Inforecord Price is not taken in Costing-CK11N

Hi,
While executing costing run for a Material (Procurement Type F(External)), i am expecting the info record price to be picked (as per the valuation variant) for costing.
However, i dont see it picked. I have checked the validity, vendor block etc., everything seems ok.
Do you suggest.
KInd Regards
Umapathi G

Hi
Rounding off after calculating the whole cost estimate is a normal behaviour....
So, if your costing lotsize and Price Unit, both are high i.e. say, 1000 - Then rounding differences are minimized...
Also, if you have alternate UoM in your scenario, that can also be one of the reasons....
Try by increasing your costing lotsize and Price unit.. You may also maintain your info record for a higher qty
BR,Ajay M
Edited by: Ajay Maheshwari on Jan 27, 2011 5:39 PM

Similar Messages

  • INFORECORD PRICES SHOULD NOT BE CHANGED IN PO

    Sir,
    INFORECORD PRICES SHIOULD NOT BE ABLE TO CHANGE IN PO.
    REGARDS
    AMEY

    Hi,
    I think you need to check on all possibilities here.
    1. Is your requirement for all kind of PO's (direct spend, indirect spend, STO's....).  If it is for all, then when you have new material to be purchased how does it pull in the price (if in case no inforecord exists)...check this.
    2. If your requirement is only for few kind of purchases, then you need to limit it with the document type.
    Your requirement could be achieved through function authorization for buyers and maintaining the parameter id for the buyers to restrict them with the access.  Check if you have used parameter id for any other purpose.
    Please clarify your business requirement elaborately.
    Sk.

  • Actual activity price does not exist for cost center / activity type

    Hi,
    We are trying to upload the time sheet related data(number of hours an employee workred on a project) ect from Non SAP to SAP.
    We have used a customized program and have loaded the data from se38.
    All this HR data will be saved in CAT2
    Later we transfer the time related data into SAP FI/CO using CAT7.
    +When  tested  with a couple of employees time sheets, they got uploaded in SE38 proerly and when transfered it through CAT7 it was properly taking the hour*rate is cost and was reflecting in the respective cost element.
    For a few time sheets in SE38 we were getting an error saying that the cost center(100501)/ activity type(EAT001) does not exist for 2010.
    Hence we have taken, FY 2010, the cost centes and activity types in KP26 and have given the planned Activity as 1. No planned cost in KP06.
    We have run the price calculation forr the FY 2010.
    Then we were able to uplaod the time sheets, but when we tried to transfer the data through CAT7, it throws an error saying no activity price exist for cost center 100501/ activity type EAT001. If I ignore the warning an proceed, no amount is being calculated.
    When uploaded employee time sheets before, all the cost were getting claculated and were entering into  the respective cost elements, but now no amounts are being calculated and it is taking Zero.
    When checked the previous years data i.e, 2009 all amounts are fine, in KSII I can see the activity quantity filled with some numbers in 2009, where from are they comming? I have checked KBk6 nothing was mentioned.
    PLease assit
    Regards,
    shilpa

    Hi
    I never used CAT* though, but the error means that you need to maintain a activity price in KBK6 (Actual price)
    Regards
    Ajay M

  • Old Purchase orders and template - Price Information not taken into account

    Hi experts,
    In MDM catalog, I have a product with 'Price Information' and with 'Contract price'. I create a shopping cart with the 'Price Information'.
    Then, I create another shopping cart using the anterior througth the functionality 'Old Purchase orders and template'.
    The price taken into account is the 'Contract Price'
    Is this the standard procedure?
    Thanks in advance,
    R Silva

    as far as i know the price preference is in this order
    1. Contract price
    2. Purchase Info record
    3. list price
    so in that case - this is standard procedure
    you can confirm - by doing the same process for an item that  has ONLY price information (list price) and see if that price is copied from old to new SC
    thanks
    -Adrivit

  • CK11N  Follow-up material not taken into account when costing

    We are running the standard cost with quantity structure and we have detected that all the follow-up information is not taken into account to determine the bill of materials that will be used to calculate the standard cost.
    SAP helpdesk has answered me the following:
    "The situation in product cost planning is we do not check availability of any material stocks, and therefore we cannot provide the same functionality as MRP. You will have to create a new BOM that includes
    the follow-up material or apply the modification to take into account the follow-up part."
    Please, if anyone knows any user-exit we could use to develop something to fix it, we would appreciate it very much. It is a normal process and we can not say it does not work.
    Regards, and waiting for any solution.
    Yolanda.

