a new
    cost estimate using CK40N.
    Now come back with your further queries.
    Regards
    Mangalraj.S

  • Repeatitive manufacturing scenario

    Dear Experts,
    We have multiple prod line & using separate prod version for each line & maintaining one BOM.
    We want to maintain Line Code & Station Number combination for components in the BOM so taht with a query we can get the report that at any particular station what parts are required from the BOM.
    Thanks.

    We want to put station number against each component where the particular part is to fitted  in the BOM of finished good. We have multiple lines & single BOM without issue sloc of component of a finished good for all the lines. We are maintaining prod version for each line & issue sloc is maintained in prod version. For a line one sloc is maintained for consumption of the component. How we can put station number & line number so that we can get information from BOM as at any particular station what components will be used.

  • Industrial machinery inspection

    Hi friends
                    I want inspect the Boiler in my plant not in the GR time,at the time of working,and also I want create only one Lot per month,daily inspection details updates  in the same lot.
                    kindly share your knowledge

    Hi,
    Why cant you try with recurring inspection.
    Please go through the below link.
    http://help.sap.com/saphelp_470/helpdata/en/be/00bbcfca5311d2961800a0c930e04c/content.htm
    Regards
    Hari