Integration of warehouse mangement with production

Hello Guru
kindly give me a brief intro on WM and its difference compared toh MM and the integration of WM with PP.
thanks
Nithi

Hi,
Please check this link to get the relevant information on warehouse
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LEWM/MMWM.pdf
Reward points if useful
Regards,
Irshad

Similar Messages

  • Warehouse stock with production date of batch

    Hello,
    Can somebody tell me any report where user can see warehouse stocks along with production date of a batch. User wants to do FIFO while doing inventory transactions. And user wants to first transfer oldest produced batch first.
    Please suggest.

    Hi Sudhir,
    Thanks for your response. LX02 shows only GR date for quant- for certain quant GR date is updated as todays date if some stock transaction is done for that quant.
    User wants report
    He will then be able to move oldest stock based on production date.  Example quant has GR date as 24th Feb 2011. But its production date is 24th Feb 2010. So ideally this stock should be moved in FIFO method based on production date.
    To summarise, I require standard SAP report  stock in LX02 as well as production date/receiving date of a batch in quant.

  • Goods Receipt with production order in WM

    Hi all,
              My client requirement is whenever i am issuing  goods to the production order the stock reserved to production order, once i confirmed the  TO stock level  reduced.Once production  completed when i put the goods receipt with production order the stock increased for finished goods only at storage location level not  upto warehouse level.
    when i put goods receipt with others the stock increased in  warehouselevel upto my destination bin(as i configured).My requirement is how to move goods to my  destination bin when goods receipt for production order. any configuration required? solve my issue
    i am maintaining configuration as
    i)in omlj iam using movt type-103, source as 901(scr checked),dest as 003,reqirement type-orders.
    ii)in omlr i am assigning 103wm mov type to 101 im type.
    whether  my configuration is correct or i have to do any other configuration ?..i am not maintain any production staging process is it necessary?
    appreciate your help always
    ramesh

    To consolidate your requirements once again
    You want imediate TO creation for components. (It is configured & working fine now)
    You dont want imediate TO creation for finished goods, only in the case of GR for Productio order. Right?
    If Yes, you need to have a small configuration setting (if it is missing)
    In OMLR Create TO immediately Indicator should be space "Do not initiate TO creation" (not X) for 101 F - 103

  • Service Manager 2010 lab environment syncing with production database

    I am trying to setup a lab environment for SCSM 2010 to test the upgrade to SCSM 2012. I have been following the instructions found here:
    http://technet.microsoft.com/en-us/library/hh914226.aspx
    I have successfully made it to step 16. However, when I open the SCSM console in the lab environment it still shows the Data Warehouse and Reporting buttons. When I create a new ticket in either the lab or production environment it shows up in both consoles,
    even though the production console is connected to the production server and the lab console is connected to the lab server.
    Any ideas on why the lab environment is still syncing with the production server?
    Thanks

    Thread of the Necro-Dancer:
    Regardless, the step Katie was apparently implying (but seems to be missing from her description) is the bit where you backup the database and restore it to a separate instance. after this is done, you can then install a new management server targeting this
    new instance, and then promote the new management server to the workflow server, and run the isolated database using the new management server. 
    i would recommend, however, that you use
    the supported method of producing a upgrade lab with production data, which is very similar to the method Katie implied, includes directions covering all of these steps involved, and allows you to periodically restore production data to the lab database
    with minimal overhead. 
    I didn't notice the date before now. I just look at the latest unanswered posts, so not sure how I got into this one. But technet has been acting weird lately. I get an internal server error far too often.
    http://codebeaver.blogspot.dk/

  • Integrating Oracle Virtual Directory with Oracle Internet Directory

    Hi Experts,
    Just wanted to know suggestions from you.... what are the advantages we have by integrating Oracle Virtual Directory with Oracle Internet Directory.
    Thanks
    parker.

