How Inspection lot should automatically be updated with the correct inspection plan and sample size upon GR ? is there any exit avialable?
As per my requirement the revision level should not be taken into account when selecting the
inspection plan. The start date of the inspection should basically be
used as a key date(i:e; current date) .how to implement this logic ?
i have found one exit for this QPAP0002.can anyone explain detail how to implement logic to my requirement?
Thanks & Regards,
Pradeep

hi
check teh material master QM view there shoul be inspection with task list and automatic assignment shoul be there
1.create inspection plan(QP01) with mIC (QS21) assign for opeartion.
2.mantion usage in plan header as 5 goods recipt.
then when ever you get inspection lot for the materil the lot will release,
3.now your lot is in CRTD status do goto QA32 slect the lot click on change inspection lot or goto QA02.
clcik on tasklist specifications and clcik on button task/specification and move to clcik on sample tab then clcik on sample and save teh lot the staus will change from CRTD to REL.
if the plan plan is created after generating date of lot then you face problem of key date.
ok still if you are not getting then use your exit. there should be logic of picking the key date and pass it into start date get these datails fromQALS table
-ashok
Edited by: Ashok Keerthipati on Nov 20, 2008 2:04 PM

Similar Messages

  • Inspection lot should be automatically generated whenever reverse GI(262)

    Hi to all,
    My scenarios is ,
    if we find any defect in raw material in shop floor after goods issue to production order (261),
    we reverse the component (262) , then inspection lot should be automatically generated , but its not happening.
    I tried by assigning inspection type 02(goods issue) to the material.
    with that inspection lot is generated at the time of goods issue (261) not at the time of reversal.
    Please sujjest me the better way to do this.

    Check the SPRO setting - inspection for goods movement.
    Generally the QM inspection is deactivated for 262.
    Inspection lot origin for 262 is  05 , So used by using inspection type 05.
    regards
    Edited by: Sarvan on Mar 3, 2010 11:21 AM
    Edited by: Sarvan on Mar 3, 2010 11:49 AM

  • Inspection lot should be created only for particular vendor

    Hi
    Can anyone please help in achieving the below scenario:
    *Material  has been assigned to the inspection type A (one time inspection) has been set as preffered and active  in the inspection set up in the material master.
    *Quality level has been created for material and vendor  such that inspection should be carried out when next stage is 1 and no inspection should carried out when next stage is 2.
    *Tasklist   has been assigned with material and vendor .
    Material can be supplied by different vendors,For this material,  inspection should be done only for one vendor  and for other vendors there should  not be any inspection to be done and no inspection lot should be created.i.e Inspection lot should be created only for one vendor say AA whereas now inspection lot is getting created when  goods receipt is done for the purchase order  with other vendor BB.
    My requirement is  the inspection lot should not be created when goods receipt is done with other vendors say BB  except AA.
    Is there any other way other than using quality info record to achieve this.
    I can try with DMR  but the thing is there should not be inspection lot created  while posting GR.
    can anyone suggest me any other way to achieve this requirement.

    There are user exits when you create an inspection lot.  One of those could be used to suppress the inspection lot.  Have you looked at these?  Have you researched any QM user exits yourself yet?  This isn't the first time this specific question has been asked over the years.
    It's not hard and there are lists of QM user exits available all over the internet.
    Please do some research.
    You can also assign vendors to inspection plans with a DMR that requires one inspection, and than after that creates all skip lot inspections which you automatically close by a batch job.  The first lot can be manually forced closed.  Thereaftter all receipts would be skipped.  Not 100% but pretty darn close.  This requires that you know which vendors to assign to which plan.  Probably as much data maintenance as maintaing the Q-info records.
    And yes.. your client needs to come up with better reasons than "I don't wanna..".  It's part of a consultants job to convince them.
    Craig