    Dear,
    Are you getting these reservation in MD04?
    Check the Planning file entry for these material in MD21 if not then create it through MD20 and take MRP run with planning mode -3 Deleted and recreated. And Processing key NETCH.
    Also check the The firmed receipt is within the rescheduling horizon. The rescheduling horizon is set in Customizing for the MRP group (Transaction OPPR, Table T438M). A default value can be predefined in the Customizing of plant data (Transaction OPPQ, Table T399D). define the longer duration for it.
    The firmed receipt (the MRP element) participates in the rescheduling check. You can set which MRP elements participate in the rescheduling check in the Customizing of the plant data (Transaction OPPQ).
    Else you can carry out modification A using the MD_CHANGE_MRP_DATA BAdI and the CONSIDER_RESB method without making a modification.
    Regards,
    R.Brahmankar

  • Error in CK11n - The system could not determine a cost component split for

    Hi All,
    When i run CK11n i have following error:
    The system could not determine a cost component split for the internal activity with activity type 502000 of cost center 10100.
    Procedure
    Check the master data for activity type 502000 of cost center 10100. It is possible that no activity price calculation has been carried out for the cost center.
    could any one give me solution
    Thanking you.

    Well, did you run activity price calculation for the relevant cost center(s)?
    The CCS you're using for product costing (either your COGM split, or the auxillary) has been marked as a "primary" cost component split.  It wants to break secondary costs down into their cost components, and assign those components to components in its own structure.
    Wihout a planned CCS for the activity, this isn't possible.  (This is normally calculated by KSPI during planning.)
    Either calculate an activity CCS is KSPI, assuming that all the prerequisites are in place for that, or uncheck the "primary cost component split" indicator in your costing variant configuration.

  • Contract price not taken in the SC

    Hi,
    We use contract management of the SRM EBP component.When creating SCs for internal Goods and service for a material on
    local contract (PCTR) we found the price picked is the valuation price maintained in the material master rather than picking up from the source(contract).
    Thanks,

    Hi
    Once the product price is imported from ECC to SRM and you maintain in product master (transaction COMMPR01), under conditions tab, the price details for the product in question, the SRM system will read locally the product price from this condition. This is the standard SRM system behaviour.
    For example, the material xxxxxx was inserted in cart xxxxxxxx. This material which has a price condition maintained in COMMPR01. So, in this case, the price will be taken from the COMMPR01 and not from the local contract. The COMMPR01 condition overwrites the local contract price, as a price is maintained under the condition tab.
    hope this information helps.

  • Po prices is not updateing from inforecord

    Guru
    In Po when enter the Material & QTy & Price for that material is appering from info earlear now  the problem is that Price is not picking from the last Po or Inforecord what must be problem. can u help me
    Thanks
    Sudhir

    Hi
    Price from inforecord has following steps
    1) System will search for inforecord with valid price if it finds then the price will be pulled to PO
    2) If there is  inforecord and no valid price then system will look for last PO to pull the price.
    3) If there is no info record then we have to enter the price manually.
    In your case check the above prerequisites additon to that
    1) If it is refering the last PO no then check whether the item is deleted or not.
    2) If it is refereing the valid price in info record then check the validity period of the PIR.
    Hope it helps.
    Thanks/Karthik

  • PO price is not picking from Inforecord

    Hello All,
    When PO is created by one particular user the price is not picked from inforecord. Inforecord validity periods are active and this price is not of previous purchase order. The problem is only for this user. Can you please advice what needs to be done here.
    Thanks a lot in advance.
    Best regards,
    Raji

    Hi,
    1. Check out user profile whether EVO parameter is maintained properly for all the users.
    2. Check in EVO parameter key you set radio button on Always copy.
    EVO is parameter ID for Defining Defualt values for buyer. Relevent customization carried out in SPRO --> Mat mangt --> Pur --> Env data --> define default value for buyer.
    Rewards, if helpful to you.
    rgds,
    rajesh

  • Inforecord Efective price is not Updating

    Dear All
    I have seen that the Effective price is not updating in Inforecord.
    Kindly can I know why it is not updating?
    I am Maintaining gross price condition
    eg:ZM00 8:00/-
    Result: Condition
    Net Price: 8.00/-
    Effective Price: 0.00/-
    Regards
    Chaitanya

    System can only update Net or Effective price in the info record based on the customizing setting made.
    sproMMPIR---Define price history.
    Reg,
    Deepak.
    Edited by: deepak k b on Oct 30, 2008 7:22 AM

  • WHY Price is not defaulted from inforecord in a P.O with material group.

    When i tried to create P O for a material group & i mentioned material text, Price was not defaulted in PO from inforecord unless i mention inforecord number even if  i mentioned vendor & valid inforecord is exist for the same material group & vendor.

    Hi,
    Data will be adopted only from PR,RFQ & contract.Eventhough if u maintained inforecord, data will not flown from info record it is only the price picked from inforecord.
    thanks
    suresh

  • Future price not deleted after cost run

    Hi all,
    If a material master has the future price maintained on the Accounting 1 view, then it is picked up in the next cost estimate that is created.
    Costing strategy is Future price, Price from PIR, Standard cost.
    However, I have been told that once the Cost estimate has been created, the future price is deleted from the material master. In this way the cost accountant can delay the release of a new standard price to avoid large re-valuations.
    The future price is not being deleted following our cost run, can anyone advise on this?
    Thanks
    Phil.