    Hi Ken/Experts ,
    Thanks for your response.
    Still we need some more clarification on My Requirement that is, we are using ‘Oracle Single Sign On’ for my product and OID (Oracle Internet Directory) is enabled for this Single Sign On. Now we are planning to use OViD (Oracle Virtual Directory) for our Product so we integrated OID with OViD and now we are able to view the OID users in OViD. But Still My Product is using Single Sign On, which is enabled with OID only. Do we need to enable OViD (Oracle Virtual Directory) for Single Sign On? If yes please help us how to integrate (enable) OViD with Single Sign On.
    Thanks in advance.
    Thanks,
    Parker

  • Discontinuation functionality with production orders

    Dear Guru's,
    Can anyone please confirm: is the functionality for discontinuation of a material (including follow-up material) not available with production orders?
    Example: in our system we have component A that is followed up by component B. This is set in material master - MRP 4.
    We also have production orders for the upcoming 4 months in our system. If the stock of component A is depleted within these 4 months, we would expect to see requirements (orderreservations?)  on component B, but this is not the case.
    Thanks for any comments,
    Rgds, AJ

    Hi
    Discontinuation works for Production orders.Couple of Checks needed for both Follow up and Discontinued Materials to arrive to actual problem
    1) Base unit of measure must be same
    2) Should have same MRP type
    3) Not defined as Co-Products
    For detailed info pl refer the link
    [Discontinuation|http://help.sap.com/saphelp_47x200/helpdata/en/b1/c044d1439a11d189410000e829fbbd/content.htm]
    Regards
    Brahmaji

  • How Can I Make A Large Photo with Product Detail for My Thumbnails in Dreamweaver

    Hello All:
    New to Dreamweaver, so my code knowledge does not exist yet. Have Mercy!!!!
    Anyway , I am making a typical product page.
    I prefer that when people click the thumbnail product photo to not have to click into another brower.
    Nowadays you are able to click in what is commonly called a "Quick View" that pops up and gives you a full sized
    image along with product detail, and pricing.  That's all I want.
    How can I link this [the larger photo and product detai] to my thumbnails in Dreamweaver???? 
    I want the look that is on every website like Target, Macy, etc.
    Someone, please help me to  !!!!!!!
    These lil' faces are really cute.  They are helping me to smile after hours and days, weeks of frustration.   TWIN MADDOG!!!

    Hi,
    don't understand your problem, ore hope to understand it right. You could put the images on a DW file and link to another file with the larger image and where you have written all your informations.
    I made this here only for a new, larger image (without additional informations):
    <!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">
    <html xmlns="http://www.w3.org/1999/xhtml">
    <head>
    <meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
    <title>Unbenanntes Dokument</title>
    </head>
    <body>
    <p><a href="pflanze1_l.jpg" target="_parent"><img src="pflanze1_s.jpg" alt="Thumbnail01" width="100" height="75" border="0" /></a></p>
    <p><a href="pflanze1_l.jpg" target="_parent">or this you use an Hyperlink to the larger image</a></p>
    </body>
    </html>
    s=small; l=large
    Hans-G.

  • Calling a stored procedure from a URL with production XE?

    I have granted execute on a stored procedure to the user ANONYMOUS in order to allow it to be called from a URL. But I am getting a Forbidden error, rather than the expected execution of the procedure. Is there a trick to get this working in production XE?

    I think I figured this out. I don't think the grant to ANONYMOUS is going to work with production XE and the online documentation is in need of an update. It appears that production XE has been locked down and you will need to specify the name of each stored procedure you wish to allow to be executed by adding it to the WWV_FLOW_EPG_INCLUDE_MOD_LOCAL function. This is spelled out in more technical detail here: http://download.oracle.com/docs/cd/B25329_01/doc/appdev.102/b25309/adm_wrkspc.htm#BEJCGJFJ
    Another alternative that would work involves creating a separate DAD. Using the DAD approach with my schema made all of my stored procedures callable from a web browser, so I rejected this approach. To make this usable (secure) I would have needed to create and maintain a separate database user for the DAD and then only granted it execute for the stored procedures I wanted to be callable from a URL.
    Finally I read about using an on-demand procedure and having it invoke the desired stored procedure. While I didn't try this out, it sounds like another good approach because it maintains session security. If it can be used to return an image I do not know.
    - Jim

  • M175nw during s/w reinstall - unable to communicate with product

    Windows 7 64-bit / LaserJet 100 MFP M175nw / firmware 20120806 / all device resets done / software uninstalled after broadband hub replaced / re-install undertaken with McAfee firewall OFF / install undertaken with D-Link hub firewall also OFF
    Software starts reinstall, proceeds and then asks for USB to be temporarily connected - after doing so it automatically proceeds (thus indicating that it's communicating OK with M175nw) - says "Product has been detected" - WIndows 7 reports "device installed" - then install stops at 15% completion and says "Unable to communicate with product".
    Can find no way past this.
    Was working beautifully but could not avoid hub upgrade which had to disrupt setup hence re-install.
    HELP!