  • Inspection Lot Status (CROK)not updating for Certificate Reciept

    Hi
    I want to inspect vendor materials on the basis of thier Quality certificates
    1) Config Set up:
    a) Certificate type :YA72
    Cert for each PO  item :checked
    Certificate Check reqd:  :Checked
    Enhance cert processing: Checked
    b) Control key :0005 ( Delivery release ,Certificate)
    2) Material Master (QM View)
        QM Procurement : Checked
       Control Key :0005
       Certificate Type :YA72
    3) Goods Recipt
        MIGO < Purchase Data<Cert Reciept :Yes
        Inspection lot is created
    Question : Inspection lot status is not updating for Certificate Recived or not
                      My understanding is Inspection lot status should be :CROK -Certificate Recieved                                                                               
    CTCM-Certificate Missing
    Pls correct my understanding in case i am missing something
    Thanks in advance

    Is the status in the GR document have the cert field set as 5?
    Since you set the "certificate check required" you must do an explicit check of the cert.  I included below the help screen from this indicator in SPRO.
    You should be able to review the status of your cert in transaction QC53.
    FF
    Explicit Inspection of GR Certificate Necessary
    If you set this indicator, at goods receipt the system will generally perform as described in the field "Control without certificate".
    This means that even if you confirm the certificate receipt at goods receipt, and thereby set the status "2 - Certificate received", the system will still perform as specified in the field "control without certificate". See Control without certificate.
    You must explicitly check the content of the certificate recieved at goods receipt and set the status "5 - Certificate filed and inspected ", before, for example, the inspection lot status will be set to CROK.
    You can confirm that you have checked the content of the certificate in the certificate transaction or when making the usage decision.
    Note
    If you have set the indicator and chosen an unsuitable setting in the field "Control without certificate", the goods receipt can be generally blocked.
    This security function is generally used at electronic certificate receipt to check the accuracy of the certificate contents.

  • Inspection lot  is not getting updated in quant

    Hi Experts,
    Need your help..
    I have posted two material doc with same material following is the consequences :
    1.we have immediate TO creation process , so now we have 2 TO's and 2 inspection lots.
    2.When i am doing UD for first inspection lot PCN does get created.
    3.Now i do TO confirmation for putaway for TR and then TO creation and confirmation for PCN and material is in bin.
    4.When i am confirming the TO(TR i.e putaway TO) ,Inspection lot  is not getting updated in the quant due to which i am not able to convert PCN to TO
    Because in quant i found previous inspection lot which is different from having in PCN document.
    So is there any solution which will update the inspection lot in quant once we confirm TO(putaway TO) ?
    Any help on this will be highly appreciated.
    Regards,
    OM

    Hi jugen,
    Thanks for you help but now i going for below development :
    Once UD is done system will take the inspection lot from from the quant and will overwrite to the
       newly created PCN
    So that during PCN to TO creation (LU04) inspection lot will remain same both in quant and PCN .
    Do you have any idea on this i mean where in QA32 tcode i have to write this logic ?
    Thank you..
    Regards,

  • Identifying the Inspection lot created automatically and manually

    Dear all,
    An Inspection lot can be created automatically or manually. Can anyone please tell how the Inpection lot can be identified as manual created or automatically created one? Please advice, thanks.
    Regards,
    Brijesh

    Hi,
    You can  create inspection lots manually for all inspection lot origins except
    the following
      10   Delivery to customer with sales order
      11   Delivery to customer without sales order
      12   General delivery
      13   Repetitive manufacturing
      14   Plant maintenance
    When you create an inspection lot manually, you cannot reference an original document (for
    example, a goods receipt document, an order, or a delivery note)
    Regards
    Hari

  • Inspection lot should not be created in stock transfer

    Hai QM masters,
        I have a following scenarios in my client side
    My client have 5 plants
       1)When a material is moved from one plant 1 to plant 2using stock transport order inspection lot is created since i have activated the 08 inspection type in the material master for partcularly for the movement type 349.But we have to restrict for the stock transport order from plant 1 and 2.Hw to restrict this?
    2)Second scenario is When a material is tranfered from plant 2 to plant 4 using stock transport order inspection lot is created with number starting 800000XXX since i have activated the 08 inspection type in the material master.But when they do 349 movement inspection lot created with same number range how to restrict this?
    Regards
    Mohanraj.C