    Future prices will not delete when a cost estimate is released.  If the Future Price is ACTIVATED (no cost estimate involved) then the Future price field will clear because it is "rolled forward"  in the same manner that a Marked cost estimate is rolled forward to the Released Cost Estimate, leaving the field Future Planned Price on Costing 2 blank.
    Be very careful with CKME - it will activate future prices and release future planned cost estimates, but it does not stop and show you what is about to be activated or released and the financial impact.   We wrote a custom transaction that had CKME report what it is going to do, so we have a chance to review the infomation.

  • Future price is not getting updated as current price when period changed

    Hi all,
    We follow the following procedure to update standard price in material master. Our organization is a manufacturer of pharma products. ( System is not live yet)
    We have BoM's for all FG's and all FG's & SFG's are having Price control indicator as "S". Rest other materials are valuated for Moving Average price.
    > Run T-code CK11n for the FG.
    > Check whether costs of utilities and final product is as per the cost sheets prepared manually (10-20% difference acceptable)
    > Do not save it and goto CK40n tcode. Mark and release price of FG's & SFG's for the current date (eg: 16.01.2008). Now as 10th period of year 2008 was not open at that time and only 9 th period of year 2007 was open, the prices were updated as "FUTURE PRICE" in costing-2 view of material master.
    > Now that when i am opening 10th period (both financial period and inventory period), my future price is not getting updated as my CURRENT PRICE in material master as my standard price.
    Pls. reply to this urgently.

    Hi,
    I am sure about it that when CK40n was done for a future date when some n-1 period was open, the costs released would get updated as future price.
    When the period for which future price was updated is opened as current period, the future price automatically gets updated as current price and is also set as standard price in accounting 1 view.
    But i m unable to identify why is not working.

  • Inforecord Price in Purchase Requisition

    Hello,
    when we create a PR manually, we are setting the material, plant, purchase organization, fixed vendor. In the PR screen then the inforecord number appears automatically, however, the valuation price for the PR is not taken from the inforecord, but from the material standard price (that in the accounting view).
    I have been looking at enhancement MEREQ001, but in any of the exits i am able to change the price. For example, in EXIT_SAPLMEREQ_010, EXIT_SAPLMEREQ_008 the field validation price is not modifiable.
    Is there a way to change this and that the valuation prices comes from the inforecord?
    Thanks.

    Hi,
    Pur. Req. when create with ref. material price only possible.
    when 1 st attempting of material number entered with respect to plant the doc. bring the value from material master.
    after that even you enter the Pur. info record it won't pick the value.
    SAM

  • Cost Center Planning done but correct price is no shouing in Costing run

    Hi,
             In cost center activity planning (KP26). i have planned cost of Setup Activity type is 10 rs per 1 min (Fixed). but when i am running Costing run (CK11N) it is not showing correct price which we have given in cost center planning (KP26).
    Cost Element category is 43
    in Work center i assigned cost Center and setup activity.
            So What is the problem. is this problem related to CO or from Workceter.
    anybody could help on this.
    Thanks
    NAG

    Dear,
    If it is low consumable material then remove its cost relevency from BOM item details. So it will  not come in costing run.
    Also refer this link,
    Order Costing in diffrent UOM
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Movement types used in these activities and also STO

    HI SAP GURUS, Movement types used in these activities and also STO ( PLANT TO DEPO), (DEPO TO PLANT ) WIT AND WITHIN 1 COMPANY CODES AT PGI AT BILLING AT RETURNS all possible ways OR any short cuts points are to be rewarded for best relevent answer

  • Changing transfer method in transfer rules

    I would like to change the transfer method in a TR. It is set by default to IDoc. I would like to set it to TRFC with PSA. However, I can't because it is dimmed. My aim is to find a workaround to an issue stated in SAP note 120446. Thxs. LauQ.

  • All browsers freeze in Mavericks

    Ever since i've moved from Mountain Lion to Mavericks i'm having major problems with all browsers (Safari, Chrome, Firefox, Chromium). They all freeze for 4-5 seconds, and this happens every 1-2 minutes. This happens on every pages i visit, even on '

  • Quicktime X Won't Load movies with AC3 track

    Not sure if anyone else has seen this, it is more than likely that this is the case but maybe some people don't realise it. Any movie file I have that has an ac3 track on it will not open in quicktime player x for me, but will work in quicktime playe

  • Listening to iPod on iPad while using another app or safari

    Is there a way to leave safari and go back to the iPod controls without using the ipads home button?