    Hi @MonicaABC ,
    I see that you are having issues the same issue with the printer installation, but you are on Windows 8.
    I would like to help you out today.
    Some of the steps are the same, I will provide more information for the Windows 8 steps.
    I have also provided steps for configuring the wireless through the ethernet connection.
    On the printer's control panel, touch the setup button, network setup menu, wireless direct, turn it on.
    Here is a document to access the Wireless on Windows 8. How to Connect to Wireless Networks in Windows 8 and Windows 8.1.
    Select the printer's network name.
    Open Internet Explorer and type in the IP address (192.168.223.1) for the printer in the address bar.
    This will load the Embedded Web Server for the printer.
    Select the networking tab, wireless on the left hand side.
    Fill out all your network information, select infrastructure, select your network name, put in password and type of encryption.
    Apply settings.
    Now the printer should be configured over the wireless network.
    Then go to the wireless on the computer and select your network name.
    Run the uninstall from the CD software to remove any registry files.
    Disconnect the USB cable if it is connected.
    Perform a clean boot and disable any Antivirus Software temporarily.
    Then run the latest drivers. Software & Drivers.
    Select your operating system, click next and click on the software to download and install.
    Wireless setup steps through a Ethernet connection steps:
    Connect the Ethernet cable from the printer to the router, temporarily.
    Run the install to see if the drivers will fully install by this connection.
    Follow these steps to configure the wireless now.
    Wait about a minute, print the configuration page to see if you get a IP address.
    Printing a Configuration Report.
    Then type the IP address into Internet Explorer's address bar to bring up the printer's web page. Select the networking tab, wireless on the left hand side. Fill out all your network information, select infrastructure, select your network name, put in password and type of encryption. Apply settings.
    Then disconnect the Ethernet cable.
    Wait for few minutes and you should get a wireless light on the printer, print the configuration page and check the IP address again. Then type the IP address into Internet Explorer's address bar to bring up the printer's web page. Just to make sure it is still on the network.
    Then flip the port with the new IP address.
    Go to start, devices and printers, right click the printer and left click printer properties, select the ports tab.
    Click Add Port, select Standard TCP/IP Port, then select New Port and follow the wizard.
    Type in the proper IP address for the printer.
    Make sure the printer is online.
    Test the printer.
    If you need further assistance, just let me know.
    Have a great day!
    Thank You.
    Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
    Click the “Kudos Thumbs Up" on the right to say “Thanks” for helping!
    Gemini02
    I work on behalf of HP

  • Unable to communicate with product message when installing laserjet cp1525nw printer

    I have a cp1525nw wireless printer that use to work fine wirelessly.  I changed my router password (linksys router) and now can't connect.  I have tried changing the password back to the original password and it still will not connect.  So I when back to the changed password.
    I have tried resetting the printer to the default settings, removed all HP software, deleted all temp files, rebooted machine and attempted to reinstall the printer.  The software loads fine, I've connected the USB cord and then get the dreaded "Unable to communicate with product" message.  I have previously tried to connect by WPS and that didn't work either.
    The Wireless Network Test Report shows that the Network Name Found test is Fail.  The Network Summary report shows a different Network Name under the wireless Network Configuration section than my network's SSID.
    What do I need to do?