    Hi Shyamal,
        THank you for ur reply.
    I have activated the 08 inspection type for a material (say A) in both plants 1,2 and 3 for the 349 movement type.
    But when they do stock transport order from plant 1 and 2 inspection lot get created when they receive it in plant 2.
    My requirement is this shouuld not be created.
    For the second one when they do stock transport order for material A from plant 2 to plant 3,the inspection lot no. is 800000XXX which starts with 8 which is the same as the inspection lot created when they do 349 in plant 3.My requirement is they should have different number ranges.
    These happens because in both the scenarios inspection lot origin is 08.
    How to restrict these?
    Regards
    Mohanraj.C

  • Automatic Inspection Lot Creation for HUs (storage Loc.) in WHS

    Hi All,
    can someone guide me through customizing/with end result expected from client. How can I setup this configuration.
    The requirement is all Chem.Raw Materilas are subject to Quality inspection with HU managed storage Loc. with WMS.
    Good Receipt is posted Via Vl31n into Quality Stock. Subsequently a Transfer Order will be created & confirmed to transfer of materials from 902 interim storage type to destination storage type and bin. (due to lack of space in the Whse).
    Now expected is that when Usage decision made (Quality Managment) the stock type should change from Q to Unresticted within the same bin and same storage type and material should be made available to issue for orders.
    Also when GR is done 101 mvt. an inspection lot should generate automatically in Whse under the quant.
    Most appreciate your help.
    Regards
    Chandra

    Hi Chandra,
    Generally WM movement type '309' is assigned for posting change (Sap standard setting). This movement type is generally assigned against 321 IM movement type.
    Modify the settings for WM movement type '309' as below:
    Path: LE -> WM -> Activities -> Transfers -> Define Movement types
    - Automatic TO X (activate)
    - Activate 'To item can be confirmed immediately'
    - Activate 'propose confirmation'
    - Activate 'post to same bin'
    This should solve your problem.
    On your other question
    Generally the inspection lot is assosiated with the WM
    stock and Quant if the stock Quality stock is posted to bins directly.
    Please display the Quant using LS23 and let me know your findings.
    Regards
    Madhu

  • QM - BAdi Required for Inspection Lot Updation

    Hi,
    1.
    <b>May i know the exact BAdi for the requirement shown below.</b>
    Actually the material master is setup for serialnumber assignment at HU, when this is the case when PGR of the delivery is done another inspection lot gets created, and correct, the second one should not be created, the first inspection lot has to be updated based on the PGR of the delivery.
    2.When I double click over the method in SE19 and try to change it,I am not able to write the code for the required method.I'm getting message as "User XX is currently editing Class XXXXX".
    Can I have a solution for this too..
    Thanks in Advance

    Hi,
      You can prefer any one of the BADI,AS per idea you can look into <b>INSPECTIONLOT_UPDATE.</b>
    Implementing Business Add-Ins (BADI)     
    The use of object orientated code within SAP has lead to new method of enhancing standard SAP code called
    Business Add-Ins or BADI's for short. Although the implementation concept is based on classes, methods and
    inheritance you do not really have to understand this fully to implement a BADI. Simply think of methods
    as a function module with the same import and export parameters and follow the simple instructions below.     
    Steps:
    1.     Execute Business Add-In(BADI) transaction SE18
    2.     Enter BADI name i.e. HRPBSGB_HESA_NISR and press the display
            button
    3.     Select menu option Implementation->Create
    4.     Give implementation a name such as Z_HRPBSGB_HESA_NISR
    5.      You can now make any changes you require to the BADI within this
            implementation, for example choose the Interface tab
    6.     Double click on the method you want to change, you can now enter
            any code you require.
    7.      Please note to find out what import and export parameters a
            method has got return the original BADI definition
            (i.e. HRPBSGB_HESA_NISR) and double click on the method name
            for example within HRPBSGB_HESA_NISR contract is a method
    8.      When changes have been made activate the implementation
    Here iam giving docs to ur ref:
    check any fo the below links. this will def help u.
    http://www.allsaplinks.com/badi.html
    And also download this file....
    http://www.savefile.com/files.php?fid=8913854
    There are other tutorials on this site...
    http://sapbrain.com/Tutorials/tuto_download.html
    BADI'S
    http://help.sap.com/saphelp_erp2005/helpdata/en/73/7e7941601b1d09e10000000a155106/frameset.htm
    http://support.sas.com/rnd/papers/sugi30/SAP.ppt
    http://www.sts.tu-harburg.de/teaching/sap_r3/ABAP4/abapindx.htm
    http://members.aol.com/_ht_a/skarkada/sap/
    http://www.ct-software.com/reportpool_frame.htm
    http://www.saphelp.com/SAP_Technical.htm
    http://www.kabai.com/abaps/q.htm
    http://www.guidancetech.com/people/holland/sap/abap/
    http://www.planetsap.com/download_abap_programs.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/c8/1975cc43b111d1896f0000e8322d00/content.htm
    /people/thomas.weiss/blog/2006/04/03/how-to-define-a-new-badi-within-the-enhancement-framework--part-3-of-the-series
    /people/thomas.weiss/blog/2006/04/18/how-to-implement-a-badi-and-how-to-use-a-filter--part-4-of-the-series-on-the-new-enhancement-framework
    <b>Reward points</b>
    Regards