    Hello,
    I see that you are having issues setting up the printer over the wireless network. I will certainly do my best to help you.
    The password might not be recognized by the printer, if there are spaces or special characters in it.
    Restore the printer defaults. Press the OK button, select Network Config, then select Restore Defaults.
    Print a configuration page to make sure the SSID and the IPv4 address are cleared.
    Printing a Configuration Report.
    Run the printer software again and select Add a Device to setup the wireless again.
    If you are having issues, then uninstall and reinstall the software to configure the wireless.
    Uninstalling the Printer Software.
    HP LaserJet Pro CP1525nw Color Printer Drivers.
    If you need further assistance, just let me know.
    Have a nice day!
    Thank You.
    Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
    Click the “Kudos Thumbs Up" on the right to say “Thanks” for helping!
    Gemini02
    I work on behalf of HP

  • Pricing issue with Product hierarchy - Urgent

    Hello,
    I have an issue on pricing determination with product hierarchy.
    I created product hierarchy as following,
    level1 - A0001
    level2 - A0001B0001
    level3 - A0001B0001C0001
    Then, assigned A0001B0001C0001 to material D in material master.
    I created condition record with A0001B0001C0001(level 3),  the system found the condition sucessfully when I created a sales order with material D.
    However, I created condition record with A0001(level1) but the system didn't get the price when I created the sales order with material D.  Since A0001B0001C0001 belongs to A0001, the system is supposed to get the price from the condition record with A0001... 
    Could you please let me know how to fix it?

    Hi,
    Thanks a lot for your kind explanation.
    Here is the access sequence I defined.  I wonder if there is anyway I can define PRODH1, PRODH2, PRODH3 in access sequnce the same way with customer hierarchy so that the system can check higher level data.  If it's not allowed, I think I should define routine in requirement as you advised.  Thanks!
    *Accesses
    AcNo       Description
      1           Customer Hierarchy/Product Hiearchy
      2           Customer Hierarchy/Product Hiearchy
      3           Customer Hierarchy/Product Hiearchy
      4           Customer Hierarchy/Product Hiearchy
    Fields
      AcNo   Condition    Doc. field      field lable
         1      HIENR      HIEBO01     CustomerHierarchy 01
                 PRODH     PRODH       Product hierarchy
         2.     HIENR      HIEBO02     CustomerHierarchy 02
                 PRODH     PRODH       Product hierarchy
         3      HIENR      HIEBO03     CustomerHierarchy 03
                 PRODH     PRODH       Product hierarchy
         4       HIENR      HIEBO04     CustomerHierarchy 04
                 PRODH     PRODH       Product hierarchy
    I wonder if I can assign product hierachy fields, PRODH1, PRODH2, PRODH3 to access sequence like customer hierarchy so that the system can check higher level data to get the price...

  • Make-to order with production in alternative plant

    Hi,
    We are thinking about implementing a scenario with Make-to Order production for our products, but with production in alternative plant (special procurement type 80).
    For example, sales orders will be directed to plant A, but production should take place in plant B - and using a make-to order strategy (in our case planning strategy 50 - planning without final assembly).
    Is there any problems with our approach, making it not feasible to implement? Is it even possible in SAP to combine MTO with special procurement key 80 (production in alternative plant)?
    Is there any other issues that can be foreseen with using this type of production strategy?
    Thanks in advance,
    Lars

    Hi,
    The production strategy which you are going to use is very fine.
    As per me there is one concern. Example you have created a sales order in Plnat A, in plant A that FG is handling through Special procurement 80, then in the MRP run system will be creating a planned order in Plant B without running MRP in plant B. In MD04 screen you can see planning plant as Plant A. In plant B, u r converting this planned order in to Production order and executing the production. While doing the GR against the production order, the goods receipt will happen directly in Plant A.
    This is the one problem (Accountability)  you can face.
    Regards,
    V. Suresh

  • I have upgraded to Lion, and want to upgrade my iPhoto 8.1.2, but when I try it says it was not purchased at a MAC Apple store, which it was.  Then it asks if I want to buy 9.2.3, and I say yes. It responds with Product Distribution file can't be verified

    I have upgraded to Lion, and want to upgrade my iPhoto 8.1.2, but when I try it says it was not purchased at a MAC Apple store, which it was.  Then it asks if I want to buy 9.2.3, and I say yes. It responds with Product Distribution file can't be verified. Maybe damaged or not signed.  How do I get this fixed, so I can download the new iphoto's that are available.