  • Material document not updated in inspection lot QALS table

    HI
    The inspection lot created for 04 inspection type  during Goods Receipt.
    The material document is appearing in the inspection lot but found not updated in table entries.  i.e.., QALS -MBLNR
    When i checked other inspection lots it was found updated. How this happened ?
    Any Snote to be applied?
    Thanks

    Hi,
    Check the number ranges for material documents. (with year) for document type WE in OMBT transaction code.
    If same material document number repeats in the same calendar year,then document update will be terminated.
    As, document no. will be already existing in tables, system won't allow to update the same no. again.
    Thanks & Regards,
    Anand.

  • Sample size does'not appear in QA02 of created Inspection lot Number.

    Hi Experts,
    I have created a production order of a material and its Inspection lot is automatically created but the inspection lot created does'not have sample size from the stock as a result I am unable to perform result recording of a inspection lot.
    Please correct me if i am wrong.
    Thanks
    Saurabh

    Dear Saurabh Mishra.
    Kumar & Barjatya's said is right. and more you can consider for solve this problem as below step;
    - You must change the sampling procedure in the inspection plan. After you have reset the sample
      in QAC3
        1. First you must change the sampling procedure to fixed sample (assuming  you have 100%
            inspection at present) in QDV2 or 
            create a new sampling procedure (as Naik remarked) with fixed sample in QDV1
        2. Then assign the changed sampling procedure in the inspection plan through QP02
        3. Then assign a sample quantity in the inspection plan in the same transaction (QP02) for the
            inspection characteristic to be inspected
        4. Save the inspection plan, and run QA02 where you re-assign the updated inspection plan and
           re-do sample calculation.
           For GR based lot i have already stated what has to be done. In case of an inspection lot caused
           due to the GR from a process or purchase order, cancel the GR. The inspection lot is also
           cancelled. Then follow steps 1 to 3. In the 4th step after saving the inspection plan, simply do the
           GR again, It should work out.
    Regards,
    Jeong, Yeong-Chul

  • Material rejected through quality inspection lot goes to blocked stock

    Dear All,
    All materials that are rejected through quality inspection lot should go to blocked stock. My client want to generate a report for viewing what all materials are rejected. How can do that?
    scenario2: If the materials are rejected then can they be automatically  be sent back to the vendor (return to vendor). if possible
    pl send me some suggestions...!!!
    pl discuss

    Hi,
    See  mvt of material directly to blocked stock u can do by setting the Selected Set of ur specific UD code. in QS51/QS52. there is one column near to code, set R=rejected and set that field "BloCked Stock" . Define there and execute ur transcation, whenever u provide an UD system automatically post the stock in blocked location.
    MCVX is the report where u can get the stock lying in blocked location, or for temp. purpose use QVI and developed the new report.
    regards

  • Control Inspection Lot Generation

    Hi Experts,
    I have a requirement where I need to use Inspection Type 04 in 2 ways.
    1) For FERT material types inspection lot should be generated automatically.
    2) For HALB material types inspection lot should not be generated. The client will generate the inspection lot manually if he finds any problem with the lot.
    A step by step guide to configure this in SAP System would be highly appreciated.
    Thanks,
    Rahul