    How did you move your iPhoto library to the new system?  the recommended way is Connect the two Macs together (network, firewire target mode, etc)  or use an external hard drive formed Mac OS extended (journaled) and drag the iPhoto library intact as a single entity from the old Mac to the pictures folder of the new Mac - launch iPhoto on the new mac and it will open the library and convert it as needed and you will be ready move forward.
    LN

  • Valuation with material cost estimate: error with product

    Hi Experts,
    Message no. KE350, Valuation with material cost estimate: error with product "2286940000". Please suggest me to resolve this issue.
    Points will be provided for good solution.
    Regards,
    Jay

    Hi Jaya
    This means that your customization is wrong then...
    In KE4J or KEPC you have assigned costing keys to your material types or some other combination... You should have done this config in a way that costing key is not called  for in the case of non valuated materials...
    In Ke40 you have defined costing key where in you have specified "Issue error msg if no cost estimate found".. This costing key is assigned in KE4J or KEPC in a way that it is getting called even in case of non valuated materials...
    Do you have a separate mat type for non valuated material? If yes, remove this mat type from KE4J/KEPC..
    If you dont have separate mat type i.e. in the same mat type if you have both valuated and non valuated, then you have a problem.. You would get stuck in that case
    Regards
    Ajay M

  • Valuation with material cost estimate: error with product "117122"

    Hi people,
    We have the error:
    =====================
    Valuation with material cost estimate: error with product "117122"
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
    In order to determine the current plan period, the system needs to read the valuation segment of the material master.
    The system has found that the current plan period is not filled forproduct "117122" in plant "UBE1".
    We have the follow configuration in trans.: KE40:
    . Determine material cost estimate
       . Transf. Standard Cost Estimate
    . Costing Variant
    . Control Data for Standard Cost Estimate
       . Period Indicator = "Current Standard Cost Estimate acc. to entry in mat master
    . Addiitonal data CO-PC
        . Transfer cost estimate in controlling area currency  "activated"
    We think the reason about our error is because the field above is activated and some configuration more is necessary for this case. For examplo: Trans.: OKYW and this one was not configurated yet.
    Do you know what happend?
    If we need to configure some transation, or sonly process the cost estimate?
    Thanks,
    Rosana.

    Hello Guido
    Thank you very much for your return.
    It is happenning in a Client that some people are doing the configuration.
    Before we didin't have in KE40, the fiel "Transfer cost estimate in controlling area currency" activated.
    And now, the people activate that in this new Client and I don't know the impact about that.
    I think we have to make the configuration in OKYW.
    The other transation you told me, we don't have any information.
    Could you tell me some other idea what happend?
    Message error is just "Message no. KE350"
    Abou claculate the cost:
    It was calculated by trans.: CK11N for future planning and the real wasn't not possible to release because this material already have moviments.
    Could you tell us is there is some thing more to do?
    Thanks,
    Rosana.

Maybe you are looking for

  • Three monitors, one G4, cant seem to make it work, HELP!!

    i have one G4 desktop that has been using two monitors for some time now, but tonight i tried to add a third and the whole thing has gone to ****! the second display that was originaly working is no longer showing up, the new one (the third) seems to

  • ISight and a G5

    Hi, Just got a isight from a friend and hooked it up to my G5 Dual 1.8 running 10.6, runs fine with photobooth and ichat but when I try Skype it crashes my computer with a K.Panic. Skype doesn't have the isight as the selected video cam, when I try t

  • WCF service shutting down

    Hi, i have been trying to access WCF service function(Which loads C++ Dll's too) in a C# client project. When ever i start client program it fetches the service, loads the dll, but suddenly WCF service will be terminated from the system tray. I have

  • HP LaserJet 9050 one vertical line duplex only

    The HP LaserJet 9050 is printing one vertcal line near the center of the page (offset 1/2" from center).  This occurs only during duplex printing on the odd number pages only.  The line is not solid, it look like varing width dash down the page.  I h

  • Detailed Documentation for Interactive Forms

    Hi,    I need a detailed documentation about Interactive Forms and how to use the transaction sfp Thanks. Regards, Muhammad