    I think you will have to use the user QPL10001 exit to suppress the HALB inspeciton lots.  The coding shouldn't be hard as long as this iis consistent across the business.  You'd simply suppress the lot for all HALB material types that are not manually created. (QALS-QSTAT01 is the field to detrermine if the lot was manually created or not).  But as soon as one HALB anywhere in the business requires automatic inspection lots your user exit would get in the way.
    So if you go this route, you might also want to create a new material type, something like "ZALB" that would allow automatic inspections.  Another option is to use a special field like the cross-plant material status field if you aten't using it.  Set up one code for inspection, and one for no inspections.  Code the user exit accordingly.
    Another option, which I don't know if you have considered, is to allow the automatic creation of your HALB 04 inspection lots. Just create them all as skip lots with posting directly to unrestricted inventory.  That way, if a problem arises, you can go into the created inspection lot and use it, or if it has been processed already by the auto UD for skip lots, you can create a new 04 lot manuallly.  This would require no development and is all standard SAP.
    FF

  • Auto creation of calibration inspection lot thru maint. planning/scheduling

    Hi
    I have to schedule calibration inspection of a few equipments in such a way that system automatically create inspection lot & calibration order daily.
    Whether user enter calibration result or not, inspection lots in future should be created automaticallly.
    I created a single cycle plan using IP41 and start the schedule using IP10, the system created first inspection lot automaticaly but always require me go to to scheduling and save the plan again if I want to create next inspection lots. How can I configure/set the system in such a way that it creates inspection lots/calibration order automaticaly
    Plz also tell after taking usage decision of inspection lot whether I need to do some act on calibration order such as technical completion or business completion.
    Thanks in advance
    Edited by: Chris SAP on Jul 5, 2010 9:56 AM

    HI Chris,
    During calibration order  creation only inspection lots are generated.
    Manual order creation
    Run Tcode IP30 deadline monitoring to create order if it is due date the order will be generated with inspection lot.
    Automatic order creation
    Create a batch program to run IP30  daily giving inputs needed so that the order will be generated daily.
    Usage decision is completion of inspection lot
    Technical completion and business completion is for order completion. Technical completion is needed to schedule the job correctly.
    Regards,
    Alagesan M

  • Cancel Inspection Lots

    Hi,
    We need cancel inspection lots should be disappear automatically without UD
    Regards,
    SADAN

    Hi Graig,
    Some times Inspection lot created after production is cancelled due to some reason, i.e we cancel the confirmation of the process order and again reconfirm the process order. So after above activities we get two inspection lot, Previous one has status  LTCA and last one has status REL. We proceed ahead against REL only and Lot which has status LTCA remain reflecting useless in the system.
    So we need LTCA Status should not be dispalyed after some time (let say 5 days).
    This is my concern only.
    Regards,
    SADAN

Maybe you are looking for

  • MacBook Pro: Won't Turn On + Battery Draining HELP?

    Bought my Macbook Pro in January, 2013. I have had no issues until yesterday, I shut it down completely the night before and took out the power cord.  Turned it on the next day, in the evening and it wouldn't turn on, put in the power cord and it was

  • Vendor missmatch in MIRO.

    Dear Experts, I have created PO for vendor X(No partner functions exists for X other than just VN). GR has been made in MIGO for vendor X. During Invoice entry in MIRO with ref.to PO, system is automatically picking vendor Y which is different from P

  • Refresh rate of the screen?

    What is the refresh rate of the screen on the iMac?

  • Weblogic 8.1 SP1 + Apache 2.0.46/44 Plugin Problem

    Hi, Im using apache 2.0.44/46 HTTP Server to proxy request to my Weblogic 8.1 SP1 server. The HTTP server and Weblogic server are running on two different machines in a non clustered environment. I have copied mod_wl_20.so available in /root/bea/webl

  • DML,Transactions and index updates

    Hi, Its known adding indexes slows down the DML on the table. i.e. every time table data changes, the index has to be recalculated. What i am trying to understand is whether the index is recalculated as soon as oracle sees the change? To elaborate, l